. . -- - . . . . _ . - . . . - ~ .

E i

... f. )

, l) uke 1%wr Company (803)831 3000 .

Catawba Nuclear Station  ;

m 600 Concord Road n York, SC29743 e-- . August 15,1995

. RE:

Catawba Nuclear Station Distribution Code CADM-03/03A i

Selected Licensee Commitments 7-Effective 08/20/95 Attached are revisions to the Catawba Nuclear Station Selected Licensee Commitments.

Please revise your manual as follows:

REMOVE THESE PAGES INSERT THESE PAGES List of Effective Pages LOEP1,2 LOEP1,2 I

Chapter 16.7  ;

Instrurnentation i Page 16.71-3 (10/21/92) ~ Page 16.71-15 (08/20/95) 1 1

Any questions concerning this revision should be directed to the undersigned at (803)831-3151.

f& A.Sh]N Kimberly A. Strickland .

. Regulatory Compliance Attachments  !

I j

0}

0 '

9508280297 950815 PDR- ADOCK 05000413 )l l P PDR *

)

g apon .wo==

^

]

I

t t .

> DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL l List Of Effective Pages .

LOEP 1 08/20/95 .

~

LOEP 2 08/20/95 LOEP 3 08/30/94 i

LOEP 4 01/01/93

, LOEP 5 11/23/94 LOEP 6 09/23/94 LOEP 7 08/01/94 LOEP 8 08/01/94 i

{ LOEP 9 08/01/94 i

I Tab 16.0 l 16.0-1 06/23/93

\ Tab 16.1 j

. l

, 16.1-1 06/23/93 ,

f Tab 16.2

!. 16.2-1 11/91

16.2-2 11/91 16.2-3 11/91 I

Tab 16.3 16.3-1 11/91 i

16.3-2 11/91 Table 16.3-1 11/91 I

i Tab 16.4 Page 1 08/20/95 l l

1

i -

l I

1 .

DUKE POWER COMPAM1f

'. SELECTED LICBMSEE COMMITMENTS MANUAL I List of Effective Pages i l i

S Tab 16.5 ,

16.5-1 11/91 1

16.5-2 11/91
16.5-3 11/91 7

l ' Tab 16.6 i

Tab 16.7 l

. Page 1 08/20/95 j-

{ Page 2 08/20/95 l

Page 3 08/20/95 s

f j \ Page 4 08/20/95

) Page 5 08/20/95 Page 6 08/20/95 4 Page 7 08/20/95 4

Page 8 08/20/95 Page 9 08/20/95 I

Page 10 08/20/95 Page 11 08/20/95

~

Page 12 08/20/95 j

l Page 13 08/20/95 l Page 14 08/20/95 Page 15 08/20/95 i

!O >

Page 2 08/20/95 l i

i 4

i I

. . . - . _ . . ~ . . _ . . - _ - . . -- . . - . - . - . - . . . . -

i ..

J t

CATAWBA NUCLEAR STATION

FINAL SAFETY ANALYSIS REPORT l SELECTED LICENSEE COMMITNENTS i- CHAPTER 16.7 1
  • i INSTRUMENTATION Table of Contents 4

l '16.7-1 ATWS Mitigation System Actuation Circuitry (AMSAC) 16.?-2 Seismic Instrumentation 16.7-3 Meteorological Instrumentation 3

16.7-4 Loose-Part Detection System ,

.16.7-5 Turbine Overspeed Protection i

i

}

i, -

l l

I I i-4 l l 1'

l i 'L i

4 I '

4 I

Chapter 16.7 Page 1 8/20/95 t

a

b

'd 16.7 INSTRUMENTATION 16.7-1 ATWS MITIGATION SYSTEM ACTUATION CIRUITRY (AMSAC)

COMMITMENT:

The AMSAC System shall be OPERABLE.

APPLICABILITY:

MODE 1, above 40% of RATED THERMAL POWER (based on Turbine Impulse Pressure).

