Revised Table of Contents for Chapter 16 of Selected License Commitments Manual
ML20249B622
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/11/1998
From: Kitlan M
DUKE POWER CO.
To:
References
PROC-980611, NUDOCS 9806230384
Download: ML20249B622 (5)


Text

.

7

\,g] - ' ,

June 11,1998

- RE: . Catawba Nuclear Station Selected License Commitment Manual Please update Selected License Commitments (SLC) manual:

Remove Insert 16.0 TABLE OF CONTENTS l

16.0 16.0 )

y^s Page 1 Page 1  !

('" ) Page 2 Page 2 l Page 3 Page 3  !

Page 4 Page 4 i

I i

1 if you have any questions conceming contents of this package update, contact l Denise Smith at 803-831-3810.

!. ~

q J' pr M. S. Killan, Jr., Manager Regulatory Compliance - CNS j)y Attachments A63 o . . . -

.no xs v

9906230384 990611

~

l l PDR ADOCK 05000413 \b l P PDR l

i l

., CATAWBA NUCLEAR STATION FINAL SAFETY ANALYSIS REPORT SELECTED LICENSEE COMMITMENTS b)-

V Table of Contents 16.0 Selected Licensee Commitments 16.1 Introduction 16.2 Applicability 16.3 Definitions 16.4 Commitments Related to Reactor Components 16.5 Commitments Related to Reactor Coolant System 16.5.1 Mid-Loop Operation with irradiated Fuel in the Core 16.5.2 Reserved for Safety Valves - Shutdown 16.5.3 Reserved for Chemistry 16.5.4 Reserved for Pressurizer 16.5.5 Reserved for Structural Integrity

.- g 16.5S Reserved for Reactor Coolant System Vents I

G'I 16.5.7 Reserved for Steam Generator Pressure / Temperature Limitation 16.6 C.ummitments Related to Engineered Safety Features ,

(Non-ESF Systems) 16.6.1 Reserved for Containment Sump 16.6.2 Reserved for Ice Bed Temperature Monitoring System i 16.6.3 Reserved for inlet Door Position Monitoring System 16.6.4 Reserved for Chlorine Detection Systems 16.7 Commitments Related to Instrumentation 16.7.1 ATWS Mitigation System Actuation Circuitry (AMSAC) 16.7.2 Seismic Instrumentation 16.7.3 MeteorologicalInstrumentation 16.7.4 Loose-Part Detection System 16.7.5 Turbine Overspeed Protection 16.7.6 RN Discharge Instrumentation I

Chapter 16.0 Page 1 06/10/98 L

_________________._______--._____-__-_a

, , , CATAWBA NUCLEAR STATION FINAL SAFETY ANALYSIS REPORT SELECTED LICENSEE COMMITMENTS 7

( . -

Table of Contents (

I 16.7.7 Reserved for Movable incore Detectors 16.7.8 Reserved for Groundwater Level 16.7.9 Reserved for Standby Shutdown System 16.7.10 Reserved for Radiation Monitoring for Plant Operations 16.7.11 Reserved for Position Indication System - Shutdown 16.8 Commitments Related to Electrical Power Systems 16.8.1 Containment Penetration Conductor Overcurrent Protective Devices 16.8.2 230 KV Switchyard Systems 16.8.3 230 KV Switchyard 125 VDC Power System 16.8.4 6900 V Shared Transformers 16.8.5 Reserved for Diesel Generator Supplemental Testing Requirements

. f 16.9 Commitments Related to Auxiliary Systems l[

( 16.9.1 Fire Suppression Water Systems 16.9.2 Spray and/or Sprinkler Systems 16.9.3 CO Systems 16.9.4 Fire Hose Stations 16.9.5 Fire Barrier Penetrations 16.9.6 Fire Detection Instrumentation 16.9.7 Reserved for Boration Systems Flow Path - Shutdown 16.9.8 Reserved for Boration Systems Flow Paths - Operating 16.9.9 Reserved for Boration Systems Charging Pump - Shutdown 16.9.10 Reserved for Boration Systems Charging Pumps - Operating 16.9.11 Reserved for Boration Systems Borated Water Source - Shutdown l

l 16.9.12 Reserved for Boration Systems Borated Water Sources - Operating 16.9.13 Reserved for Snubbers

( ) 16.9.14 Reserved for Lake Wylie Water Temperature

%J Chapter 16.0 Page 2 06/10/98 l

p

CATAWBA NUCLEAR STATION FINAL SAFETY ANALYSIS REPORT SELECTED LICENSEE COMMITMENTS Table of Contents 16.9.15 Reserved for Auxiliary Building Filtered Exhaust System Filter Cooling Bypass Valves 16.9.16 Reserved for Fuel Handling Ventilation Exhaust System Filter Cooling Bypass Valves 16.9.17 Reserved for Refueling Operations - Decay Time 16.9.18 Reserved for Refueling Operations - Communications 16.9.19 Reserved for Refueling Operations - Manipulator Crane 16.9.20 Reserved for Refueling Operations - Crane Travel- Spent Fuel Storage Pool Building 16.9.21 Reserved for Refueling Operations - Storage Pool Water Level 16.9.22 Reserved for Control Room Area Ventilation System - Intake Alarms 16.9.23 Fire Hydrants 16.10 Commitments Related to Steam and Power Conversion Systems 16.10.1 Steam Vent to Atmosphere 16.10.2 Condenser Circulating Water System 16.11 Commitments Related to Radioactive Waste Management 16.11.1 Liquid Effluents 16.11.2 Radioactive Liquid Effluent Monitoring instrumentation 16.11.3 Dose 16.11.4 Liquid Radwaste Treatment System 16.11.5 Chemical Treatment Ponds 16.11.6 Gaseous Effluents 16.11.7 Radioactive Gaseous Effluent Monitoring instrumentation 16.11.8 Dose Noble Gases 16.11.9 Dose - lodine-131, lodine-133, Tritium, and Radioactive Materialin Particulate Form 16.11.10 Gaseous Radwaste Treatment System Chapter 16.0 Page 3 06/10/98

^'

,. CATAWBA NUCLEAR STATION FINAL SAFETY ANALYSIS REPORT SELECTED LICENSEE COMMITMENTS Table of Contents 16.11.11 Solid Radioactive Wastes 16.11.12 Total Dose 16.11.13 Monitoring Program 16.11.14 Land Use Census 16.11.15 Interlaboratory Comparison Program 16.11.16 Annual Radiological Environmental Operating Report and Annual Radioactive Effluent Release Report 16.11.17 Reserved for Liquid Holdup Tanks 16.11.18 Reserved for Explosive Gas Mixture 16.11.19 Reserved for Gas Storage Tanks 16.11.20 Reserved for Explosive Gas Monitoring Instrumentation 16.11.21 Reserved for Major Changes to Liquid, Gaseous, and Solid Radwaste Treatment Systems 16.12 Commitments Related to Radiation Protection 16.12.1 Reserved for Sealed Source Contamination 16.13 Commitments Related to Conduct of Operations 16.13.1 Fire Brigade 16.13.2 Technical Review and Control 16.13.3 Plant Operations Review Committee Appendix Compliance Functional Area Manual, Section 3.8 i

O Chapter 16.0 Page 4 06/10/98