ML20092F850

From kanterella
Jump to navigation Jump to search
Forwards Response to NRC 950523 RAI Re LAR 94-022 Concerning Spent Fuel Storage Capacity Increase
ML20092F850
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 09/14/1995
From: Terry C
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-95235, NUDOCS 9509180377
Download: ML20092F850 (11)


Text

.--

l Log # TXX 95235 P7 File # 916 (5.6)

._ = 10010

lilELECTRIC September 14, 1995 C. lance Terry Greap Vkt PresMnet.Marient U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) ~

DOCKET NOS. 50 445 AND 50 446 SUPPLEMENTAL RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION ON LICENSE AMENDMENT REQUEST 94 022, SPENT FUEL STORAGE CAPACITY INCREASE REF: 1) TV Electric letter logged TXX 94325, from C. L. Terry to the NRC, dated December 30, 1994

2) NRC Letter from Timothy J. Polich to C. Lance Terry, dated May 23. 1995
3) TU Electric letter logged TXX 95187, from C. L. Terry to the NRC, dated July 28, 1995 Gentlemen:

TU Electric transmitted License Amendment Request 94 022 (Reference 1) which revises the specification for fuel storage to authorize usage of the high density fuel storage racks, to increase the spent fuel storage capacity, and to adopt the wording, content, and format of the Improved Standard Technical Specifications. The NRC transmitted (Reference 2) a Request for Additional Information (RAI) regarding the subject License 8 Amendment Request. TU Electric provided an initial response to the RAI in 1 Reference 3. The Attachment herein contains TV Electric's updated '

responses for RAI No. 8 and 11. With these updated responses, TV Electric ,

has provided complete responses to all the requests in the NRC's RAI. l The information provided in the Attachment does not affect the proposed l Technical Specification changes, the safety analysis of those changes, or the determination that the proposed changes do not involve a significant hazard consideration (provided by Attachments 2 and 3 of Reference 1).

i  ;

L

. ..i CCCG0 "

i 9509180377 950914 j i PDR ADOC P__._ _ _ _K 05000445 ,_p I C.-________...__________

l 1

~

TXX 95235 Page 2 of 2 Should you have any questions, please contact Carl B. Corbin at (214) 812 8859 or David A. Bersi at (817) 897-8134.

Sincerely, 1 l

C. L. Terry I By:

D. R. Woodlan Docket Licensing Manager CBC/cbc

Attachment:

Response to Request for Additional Information Regarding Spent Fuel Pool Storage Increase c- Mr. L. J. Callan. Region IV Mr. T. J. Polich. NRR Hr. D. F. Kirsch, Region IV Resident Inspector, CPSES Mr. D. K. Lacker Bureau of Radiation Control Texas Department of Public Health 1100 West 49th Street

' Austin. Texas 78704 l

l 1

I t

Attachment to TXX 95235 Page 1 of 9 RESPONSE TO NRC RE0 VEST FOR ADDITIONAL INFORMATION (RAI) 4 REGARDING SPENT FUEL POOL STORAGE INCREASE NRC RAI # 8:

f With respect to the fuel pool structure analyses, a table in the submittal 4

(Reference 2) shows a safety margin of 1.02 for the South Wall. TV Electric concluded that the pool structure maintains its structural integrity during

> a critical loading combination since the safety margin is larger than 1.0.

However, the calculated factor of safety is very marginal, and it could be changed depending on analytical methodologies used and other parameters (i.e., material properties used in the analyses, etc.). Submit the input

and output of the pool structural analyses of the slab and South Wall for

' different critical loading conditions including the physical dimensions and a locations of the reinforcement of the pool structure. Any technical assumptions made during the analyses should be discussed in detail.