1 REMEDIAL ACTION:

With the AMSAC System inoperable, restore it to OPERABLE status within 7 days or submit a Special Report to the Nuclear Regulatory Commission within the following 30 days. This report shall outline the cause of the malfunction and the plans for restoring the system to OPERABLE status.

TESTING REQUIRENENTS: 1 Perform a CHANNEL CALIBRATION on the AMSAC System instruments at least once per 18 months.

REFERENCES:

l

1) 10 CFR 50.62, Requirements for Reduction of Risk From Anticipated Transients Without Scram (ATWS) Events for Light-Water Cooled Nuclear Power Plants.

1

2) Generic Letter 85-06, " Quality Assurance Guidance for ATWS  ;

Equipment That Is Not Safety-Related." l

3) Information Notice 92-06, " Reliability of ATWS Mitigation System and Other NRC Required Equipment Not Controlled by Plant Technical Specifications."

I 1

rh Chapter 16.7 Page 2 84p/55

m BASES:

)

Per 10 CFR 50.62, "Each pressurized water reactor ': t have equipment from sensor output to final actuation de>;cs, that is diverse from the reactor trip system, to automatica.Jy initiate the auxiliary feedwater system and initiate a turbine trip under conditions indicative of an ATWS. This equipment must be designed to perform its function in a reliable manner and be ,

independent from the existing reactor trip system." When this rule was issued, the NRC did not require licensees to address the OPERABILITY of this equipment in the plant Technical Specifications nor require that this equipment be designated as safety-related.

On January 15, 1992, the NRC issued Information Notice 92-06 which discussed the reliability of AMSAC and other equipment not controlled by plant Technical Specifications. This notice described two separate incidents where violations were cited because the licenseen failed to adequately maintain the reliability of their AMSAC systems. The NRC is concerned that licensees may not place an appropriate level of priority on resolving problems with the AMSAC System because it is not a safety-related system and because the plant's Technical Specifications do not govern its operability. The NRC considers the failure of licensees to adequately ensure the reliable e' operation of AMSAC equipment to be a significant regulatory

( ,g f

j concern.

This Selected Licensee Commitment was developed to ensure that appropriate attention is given to maintaining the AMSAC System in a reliable condition and that prompt action will be taken to repair and restore any AMSAC equipment that is discovered in a condition where it is incapable of performing its intended function.

l

b l

{V s Chapter 16.7 Page 3 840/95

)

16.7 INSTRUMENTATION 16.7-2 SEISMIC INSTRUMENTATION j l

COMMITMENT:  !

a. The seismic monitoring instrumentation shown in Table 16.7-2A.shall be OPERABLE.

APPLICABILITY:

At all times.

. REMEDIAL. ACTION:

a. With one or more of the above required seismic monitoring instruments inoperable for more than 30 days, prepare and submit a Special Report to the Commission pursuant to Technical Specification 6.9.2 within the next 10 days outlining the cause of the malfunction and the plans for restoring the instrument (s) to OPERABLE status. l

, 1 (s') TESTING REQUIREMENTS:

a. Each of the above required seismic monitoring instruments  ;

shall be demonstrated OPERABLE by the performance of the '

CHANNEL CHECK, CHANNEL CALIBRATION and ANALOG CHANNEL I 1

OPERATIONAL TEST operations at the frequencies shown in Table 16.7-2B.

b. Each of the above accessible seismic monitoring instruments actuated during a seismic event greater than or equal to 0.01 g shall be restored to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following the seismic event. Data shall be retrieved from actuated instruments and analyzed to determine the magnitude 4 of the vibratory ground motion. Data retrieved from the triaxial time-history accelerograph shall include a post-event CIUWNEL CALIBRATION obtained by actuation of the internal test and calibrate function immediately prior to removing data. CHANNEL CALIBRATION shall be performed immediately'after insertion of the new recording media in the triaxial time-history accelerograph recorder. A Special
Report shall be prepared and submitted to the Commission pursuant to Technical Specification 6.9.2 within 10 days describing the magnitude, frequency spectrum, and resultant effect upon facility features important to safety.

