p 1

.i f

1

- /9 <

DUKE POWER COMPANY  !

IV '

PCP REVISI6N APPROVAL I Revised PCP Section:

Corporate PCP, Rev.

ONS PCP, Rev.

MNS PCP, Rev. .

CNS PCP, Rev'. 8 This revision has been reviewed against Technical Specifications, and applicable L- NRC guidance documents and found to be acceptable. .!

t Prepared By: Mary B. Vaught j i

Title:

Engineer i Nuclear Chemistry I l

Date: 2-22~-95 i

General Office Review Station Review  ;

NA By: d,e M, - By ,

Title:

6c' : < - 7&/I

Title:

[

Date: 2-3 AA, / */95 Date: A ?b This revision is approved for use at Catawba Nuclear Station.

h Ann ~ A r

T(chnical Manager, NuclFChemistry 2# l Catawba Chemistry Manager l Date: 1 fP Date: 2'23-PS lr

/

N  !

W Catawba Statibn Manager l Date: 7 13' %

MBV.jl.011 l

t 9503170298 950313 i PDR ADDCK 05000413 P PDR  ;

t l

4 F

DUKE POWER COMPANY CATAWBA NUCLEAR STATION

.. PROCESS CONTROL PROGRAM lC') 1.0 s

  • PURPOSE -

The purpose of the Catawba Nuclear Station Process Control

' Program is to ensure all requirements of the DPC Corporate Process Control Program have been met for each container of solidified radioactive or mixed waste and dewatered radioactive waste shipped for burial at a licensed disposal facility. The PCP is applicable only to the solidification or dowatering of liquid or wet solid radioactive waste.

2.0 COMPOSITION 2.1 Th'e Catawba Nuclear Station Process Control Program shall consist of:

2.1.1 The Duke Power Company Corporate Process Control Program.

2.1.2 A list of all station-specific procedures that implement the requirements of the Corporate Process Control Program.

2.1.3 Catawba Nuclear Station diagrams, drawings or f(N

q  !

drawing numbers showing interfaces between

\' CNS radwaste systems and solidification and dewatering equipment.

2.1.4 Documentation of Technical System Manager Nuclear Chemistry, CNS Station Chemist and CNS Station Manager approval of the changes to the Corporate Process Control Program.

3.0 EXCEPTIONS 3.1 Tne Catawba Nuclear Station Process Control Program takes the following exceptions with DPC Corporate Process Control Program:

3.1.1 For Corporate PCP Section 3.1.3, Station review and approval are not required.  !

Corporate review and approval of vendor solidification and dewatering services are sufficient.

f%

( J C-1 CNSPCP Rev. 8

. DUKE POWER COMPANY- ,

~* -

CATAWBA NUCLEAR STATION  !

PROCESS CONTROL PROGRAM  !

fru\

L SECTION 2.1.2 . ~i

\ _)Y .

IMPLEMENTING PROCEDURE

]

I i HP/0/B/1006/09 " Shipment of Radioactive. Filters and Filter  !

Media"

  • HP/O/B/1006/10 " Shipment of' Solidified Radwaste" +

HP/0/B/1006/12 " Shipment of Dewatered Resins" t HP/0/B/1006/13 " Determination of the Waste classification  :

for Radioactive Waste Offered for Shallow . j Land Burial" '

~

HP/O/B/1006/15 " Handling and Packaging of R*.dwaste Filters '

and Filters Medias" OP/0/A/6250/16~ " Operating Procedure for the Condensate- (

Polishing Demineralizer Backwash Tank i Subsystem"  !

OP/0/B/6500/13 " Operating Procedure for the Nuclear Solid  !

Waste (WS) Disposal System"

( ,

/ OP/0/B/6500/46 "Radwaste Operating Procedure for  !

Solidification and Dewatering of Radioactive Waste" i

OP/0/B/6500/53 "Radwaste Chemistry Operating Procedure for- li; Dewatering Contaminated Secondary Resins" i OP/0/B/6500/09 " Chemistry Operatiing Procedure for Monitor Tank Building (MTB) Ion Exchange and-  !

Filtration Media Operations" I OP/O/B/6500/72 " Operating Procedure.for Filter HIC Operations" '

i i

4 1

I C-2 j

CNSPCP  !

Rev. 8 j I