ML20111B740

From kanterella
Jump to navigation Jump to search
Revised Selected License Commitment Manual, New Selected License Commitment
ML20111B740
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/02/1996
From: Asbury B
DUKE POWER CO.
To:
References
PROC-960502, NUDOCS 9605150153
Download: ML20111B740 (140)


Text

. e.- . . . , m o.

- o, - .

PRNH m NORMAL V ,, ", Qgg{l{y CH , w AD DUKE POWER COMPANY (180933 CNS DOCUMENT MGT. CN04DM l oATE:

05/02/96 (235302 M J BRADY OPS StPPORT CN020P DOCUMENTTRANSMITTALFORM oocUMENT TRANSMITTAL

  • I3.767 13)3759 U S fAACLEAR RE8 WA8H, DC -

14)0085 6 A COPP EC050 (5) 3538 P M ABRAHAM EC081 (6)2268 L E LOUCKS EC07F onconomoa O ves ENO 17)0297 IWtC REGION II LIBRARY ATL

REFERENCE:

(8)5512 M S KITLAN CN01RC omen acunowmMmienTneeuwien hYES (813945 M J E8 STER CT01A CATAWBA PRELEAR STATION IF QA OR OTHER ACKNOWLEDGEMENT REQUIRED. PLEASE 11012 3 10 CNS CHEMISTRY HI-RI CNO3CH SELECTED LICENSEE COMMITMENTS , &%ERECEIM W REMRMNG mtS FORM OR E 111105 82 S THOMAS ECOGG i casa.ba Nuci.ar stauon 11211448 CNS RP SHIFT LAB CN02RP (1312188 L M BRAFFORO EC05N 4soo concord noad voMc"a*roU 4s ChVDR (1814406 PAELA PALMER EC06H (1511648 T P HARRALL CNO3MA (1810486 T E CRAWFORO SYS ENG CNO3SE R co ey D.i.

(1710276 D J PHILLIPS CN05SR (1811127 M S SILLS CNQ5SG PAE E 1 OF 6 DOCUMENT NO. GA ctWD ""Z co,

[B 1 2 3 4 5 6 7 18 VI 9 10 11 12 13 14 15 16 17 18 TOTAL VI 86 SLC LOEP (1-11) NA 03/18/96 CADM-03 V1 V1 V10V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 V1 SLC 16.7.6 (PGS 16,17) NA 03/18/96 SLC LOEP (1-11) NA 03/18/96 CADM-03A 23 SLC 16.7.6 (PGS 16,17) NA 03/18/96 9605150153 960502 PDR ADOCK 05000413 p PDR REMARKS:

W R MC COLLUM 8I VICE PRESH N 140154 CATAWBA NUCLEAR SITE O7 BY 8 S AS8tAtY CN01RC BSA/ SAL

___-. . - _ _P - _ - _ - _ _ _ _ _ - _ - - _ _ _ - - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ -

. - . ~..~ . _. . . - .. ._ - . , _ .. _ _ _ ._ . . - . . _ ..~ .. _ _ _ .__ _ _ _ _

ll l Duke kwr Cornpany (803)831J000 Catau ba Nuclear Station 4800 Concord Road York. sc 29745 g--

April 3,1996 ,

i RE: Catawba Nuclear Station Selected License Commitment Section 16.7-6 RN Discharge Instrumentation Please add the following pages in the Selected License Commitment manual.

16.7-6 is a new Selected License Commitment.

Remove insert LOEP 1 - 11 LOEP 1 - 11 .

Section 16.7-6 ,

(

Pages 16 - 17  !

If you have any questions concerning contents of this package update, contact i the undersigned at (803) 831-3640.

\

l M.S. Kitlan, Manager ikO/d h l l By: Barbara S. Asbury Regulatory Compliance Attachments i

lO "Y ? W?q(Y &Y

L

( DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages LOEP1 02/08/96 LOEP2 08/28/95 LOEP3 08/28/95 LOEP 4 08/28/95 LOEP5 08/28/95 i

LOEP 6 08/28/95 LOEP 7 08/28/95 i

i LOEP 8 08/28/95 l

LOEP 9 08/28/95 Tab 16.0 16.0-1. 06/23/93 l

l Tab 16.1 l

l 16.1-1 06/23/93 Tab 16.2 l

l 16.2-1 11/91 l 6.2-2 11/91 16.2-3 11/91 l

Page1 03/18/96 i

i s DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL i

List of Effective Pages i

)

Tab 16.3

{ 16.3-1 11/91 16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 Tab 16.5 16.5-1 11/91  !

i l 6.5-2 11/91 16.5-3 11/91 l

Tab 16.6 Tab 16.7 Page 1 08/20/95 Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 Page 5 08/20/95 O Page 2 03/18/96

.-- . .- _. - - - _ . . . . . . . . ~ . - . . .- . .

DUKE POWER COMPANY l O' SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages j Page 6 08/20/95 j Page 7 08/20/95 Page 8 08/20/95 l

Page 9 08/20/95 Page 10 08/20/95 Page11 08/20/95 i Page 12 08/20/95

( Page 13 08/20/95 I Page 14 02/08/96 l Page 15 02/08/96 Page 16 03/18/96 Page 17 03/18/96 i

Tab 16.8 Page 1 06/20/94 Page 2 06/20/94 l Page 3 06/20/94 l

Page 4 06/20/94 lO Page 3 03/18/96

I DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l Page 5 06/20/94 l Page 6 06/20/94 i

Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 Page 10 06/20/94 Page 11 06/20/94 Page 12 06/20/94 Page 13 06/20/94 Page 14 06/20/94 l Page 15 06/20/94 Page 16 08/30/94 l

Page 17 06/20/94 i

Page 18 06/20/94 l

Page 19 06/20/94 '

Page 20 06/20/94 l

l Page 21 06/20/94 Page 22 06/20/94 O

O Page 4 03/18/96 l

I \

\

DUKE POWER COMPANY Os SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages i Page 23 06/20/94 i

Page 24 06/20/94  !

l Page 25 06/20/94 Page 26 08/30/94  !

l Page 27 08/30/94 l Page 28 08/30/94 Page 29 08/30/94 Page 30 08/30/94

(

Page 31 08/30/94  ;

Page 32 08/30/94 l

Page 33 08/30/94 1 J

Page 34 08/30/94 Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94 r

Page 5 03/18/96 I

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 40 08/30/94 i

Page 41 08/30/94 Page 42 08/30/94 Page 43 08/30/94 Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94 1

Page 47 08/30/94 O Page 48 08/30/94 Tab 16.9 16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96 16.9-3 Page 1 - 3 01/30/96 16.9-4 Page 1 - 5 01/30/96 16.9-5 Page 1 - 6 01/30/96 l

l O Page 6 03/18/96 1

1

)

l 1

DUKE POWER COMPANY l SELECTED LICENSEE COMMITMENTS MANUAL l

List of Effective Pages 16.9-6 Page 1 - 8 01/30/96 l

l Tab 16.10 1

16.10-1 02/91 16.10-2 02/91 Tab 16.11 i

16.11-1 08/01/94 16.11-2 08/01/94 16.11-3 09/23/94 16.11-4 08/01/94 16.11-5 08/01/94 16.11-6 08/01/94 16.Il-7 08/01/94 16.11-8 08/01/94 16.11-9 08/01/94 ,

16.11-10 08/01/94 16.11-11 08/01/94 16.11-12 08/01/94 i

O Page 7 03/18/96

O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-13 08/01/94 16.11-14 08/01/94 l

16.11-15 06/23/94

! 16.11-16 08/01/94 .

16.11-17 08/01/94 1 I I 16.11-18 08/01/94 l

l 16.11-19 08/01/94 16.11-20 08/01/94 l 16.I l-21 08/01/94 l

16.11-22 08/01/94 16.11-23 08/01/94 l

l l 16.11-24 08/01/94 16.11-25 08/01/94 16.11-26 08/01/94 l

16.11 27 08/01/94 16.11-28 08/01/94 16.11-29 08/01/94 r

i f

O Page 8 03/18/96 i

r__. _ _ - _ _

l l l l

l

! F DUKE POWER COMPANY

! SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages  !

16.11-30 08/01/94 16.11-31 08/01/94 l

16.11-32 08/01/94 16.11-33 08/01/94 l '

16.11-34 08/01/94 16.11-35 08/01/94 l l

1 16.11-36 08/01/94 16.11-37 08/01/94 O 16.11-38 08/01/94 16.11-39 08/01/94 16.11-40 08/01/94 16.11-41 08/01/94 16.11-42 08/01/94 I

16.11-43 08/01/94 16.11-44 08/01/94 i

16.11-45 08/01/94 16.11-46 08/01/94 16.11-47 08/01/94 '

O Page 9 03/18/96

I DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL l List of Effective Pages l

16.11-48 08/01/94 16.11-49 08/01/94 16.11-50 08/01/94 16.11-51 08/01/94 16.11-52 08/01/94 l

16.11-53 08/01/94 l 16.11-54 08/01/94

[ 16.11-55 08/01/94 16.11-56 08/01/94 ,

i 16.11-57 08/01/94 l

16.11-58 08/01/94 l

l 16.11-59 08/01/94 16.11-60 08/01/94 16.11-61 08/01/94 16.11-62 08/01/94 16.11-63 08/01/94 16.I l-64 08/01/94 Page 10 03/18/96 l

I

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-65 08/01/94 Tab 16.12 Tab 16.13 16.13-0 12/90 16.13-1 12/90 Tab 16.14 Tab 16.15 Apnendix Compliance Function Area Manual, Section 3.8

" Selected Licensee Commitments" I

l O Page 11 03/18/96

Ifil INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION

(

COMMITMENT:

The following shall be OPERABLE:

Instrument Components:

Loops:

1RNFE7520 RN Pump A Discharge Flow Annubar 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) 1RNFE7510 RN Pump B Discharge Flow Annubar ,

' 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) 2RNFE7510 RN Pump B Discharge Flow Annubar 2RNLP7510 2RNFI'7510 RN Pump B Discharge Flow 2RNP7510 RN Pump B Discharge Flow (Control Room Indication)

Annunciators:

\ 1AD12-N1 RN Pump A Flow Hi/ Low 1AD12-N4 RN Pump B Flow Hi/ Low 2AD12-N1 RN Pump A Flow Hi/ Low 2AD12-N4 RN Pump B Flow Hi/ Low APPLICABIT TTY:

Any time the associated pump is required to be OPERABLE.

REMEDIAL ACTION:

a. With any component on both trains of the above listed instrument loops associated with the same unit inoperable DR both annunciators associeted with the same unit inoperable OR any component of one instrument loop and one annunciator from different trains associated with the same unit inoperable:

For Example: 1RNFT7520 and 1RNFT7510 QB 1AD12-N1 and 1AD12-N4 QB 1RNFT7520 and 1AD12-N4.

Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), DR. enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Speci5 cation 3.7.4 'on O. RN for the affected unit.

CHAPTER 16.7 Page 16 3-18-96

b. -With the conditions specified in remedial action a. mst on both units:

Open IRN-58B(RN Ndr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to I SNSWP), .OR. enter Technical Specification 3.0.3 for both units.

i TESTING REQUIREMENTS: '!

l Perform channel calibrations per IP/1(2)/B/3112/04 as required.