/N b Chapter 16.7 Page 4 840/55

t htEFERENCES: N/A-BASES:

16.7-2 SEISMIC INSTRUMENTATION

~ The: OPERABILITY of the seismic instrumentation' ensures that

, l sufficient capability is available to promptly determine the magnitude of.a seismic! event and evaluate the response of those ,

features important to safety. This capability is required to .

permit comparison of the measured response to that used in the t

. design basis for the' facility to determine'if plant shutdown is required pursuant.~to Appendix A of 10 CFR Part 100. The-

-instrumentation'is consistent with the recommendations of

. Regulatory Guide 1.12,." Instrumentation for Earthquakes," April-s1974.  !

O

~

e i;( .

' Chapter 16.7. Page 5 840/95 ,

9

r. ,

i e

ID TABLE 16.7-2A

.qf SEISMIC MONITORING INSTRUMENTATION MINIMUM MEASUREMENT INSTRUMENTS INSTRUMENTS AND SENSOR LOCATIONS RANGE OPERABLE

1. Triaxial Time-History Accelerographs
a. 1MIMT 5070 (Remote Sensor A)- -1 g to + 1 g :L [

Containment Base Slab

~

b. 1MIMT 5080 (Remote Sensor B) -1 g to + 1 g 1 Containment Vessel'Elev 619'5"-  ;
c. 1MIMT 5090 (Starter Unit) 0.005-g to 0.05 g 1 ,

Containment Base Slab

2. Triaxial Peak Accelerographs
a. 1MIMT 5010 - Containment Bldg. O g to + 2 g 1 ,

Elev 588' + 6 1/8" .

b. 1MIMT 5020 - Containment Bldg. O g to + 2 g 1 s Elev 567'2H"
c. 1MIMT 5030 - Auxiliary Bldg. O g to + 2'g 1 Elev-543'
3. Triaxial Seismic Switch 1MIMT 5000 - Containment 0.025 g to 0.25 g 1*

Base Slab

4. Triaxial Response-Spectrum Recorders
a. 1MIMT 5040 - Containment 0 to 34 g at ,1*

Base' Slab 2 to 25 Hz

b. 1MIMT 5050 - Containment Bldg. O to 34 g at 1 Elev 579'3H" 2 to 25 Hz

-c. - 1MIMT 5060 - Auxiliary Bldg.

O to 34 g at 1 Elev~577' 2 to 25 Hz l

L f

/Y *With reactor control room indication.

j-U Chapter 16.7 Page 6 8/20/95

,q TABLE 16.7-2B (u,j  !

SEISMIC MONITORING INSTRUMENTATION SURVEILLANCE REOUIREMENTS ANALOG CHANIEL CHANNEL CHANNEL OPERATIONAL INSTRUMENTS AND SENSOR LOCATIONS CHECK CALIBRATION TEST I

1. Triaxial Time-History Accelerographs i
a. 1MIMT 5070 (Remote Sensor A) M* R SA Containment Base Slab
b. 1MIMT 5080 (Remote Sensor B) M* R SA Containment Vessel Elev 619'5"
c. 1MIMT 5090 (Starter Unit) N.A. R SA Containment Base Slab
2. Triaxial Peak Accelerographs
a. 1MIMT 5010 - Containment Bldg. N.A. R N.A.

Elev 588' + 6 1/8" p)

's

b. 1MIMT 5020 - Containment Bldg. N.A. R N.A.

Elev 567' 2M"

c. 1MIMT 5030 - Auxiliary Bldg. N.A. R N.A.

