Forwards Util Scenario Package for Scheduled 911212 Full Participation Exercise for Plant
ML20092G663
Person / Time
Site: Pilgrim
Issue date: 10/07/1991
From: Gina Davis
BOSTON EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20092G669 List:
References
91-128, NUDOCS 9202200266
Download: ML20092G663 (2)


Text

...

10 CFR 50, APP. E Section IV.F.3

{

0 EOSTON EOl50N Pdgrim Nuclear Power Station Rocky Hdl noad Plymouth, Massachusetts 0230o j

)

George W. Davis s.na ve, p,..gi.nt - Nuci..,.

October 7, 1991 BECo Ltr.91-128 U.S. Nuclear Regulatory Commission Attn:

Document Control Desk Hashington, D.C.

20555 1

Docket No. 50-293 License No. DPR-35

Subject:

1991 NRC/ FEMA Evaluated Exercise Scenario Submittal l

Dear Str:

-Enclosed is' Boston-Edison's scenario package for the scheduled December 12, 1991 full participation exercise for Pilgrim Nuclear Power 5tation.

The scenario package is submitted in accordance with-the June 9, 1989 letter from Mr. H. Lazarus Chief, Emergency Preparedness Section.- Enclosures to this letter are being provided to the individuals identified in Mr. Lazarus' letter.

The enclosures adhere to FEMA's Guidance Memorandum EX-3, dated February 26, 1989, which stipulates that the exercise scenario be submitted at least 60 days in advance of the exercise.

The scenario package includes:

ScopeandObjectives h

  • Schedules-Contingency & Simulation Information

. Exercise Rules-I Radiation: levels & Release Data r

e-s l Data /Hessages (Operations Radiochemistry, Radiological),

i Ifyouhavequestiont.or. require.additionalinformation,pleasecontactMr.

Stephen Hook eEmergency Preparedness Onsite Section Manager, 118 Long. Pond Road. Plymouth : MA 02360, or telephone (508) 7.47-9463.

1

. f).

./jpg~, Q s

4

/

George

. Davis

-4

-t7 i

n Enclosures I

-JAN/RLC/bal jg

gp % ggt G g;y i;

j g

j

Page 2 U.S. Nucidar Regulatory Comission s

October 7, 1991 i

DECO Ltr. No.91-128 cc:

Mr. Ronald Bellamy, Chief - w/ enclosure - 2 copies facilities, Radiological Safety and Safeguards Branch, Region I 475 Allendale Road King of Prussia PA 19406 Hr. James Jamison - w/ enclosure Battelle Pacific Laboratory Emergency Preparedness Group Health Physics Department 2933 George Washington Hay Richland, Washington 99352 Mr. Thomas T. Martin - w/o enclosure Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Rd.

King of Prussia, PA 19406 Hi R. B. Eaton, Project Manager - w/o enclosure Division of Reactor Projects I/II office of NRR - USNRC One White Flint North - Hail Stop 1401 11555 Rockville Pike Rockville, MD 20852 Sr. NRC Resident Inspector - w/ enclosure Pilgrim Nuclear Power Station l