REFERENCES:

i  !

l 1) NRC Inspection Report,50-413,414/94-17, September 9,1994 I l 2) Catawba Nuclear Station PIP 0-C94-1555 BASES:

i The bases for this Selected License Commitment is stated in reference 1, page 11, "Part of the. '

licensing bases of the RN system included the ability for operators to manually change the l discharge path for the RN system from the non-safety related Lake Wylie to the safety related

SNSWP." I i

l This Selected License Commitment was developed to address the NRC concerns about actions to  !

l be taken in the event instrumentation / alarms were out of service which would impair the ability I of Operations to recognize loss of the non-safety discharge. This SLC shall ensure the proper actions are taken based on plant equipment conditions.

I i

1 i

i s i

!O t

! l i

i e

! CHAPTER 16.7 Page 17 3-18-96

. =.-... ~.._.__ - - -- - ._..- . - ..-_.. -

1 Il i Duke Pouwr Company (803)831 3000 Catawba Nuclear Station 4800 Concord Road York. SC29745 g --

April 3,1996 l

RE: Catawba Nuclear Station Selected License Commitment Section 16.7-6 RN Discharge Instrumentation  !

i l

Please add the following pages in the Selected License Commitment manual.

16.7-6 is a new Selected License Commitment.

Remove Insert LOEP 1 - 11 LOEP 1 - 11 Section 16.7-6 O Pages 16 - 17 If you have any questions concerning contents of this package update, contact the undersigned at (803) 831-3640.

M.S. Kitlan, Manager M/d .

By: Barbara S. Asbury Regulatory Compliance Attachments O

p V

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages LOEP1 02/08/96 l

LOEP 2 08/28/95 LOEP 3 08/28/95 LOEP 4 08/28/95 LOEP 5 08/28/95 LOEP 6 08/28/95 LOEP 7 08/28/95 l LOEP 8 08/28/95 LOEP 9 08/28/95 Tab 16.0 16.0-1 06/23/93 Tab 16.1 16.1-1 06/23/93 l

Tab 16.2 a

l 16.2-1 11/91 1

16.2-2 11/91 16.2-3 11/91 l I

1 lO Page1 03/18/96 i

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.3

-i I

16.3-1 11/91 i

16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 Tab 16.5 16.5-1 11/91 16.5-2 11/91 16.5-3 11/91 l Tab 16.6 Tab 16.7 Page1 08/20/95 l Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 l Page 5 08/20/95 1

i Page 2 03/18/96

DUKE POWER COMPANY

'O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages i

Page 6 08/20/95 Page 7 08/20/95 Page 8 08/20/95 l l Page 9 08/20/95 Page 10 08/20/95 l Page11 08/20/95 l

l Page 12 08/20/95 i

Page 13 08/20/95

Page 14 02/08/96 l

l Page 15 02/08/96 l

Page 16 03/18/96 Page 17 03/18/96 l

Tab 16.8 Page1 06/20/94 Page 2 06/20/94 j Page 3 06/20/94 4 Page 4 06/20/94 iO I Page 3 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL i

List of Effective Pages Page 5 06/20/94 Page 6 06/20/94 l Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 Page 10 06/20/94 i

Page11 06/20/94 l Page 12 06/20/94 Page 13 06/20/94 Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 17 06/20/94 Page 18 06/20/94 l

Page 19 06/20/94 Page 20 06/20/94 Page 21 06/20/94 i

Page 22 06/20/94 lO

! Page 4 03/18/96 l l

(

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL 1

List of Effective Pages l l

l Page 23 06/20/94  ;

Page 24 06/20/94 Page 25 06/20/94 ,

l l Page 26 08/30/94 i

Page 27 08/30/94 l l Page 28 08/30/94 Page 29 08/30/94 r Page 30 08/30/94 Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94 Page 34 08/30/94 Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 Page 38 08/30/94  ;

Page 39 08/30/94 i

l l

lO Page 5 03/18/96 l

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 40 08/30/94 Page 41 08/30/94 Page 42 08/30/94 Page 43 08/30/94 Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94 Page 47 08/30/94 O Page 48 08/30/94 i

Tab 16.9  !

16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96  ;

16.9-3 Page 1 - 3 01/30/96 16.9-4 Page 1 - 5 01/30/96 16.9-5 Page 1 - 6 01/30/96 o Page 6 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.9-6 Page 1 - 8 01/30/96 Tab 16.10

16.10-1 02/91 16.10-2 02/91 fab 16.11 16.11-1 08/01/94 16.11-2 08/01/94 4

O 16.11-3 09/23/94 16.11-4 08/01/94 16.11-5 08/01/94 16.11-6 08/01/94 16.11-7 08/01/94 16.11-8 08/01/94 16.11-9 08/01/94 16.11-10 08/01/94 16.11-11 08/01/94 16.11-12 08/01/94 O Page 7 03/18/96 i

1

[

i l

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-13 08/01/94 16.11-14 08/01/94  ;

l 16.11-15 06/23/94 l I

16.11-16 08/01/94 16.11-17 08/01/94 16.11-18 08/01/94 16.11-19 08/01/94 16.11-20 08/01/94 16.11-21 08/01/94 i

16.11-22 08/01/94 (

l6.I1-23 08/01/94 l l

16.11-24 08/01/94 ,

l 16.11-25 08/01/94 l 16.11-26 08/01/94 16.11-27 08/01/94 I 16.11-28 08/01/94 16.11-29 08/01/94 O Page 8 03/18/96 l

l l  !

l \

O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-30 08/01/94 ,

16.11-31 08/01/94 16.11-32 08/01/94 1 16.11-33 08/01/94 16.11-34 08/01/94 16.11-35 08/01/94 16.11-36 08/01/94

, 16.11-37 08/01/94 I

O 16.I1-38 08/01/94 16.11-39 08/01/94 l 16.11-40 08/01/94

! l 16.11-41 08/01/94 l 16.11-42 08/01/94 i

16.11-43 08/01/94 16.11-44 08/01/94 l

16.11-45 08/01/94 16.11-46 08/01/94

, 16.11-47 08/01/94 iO Page 9 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l 16.11-48 08/01/94 16.11-49 08/01/94 16.11-50 08/01/94 l- 16.11-51 08/01/94 l

l 16.11-52 08/01/94 l

16.11-53 08/01/94 16.11-54 08/01/04

, 16.11-55 08/01/94 16.11-56 08/01/94 16.11-57 08/01/94 16.11-58 08/01/94 l

l 16.11-59 08/01/94 l

16.11-60 08/01/94 l

16.11-61 08/01/94 16.11-62 08/01/94 16.11-63 08/01/94 16.11-64 08/01/94

O

! Page 10 03/18/96 I

l

r DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL l I

List of Effective Pages 16.11-65 08/01/94 l l

l Tab 16.12

)

l l Tab 16.13 16.13-0 12/90 1

16.13-1 12/90 Tab 16.14 Tab 16.15 l Apnendix .

t i Compliance Function Area Manual, Section 3.8 l

" Selected Licensee Commitments" l

l l

l l

j

!O Page 11 03/18/96 i

ifil INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION -

COMMITMENT:

The following shall be OPERABLE:

Instrument Components:

Loops:

1RNFE7520 RN Pump A Discharge Flow Annubar l 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) 1RNFE7510 RN Pump B Discharge Flow Annubar 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) 2RNFE7510 RN Pump B Discharge Flow Annubar 2RNLP7510 2RNFT7510 RN Pump B Discharge Flow 2RNP7510 RN Pump B Discharge Flow (Control Room Indication) l l p Annunciators:

d 1AD12-N1 RN Pump A Flow Hi/ Low l 1AD12-N4 RN Pump B Flow Hi/ Low 2AD12-A/1 RN Pump A Flow Hi/ Low 2AD12-N4 RN Pump B Flow Hi/ Low l

APPLICABTI TTY:

Any time the associated pump is required to be OPERABLE.

l REMEDIAL ACTION:

l a. With any component on both trains of the above listed instrument loops associated with the same unit inoperable OE both annunciators associated with the same unit inoperable DE any component of one instrument loop and one annunciator from different trains associated with the same unit inoperable:

For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12-N1 and I

1AD12-N4 OB 1RNFT7520 and 1AD12-N4.

[ Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), DR. enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on

- k RN for the affected unit.

l CHAPTER 16.7 Page 16 3-18-96

b. With the conditions specified in remedial action a. mst on both unit:::

Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to i SNSWP), DB_ enter Technical Specification 3.0.3 for both units.

TESTING REQUIREMENTS:  !

Perform channel calibrations per IP/1(2)/B/3112/04 as required.

i

REFERENCES:

1) NRC Inspection Report, 50-413,414/94-17, September 9,1994 l 2)- Catawba Nuclear Station PIP 0-C94-1555 i

BASES-  !

i The bases for this Selected License Commitment is stated in reference 1, page 11, "Part of the licensing bases of the RN system included the ability for operators to manually change the discharge path for the RN system from the non-safety related Lake Wylie to the safety related SNSWP."

l This Selected License Commitment was developed to address the NRC concerns about actions to  !

O be taken in the event instrumentation / alarms were out of service which would impair the ability of Operations to recognize loss of the non-safety discharge. This SLC shall ensure the proper i

actions are taken based on plant equipment conditions.- i l ,

l l

I i

i l  ;

l l

I i

Lo CHAPTER 16.7 Page 17 3-18-96

ll I Duke Ibuer Company . (803)831 3000 Catawba kclear Station 4800 Concord Road krk. SC29745

, DUKEPOWER April 3,1996 RE: Catawba Nuclear Station Selected License Commitment Section 16.7-6 RN Discharge instrumentation Please add the following pages in the Selected License Commitment manual.

16.7-6 is a new Selected License Commitment.

Remove Insert LOEP 1 - 11 LOEP 1 - 11 Section 16.7-6 O- Pages 16 - 17  ;

If you have any questions conceming contents of this package update, contact the undersigned at (803) 831-3640.