Elev 543'

3. Triaxial Seismic Switch 1MIMT 5000 - Containment M R SA Base Slab **
4. Triaxial Response-Spectrum Recorders
a. 1MIMT 5040 - Containment Base M R SA Slab **
b. 1MIMT 5050 - Containment Bldg. N.A. R N.A.

Elev 579' 3H"

c. 1MIMT 5060 - Auxiliary Bldg. N.A. R N.A.

Elev 577'

  • Except seismic trigger.
    • With reactor control room indications.

['s)

Chapter 16.7 Page 7 8AA/55

4 I

1 .

l INSTRUMENTATION

( f 16.7 16.7-3 METEOROLOGICAL INSTRUMENTATION -

i f

COMMITMENT:

?

a. .The meteorological monitoring instrumentation channels shown in I Table 16.7-3A shall be. OPERABLE. l APPLICABILITY:

LAt all times.  !

REMEDIAL ACTION:

a. With one or more required meteorological monitoring channels inoperable for more than 7 days, prepare and submit a Special  !

! Report to the Commission pursuant to Technical Specification 6.9.2 within the.next 10 days _ outlining the cause of the malfunction and the plans for restoring the channel (s) to OPERABLE status.

("N

\_,] .

TESTING REQUIREMENTS:

a. Each of the above meteorological monitoring instrumentation ,

channels shall be demonstrated OPERABLE by the performance of the

< CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 16.7-3B.  ;

l REFERENC5S: N/A i

l t

a

. Chapter'16.7 Page 8 840/95 ,

f t

, 2. . ...~ I<

. I lf$ -

.$ BASES::

16.7-3 METEOROLOGICAL INSTRUMENTATION The OPERABILITY:of the. meteorological' instrumentation ensures that

~

sufficient meteorological data are available for estimating potential radiation doses to the public as a result of' routine'or accidental release of radioactive materials to the atmosphere. .This" capability. .- ,

is-required to evaluate the need for, initiating protective. measures to  !

. protect the' health;and' safety.of the'public and is consistent with the i recommendations of. Regulatory Guide 1.23,."Onsite Meteorological  !

Programs," February.1972.

. l l

i l

1 1

l I

l

/ .

.V:

~ Chapter: 16,7 lPage 9 8/20/95 i

{

1

TABLE 16.7-3A METEOROLOGICAL MONITORING INSTRUMENTATION MINIMUM INSTRUMENT LOCATION OPERABLE

1. Wind speed
a. Meteorological Tower Nominal Elev. 661'10" 1
b. Meteorological Tower Nominal Elev. 768'10" 1  ;
2. Wind Direction .
a. Meteorological Tower Nominal Elev. 661'10" 1

'b.- Meteorological Tower Nominal Elev. 768'10" 1

3. ir Temperature - AT Meteorological Tower Nominal Elev. 768'10"-661'10" 1 I

l 1

i l')

\J' chapter 16.7- Page 10 8/20/95

. _ _ _. . . . ~ . _ . _ _ _ _ _ _ . . _ . . . . _ . _ _ _ .

TABLE 16.7-3B METEOROLOGICAL MONITORING' INSTRUMENTATION SURVEILLANCE REOUIREMENTS CHANNEL. CHANNEL >

INSTRUMENT CHECK CALIBRATION ,

-1. Wind speed

a. Nominal Elev. 661' 10" D SA
b. Nominal Elev. 768' 10" D SA

-2. . Wind Direction

a. Nominal Elev. 661' 10" D SA
b. Nominal Elev. 768' 10" D SA,
3. Air Temperature - AT Nominal Elev. 768'10" - 661'10" D SA J

l 1

l i

i

l

!. . i t * ,  ;

J Chapter 16.7 Page 11 8/20/95 4

_ . _ , - , - y .-._r

l .

16.7 INSTRUMENTATION uI 16.7-4 LOOSE-PART DETECTION SYSTEM COMMITMENT:

The Loose-Part Detection System shall be OPERABLE.

APPLICABILITY:

MODES 1 and'2.

