Updated Pages to Catawba Nuclear Station Selected License Commitments Manual
ML20236P867
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 07/06/1998
From:
DUKE POWER CO.
To:
Shared Package
ML20236P866 List:
References
PROC-980706, NUDOCS 9807170179
Download: ML20236P867 (2)


Text

_ __ ______ __ _-_ __ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

. 16.7 l_N_STR_UMENTATION 16.7.3 METEOROLOGICAL INSTRUMENTATION i

v' COMMITMENT: I

a. The meteorological monitoring instrumentation channels shown in Table 16.7-3A shall be OPERABLE.

APPLICABILITY:

At all times.

REMED' KL ACTION:

a. With one or more required meteorological monitoring channels inoperable for more than 7 days, prepare and submit a Special Report to the Commission pursuant to Technical Specification 6.9.2 within the next 10 days outlining the cause of the malfunction and the plans for restoring the l

channel (s) to OPERABLE status.

TESTING REQUIREMENTS:

a. Each of the above meteorological monitoring instrumentation channels

[]

(/

shall be demonstrated OPERABLE by the performance of a CHANNEL CHECK and Instrument Calibration operations at the frequencies shown in Table 16.7-3B.

REFERENCES:

I N/A BASES:

16.7-3 METEOROLOGICAL INSTRUMENTATION The OPERABILITY of the meteorologicalinstrumentation ensures that sufficient meteorological data are available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for initiating protective measures to protect the health and safety of the public and is consistent with the recommendations of Regulatory Guide 1.23, "Onsite Meteorological Programs," February 1972.

i An Instrument Calibration will consist of the following test: l I

l i 1) A bench based test and calibration of the tower mounted sensors for:

O V C51 APTER 16.7.3 Page 1 07/06/98 I I

9807170179 900706 PDR ADOCK 05000413 P PDR b

O..:*L- , o Wind Sperd i

i l  ;. e ' - Wind Direction

. Temperature RTD's and Temperature Processing Module (Ambient 1 p and Delta T)

Q 2) An instrument Loop Calibration from the input of the signal processors to the end devices.

l l

3) '

. For Wind Direction a Line Phase Differential Compensation will be L performed, which includes the tower signal cable.

l

.4) A CHANNEL CHECK, subsequent to any work performed. This will verify continuity of the signal cable between the sensor and signal processors.

5) The Wind Speed Sensors and cup-sets or Wind Direction Sensors and
. Vanes do not require wind tunnel testing as an assembly.

l 6) Replacement of cup-sets or vanes does not require an Instrument l l Calibration of the affected channel. '

1 l

[-

i

! i i l

[',

i l

i l,

l l t

I l -l I

l CHAPTER 16.7.3 Page 2 07/06/98