TU ELECTRIC RESPONSE TO RAI # 8 :

TU Electric provided a response to RAI # 8 in Reference 1. As a result of subsequent discussions with the NRC staff regarding the safety margin for the south wall, additional information is provided below.

l The data points for forces and moments on the South wall elements under critical load combinations are within the interaction curve, with the

exception of element 303. The axial force and bending moment in the horizontal and vertical directions were averaged with the adjacent elements

< of element 303. This averaged value was used to determine the safety margin for element 303. The safety margin was determined as follows. The distance of the line joining the data point on the interaction diagram with the

- origin was taken as L1. The distance of the intersection point of the above 4

line with the interaction curve from the origin was taken as L2. The ratio L2/L1 was taken as the safety margin. The computed safety margin was 1.23.

In the initial submittal of Licensing Amendment Request 94 22 (TXX 94325),

no stress averaging was done for element 303 of the South wall. The safety margin was computed as follows. For the axial force in the element, bending moment capacity (Mu) was obtained from the interaction diagram. The ratio

' of Hu/M, where M is the bending moment on the element, was taken as the

safety margin. The computed safety margin was 1.02, 4

In summary, the improvement in the safety margin for the South wall is attributable to:

1) Stress averaging with the adjacent elements
2) More standard determination of the Safety Margin.

- 1 f

' Attachment to TXX 95235-Page 2 of 9

NRC RAI # 11: ]

TV Electric indicated that the rack design is controlled by the results of 1' the single rack analysis. Provide justification that the results of a

single rack analysis are more conservative than the results of a whole pool multiple rack (WPMR) analysis, or provide comparison of results from a single rack and WPMR results.

TU ELECTRIC RESPONSE TO RAI # 11 :

A whole pool multiple rack (WPHR) analysis has been performed for the high density rack arrangement to be used in Comanche Peak spent fuel pool 2.

~

This evaluation is a supplement to the single rack analysis, previously performed and documented in the CPSES Fuel Storage Licensing Report 4

(References 1 and 2), which has demonstrated acceptable loads, displacements, and stresses for the fuel rack modules. The WPMR analysis includes all nine rack modules as well as the hydrodynamic effect of the ,

surroundirig fluid. Thus, the interactions between the individual rack l

, module 3, the surrounding fluid, and the pool structure are fully I i represented. The results obtained from the WPHR analysis confirm that the i single rack analysis results previously reported well represent the limiting  ;

response of the racks. 1 A series of evaluations were performed in the process of completing the WPMR I analysis. The key steps in the process are:

i i L Develop a reduced element (reduced degree of freedom) single rack j model.

2. Perform a fluid structure interaction analysis to determine the fluid i- coupling hydrodynamic mass matrix for the pool and all nine racks.

} 3. Based on steps 1 and 2, create the WPMR model with nine racks modeled and incorporating the whole pool fluid coupling hydrodynamic mass matrix.

4. Perform WPHR time history seismic analyses for both SSE and OBE for cases with friction coefficients equal to 0.8 and 0.2.
5. Determine the maximum rack displacements and stresses for the WPMR 4 analysis and compare to the results previously calculated for the single rack analysis.

Each of these steps is discussed below.

In order to perform the WPMR analysis, a reduced element, i.e. reduced degree of freedom (00F), finite element model for a single rack has been developed. Figure 11 1 shows the full D0F model (2 D view of the 3 D model) used in the single rack analysis, while Figure 11 2 provides the same 2 D

. view of the 3 D reduced DOF model used to represent an individual rack in 0 the WPHR evaluation. Both models represent the rack in a similar manner, with the elements representing the rack base and support pads being the same in both models. The major difference between the full 00F and reduced DOF 1

4 .

] ' Attachment to TXX 95235 Page 3 of 9 )

i models is a decrease in the number of elements used to represent the cell and fuel beams, the number of fuel to cell impact elements, and the number .

j of elevations at which hydrodynamic fluid coupling mass matrix elements are

used, i I
The reduced DOF model has been qualified by applying both SSE and OBE loadings using the same sets of acceleration time histories as in the full D0F single rack analysis. For both seismic loading conditions, evaluations were made for friction coefficients of 0.8 and 0.2. The results from the evaluation demonstrate that comparable displacements and loads are obtained for the reduced D0F model when compared to those of the full 00F single rack model. It is concluded, therefore, that the use of the reduced D0F model to i represent an individual rack in the WPMR analysis is acceptable.