M.S. Kitlan, Manager

.ll,O/d By: Barbara S. Asbury h l Regulatory Compliance Attachments i

l l

l 1

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages LOEP1 02/08/96 LOEP 2 08/28/95 LOEP3 08/28/95 LOEP 4 08/28/95 LOEP 5 08/28/95 LOEP 6 08/28/15 LOEP 7 08/28/f<5 l l

LOEP 8 08/28/95 LOEP 9 08/28/95 Tab 16.0 16.0-1 06/23/93 Tab 16.1 16.1-1 06/23/93 Tab 16.2 16.2-1 11/91 16.2-2 11/91 16.2-3 11/91 O Page1 03/18/96

l DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.3 16.3-1 11/91 16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 1

Tab 16.5 16.5-1 11/91 16.5-2 11/91 16.5-3 11/91 4 i

Tab 16.6 I

Tab 16.7 Page 1 08/20/95 l Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 I

! Page 5 08/20/95 7

iO Page 2 03/18/96

l DUKE POWER COMPAhT i SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages ,

Page 6 08/20/95 Page 7 08/20/95 Page 8 08/20/95 j Page 9 08/20/95 Page 10 08/20/95 Page11 08/20/95 Page 12 08/20/95 Page 13 08/20/95 Page 14 02/08/96 I

Page 15 02/08/96 Page 16 03/18/96 Page 17 03/18/96 Tab 16.8 Page 1 06/20/94 Page 2 06/20/94 Page 3 06/20/94 Page 4 06/20/94

O Page 3 03/18/96

l l s

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages i

Page 5 06/20/94 Page 6 06/20/94 i Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 Page 10 06/20/94 Page11 06/20/94 Page 12 06/20/94 O Page 13 06/20/94 I

Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 17 06/20/94 Page 18 06/20/94 Page 19 06/20/94 Page 20 06/20/94 Page 21 06/20/94 Page 22 06/20/94 lO i Page 4 03/18/96 l

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 23 06/20/94 Page 24 06/20/94 Page 25 06/20/94 Page 26 08/30/94 Page 27 08/30/94 Page 28 08/30/94 Page 29 08/30/94 Page 30 08/30/94 l

Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94 Page 34 08/30/94 Page 35 08/30/94

, Page 36 08/30/94 l

l Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94 l

o l

l Page 5 03/18/96

)

DUKE POWER COMPANY i SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 40 08/30/94 Page 41 08/30/94 Page 42 08/30/94 Page 43 08/30/94 l Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94 i

Page 47 08/30/94 Page 48 08/30/94 i Tab 16.9 16.9-1 Page 1 - 4 01/30/96 l

l 16.9-2 l Page 1 - 4 01/30/96 16.9-3 l

Page 1 - 3 01/30/96 l

I 16.9-4 Page 1 - 5 01/30/96 16.9-5 Page 1 - 6 01/30/96 1

(

O Page 6 33/18/96 I

l i

l _

I I

I DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages ,

J 16.9-6 l Page 1 - 8 01/30/96 j i

Tab 16.10 16.10-1 02/91 16.10-2 02/91 l Tab 16.11 16.11-1 08/01/94 16.I1-2 08/01/94 O 16.I1-3 09/23/94 16.11-4 08/01/94 16.11-5 08/01/94 16.11-6 08/01/94 l

16.11-7 08/01/94 1 16.11-8 08/01/94 16.11-9 08/01/94 16.11-10 08/01/94 16.11-11 08/01/94 16.11-12 08/01/94 O Page 7 03/18/96

I i

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-13 08/01/94 16.11-14 08/01/94 16.11-15 06/23/94 16.11-16 08/01/94 16.11-17 08/01/94 16.11-18 08/01/94 l

16.11-19 08/01/94

I6.11-20 08/01/94 16.11-21 08/01/94 j 16.11-22 08/01/94 l

l 16.11-23 08/01/94 16.11-24 08/01/94 16.11-25 08/01/94 l 16.11-26 08/01/94 l

16.11-27 08/01/94 16.11-28 08/01/94 l

16.11-29 08/01/94

O Page 8 03/18/96

DUKE POWER COMPANY I SELECTED LICENSEE COMMITMENTS MANUAL l

l List of Effective Pages 16.11-30 08/01/94 16.11-31 08/01/94 16.11-32 08/01/94 l

16.11-33 08/01/94 16.11-34 08/01/94 16.11-35 08/01/94 16.11-36 08/01/94 16.11-37 08/01/94 N 16.11-38 08/01/94 16.11-39 08/01/94 16.11-40 08/01/94 l l6.11-41 08/01/94  ;

16.11-42 08/01/94 16.11-43 08/01/94 16.11-44 08/01/94 l 16.11-45 08/01/94 l 16.11-46 08/01/94 l

16.11-47 08/01/94 l

$1 l Page 9 03/18/96 l

l l

l C DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL j List of Effective Pages l 16.11-48 08/01/94 16.11-49 08/01/94 16.11-50 08/01/94 16.11-51 08/01/94 16.11-52 08/01/94 l 16.11-53 08/01/94 i

16.11-54 08/01/94 16.11-55 08/01/94 16.11-56 08/01/94 16.11-57 08/01/94 l 16.11-58 08/01/94 16.11-59 08/01/94 16.11-60 08/01/94 ,

I l 16.11-61 08/01/94 l6.11-62 08/01/94 16.11-63 08/01/94 16.11-64 08/01/94 1

Page 10 03/18/96

. ._ ~ __ _ _..._._._ _ ._..

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL i

List of Effective Pages 16.11-65 08/01/94 Tab 16.12 i

Tab 16.13 16.13-0 12/90 16.13-1 12/90 Tab 16.14 Tab 16.15 Apnendix Compliance Function Area Manual, Section 3.8

" Selected Licensee Commitments" l

l l

l

O Page 11 03/18/96 1 .

161 INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION COMMITMENT:

The following shall be OPERABLE:

Instrument Components:

Loops:

1RNFE7520 RN Pump A Discharge Flow Annubar 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) 1RNFE7510 RN Pump B Discharge Flow Annubar 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) l 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) 2RNFE7510 RN Pump B Discharge Flow Annubar 2RNLP7510 2RNFT7510 RN Pump B Discharge Flow 2RNP7510 RN Pump B Discharge Flow (Control Room Indication)

(C Annunciators:

1AD12-N1 RN Pump A Flow Hi/ Low 1AD12-A/4 RN Pump B Flow Hi/ Low 2AD12-N1 RN Pump A Flow Hi/ Low 2AD12-N4 RN Pump B Flow Hi/ Low APPLICABIT. TTY:

Any time the associated pump is required to be OPERABLE.

REMEDIAL ACTION:

a. With any component on both trains of the above listed instrument loops associated with the same unit inoperable DE both annunciators associated with the same unit inoperable DE any component of one instrument loop and one annunciator from different l trains associated with the same unit inoperable:

For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12-A/1 and

! 1AD12-N4 DE 1RNFT7520 and 1AD12-N4.

! Open 1RN-58B(RN Hdr'B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), DE_ enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on

\ RN for the affected unit.

i CHAPTER 16.7 Page 16 3-18-96

1 1

b. With the conditions specified in rsmedial action a. m:t on both units:

1 Open IRN-58B(RN Hdr B.Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to  ;

SNSWP), OR. enter Technical Specification 3.0.3 for both units.

j l

l TESTING REQUIREMENIS: '

l Perform channel calibrations per IP/1(2)/B/3112/04 as required. I l

REFERENCES. l i

l

! 1) NRC Inspection Report,50-413,414/94-17, September 9,1994  !

! l l 2) . Catawba Nuclear Station PIP 0-C94-1555 l- BASES-l l

The bases for this Selected License Commitment is stated in reference 1, page 11,"Part of the licensing bases of the RN system included the ability for operators to manually change the discharge path for the RN system from the non-safety related Lake Wylie to the safety related SNSWP."

This Selected License Commitment was developed to address the NRC concerns about actions to pg be taken in the event instrumentation / alarms were out of service which would impair the ability l

. V of Operations to recognize loss of the non-safety discharge. This SLC shall ensure the proper actions are taken based on plant equipment conditions.

I i

I i

l I

LO CHAPTER 16.7 Page 17 3-18-96

I

' l ll l  !

Duke fourr Company (803)831 3000 Catawba NuclearStation 4R00 Concord Road

)*o rk. SC29745 0-- l April 3,1996 i

RE: Catawba Nuclear Station  :

Selected License Commitment I Section 16.7-6 RN Discharge Instrumentation Please add the following pages in the Selected License Commitment manual.

l 16.7-6 is a new Selected License Commitment. '

Remove Insert LOEP 1 - 11 LOEP 1 - 11 Section 16.7-6 Pages 16 - 17 If you have any questions concerning contents of this package update, contact the undersigned at (803) 831-3640.

M.S. Kitlan, Manager bd h L By: Barbara S. Asbury y l l Regulatory Compliance i j Attachments l '

\

c I

DUKE POWER COMPANT

/ SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages LOEP1 02/08/96 LOEP2 08/28/95 LOEP 3 08/28/95 l LOEP 4 08/28/95

! 1 l

LOEP 5 08/28/95 l I

I LOEP 6 08/28/95 )

i l LOEP 7 08/28/95 LOEP 8 08/28/95 l

LOEP 9 08/28/95 Tab 16.0 l 16.0-1 06/23/93 I Tab 16.1 l

16.1-1 06/23/93 l Tab 16.2 l

16.2-1 11/91 l

16.2-2 11/91 16.2-3 11/91 lO Page1 03/18/96

DUKE POWER COMPANY 4

O SELECTED LICENSEE COMMITMENTS MANUAL i List of Effective Pages

. Tab 16.3 I i 16.3-1 11/91 1

16.3-2 11/91 '

Table 16.3-1 11/91 Tab 164 Tab 16.5 16.5-1 11/91 O 16.5-2 11/91 16.5-3 11/91 Tab 16.6 Tab 16.7 Page 1 08/20/95 Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 i Page 5 08/20/95

~

O Page 2 03/18/96

._ ~. ._ _ . . _ . . _ . . _

DUKE POWER COMPANY

'O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 6 08/20/95 Page 7 08/20/95 Page 8 08/20/95 Page 9 08/20/95 Page 10 08/20/95 Page11 08/20/95 Page 12 08/20/95 Page 13 08/20/95 Page 14 02/08/96 Page 15 02/08/96  !

l Page 16 03/18/96 Page 17 03/18/96 Tab 16.8

, Page1 06/20/94 Page 2 06/20/94 Page 3 06/20/94

Page 4 06/20/94 O Page 3 03/l8/96

DUKE POWER COMPANY

'O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l

i

[

Page 5 06/20/94 Page 6 06/20/94 Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 Page 10 06/20/94 I

Page11 06/20/94 3 Page 12 06/20/94 Page 13 06/20/94 1

Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 17 06/20/94 Page 18 06/20/94 Page 19 06/20/94 Page 20 06/20/94 l l

Page 21 06/20/94

. Page 22 06/20/94 i.

Page 4 03/18/96 l

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pcges Page 23 06/20/94 Page 24 06/20/94 Page 25 06/20/94 Page 26 08/30/94 Page 27 08/30/94 Page 28 08/30/94 Page 29 08/30/94 Page 30 08/30/94 Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94 Page 34 08/30/94 Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94 O Page 5 03/18/96

I l DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL l List of Effective Pages Page 40 08/30/94 Page 41 08/30/94 Page 42 05/30/94 Page 43 08/30/94 Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94 Page 47 08/30/94 .

l -

Page 48 08/30/94 '

Tab 16.9 16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96 16.9-3 Page 1 - 3 01/30/96 16.9-4 Page 1 - 5 01/30/96

16.9-5 l Page 1 - 6 01/30/96

.O i Page 6 03/18/96 l

l . - _ _ _

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL i

List of Effective Pages 16.9-6 Page 1 - 8 01/30/96 Tab 16.10 16.10-1 02/91 16.10-2 02/91 Tab 16.1i 16.11-1 08/01/94 16.11-2 08/01/94 16.11-3 09/23/94 16.11-4 08/01/94

'6.11-5

, 08/01/94 16.11-6 08/01/94 16.Il-7 08/01/94 16.11-8 08/01/94 16.11-9 08/01/94 16.11-10 08/01/94 16.11-11 08/01/94 16.11-12 08/01/94 O Page 7 03/18/96 l

i DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL ,

1 l

List of Effective Pages 1

16.11-13 08/01/94 16.11-14 08/01/94 16.I l-15 06/23/94 16.11-16 08/01/94 16.11-17 08/01/94 16.11-l8 08/01/94 16.11-19 08/01/94 16.11-20 08/01/94 16.11-21 08/01/94 16.11-22 08/01/94 16.11-23 08/01/94 16.11-24 08/01/94 16.11-25 08/01/94 l 16.11-26 08/01/94 16.11-27 08/01/94 4

