Revised Selected Licensee Commitments Manual, Including List of Effective Pages,Pages 1 & 3 & Chapter 16.9,pages 23, 25 & 26
ML20059C933
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 12/15/1993
From: Dover G
DUKE POWER CO.
To:
References
PROC-931215, NUDOCS 9401060234
Download: ML20059C933 (6)


Text

.  !!: . . I

  • Duke Ibury Company (803)S31-3000 Cataa'ba Nuclear Station

..; IN00 Concordkd l ') York,5C29745 gj DUKE POWER December 15,1993 RE: Catawba Nuclear Station Distribution Code CADM-03/03A Selected Licensee Commitments Effect!ve 12/15/93 Attached are revisions to the Catawba Nuclear Station Selected Licensee Commitments. Please revise your manual as follows:

Remove Insert LOEP (G~')

Page 1 (07/21/93) Page 1 (12/15/93)

Page 3 (12/29/92) Page 3 (12/15/93)

Chapter 16.9 Page 23 (07/92) Page 23 (12/93)

Page 25 (07/92) Page 25 (12/93)

Page 26 (10/92) Page 26 (12/93)

Any questions concerning this revision should be directed to the undersigned ,

at 803-831-3486.

LAJL-Gate C. Dover Regulatory C-ompliance

,~ Attachments

's :ste tin ,

,,9 9401060234 931215 ' I -

PDR ADOCK 05000413 i F PDR Ar

(

nn:w nwaae ffJ itt

~

DUKE POWER COMPANY.

[;., '}.Nj;9 -SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages-Page jtevision Date LOEP 1 07/21/93 -

LOEP 2 12/29/92-LOEP 3 12/15/93 LOEP 4 01/01/93 L---

LOEP 5 07/21/93 LOEP'6 01/01/93 LOEP 7 06/23/93 Ipb 16.0 16.0-1 06/23/93 Tab _lia 16.1-1 06/23/93 Tab 16.2 16.2-1 11/91 16.2-2 11/91 16.2-3. 11/91 Tab 16.3 16.3-1 11/91 i'

16.3-2 11/91

. Table 16.3-1 11/91-Tab 16.4 Page 1 12/15/93' e

[ T DUKE POWER COMPANY (s/ SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages Pace Revision Date Page 11 12/29/92 Page 12 07/92 Page 13 07/92 Page 14 07/92 Page 15 07/92 Page 16 07/92 Page 17 07/92 ,

Page 18 07/92 Page 19 07/92 Page 20 07/92 Page 21 10/92 <

Page 22 10/92 Page 23 12/93 Page 24 07/92 Page 25 12/93 Page 26 12/93 Page 27 07/92 Page 28 10/92 Igb 16.10 16.10-1 02/91 .

16.10-2 02/91 Page 3 12/15/93 ;

/\

RA8_R.s_:

OPERABILITY of the detection instrumentation ensures that both adequate warning capability is available for prompt detection of-fires and that Fire Suppression Systems, that are actuated by fire detectors, will discharge extinguishing agents in a timely manner. Prompt detection and suppression of fires will reduce the potential for damage to safety-related equipment and is an  ;

integral element in the overall facility Fire Protection Program.

Fire detectors that are used to actuate Fire Suppression Systems ,

represent a more critically important component of a plant's-Fire Protection Program than detectors that are installed solely for -

early fire warning and notification. Consequently, the minimum number of OPERABLE fire detectors must be greater.

The loss of detection capability for Fire Suppression Systems,.

actuated by fire detectors, represents a significant degradation of fire protec, tion for any area. As a result, the establishment of a fire watch patrol must be initiated at an earlier stage than would be warranted for the loss of detectors that provide only '

early fire warning. The establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to. OPERABILITY.