I Having developed an acceptable single rack reduced 00F model, the WPMR model l 'is compiled by combining nine such single rack models in a 3x3 array using

the same rack to rack spacing as in the Comanche Peak spent fuel pool. Each i single rack model within the WPMR model has the appropriate mass and g stiffness properties for the rack size (either 11x14 or 12x14) it i represents. The WPHR finite element model is shown in Figure 113. ,

1

! The hydrodynamic effect of the water surrounding the fuel rack modules is j incorporated into the WPMR model as 20x20 mass matrices. The twenty rows  !

l and columns represent two horizontal D0F's for each of the nine fuel rack

< modules plus the pool wall. Since the mass matrix is fully populated, the i hydrodynamic' interaction effects, both rack to rack and rack to wall, are

! included in the analysis. Three such mass matrices are used over the height 4 of the WPMR model.

{ The hydrodynamic mass matrix is calculated using a two dimensional finite i element analysis in which a horizontal cross section of the entire pool

! fluid area is meshed with pressure elements bounded by fluid structure i

interface (FSI) elements. The finite element model is shown in Figure 11 4.

The FSI elements, not depicted in the figure, serve to account for the interactions between the fluid pressure and the in plane structural i accelerations. By using the substructuring capabilities of the finite
element code, the hydrodynamic mass matrix is obtained by substructural

, elimination of the pressure D0F's, retaining only two in plane (horizontal)

acceleration D0F's for each fuel rack plus the pool wall. The result is a
10 node, 2 00F "superelement" which is included in the WPMR finite element 4

model to incorporate the 20x20 hydrodynamic mass matrix into the overall

! system mass matrix.

The WPMR model is evaluated for both SSE and OBE by applying the same acceleration time histories as were used in the single rack analysis.

i.

4 . Analyses have been performed for friction coefficients equal to 0.8 and 0.2 for both seismic loading conditions. The stress results for the limiting i locations from the WPMR analysis are summarized in Table 11 1 along with the corresponding results from the single rack analysis. An inspection of this 4

table reveals that, in all cases, larger margins are obtained for the WPMR analysis versus the single rack analysis. The displacement results, suma rized in Table 11 2, show that the maximum relative displacement between adjacent racks is smaller for the WPMR analysis than for the single 4

s l

I

j

  • Attachment to TXX 95235 Page 4 of 9 rack analysis, thus indicating larger margin against rack to rack collision.

The maximum individual rack displacement is slightly higher for the WPHR analysis than for the single rack analysis, but ample margin exists against rack to wall collision. Therefore, it is concluded that both the single rack analysis and the WPHR analysis demonstrate acceptable loads, displacements, and stresses for the Comanche Peak fuel racks.

Table 111

< Comparison of Single Rack and WPHR Analysis Stress Results OBE Minimum Margin to SSE Hinimum Margin to Location Allowable

  • Allowable
  • Single Rack WPHR Single Rack WPHR
Support Pads 0.35 0.79 0.82 0.96 Cells 0.09 0.42 0.38 0.49 t se 0.95 1.58 0.51 1.28 e

Cell to Cell 0.13 0.41 0.45 0.64 Weld Cell Seam Weld 0.26 0.64 0.58 0.79 Cell to Spacer 0.26 0.71 0.25 0.54 Weld 1

  • Note: Hargin to Alowable = -1 Applied Stress

' Table 11 2 Comparison of Single Rack and WPHR Analysis Displacement Results Single WPHR Rack Maximum Individual Rack 0.29 0.30 Displacement (inches)

Maximum Relative Displacement 0.58** 0.28

_Setween Adjacent Racks (inches)

    • Conservative value was reported based on the assumption that adjacent racks move completely out of phase.

Attachment to TXX 95235 RACK HYDRODYNAMIC MA$$

Page 5 of 9 CELL-TO-CELL CONNECT!ON CELL ASSEMBLY FUEL-TO-CELL GAP CLEMENT FUEL ASSEM8LY e,-

g

\

FUEL GRID ROTATIONAL ' ,

\

STIFFNESS a T [8H] \

p g eu,3s 6 g

  • \

s T (" : N a.Qs, \

Aj v I  :: (\

{ g 1 *: \

1.7 \

a I  :=~) \

' \

J g / ru,,a u

\

\

, \

s T Cus : N N

FUEL BASE \

LIFT-OFF ELEMENT [g]

' / \

/ ..