16.11-28 08/01/94 16.Il-29 08/01/94 O Page 8 03/18/96

l O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL j List of Effective Pages l 16.11-30 08/01/94 i

16.11-31 08/01/94 16.11-32 08/01/94 l

16.11-33 08/01/94 16.11-34 08/01/94 16.11-35 08/01/94 16.11-36 08/01/94 16.11-37 08/01/94 O 16.11-38 08/01/94 16.11-39 08/01/94 16.11-40 08/01/94 i 16.11-41 08/01/94 16.11-42 08/01/94 16.11-43 08/01/94 I 16.11-44 08/01/94 16.11-45 08/01/94 16.11-46 08/01/94 16.11 47 08/01/94 lO Page 9 03/18/96 l

w-- y a- - , , - ---

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL

List of Effective Pages I

l l

16.11-48 08/01/94 )

16.11-49 08/01/94 16.11-50 08/01/94 l

l 16.11-51 08/01/94 l

l 16.11-52 08/01/94 16.11-53 08/01/94 I

l l

16.11-54 08/01/94 16.11-55 08/01/94 16.11-56 08/01/94 j 16.11-57 08/01/94 16.11-58 08/01/94 16.11-59 08/01/94 16.11-60 08/01/94 16.11-61 08/01/94 16.11-62 08/01/94 16.11-63 08/01/94 l

16.11-64 08/01/94 lO Page 10 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-65 08/01/94 t

l l

Tab 16.12 l

Tab 16.13 16.13-0 12/90 16.13-1 12/90 Tab 16.14 Tab 16.15 O Apnendix Compliance Function Area Manual, Section 3.8

" Selected Licensee Commitments" lO

! Page 11 03/18/96

l Ifil INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION I

( COMMITMENT:

l l The following shall be OPERABLE:

l l Instrument Components:

j Loops:

1RNFE7520, RN Pump A Discharge Flow Annubar i 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow l 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) 1RNFE7510 RN Pump B Discharge Flow Annubar 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication)  ;

\ l l 2RNFE7510 RN Pump B Discharge Flow Annubar I i 2RNLP7510 2RNFT7510 RN Pump B Discharge Flow l 2RNP7510 RN Pump B Discharge Flow (Control Room Indication) l

l. Annunciators:

l 1AD12-N1 RN Pump A Flow H&w i 1AD12-A/4 RN Pump B Flow H&w l 2AD12-N1 RN Pump A Flow Hhw  !

2AD12-N4 RN Pump B Flow H&w  ;

\

l APPLICABII ITY:

Any time the associated pump is required to be OPERABLE.

REMEITIAL ACTION:

a. With any component on both trains of the above listed instrument loops associated with the same unit inoperable DB both annunciators associated with the same unit inoperable DB any component of one instrument loop and one annunciator from different trains associated with the same unit inoperable:

For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12-N1 and 4

1AD12 N4 DE 1RNFT7520 and 1AD12-N4.

Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN 63A(RN Hdr A Rtn to SNSWP), OR. enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on RN for the affected unit.

CHAPTER 16.7 Page 16 3-18-96

r

b. With the conditions specified in remedial cction a. mrt on both units:

Open IRN-58B(RN Hdr B Rtn to SNSWP) and IRN-63A(RN Hdr A Rtn to SNSWP), .0B enter Technical Specification 3.0.3 for both units.

TESTING REQUIREMENTS:

Perform channel calibrations per IP/1(2)/B/3112/04 as required. I t

REFERENCES:

1) NRC Inspection Report,50-413,414/94-17, September 9,1994
2) Catawba Nuclear Station PIP 0-C94-1555 l

l l BASES-I l l The bases for this Selected License Commitment is stated in reference 1, page 11, "Part of the l licensing bases of the RN system included the ability for operators to manually change the ,

l- discharge path for the RN system from the non-safety related Lake Wylie to the safety related l SNSWP."

l l This Selected License Commitment was developed to address the NRC concerns about actions to O of Operations to recognize loss of the non-safety discharge. This SLC shall e actions are taken based on plant equipment conditions.

l l

\

l l

I 1

I 1

i

!o l CHAPTER 16.7 Page 17 3-18-96

l ll l l

l Duke Iburr Company (803)831 3000 Catawba Nuclear Statson 4800 Concord Road krk. SC 29745 l g--

l April 3,1996 RE: Catawba Nuclear Station Selected License Commitment Section 16.7-6 RN Discharge Instrumentation Please add the following pages in the Selected License Commitment manual.

16.7-6 is a new Selected License Commitment.  ;

i Remove Insert l l

LOEP 1 - 11 LOEP 1 - 11 i

! Section 16.7-6 Pages 16 - 17 If you have any questions conceming contents of this package update, contact the undersigned at (803) 831-3640.

l M.S. Kitlan, Mar.ager hl{0lA O l

l l

By: Barbara S. Asbury Regulatory Compliance Attachments 4

O

l l

l l

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL l List of Effective Pages LOEP1 02/08/96 l

LOEP 2 08/28/95 LOEP 3 08/28/95

' l' LOEP4 08/2'8/95 LOEP 5 08/28/95 LOEP 6 08/28/95 LOEP 7 08/28/95  !

l LOEP 8 08/28/95  !

I LOEP 9 08/28/95 Tab 16.0 16.0-1 06/23/93 l

Tab 16.1 16.1-1 06/23/93 l

Tab 16.2 l 16.2-1 11/91 16.2-2 11/91 i

1 16.2-3 11/91 I

l

O Page1 03/18/96 l

i - , _-

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.3 16.3-1 11/91 16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 Tab 16.5 16.5-1 11/91 16.5-2 11/91 16.5-3 11/91 Tab 16.6 Tab 16.7 Page 1 08/20/95 Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 Page 5 08/20/95 O Page 2 03/18/96

1 i

i DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 6 08/20/95 Page 7 08/20/95 Page 8 08/20/95 Page 9 08/20/95 Page 10 08/20/95 Page11 08/20/95 l

Page 12 08/20/95 Page 13 08/20/95 1

Page 14 02/08/96 Page 15 02/08/96 Page 16 03/18/96 l Page 17 03/18/96 l Tab 16.8 Page1 06/20/94 Page 2 06/20/94 Page 3 06/20/94 l Page 4 06/20/94

O  !

Page 3 03/18/96

- DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 5 06/20/94 Page 6 06/20/94 Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 Page 10 06/20/94 Page11  % /20/94 Page 12 06/20/94 Page 13 06/20/94 Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 17 06/20/94 Page 18 06/20/94

Page 19 06/20/94 1 Page 20 06/20/94
Page 21 06/20/94 Page 22 06/20/94

!O Page 4 03/18/96

~I DUKE POWER COMPANY O SELF,CTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 23 06/20/94 Page 24 06/20/94 l

Page 25 06/20/94 Page 26 08/30/94 Page 27 08/30/94 Page 28 08/30/94 Page 29 08/30/94 Page 30 08/30/94 Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94 Page 34 08/30/94 Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94 O Page 5 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages i

Page 40 08/30/94 l l

Page 41 08/30/94 l

Page 42 08/30/94 Page 43 08/30/94 Page 44 08/30/94 ,

l Page 45 08/30/94 Page 46 08/30/94  :

Page 47 08/30/94 Page 48 08/30/94 Tab 16.9 16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96 l

16.9-3 Page 1 - 3 01/30/96 1 16.9-4 Page 1 - 5 01/30/96 16.9-5 Page 1 - 6 01/30/96 O Page 6 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.9-6 Page 1 - 8 01/30/96 Tab 16.10 16.10-1 02/91 16.10-2 02/91 Tab 16.11 16.11-1 08/01/94 16.11-2 08/01/94 i

16.11-3 09/23/94 16.11-4 08/01/94 16.11-5 08/01/94 l

16.11-6 08/01/94 16.11-7 08/01/94 16.11-8 08/01/94 16.11-9 08/01/94 16.11-10 08/01/94 16.11-11 08/01/94 i

16.11-12 08/01/94 i O Page 7 03/18/96

V DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL i

j List of Effective Pages l

l l

16.11-13 08/01/94 )

16.11-14 08/01/94 1

i 16.11-15 06/23/94 i

l 16.11-16 08/01/94 16.11-17 08/01/94 16.11-l8 08/01/94 I

16.11-19 08/01/94

( < 16.11-20 08/01/94 16.11-21 08/01/94 16.I l-22 08/01/94 16.11-23 08/01/94 16.11-24 08/01/94 16.11-25 08/01/94 16.11-26 08/01/94 I6.11-27 08/01/94 16.I l-28 08/01/94 i

j 16.11-29 08/01/94 I

O Page 8 03/18/96

{ DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 1

16.11-30 08/01/94 16.11-31 08/01/94 16.11-32 08/01/94 l

16.11-33 08/01/94 16.11-34 08/01/94 16.11-35 08/01/94 l

16.11-36 08/01/94 16.11-37 08/01/94 O 16.11-38 08/01/94 16.11-39 08/01/94 16.11-40 08/01/94 16.I1-41 08/01/94 16.11-42 08/01/94 16.11-43 08/01/94 16.11-44 08/01/94 16.11-45 08/01/94 l 16.11-46 08/01/94 16.11-47 08/01/94 O Page 9 03/18/96

l i

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l

16.11-48 08/01/94 16.11-49 08/01/94 16.11-50 08/01/94 16.11-51 08/01/94 16.11-52 08/01/94 16.11-53 08/01/94 16.11-54 08/01/94 i

s 16.11-55 08/01/94 16.11-56 08/01/94 16.11-57 08/01/94 i

16.11-58 08/01/94 l

16.11-59 08/01/94 16.11-60 08/01/94 16.11-61 08/01/94 16.11-62 08/01/94 16.11-63 08/01/94 j 16.11-64 08/01/94 iO Page 10 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-65 08/01/94 Tab 16.12 Tab 16.13 16.13-0 12/90 16.13-1 12/90 Tab 16.14 Tab 16.15 0 Anpend.ix Compliance Function Area Mar.u? Section 3.8

" Selected Licensee Commitmerts" Page11 03/18/96

ifL2 INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION COMMITMENT:

The following shall be OPERABLE:

Instrument Components: l Loops: 1 1RNFE7520 RN Pump A Discharge Flow Annubar 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow ,

1RNP7520 RN Pump A Discharge Flow (Control Room Indication)  !

l 1RNFE7510 RN Pump B Discharge Flow Annubar 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) 2RNFE7510 RN Pump B Discharge Flow Annubar 2RNLP7510 2RNFT7510 RN Pump B Discharge Flow 2RNP7510 RN Pump B Discharge Flow (Control Room Indication)

A Annunciators:

V 1AD12-A/1 RN Pump A Flow H&w 1AD12-N4 RN Pump B Flow H&w 2AD12 A/1 RN Pump A Flow H&w 2AD12-N4 RN Pump B Flow H&w APPLICABil.ITY:

Any time the associated pump is required to be OPERABLE.

REMEDIAL ACTION:

a. With any component on both trains of the above listed instrument loops associated  !

with the same unit inoperable DE both annunciators associated with the same unit l inoperable DB any component of one instrument loop and one annunciator from different <

trains associated with the same unit inoperable:

For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12-A/1 and l 1AD12-A/4 DE 1RNFT7520 and 1AD12 A/4.

Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to O SNSWP), DR. enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on RN for the affected unit.

CHAPTER 16.7 Page 16 3-18-96

_a

I

b. With the conditions specified in rem: dial cetion e. mrt on both units:

Open 1RN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), DR. enter Technical Specification 3.0.3 for both units.

TESTING REQUIREMENTS:

Perform channel calibrations per IP/1(2)/B/3112/04 as required.

REFERENCES:

1) NRC Inspection Report,50-413,414/9417, September 9,1994
2) Catawba Nuclear Station PIP 0-C94-1555 BASES The bases for this Selected License Commitment is stated in reference 1, page 11, "Part of the licensing bases of the RN system included the ability for operators to manually change the discharge path for the RN system from the non-safety related Lake Wylie to the safety related '

SNSWP."

l This Selected License Commitment was developed to address the NRC concerns about actions to

(- be taken in the event instrumentation / alarms were out of service which would impair the ability  ;

of Operations to recognize loss of the non-safety discharge. This SLC shall ensure the proper i actions are taken based on plant equipment conditions.

l 1

\

l l

i I

L!

CHAPTER 16.7 Page 17 3-18-96

ll 1 l

l Duke Pouvr Company (803)831J000 Catau'ba Nuclear Statson

  1. 00 Concord Road tork.sC2 sits

! O DUKEPOWER l

)

April 3,1996 l RE: Catawba Nuclear Station I li Selected License Commitment l Section 16.7-6 RN Discharge Instrumentation l l

1

] Please add the following pages in the Selected License Commitment manual. l 16.7-6 is a new Selected License Commitment.

l Remove Insert ,

I i LOEP 1 - 11 LOEP 1 - 11 i 4

O Section 16.7-6 l 4

V Pages 16 - 17 i

i
If you have any questions concerning contents of this package update, contact
the undersigned at (803) 831-3640.

j ,

M.S. Kitlan, Manager l.00lA f

By
Barbara S. Asbury l Regulatory Compliance Attachments d
O ,

~ ~ , - - -  ;

I

l l

l l

l DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l l

LOEP1 02/08/96 LOEP 2 08/28/95 LOEP 3 08/28/95 LOEP 4 08/28/95 LOEP5 08/28/95  :

l LOEP 6 08/28/95 i

LOEP 7 08/28/95 i LOEP 8 08/28/95 1

LOEP 9 08/28/95 Tab 16.0 16.0-1 06/23/93 Tab 16.1 l 1

16.1-1 06/23/93 Tab 16.2 16.2-1 11/91 16.2-2 11/91 16.2-3 11/91 l

l l

lO Page1 03/18/96 j

l l

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.3 16.3-1 11/91 16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 Tab 16.5 16.5-1 11/91 16.5-2 11/91 16.5-3 11/91 Tab 16.6 Tab 16.7 Page 1 08/20/95 Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 Page 5 08/20/95 O Page 2 03/18/96 1

j

I-i i DUKE POWER COMPANY l SELECTED LICENSEE COMMITMENTS MANUAL l

List of Effective Pages Page 6 08/20/95 Page 7 08/20/95 Page 8 08/20/95 Page 9 08/20/95 Page 10 08/20/95 Page11 08/20/95 Page 12 08/20/95 l Page 13 08/20/95 Page 14 02/08/96 Page 15 02/08/96 Page 16 03/18/96 Page 17 03/18/96 Tab 16.8 Page1 06/20/94 i

Page 2 06/20/94 l

l Page 3 06/20/94 Page 4 06/20/94 l l

Page 3 03/18/96 4

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 5 06/20/94 Page 6 06/20/94 l

Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 Page 10 06/20/94 Page11 06/20/94 Page 12 06/20/94 1

Page 13 06/20/94 '

Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 17 06/20/94 Page 18 06/20/94 )

Page 19 06/20/94 Page 20 06/20/94 Page 21 06/20/94 Page 22 06/20/94 i

O Page 4 03/18/96 i

)

""""" """' ""^"'

(J SELECTED LICENSEE COMMITMENTS MANUAL l List of Effective Pages i l

1 Page 23 06/20/94 '

Page 24 06/20/94 1 l

Page 25 06/20/94 l 1

l Page 26 08/30/94 l Page 27 08/30/94 Page 28 08/30/94 Page 29 08/30/94 Page 30 08/30/94 Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94 Page 34 08/30/94 Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94 iO f

Page 5 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 40 08/30/94 Page 41 08/30/94 Page 42 08/30/94 Page 43 08/30/94 Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94 ,

Page 47 08/30/94 Page 48 08/30/94 Tab 16.9 16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96 -

16.9-3 Page 1 - 3 01/30/96 16.9-4 Page 1 - 5 01/30/96 16.9-5 Page 1 - 6 01/30/96 O Page 6 03/18/96 l

I l

O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL i

List of Effective Pages '

16.9-6 Page 1 - 8 01/30!96 Tab 16.10 16.10-1 02/91 16.10-2 02/91 Tab 16.11 16.11-1 08/01/94 16.11-2 08/01/94 O 16.11-3 09/23/94 16.11-4 08/01/94 16.11-5 08/01/94 1 1

i' 16.11-6 08/01/94 16.11-7 08/01/94 16.11 8 08/01/94 I

s6.11-9 08/01/94 16.11-10 08/01/94 16.11-11 08/01/94 16.11-12 08/01/94 O Page 7 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-13 08/01/94 16.11-14 08/01/94 i

16.11-15 06/23/94 l

16.11-16 08/01/94 l l

16.11-17 08/01/94 i

16.11-18 08/01/94 j

16.11-19 08/01/94 16.11-20 08/01/94 16.11-21 08/01/94 16.11-22 08/01/94 16.11-23 08/01/94 16.11-24 08/01/94 16.11-25 08/01/94 i

i 16.11-26 08/01/94 i 16.11-27 08/01/94 i

16.11-28 08/01/94 j 16.11-29 08/01/94 Pitge 3 03/18/96 c

9

1 p DUKE POWER COMPANY l 4

() SELECTED LICENSEE COMMITMENTS MANUAL l List of Effective Pages i

16.11-30 08/01/94 16.11-31 08/01/94 16.11-32 08/01/94 16.11-33 08/01/94 16.11-34 08/01/94 16.11-35 08/01/94 l

16.11-36 08/01/94 16.11-37 08/01/94 O 16.11-38 08/01/94 16.11-39 08/01/94 16.11-40 08/01/94 16.11-41 08/01/94 16.11-42 08/01/94 l

16.11-43 08/01/94 l l

16.11-44 08/01/94 16.11-45 08/01/94 16.11-46 08/01/94 l 16.11-47 08/01/94 O Page 9 03/18/96

O DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-48 08/01/94 16.I1-49 08/01/94 16.11-50 08/01/94 16.11-51 08/01/94 16.11-52 08/01/94 16.11-53 08/01/94 l

16.11-54 08/01/94 16.11-55 08/01/94 16.11-56 08/01/94 i 16.11-57 08/01/94 l 16.11-58 08/01/94 16.11-59 08/01/94 16.11-60 08/01/94 16.11-61 08/01/94 16.11-62 08/01/94

16.11-63 08/01/94 i 16.11-64 08/01/94 4
O' Page 10 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL 1

1 List of Effective Pages i

l6.11-65 08/01/94 Tab 16.12 Tab 16.13 16.13-0 12/90 16.13-1 12/90 l Tab 16.14 I Tab 16.15 l

Apnendix Compliance Function Area Manual, Section 3.8

" Selected Licensee Commitments" l

l l

i l

l I

1 t ,

I

}O Page 11 03/18/96 i

1

Ifil INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION O

V COMMITMENT:

The following shall be OPERABLE:

Instrument Components:

Loops:

1RNFE7520 RN Pump A Discharge Flow Annubar 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) 1RNFE7510 RN Pump B Discharge Flow Annubar 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) l 2RNFE7510 RN Pump B Discharge Flow Annubar i 2RNLP7510 2RNFT7510 RN Pump B Discharge Flow i 2RNP7510 RN Pump B Discharge Flow (Control Room Indication)

(~ s Annunciators: l

\ 1AD12-N1 RN Pump A Flow Hi/ Low '

1AD12-A/4 RN Pump B Flow Hi/ Low l 2AD12-A/1 RN Pump A Flow Hi/ Low I 2AD12-A/4 RN Pump B Flow Hi/ Low APPLICABILITY:

Any time the associated pump is required to be OPERABLE.

l l

l REMEDIAL ACTION:  !

a. With any component on both trains of the above listed instrument loops associated l with the same unit inoperable DE both annunciators associated with the same unit inoperable DE any component of one instrument loop and one annunciator from different trains associated with the same unit inoperable: l For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12-A/1 and 1AD12-A/4 DE 1RNFT7520 and 1AD12-N4.

Open 1RN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), DE_ enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on RN for the affected unit.

CHAPTER 16.7 Page 16 3-18-96

b. With th3 conditions specified in r:mediti ection a. met on both units:

Open IRN-58B(RN Hdr B Rtn to SNSWP) and IRN-63A(RN Hdr A Rtn to SNSWP), DR. enter Technical Specification 3.0.3 for both units.

TESTING REQUIREMENTS:

Perform channel calibrations per IP/1(2)/B/3112/04 as required.

REFERENCES

1) NRC Inspection Report,50-413,414/94-17, September 9,1994
2) Catawba Nuclear Station PIP 0-C94-1555 BASES:

The bases for this Selected License Commitment is stated in reference 1, page 11, "Part of the licensing bases of the RN system included the ability for operators to manually change the discharge path for the RN system from the non-safety related Lake Wylie to the safety related SNSWP."

This Selected License Commitment was developed to address the NRC concerns about actions to -

be taken in the event instrumentation / alarms were out of service which would impair the ability

(')N

( of Operations to recognize loss of the non-safety discharge. This SLC shall ensure the proper {

actions are taken based on plant equipment conditions. l l

CHAPTER 16.7 Page 17 3-18-96

?

\

L ll l i

Duhr Ibarr Company (803)831 3000 Catau ba Nudear Statnon 4800 Concord Road krk. SC 29745 O l M M ER l

April 3,1996 RE: Catawba Nuclear Station Selected License Commitment Section 16.7-6 RN Discharge Instrumentation Please add the following pages in the Selected License Commitment manual.

16.7-6 is a new Selected License Commitment.

Remove insert LOEP 1 - 11 LOEP 1 - 11 Section 16.7-6 O Pages 16 - 17 If you have any questions conceming contents of this package update, contact the undersigned at (803) 831-3640.