EFA Zone 65 consists of 18 smoke detectors. Table 16.9-3 lists

'fi the Minimum Instruments Operable for EFA Zone 65 as 15. The V basis for this difference is as follows:

  • Two smoke detectors are located in the Auxiliary Service These smoke detectors are not included in the Table Building. . Zone 65 Minimum Instruments Operable because they are 16.9-3 EFA located in a nonsafety-related area.
  • The smoke detector located in the Spent Resin Batching Tank Room is not included in the Table 16.9-3 EFA Zone 65 Minimum Instruments Operable because the Spent Resin Batching Tank Room is a High Rad Area with minimal combustible loading. Entering this room twice a year to perform smoke detector testing is'not  ;

justified. The Spent Resin Batching Tank Room is enclosed by l four foot thick reinforced concrete walls. The only access to i this room is through a reinforced concrete hatch' in the 594+0  !

Elevation floor slab. In the unlikely event that a'significant- l fire should owur in the Spent Resin Batt hing ' Tank Room, the  !

smoke detectors adjacent to (Elevation 577 -

EFA Zone 65) . or - L above (Elevation 594 - EFA Zone 84) the Spent Resin Batching Tank i Room would provide an alarm to the Control Room. The areas-adjacent to the Spent Resin Batching Tank Room rely on the same assured train of Post Fire Safe Shutdown; therefore, a fire in ,

this room would have no adverse impact on Post Fire Safe Shutdown even in the unlikely event of fire extension into the adjacent areas.

CHAPTER 16.9 Page 23 12/15/93

m g Q Q ,/

TABLE 16.9-3 '

FIRE DETECTION INSTRUMENTS g Page 2 of 5 m

x

- FIRE MINIMUM INSTRUMENTS OPERABLE *

. DESCRIPTION LOCATION SMOKE FLAME HEAT FUNCTION **

] ZONE m '

$* 36 Cable Tray Access FF-56 El.568 + 0 2 0 0 A 37 Equip Batteries DD-55 El.554 + 0 5 0 0 A O 38 Equip Batteries CC-55 E7.554 + 0 5 0 0 A '

39 Battery Room CC-56 El.554 + 0 17 0 0 A 41 Swgr Equip Room AA-64 El.560 + 0 7 0 0 A 42 Elect Pen Room CC-65 El.560 + 0 8 0 0 A 43 Corridor / Cables FF-61 El.560 + 0 5 0 0 A 44 Aisles / Cables KK-63 El.560 + 0 8 0 0 A 45 Aisles / Cables NN-60 El.560 + 0 13 0 0 A 46 Aisles / Cables HH-59 El.560 + 0 13 0 0 A 47 Motor Control Center GG-58 El.560 + 0 2 0 0 A 48 Cable Tray Access FF-58. El.560 + 0 2 0 0 A 49 Equip Batteries DD-60 El.560 + 0 5 0 0 A 50 Equip Batteries CC-60 El.560 + 0 5 0 0 A 51 Battery Room CC-59 El.560 + 0 17 0 0 A 53 Swgr Equip Room AA-49 El.577 + 0 7 0 0 A 54 Aisles / Cables CC-50 El.577 + 0 10 0 0 A 55 Aisles / Cables NN-52 El.577 + 0 9 0 0 A 56 Aisles / Cables PP-55 El.577 + 0 13 0 0 A 57 Aisles / Cables LL-55 El.577- + 0 11 0 0 A 58 Aisles / Cables HH-55 El.577 + 0 21 0 0 A 59 Motor Control Center EE-54 El.577 + 0 2 0 0 A 60 Cable Room CC-56 El.574 + 0 18 0 0 A 62 Swgr Equip Room' AA-64 El.577 + 0 7 0 0 A 63 Elect Pen Room CC-64 El.577 + 0 10 0 0 A 64 Aisles / Cables PP-62 El.577 + 0 9 _O O A 65 Aisles / Cables PP-59 El.577 + 0 15 0 0 A (See Bases) 66 Aisles / Cables LL-59 El.577 + 0 11 0 0 A 67 Aisles / Cables HH-59 El.577 + 0 21' O O A 68 Motor Control Center- FF-60 El.577 + 0 2 0 0 A 69 Cable Room 'CC-59 El.577 + 0 18 0 0 A 71 Elect Pen' Room CC-51 El.594 + 0 10 0 0 A