REMEDIAL ACTION: -

a. .W . ith one'or more Loose-Part Detection System channels inoperable for more than-30 days, prepare and submit a Special Report to the Commission pursuant to Technical Specification 6.9.2 within the next 10 days outlining the cause of the malfunction and the~ plans for restoring the channel (s) to OPERABLE status.

TEATINR_EENIEEtEIRA:

p a. Each channel of the Loose-Part Detection Systems shall be Q demonstrated OPERABLE by performance of:

1. A CHANNEL CHECK at le~ast once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />,
2. An ANALOG CHANNEL OPERATIONAL TEST except for verification of Setpoint at least once per 31 days, and
3. A CHANNEL CALIBRATION at least once per 18 months.

REFERENCES:

N/A b):'

'q.

Chapter 16.7 Page 12 8/20/95

& RASES:

.i I

16.7 LOOSE-PART~ DETECTION SYSTEM i  !

.The. OPERABILITY of the loose-part detection instrumentation ,

ensures:.that sufficient. capability is available to detect loose metallic parts in a the Reactor System and avoid or mitigate damage'to .

Reactor System components. The allowable out-of-service times'and-surveillance. requirements are consistent with the recommendations of

. Regulatory Guide 1.133, " Loose'-Part Detection' Program for the Primary t

System of Light-Water-Cooled Reactors," May.1981. l l

i k

i

)

i r

1

)

i i

4

? /N Q Chapter 16.7 -Page 13 8/20/95 i i

l

  • ~

[J

~

if$ INSTRUMENTATION 4

16.7-5 TURBINE OVERSPEED PROTECTION COMMITMENT:

a. At least'one. Turbine Overspeed Protection System shall'be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

REMEDIAL ACTION:

at With one stop valve or one control valve per high pressure turbine steam line-inoperable.and/or with one intermediate stop valve or one intercept valve per low pressure turbine steam line

' inoperable, restore the inoperable valve (s) to_ OPERABLE status within;72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or close.at least one valve in the affected steam line (s) or isolate the turbine from the steam supply within the next'6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

b. With the above required Turbine Overspeed Protection System  !

O otherwise. inoperable, within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate the turbine from the steam supply.

TESTING REQUIREMENTS: i

a. - The above required Turbine Overspeed Protection System shall be '

. demonstrated-OPERABLE:

1. At least.once per 7 days while in MODE 1 and while in MODE 2 with the turbine operating, by cycling each of the following valves through at least one complete cycle from the running position: )

a) 'Four high pressure turbine stop valves,

b) Six low pressure turbine intermediate stop valves, and ,

c) Six low pressure turbine intercept valves, j

2. At least once per 31 days while in MODE 1 and while in MODE 2 i
with the turbine operating, by direct observation of the. j movement of each of the above valves and the four high  !

' pressure turbine. control valves, through one complete cycle

'- from the running position,

~3. At-least once:per'18 months by performance of a CHANNEL j

LCALIBRATION on.the Turbine Overspeed Protection Systems, and ChapterL16.7':Page 14 840/55 r w r._ , m .e -_

=. . .. - -

.e

[~D '4. At' least once per 40 months by disassembling at least one of

\_) each of the above valves (including the four high pressure turbine control. valves) and performing a visual and surface l inspection of valve seats, disks and stems and verifying no unacceptable flaws or corrosion.

REFERENCES:

N/A BASEST.

16.7-5 TURBINE OVERSPEED PROTECTION This commitment is provided to ensure that theJturbine-overspeed -

protection instrumentation and the turbine speed control valves are OPERABLE and will protect the turbine from excessive overspeed.

Protection from turbine excessive overspeed is-required since .

l cxcessive overspeed of the turbine could generate potentially damaging missiles which could impact and damage safety-related components, cquipment, or structures.

1 i

l l

i I

l l

4

. (3

\m/ Chapter.16.7 Page 15 8/20/95 l l