M.S. Kitlan, Manager L0.0lA By: Barbara S. Asbury l f y

Regulatory Compliance Attachments i

l t

i

O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages LOEP1 02/08/96 LOEP 2 08/28/95 LOEP 3 08/28/95 LOEP4 08/28/95 LOEP5 08/28/95 LOEP 6 08/28/95 LOEP 7 08/28/95 LOEP 8 08/28/95 LOEP 9 08/28/95 Tab 16.0 16.0-1 06/23/93 Tab 16.1 16.1-1 06/23/93 Tab 16.2 16.2-1 11/91 16.2-2 11/91 16.2-3 11/91 Page 1 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.3 16.3-1 11/91 16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 l

Tab 16.5 16.5-1 11/91 16.5-2 11/91 16.5-3 11/91 Tab 16.6 Tab 16.7 Page 1 08/20/95 Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 Page 5 08/20/95 O Page 2 03/18/96

C DUKE POWER COMPANT SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 6 08/20/95 f

Page 7 08/20/95 i

Page 8 08/20/95 i

Page 9 08/20/95 Page 10 08/20/95 Page11 08/20/95 Page 12 08/20/95

$ Page 13 08/20/95 Page 14 02/08/96 Page 15 02/08/96 4

Page 16 03/18/96

)

Page 17 03/18/96 Tab 16.8 Page 1 06/20/94 Page 2 06/20/94 Page 3 06/20/94 Page 4 06/20/94 Page 3 03/18/96

t DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUA.L

L ist of Effective Pages i

Page 5 06/20/94 Page 6 06/20/94 Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 Page 10 06/20/94 Page11 06/20/94 Page 12 06/20/94 Page 13 06/20/94 Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 17 06/20/94 Page 18 06/20/94 i

Page 19 06/20/94 i Page 20 06/20/94 Page 21 06/20/94 Page 22 06/20/94 O Page 4 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 23 06/20/94 Page 24 06/20/94 Page 25 06/20/94 Page 26 08/30/94 Page 27 08/30/94 Page 28 08/30/94  !

Page 29 08/30/94 Page 30 08/30/94 Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94  ;

Page 34 08/30/94 Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94 O Page 5 03n8/96

1

% DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 40 08/30/94 Page 41 08/30/94 Page 42 08/30/94 l

Page 43 08/30/94 i

Page 44 08/30/94 l I

Page 45 08/30/94 Page 46 08/30/94 )

I Page 47 08/30/94 V Page 48 08/30/94 i

1 Tab 16.9 )

l 16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96 16.9-3 Page 1 - 3 01/30/96 16,9-4  ;

Page 1 - 5 01/30/96 16.9-5 Page 1 - 6 01/30/96 O Page 6 03/18/96

DUKE POWER COMPANY t

SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.9-6 Page 1 - 8 01/30/96 Tab 16.10 l 16.10-1 02/91 16.10-2 02/91 Tab 16.11 16.11-1 08/01/94 16.11-2 08/01/94 O I6.11-3 09/23/94

) 16.11-4 08/01/94 16.11-5 08/01/94 16.11-6 08/01/94 16.11-7 08/01/94 l

16.11-8 08/01/94 l 16.11-9 08/01/94 16.11-10 08/01/94 16.11-11 08/01/94 16.11-12 08/01/94 lO Page 7 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-13 08/01/94 16.11-14 08/01/94 16.11-15 06/23/94 16.11-16 08/01/94 16.11-17 08/01/94 16.11-18 08/01/94 16.11-19 08/01/94 16.11-20 08/01/94 16.11-21 08/01/94  !

16.11-22 08/01/94 l 1

16.11-23 08/01/94 16.11-24 08/01/94 16.11-25 08/01/94 16.11-26 08/01/94 16.11-27 08/01/94 16.11-28 08/01/94 16.11-29 08/01/94 O Page 8 03/18/96

DUKE POWER COMPANY

  • O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-30 08/01/94 16.11-31 08/01/94 16.11-32 08/01/94 16.11-33 08/01/94 16.11-34 08/01/94 l

16.11-35 08/01/94 1 1

16.11-36 08/01/94 16.11-37 08/01/94 O 16.11-38 08/01/94 16.11-39 08/01/94 16.Il-40 08/01/94 16.11-41 08/01/94 16.11-42 08/01/94 16.11-43 08/01/94 16.11-44 08/01/94 i

16.11-45 08/01/94 1 16.11-46 08/01/94 16.11-47 08/01/94 Page 9 03/18/96

. = -. - --. .

/m DUKE POWER COMPANY l\ SELECTED LICENSEE COMMITMENTS MANUAL r

j List of Effective Pages 4

~

l6.11-48 08/01/94 16.11-49 08/01/94 16.11-50 08/01/94 16.11-51 08/01/94 16.11-52 08/01/94 16.11-53 08/01/94 16.11-54 08/01/94 16.11-55 08/01/94 16.11-56 08/01/94 16.11-57 08/01/94 I

16.11-58 08/01/94 i

16.11-59 08/01/94 16.11-60 08/01/94 16.11-61 08/01/94 16.11-62 08/01/94 16.11-63 08/01/94 16.11-64 08/01/94 Page 10 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-65 08/01/94 I

Tab 16.12 i

Tab 16.13 16.13-0 12/90 16.13-1 12/90 Tab 16.14 Tab 16.15 O Appendix Compliance Function Area Manual, Section 3.8

" Selected Licensee Commitments" l

l O Page 11 03/18/96

Ifil INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION C

f} COMMITMENT:

The following shall be OPERABLE:

Instrument Components:

Loops:

1RNFE7520 RN Pump A Discharge Flow Annubar 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) 1RNFE7510 RN Pump B Discharge Flow Armubar 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) 2RNFE7510 RN Pump B Discharge Flow Annubar i 2RNLP7510 2RNFT7510 RN Pump B Discharge Flow '

2RNP7510 RN Pump B Discharge Flow (Control Room Indication)

,G Annunciators:

V 1AD12-N1 RN Pump A Flow Hi/ Low 1AD12-A/4 RN Pump B Flow Hi/ Low 2AD12-A/1 RN Pump A Flow Hi/ Low 2AD12-N4 RN Pump B Flow Hi/ Low l APPLICABILITY:

Any time the associated pump is required to be OPERABLE.

REMEDIAL ACTION:

i

a. With any component on both trains of the above listed instrument loops associated I with the same unit inoperable DB both annunciators associated with the same unit inoperable DB any component of one instrument loop and one annunciator from different trains associated with the same unit inoperable:

For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12 N1 and 1AD12-A/4 DE 1RNFT7520 and 1AD12-N4.

Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to O SNSWP), DE_ enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on RN for the affected unit.

CHAPTER 16.7 Page 16 3-18-96

E

b. With the conditions specifi d in r: medial action a. m t on both units:

Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to

- SNSWP), OR. enter Technical Specification 3.0.3 for both units.

TESTING REQUIREMENTS:

Perform channel calibrations per IP/1(2)/B/3112/04 as required.

REFERENCES:

1) NRC Inspection Report,50-413,414/94-17, September 9,1994
2) Catawba Nuclear Station PIP 0-C94-1555 BASES:

The bases for this Selected License Commitment is stated in reference 1, page 11, "Part of the licensing bases of the RN system included the ability for operators to manually change the discharge path for the RN system from the non-safety related Lake Wylic to the safety related SNSWP."

This Selected License Commitment was developed to address the NRC concerns about actions to p be taken in the event instrumentation / alarms were out of service which would impair the ability

( of Operations to recognize loss of the non-safety discharge. This SLC shall ensure the proper actions are taken based on plant equipment conditions.

O CHAPTER 16.7 Page 17 3-18-96

1 ll l i l

Date Pouer Company (803)83).3000 Catawba Nuclear Statson 4800 Concord Road York. SC29745 g--

l l

April 3,1996 RE: Catawba Nuclear Station Selected License Commitment Section 16.7-6 RN Discharge Instrumentation Please add the following pages in the Selected License Commitment manual.

16.7-6 is a new Selected License Commitment.

Remove Insert I LOEP 1 - 11 LOEP 1 - 11 l

Section 16.7-6 lO l

Pages 16 - 17 l

l If you have any questions concerning contents of this package update, contact i the undersigned at (803) 831-3640. i l

M.S. Kitlan, Manager 4.[.O/d h By: Barbara S. Asbury Regulatory Compliance Attachments l

!O l l

.- ~

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages LOEP1 02/08/96 LOEP 2 08/28/95 LOEP3 08/28/95 LOEP 4 08/28/95 '

LOEP5 08/28/95 LOEP 6 08/28/95 LOEP 7 08/28/95  !

LOEP 8 08/28/95 LOEP 9 08/28/95 Tab 16.0 16.0-1 06/23/93 Tab 16.1 16.1-1 06/23/93 Tab 16.2 16.2-1 11/91 16.2-2 11/91 16.2-3 11/91 O Page1 03/18/96

4 DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.3 16.3-1 11/91 16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 Tab 16.5 16.5-1 11/91 16.5-2 11/91 16.5-3 11/91 Tab 16.6 Tab 16.7 Page 1 08/20/95 Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 Page 5 08/20/95 O Page 2 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 6 08/20/95 Page 7 08/20/95 Page 8 08/20/95 Page 9 08/20/9S j Page 10 08/20/95 i

Page11 08/20/95 Page 12 08/20/95 Page 13 08/20/95

Page 14 02/08/96 j Page 15 02/08/96 Page 16 03/18/96 4 Page 17 03/18/96 Tab 16.8 Page 1 06/20/94 Page 2 06/20/94 Page 3 06/20/94 Page 4 06/20/94 O Page 3 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 5 06/20/94 Page 6 06/20/94 Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 i

Page 10 06/20/94 l Page11 06/20/94 l

Page 12 06/20/94 Page 13 06/20/94 Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 17 06/20/94 Page 18 06/20/94 Page 19 06/20/94 Page 20 06/20/94 Page 21 06/20/94 Page 22 06/20/94 Page 4 03/18/96 I

l DUKE POWER COMPANY

SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 23 - 06/20/94 Page 24 06/20/94 Page 25 06/20/94

, Page 26 08/30/94 i

i Page 27 08/30/94 l Page 28 08/30/94 Page 29 08/30/94 Page 30 08/30/94 Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94  !

Page 34 - 08/30/94 i

Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94 O Page 5 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 40 08/30/94 Page 41 08/30/94 Page 42 08/30/94 Page 43 08/30/94 Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94 Page 47 08/30/94 O

08/30/94 Page 48 Tab 16.9 16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96 16.9-3 Page 1 - 3 01/30/96 16.9-4 Page 1 - 5 01/30/96 16.9-5 Page 1 - 6 01/30/96 O Page 6 03/18/96 a

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.9-6 Page 1 - 8 01/30/96 Tab 16.10 16.10-1 02/91 16.10-2 02/91 Tab 16.11 16.11-1 08/01/94 16.11-2 08/01/94 O 16.11-3 09/23/94 16.11-4 08/01/94 16.11-5 08/01/94 16.11-6 08/01/94 16.11-7 08/01/94 16.11-8 08/01/94 16.11-9 08/01/94 16.11-10 08/01/94 16.11-11 08/01/94 16.11-12 08/01/94 O Page 7 03/18/96

-- - -,y

t 1

DUKE POWER COMPANY l SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l

16.11-13 08/01/94 16.11-14 08/01/94 16.11-15 06/23/94 16.11-16 08/01/94 16.11-17 08/01/94 16.11-18 08/01/94 ,

i 16.11-19 08/01/94 i

i 16.11-20 08/01/94 16.11-21 08/01/94 16.11-22 08/01/94 16.11-23 08/01/94 16.11-24 08/01/94 16.11-25 08/01/94 16.11-26 08/01/94 16.11-27 08/01/94 16.11-28 08/01/94 16.11-29 08/01/94 lO Page 8 03/18/96 1

l

1 l

7 DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL j List of Effective Pages f

16.11-30 08/01/94 l l

16.11-31 08/01/94 16.11-32 08/01/94  ;

i 16.11-33 08/01/94 16.11-34 08/01/94 l

16.11-35 08/01/94 t

j 16.11-36 08/01/94 l 16.11-37 08/01/94 16.11-38 08/01/94 l

16.11-39 08/01/94 16.11-40 08/01/94 16.11-41 08/01/94

! l6.11-42 08/01/94 16.11-43 08/01/94 16.11-44 08/01/94 l 16.11-45 08/01/94 16.11-46 08/01/94 16.11-47 08/C1/94 f

iO I Page 9 03/18/96

l DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 1-i t

16.11-48 08/01/94 16.11-49 08/01/94 -

l6.11-50 08/01/94 16.11-51 08/01/94 16.11-52 08/01/94 l

16.11-53 08/01/94 l

l 16.11-54 08/01/94 i 16.11-55 08/01/94 16.11-56 08/01/94 16.11-57 08/01/94 16.11-58 08/01/94 16.11-59 08/01/94 16.11-60 08/01/94 16.11-61 08/01/94 16.11-62 08/01/94 16.11-63 08/01/94 16.11-64 08/01/94 l

lO ......

r DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages '

16.11-65 08/01/94 Tab 16.12 1

Tab 16.13 16.13-0 12/90 i

16.13-1 12/90 l Tab 16.14 1

Tab 16.15 Anoenda.