N SUPPORT PAD ELEMENT

\

h O \

\

\

NNNNNNNNNNNNNNNNNNNNNNNNNNNNN Figure 11 1. Full DOF Nonlinear Finite Element Model (2 D View of 3 D Model)

' Attachment to TXX 95235 RACK HYDRODYNAM[C MASS Page 6 of 9 CELL-70-CELL CONNECT [GN CELL ASSEMBLY FUEL-TO-CELL GAP ELEMENT FUEL ASSEM8LY q

\

R TAT C L 1 ["H3 \

ST(FFNESS

\

\

\

\

x \

g ts: N

= o, >

N x

' \

A i,, \

N 13 \

3 g .

Es: \

\

q

\

\

FUEL BASE

w , ,

N LIFT-OFF ELEMENT \& (<]

\

\

i

/ \

U

/ ..

N SUPPORT PAD \

ELEMENT g \

\

Nggg%N%%\%%\%%\%%

Figure 11 2. Reduced 00F Nonlinear Finite Element Model (2-0 View of 3 0 Model)

\

n

' Attachment to TXX 95235 Page 7 of 9 4

t t

c 1

i l

t b

i i

. ~ 1 aus i

t

i 4 ..

I a ,

. .. pes

.... N

... .. N x s N s N

$ .........,,, N N h

.......... h ..;..__ N.______ ..............,y.....

y x Figure 11 3. WPMR Finite Element Model 1

l

-- .-__---________--__--__-_____________-____________--__-__1

- _ . - . - - -- - - ~ .

Attachment to TXX 95235 Page 8 of 9 i

l I a

4 x-m/w/Mm/- N-VN/NNmN./ /N-/rN-pNA/N/%/M/TN/MLM N#WN/NNVV /Nh/TNN

_N#XIX/%##Mm/M N N#VN/NNWV /NMm6

/N/\/\/N g X/\/\/N/ I

  1. X/N/\/N N/N/\/\/  !'

4

/\/N./\/\ ,

tN /N/\/\/

j NN/\/N ,

Nam /\/N/

'/N/N/\/\ l j A/N/\/N/

/N/\/\/\ l ,,

gj N_/N/\/\/ i l l 4

X/N/\/\/ 3

/N/N/\/\ ,

l X/N/\/\/

/N/\/\/\ l X/N/\/\/

/N/N./\/N l, VN/\/\/ g i i A/N./\/\ ,

l N/.N/\/\/

t /N'A/N/\ l N/N/N /\/ s i

X/N/N/\/ l h

/N/N./\/N 1 l j VN/\/\/ l ,

A/\/\/N l

[N/Wi\./\/ l l

'/XAi/\/N t l l

N/WN/\/ 4

~

' /NA/\/N 3 N/N/N/N/ l h

/N/N./\/\ l l N/N/\/\/ l l

/v%/\/s x n m .v _- - mm_ _ - ,i

-~

x _-

n m--m,,

I n

l i

.i n .. ,

t 1

i 4

Figure 11-4. WPMR Hicrodynamic Mass Finite Element Model

'~ ,-

' Attachment to TXX 95235 Page 9 of 9

References:

1. " Comanche Peak Steam Electric Station (CPSES), Docket Nos. 50 445 and 50 446. Response to Request for Additional Information on License Amendment Recuest 94 022, Spent fuel Storage Capacity Increase,"

letter loggec TXX 95187, dated July 28, 1995, from TV Electric to U.S.

NRC.

2. " Comanche Peak Steam Electric Station (CPSES), Docket Nos. 50 445 and' 50 446, Submittal of License Amendment Request 94 022. Spent fuel Storage Capacity Increase " letter logged TXX-94325, dated December 30, 1994, from TU Electric to U.S. NRC.

- - - -