- 72 Control Room CC-56 El.594 + 0 23 0 6 A h73 -Vent Equip Room FF-56 El.594 + 0' 9 0 0 A w 74- Aisles / Cables LL-56 El.594 + 0 25 0 0 A

i TABLE 16.9-3 n FIRE DETECTION INSTRUMENTS Page 3 of.5 -

k .

Y

e
  • I FIRE LOCATION SMOKE MINIMUM INSTRUMENTS OPERABLE
  • FLAME HEAT FUNCTION **

ZONE DESCRIPTION m

?

15 0 0 A

[ 76 m 79 Aisles / Cables Elect Pen Room PP-54

.BB-63 El.594 + 0 El.594 + 0 11 0 0 A 80 Control Room BB-59 El.594 + 0 22 0- 6 A 81 Vent Equip Room FF-58 El.594 + 0 12 0 0 A 82 Aisles / Cables KK-58 El.594 + 0 27 0 0 A 84~ Aisles / Cables NN-58 El.594 + 0 17 0 0 A 89 Fuel Pool Area (Unit 1) PP-50 El.605 + 10 19 7 0 A A

90 Fuel Pool: Area (Unit 2) __ PP-64 El.605 + 10 19 7 0 129 Fuel-Pool Purge Room (Unit 1)- NN-50 El.631 + 6 6 0 0 A 131 Reactor Bldg 0*-45' Bel. El.565 + 3 4 0 0 A 132 Reactor Bldg 45'-90' Bel. El.565 + 3 3 0 0 A 133 Reactor Bldg 90*-135' Bel. El.565 + 3 4 0 0 A 134 Reactor Bldg 135*-180' Bel. El.565 + 3 5 0 0 A 135 Reactor Bldg 180*-225' Bel. El.565 + 3 4 0 0 A 136 Reactor Bldg 270*-315' Bel. El.565 + 3 3 0 0 A 137 Reactor Bldg 315'-0* Bel. El.565 + 3 8 0 0 A 138 Reactor Bldg 0*-45' Bel. El.586 + 3 6 0. O A 139 Reactor Bldg 45*-90' Bel. El.586 + 3 4 'O O A 140 Reactor Bldg- 90*-135* Bel. El.565 + 3 3 0 0 A 141 Reactor Bldg _ 135'-180' Bel. El.586 +.3 8 0 0 A 142 Reactor Bldg 180*-225' Bel. El.586 + 3 5 0 0 A 143 Reactor Bldg 315'-0* Bel. El.586 + 3 5 0 0 .A

144 Reactor Bldg 0*-45* Bel. El.593 + 2 14 0 0 A 145 Reactor Bldg '45*-90' Bel.-El.593 + 2 16 0 0 A 146 Reactor Bldg 90*-135' Bel.'El.593 + 2 11 0 0 A.

147 Reactor Bldg -135'-180' Bel. El.593 + 2 .

10 0 0 A 148 ' Reactor Bldg 180*-225' Bel. El.593 + 2 2 0 0 'A 149 Reactor Bldg 315'-0* Bel. El.593 + 2 7 0 0 A 150 Reactor Bldg-(Unit 2); 0*-45' Bel. El.565 + 3 4 0 0 A

-151 Reactor Bldg (Unit-2) 45'-90' Bel. El.565 + 3 3 0 0 A 152 Reactor. Bldg (Unit 2) 90*-135'- Bel..El.565.+ 3 ~4- 0 0- A

[ 153 Reactor Bldg _(Unit-'2) 135'-180'~ Bel. El.565 +'3 5 0 0 A g 154 Reactor Bldg (Unit 2) 180*-225' Bel. El.565 +-3 3 0 0 A