Compliance Function Area Manual, Section 3.8 l " Selected Licensee Commitments" l

I l

l l

lO l

Page 11 03/18/96 1

1 Ifil INSTRUMENTATION )

l 16.7-6 RN DISCHARGE INSTRUMENTATION l O '

V COMMITMENT:

. The following shall be OPERABLE:

l Instrument Components: ,

l Loops:

1RNFE7520 RN Pump A Discharge Flow Annubar 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) 1RNFE7510 RN Pump B Discharge Flow Annubar 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow l

1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) 2RNFE7510 RN Pump B Discharge Flow Annubar 2RNLP7510 2RNFT7510 RN Pump B Discharge Flow 2RNP7510 RN Pump B Discharge Flow (Control Room Indication)

N ' Annunciators:

1AD12-N1 RN Pump A Flow Hi/ Low 1AD12-N4 RN Pump B Flow Hi/ Low 2AD12-N1 RN Pump A Flow Hi/ Low 2AD12-N4 RN Pump B Flow Hi/ Low APPLICABILITY:

I Any time the associated pump is required to be OPERABLE.

REMEDIAL ACTION:

a. With any component on both trains of the above listed instrument loops associated with the same unit inoperable DR both annunciators associated with the same unit inoperable DB any component of one instrument loop and one annunciator from different trains associated with the same unit inoperable:

I l For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12-N1 and l 1AD12-N4 QB 1RNFT7520 and 1AD12-N4.

i Open 1RN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to

. SNSWP), DE_ enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on l RN for the affected unit.

CHAPTER 16.7 Page 16 3-18-96

l i

b. With the conditions specified in remedial action a. met on both units:

Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN 63A(RN Hdr A Rtn to SNSWP), DE_ enter Technical Specification 3.0.3 for both units.

TESTING REQUIREMENTS:

Perform channel calibrations per IP/1(2)/B/3112/04 as required. I

REFERENCES:

1) NRC Inspection Report,50-413,414/94-17, September 9,1994 l
2) Catawba Nuclear Station PIP 0-C94-1555 i I

BASES:

The bases for this Selected License Commitment is stated in reference 1, page 11, "Part of the licensing bases of the RN system included the ability for operators to manually change the discharge path for the RN system from the non-safety related Lake Wylie to the safety related S N S W P."

' This Selected License Commitment was developed to address the NRC concerns about actions to -

be taken in the event instrumentation / alarms were out of service which would impair the ability O. of Operations to recognize loss of the non-safety discharge. This SLC shall ensure the proper actions are taken based on plant equipment conditions, i

l O

CHAPTER 16.7 Page 17 3-18-96

- . _._.-...-... ._ . - .. ... .... __... -..-. - . . . . . ~ - - - - . _ , _ . . __

ll l l Duke Pbwer Company (803)831 3000 Catawba Nuclear Station 4800 Concord Road

>brk. SC 29.~45

, DUKEPOWER April 3,1996 RE: Catawba Nuclear Station Selected License Commitment Section 16.7-6 RN Discharge Instrumentation l

Please add the following pages in the Selected License Commitment manual.

16.7-6 is a new Selected License Commitment.

Remove Insert LOEP 1 - 11 LOEP 1 - 11  ;

Section 16.7-6 O Pages 16 - 17 1

If you have any questions concerning contents of this package update, contact the undersigned at (803) 831-3640.

l M.S. Kitlan, Manager

$0lA h I By: Barbara S. Asbury Regulatory Compliance Attachments O

l DUKE POWER COMPANY l v SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l

LOEP1 02/08/96 i

LOEP 2 08/28/95 '

LOEP 3 08/28/95 LOEP 4 08/28/95 l

LOEP 5 08/28/95 l

l LOEP 6 - 08/28/95 i LOEP 7 08/28/95 l l l LOEP 8 08/28/95 l

LOEP 9 08/28/95 l

l Tab 16.0 16.0-1 06/23/93 Tab 16.1 l 16.1-1 06/23/93 l

Tab 16.2 16.2-1 11/91 l 16.2-2 11/91 l

l 16.2-3 11/91 i

iO Page 1 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Tab 16.3 16.3-1 11/91 16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 Tab 16.5 16.5-1 11/91 l

16.5-2 11/91 I

16.5-3 11/91 l Tab 16.6 l

Tab 16.7 Page 1 08/20/95 Page 2 08/20/95 Page 3 08/20/95 Page 4 08/20/95 Page 5 08/20/95 l

O Page 2 03/18/96

DUKE POWER COMPANY l

O' SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l

l Page 6 08/20/95 Page 7 08/20/95 Page 8 08/20/95 Page 9 08/20/95 Page 10 08/20/95 Page11 08/20/95 Page 12 08/20/95 Page 13 08/20/95 Page 14 02/08/96 Page i3 02/08/96 Page 16 03/18/96 l

l Page 17 03/18/96 Tab 16.8 j Page1 06/20/94 Page 2 06/20/94 l l 06/20/94 Page 3 Page 4 06/20/94 l

lO Page 3 03/18/96

--- . _ - . . . - . _ . - - . . . = . . - . - _ - - . . . - . - . _ - _ - _ _ ._. . .. - . .

l l

l l

DUKE POWER COMPANY I

SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 5 06/20/94 Page 6 06/20/94 Page 7 06/20/94 j Page 8 06/20/94 Page 9 08/30/94 l

Page 10 06/20/94 l Page11 06/20/94 l Page 12 06/20/94 l

l v Page 13 06/20/94 Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 17 06/20/94 Page 18 06/20/94

Page 19 06/20/94 i

Page 20 06/20/94 Page 21 06/20/94 l Page 22 06/20/94 iO Page 4 03/18/96

( DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l

l Page 23 06/20/94 Page 24 06/20/94 Page 25 06/20/94 Page 26 08/30/94  ;

Page 27 08/30/94 Page 28 08/30/94 Page 29 08/30/94 ,

l Page 30 08/30/94 Page 31 08/30/94 )

Page 32 08/30/94 Page 33 08/30/94 Page 34 08/30/94 l

i Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 j l

l Page 38 08/30/94 Page 39 08/30/94 i

'O Page 5 03/18/96

I l

l DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 1 1

i Page 40 08/30/94  !

Page 41 08/30/94 Page 42 08/30/94 Page 43 08/30/94 l

Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94 Page 47 08/30/94 lO Page 48 08/30/94 l

Tab 16.9 16.9-1 Page 1 - 4 01/30/96

! 16.9-2 Page 1 - 4 01/30/96 l

l l 16.9-3 l Page 1 - 3 01/30/96 16.9-4 Page 1 - 5 01/30/96 16 9-5 Page 1 - 6 01/30/96 O Page 6 03/18/96

l l

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL l

i l List of Effective Pages l l 16.9-6

Page 1 - 8 01/30/96 l

Tab 16.10 i 16.10-1 02/91 16.10-2 02/91 Tab 16.11 l 16.11-1 08/01/94 i I6.11-2 08/01/94

.O 16.11-3 09/23/94 16.11-4 08/01/94 16.11-5 08/01/94 16.11-6 08/01/94 16.11-7 08/01/94 16.11 08/01/94 16.11-9 08/01/94 i

16.11-10 08/01/94

l. 16.11-11 08/01/94 16.11-12 08/01/94 lO

! Page 7 03/18/96 l

. - . . - . . - . . = - - _ _ . - . . . - - - - - .

l DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages I

16.11-13 08/01/94 16.11-14 08/01/94 l 16.11-15 06/23/94 16.11-16 08/01/94 16.11-17 08/01/94 16.11-18 08/01/94 16.11-19 08/01/94 l l

16.11-20 08/01/94 16.11-21 08/01/94 l 16.11-22 08/01/94 16.I1-23 08/01/94 l 1 ,

1 16.11-24 08/01/94 l 16.11-25 08/01/94 i

l l 16.11-26 08/01/94 16.11-27 08/01/94 16.11-28 08/01/94

, 16.11-29 08/01/94 i

iO I Page 8 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-30 08/01/94 16.11-31 08/01/94 16.11-32 08/01/94 16.11-33 08/01/94 j 16.11-34 08/01/94 16.11-35 08/01/94 1

16.11-36 08/01/94 i 16.11-37 08/01/94 O 16.I1-38 08/01/94 16.11-39 08/01/94 16.Il-40 08/01/94 16.11-41 08/01/94 16.11-42 08/01/94 l 16.11-43 08/01/94 16.11-44 08/01/94

, 16.11-45 08/01/94 l

16.11-46 08/01/94 l 16.11-47 08/01/94

!O Page 9 03/18/96

7 .-

I DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-48 08/01/94 16.11-49 08/01/94 16.11-50 08/01/94 16.11-51 08/01/94 I l

l 16.11-52 08/01/94 16.11-53 08/01/94 16.11-54 08/01/94 16.11-55 08/01/94 16.11-56 08/01/94 16.11-57 08/01/94 16.11-58 08/01/94 l

16.11-59 08/01/94 16.11-60 08/01/94 16.11-61 08/01/94 16.11-62 08/01/94 16.11-63 08/01/94

! 16.11-64 08/01/94 I

iO Page 10 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-65 08/01/94 Tab 16.12 Tab 16.13 16.13-0 12/90 16.13-1 12/90 Tab 16.14 Tab 16.15 O

O Apnend-n Compliance Function Area Manual, Section 3.8

" Selected Licensee Commitments" I

l Page 11 03/18/96

ifLZ INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION

/ '

COMMITMENT:

The following shall be OPERABLE:

Instrument Components:

Loops:

1RNFE7520 RN Pump A Discharge Flow Annubar 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) l 1RNFE7510 RN Pump B Discharge Flow Annubar 1RNLP7510 1RNFI'7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar l 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) 2RNFE7510 RN Pump B Discharge Flow Annubar 2RNLP7510 2RNFT7510 RN Pump B Discharge Flow ,

2RNP7510 RN Pump B Discharge Flow (Control Room Indication) l l

A Annunciators:

i V 1AD12-N1 RN Pump A Flow Hhw l 1AD12-N4 RN Pump B Flow HLw  ;

2AD12-N1 RN Pump A Flow Hhw

{

, 2AD12-N4 RN Pump B Flow HLw l l

l APPLICABTI TTY:

l Any time the associated pump is required to be OPERABLE.

REMEDIAL ACTION:

a. With any component on both trains of the above listed instrument loops associated with the same unit inoperable DE both annunciators associated with the same unit inoperable DE any component of one instrument loop and one annunciator from different trains associated with the same unit inoperable: l For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12-N1 and i 1AD12 A/4 DE 1RNFT7520 and 1AD12-A/4.

1 Open 1RN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), DB_ enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on l RN for the affected unit.

I CHAPTER 16.7 Page 16 3-18-96

1

b. With the conditions specified in remedial action a. met on both units:

Open 1RN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), .QR_ enter Technical Specification 3.0.3 for both units.

TESTING REQUIREMENTS:

Perform channel calibrations per IP/1(2)/B/3112/04 as required.

REFERENCES:

1)' NRC Inspection Report,50-413,414/94-17, September 9,1994

2) Catawba Nuclear Station PIP 0-C94-1555 BASES-The bases for this Selected License Commitment is stated in reference 1, page 11, "Part of the licensing bases of the RN system included the ability for operators to manually change the discharge path for the RN system from the non safety related Lake Wylie to the safety related SNSWP."

i This Selected License Commitment was developed to address the NRC concerns about actions to be taken in the event instrumentation / alarms were out of service which would impair the ability of Operations to recognize loss of the non-safety discharge. This SLC shall ensure the proper actions are taken based on plant equipment conditions.

. l l

l l

I l

l r

I l

4

, CHAPTER 16.7 Page 17 3-18-96

.. .. - . . . .. - _.. _..~ . . . . . .- - -. - -.-

Il I Duke 1%urr Corapany (803)831 3000 Catattba Nuclear Station

  1. 00 Concord Road  ;

York. SC29745 O l

, DUKEPOWER April 3,1996 RE: Catawba Nuclear Station Selected License Commitment Section 16.7-6 RN Discharge Instrumentation Please add the following pages in the Selected License Commitment manual.

16.7-6 is a new Selected License Commitment.

Remove insert LOEP 1 - 11 LOEP 1 - 11 Section 16.7-6 O Pages 16 - 17 If you have any questions concerning contents of this package update, contact the undersigned at (803) 831-3640.

M.S. Kitlan, Manager LLNlA l By: Barbara S. Asbury Regulatory Compliance Attachments l 1 l

I i

1 1

!O l

s -wr :e me.cx car

4

O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL i List of Effective Pages LOEP1 02/08/96 LOEP2 08/28/95 l J '

l LOEP 3 08/28/95 l

. 1 LOEP4 08/28/95 i LOEP 5 08/28/95

. LOEP 6 08/28/95 1

! LOEP 7 08/28/95 i LOEP 8 08/28/95 LOEP 9 08/28/95 )

l

Tab 16.0 16.0-1 06/23/93 l

i Tab 16.1 1

16.1-1 06/23/93 1

Tab 16.2 )

! i

[

16.2-1 11/91 i i 16.2-2 11/91 l 16.2-3 11/91 l i,

i O Page1 03/18/96 j

i o

r , , .

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL i List of Effective Pages Tab 16.3 16.3-1 11/91 16.3-2 11/91 Table 16.3-1 11/91-Tab 16.4 l

r l l Tab 16.5 l 16.5-1 11/91 O 16.5-2 11/91 j t

16.5-3 11/91 l

l Tab 16.6 l

l l

l Tab 16.7 l

Page 1 08/20/95 Page 2 08/20/95

)

Page 3 08/20/95 Page 4 08/20/95

) Page 5 08/20/95 iO l Page 2 03/18/96 l

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 6 08/20/95 Page 7 08/20/95 Page 8 08/20/95 Page 9 08/20/95 Page 10 08/20/95 Page11 08/20/95 Page 12 08/20/95 Page 13 08/20/95 Page 14 02/08/96 ,

Page 15 02/08/96 Page 16 03/18/96 ,

Page 17 03/18/96 Tab 16.8 Page 1 06/20/94  !

l Page 2 06/20/94 Page 3 06/20/94 Page 4 06/20/94 lO Page 3 03/18/96

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 5 06/20/94 Page 6 06/20/94 Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 Page 10 06/20/94 Page11 06/20/94 l Page 12 06/20/94 I

Page 13 06/20/94 Page 14 06/20/94 Page 15 06/20/94 l

j Page 16 08/30/94 l i Page 17 06/20/94 )

Page 18 06/20/94 Page 19 06/20/94 Page 20 06/20/94 Page 21 06/20/94 Page 22 06/20/94 o Page 4 03/18/96

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Page 23 06/20/94 Page 24 06/20/94 l l

Page 25 06/20/94 l Page 26 08/30/94 Page 27 08/30/94 Pag; 28 08/30/94 Page 29 08/30/94 Page 30 08/30/94 Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94 Page 34 08/30/94 Page 35 08/30/94 ,

Page 36 08/30/94 i

Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94

!O Page 5 03/18/96

S DUKE POWER COMPANY d

SELECTED LICENSEE COMMITMENTS MANUAL 1

List of Effective Pages Page 40 08/30/94 Page 41 08/30/94 Page 42 08/30/94 Page 43 08/30/94 Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94  ;

Page 47 08/30/94 Page 48 08/30/94 Tab 16.9 16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96 16.9-3 Page 1 - 3 01/30/96 16.9-4 Page 1 - 5 01/30/96 16.9-5 Page 1 - 6 01/30/96 O Page 6 03/18/96

l DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.9-6 ,

Page1-6 01/30/96 Tab 16.10 16.10-1 02/91 16.10-2 02/91 Tab 16.11 ,

l 16.11-1 08/01/94 16.11-2 08/01/94 O 16.11-3 09/23/94 16.11-4 08/01/94 16.11-5 08/01/94 16.Il-6 08/01/94 16.11-7 08/01/94 16.11-8 08/01/94 i

16.11-9 08/01/94 16.11-10 08/01/94 I 16.11-11 08/01/94 I l \

16.11-12 08/01/94 j lO Page 7 03/18/96 i

DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-13 08/01/94 l

16.11-14 08/01/94 16.11-15 06/23/94 16.11-16 08/01/94 16.11-17 08/01/94 16.11-18 08/01/94 16.11-19 08/01/94 16.11-20 08/01/94 16.11-21 08/01/94 16.11-22 08/01/94 16.11-23 08/01/94 .

l 16.11-24 08/01/94 16.11-25 08/01/94 l 16.11-26 08/01/94 16.11-27 08/01/94 l

j 16.11-28 08/01/94 16.11-29 08/01/94 l \

O Page 8 03/18/96 I

i

)

DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-30 08/01/94 16.11-31 08/01/94 16.11-32 08/01/94 l 16.11-33 08/01/94 16.11-34 08/01/94 16.I1-35 08/01/94 16.11-36 08/01/94 lg 16.11-37 08/01/94 i L 16.11-38 08/01/94 16.11-39 08/01/94 16.11-40 08/01/94 l

16.11-41 08/01/94 16.11-42 08/01/94 16.11-43 08/01/94 l

16.11-44 08/01/94 16.11-45 08/01/94 16.11-46 08/01/94 l 16.11-47 08/01/94

!O Page 9 03/18/96 i

1 c

l I

l DUKE POWER COMPANY O SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-48 08/01/94 l

t 16.11-49 08/01/94 16.11-50 08/01/94 16.11-51 08/01/94 16.11-52 08/01/94

! l6.11-53 08/01/94 l

l 16.11-54 08/01/94 i

16.11-55 08/01/94 16.11-56 08/01/94 16.11-57 08/01/94 16.11-58 08/01/94  !

16.11-59 08/01/94 l 16.11-60 08/01/94 16.11-61 08/01/94 l 16.11-62 08/01/94 l

16.11-63 08/01/94

16.11-64 08/01/94
O Page 10 03/18/96 i

N

l i

I l

DUKE POWER COMPANY l

l O SELECTED LICENSEE COMMITMENTS MANUAL l

l List of Effective Pages 16.11-65 08/01/94 l

I Tab 16.12 l

Tab 16.13 16.13-0 12/90 16.13-1 12/90 Tab 16.14 i

i Tab 16.15 O Apnendix Compliance Function Area Manual, Section 3.8

" Selected Licensee Commitments" O Page 11 03/18/96 l

IfL2 INSTRUMENTATION 16.7-6 RN DISCHARGE INSTRUMENTATION O

COMMITMENT:

The following shall be OPERABLE:

Instrument Components:

Loops:

1RNFE7520 RN Pump A Discharge Flow Annubar 1RNLP7520 1RNFT7520 RN Pump A Discharge Flow 1RNP7520 RN Pump A Discharge Flow (Control Room Indication) 1RNFE7510 RN Pump B Discharge Flow Annubar 1RNLP7510 1RNFT7510 RN Pump B Discharge Flow 1RNP7510 RN Pump B Discharge Flow (Control Room Indication) 2RNFE7520 RN Pump A Discharge Flow Annubar 2RNLP7520 2RNFT7520 RN Pump A Discharge Flow 2RNP7520 RN Pump A Discharge Flow (Control Room Indication) l 2RNFE7510 RN Pump B Discharge Flow Annubar 2RNLP7510 2RNFI'7510 RN Pump B Discharge Flow 2RNP7510 RN Pump B Discharge Flow (Control Room Indication)

C Annunciators:

\ 1AD12-N1 RN Pump A Flow Hi/ Low 1AD12-N4 RN Pump B Flow Hi/ Low 2AD12-N1 RN Pump A Flow Hi/ Low 2AD12-N4 RN Pump B Flow Hi/ Low APPLICABILITY:

l Any time the associated pump is required to be OPERABLE. l I

REMEDIAL ACTION:

a. With any component on both trains of the above listed instrument loops associated l

l with the same unit inoperable OR both annunciators associated with the same unit i j inoperable DE any component of one instrument loop and one annunciator from different trains associated with the same unit inoperable:

For Example: 1RNFT7520 and 1RNFT7510 DE 1AD12-N1 and

1AD12-N4 QR 1RNFT7520 and 1AD12-N4.

Open IRN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), DB_ enter a 72 hour8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> action statement per Technical Specification 3.7.4 'on s RN for the affected unit.

! CHAPTER 16.7 Page 16 3-18-96

b. With the conditions specified in r: medial action a. mst on both units:

.. Open 1RN-58B(RN Hdr B Rtn to SNSWP) and 1RN-63A(RN Hdr A Rtn to SNSWP), .OR. enter Technical Specification 3.0.3 for both units.

TESTING REQUIREMENTS:

Perform chennel calibrations per IP/1(2)/B/3112/04 as required.

REFERENCES-

1) NRC Inspection Report,50-413,414/94-17, September 9,1994
2) Catawba Nuclear Station PIP 0-C94-1555 BASES-The bases for this Selected License Commitment is stated in reference 1, page 11,"Part of the licensing bases of the RN system included the ability for operators to manually change the discharge path for the RN system from the non-safety related Lake Wylie to the safety related SNSWP."

This Selected License Commitment was developed to address the NRC concerns about actions to be taken in the event instrumentation / alarms were out of service which would impair the ability N of Operations to recognize loss of the non-safety discharge' This SLC shall ensure the proper actions are taken based on plant equipment conditions.

O CHAPTER 16.7 Page 17 3-18-96 l h _ J