.- ___ _ _-_ _ _ _ _ _ _ __

Dune her Compa.:y (803)831 3000 Catawba NuclearStation

. 4800 CnncordRoad York. SC29745 l

g-4 i June 18,1996 1

i t

RE: Catawba Nuclear Station Selected Licensee Commitments Chapter 16.13 - Conduct of Operations j Please add the following pages in the Selected Licensee Commitment manual.

Remove Insert g List of Effective Pages LOEP page 1 of11 LOEP page 1 of10

) LOEP page 2 of 11 LOEP page 2 of 10

LOEP page 3 of 11 LOEP page 3 of 10 j ,

LOEP page 4 of11 LOEP page 4 of10 LOEP page 5 of 11 LOEP page 5 of10 j LOEP page 6 of11 LOEP page 6 of10 LOEP page 7 of 11 LOEP page 7 of10 LOEP page 8 of11 LOEP page 8 of10 LOEP page 9 of11 LOEP page 9 of10 l LOEP page 10 of 11 LOEP page 10 of10

LOEP page 11 of11 Chapter 16 -Table of Contents 4

i Page 16.13.0 Page 16.13.0 Chapter 16.13 - Conduct of Operations 9607160274 960618 16.13-2 Page 1 of 4 ADOCK 0500 3 l

fDR 16.13-2 Page 2 of 4

?

16.13-2 Page 3 of 4 16.13-2 Page 4 of 4 E50?Q i

$D ' i ,

ll l DukeIbwer Company Catawpa NuclearStation WI' 0* ,

    • 4800 Concord Road RMN Insert 9"" 16.13-3 Page 1 of 2 16.13-3 Page 2 of 2 If you have any questions concerning cor. tents of this package update, please contact l Denise Smith - Regulatory Compliance at (803) 831-3810.

i i

i Michael S. Kitlan, Jr. I Manager, Regulatory Compliance Catawba Nuclear Station Attachments O ,

1 i

O

8  :. .'.

1 DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL l

List of Effective Pages LOEP1-9 1
Tab 16.0 16.0-1 06/23/93 Tab 16.1 4

l 16.1-1 06/23/93 1

Tab 16.2 3

4

16.2-1 11/91 4 i
I 6.2-2 11/91 1

16.2-3 11/91 Tab 16.3 1

J 16.3-1 11/91 I

l 16.3-2 11/91 Table 16.3-1 11/91 Tab 16.4 Tab 16.5 16.5-1 11/91 16.5-2 11/91 Page 1 of10 06/07/96

l l

s 1 i

O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages l 16.5-3 11/91 i

l Tab 16.6

) Tab 16.7

] Page 1 08/20/95 Page 2 08/20/95 1

Page 3 08/20/95 l l

4 Page 4 08/20/95 l l Page 5 08/20/95 Page 6 08/20/95 Page 7 08/20/95 l

Page 8 08f 0/95 I

Page 9 08/20/95 1

Page 10 08/20/95 j Page 11 08/20/95 i

Page 12 08/20/95 Page 13 08/20/95 Page 14 02/08/96 Page 15 02/08/96 Page 16 03/18/96 Page 2 of10 06/07/96

O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL l

List of Effective Pages Page 17 03/18/96 l

Tab 16.8 Page 1 06/20/94 Page 2 06/20/94 Page 3 06/20/94 Page 4 06/20/94 Page5 06/20/94 Page 6 06/20/94 Page 7 06/20/94 Page 8 06/20/94 Page 9 08/30/94 1

Page 10 06/20/94 Page 11 06/20/94 Page 12 06/20/94 Page 13 06/20/94 Page 14 06/20/94 Page 15 06/20/94 Page 16 08/30/94 Page 3 of10 06/07/96

l DUKE POWER COMPANY

SELECTED LICENSEE COMMITMENTS MANUAL List of Effketive Pages t

Page 17 06/20/94 Page 18 06/20/94 4

Page 19 06/20/94 l

i Page 20 06/20/94 Page 21 06/20/94 Page 22 06/20/94 Page 23 06/20/94 Page 24 06/20/94 1

Page 25 06/20/94 '

Page 26 08/30/94 Page 27 08/30/94 Page 28 08/30/94 Page 29 08/30/94 Page 30 08/30/94 Page 31 08/30/94 Page 32 08/30/94 Page 33 08/30/94 Page 34 08/30/94 Page 4 of10 06/07/96

]

1

..  :. l O DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL l

List of Effective Pages Page 35 08/30/94 Page 36 08/30/94 Page 37 08/30/94 Page 38 08/30/94 Page 39 08/30/94 Page 40 08/30/94 Page 41 08/30/94 Page 42 08/30/94 Page 43 08/30/94 Page 44 08/30/94 Page 45 08/30/94 Page 46 08/30/94 Page 47 08/30/94 Page 48 08/30/94 Tab 16.9 16.9-1 Page 1 - 4 01/30/96 16.9-2 Page 1 - 4 01/30/96 Page 5 of 10 06/07/96

i DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL

, List of Effective Pages 4

16.9-3

Page 1 - 3 01/30/96 4 16.9-4 j Page 1 - 5 01/30/96 1

16.9-5 i Page 1 - 6 01/30/96

~l 16.9-6 Page 1 - 8 01/30/96 4

Tab 16.10 1

16.10-1 02/91 1

16.10-2 02/91 I
Tab 16.11

! 16.11-1

08/01/94 1 16.11-2 08/01/94

! l6.11-3 09/23/94 1 16.I1-4 08/01/94 16.11-5 08/01/94 16.11-6 08/01/94 i

16.11-7 08/01/94

]' Page 6 of10 06/07/96 9

f

l DUKE POWER COMPANY SELECTED LICENSEE COMMITMENTS MANUAL i l List of Effective Pages 16.11-8 08/01/94

~

16.11-9 08/01/94 16.11-10 08/01/94 16.11-11 08/01/94 16.11-12 08/01/94 16.11-13 08/01/94 l

l 16.11-14 08/01/94 16.11-15 06/23/94 l

l 16.11-16 08/01/94 l

16.11-17 08/01/94 16.11-18 08/01/94 16.11-19 08/01/94 16.11-20 08/01/94 16.11-21 08/01/94 I6.11-22 08/01/94 16.11-23 08/01/94 16.11-24 08/01/94 16.11-25 08/01/94 4

16.11-26 08/01/94 -

Page 7 of10 06/07/96

DUKE POWER COMPANY 01 SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.11-27 08/01/94 16.11-28 08/01/94 16.11-29 08/01/94 16.11-30 08/01/94 16.11-31 08/01/94 16.11-32 08/01/94 16.11-33 08/01/94 16.11-34 08/01/94 O 16.11-35 08/01/94 16.11-36 08/01/94 16.11-37 08/01/94 16.11-38 08/01/94 16.11-39 08/01/94 16.11-40 08/01/94 16.11-41 08/01/94 16.11-42 08/01/94 16.11-43 08/01/94 16.11-44 08/01/94

\ Page 8 of10 06/07/96

l l

l DUKE POWER COMPAhT SELECTED LICENSEE COMMITMENTS MANUAL List of Effective Pages 16.I1-45 08/01/94 l

16.11-46 08/01/94 l

16.11-47 08/01/94 16.11-48 08/01/94 16.11-49 08/01/94 16.11-50 08/01/94 1

16.11-51 08/01/94 16.11-52 08/01/94 16.11-53 08/01/94 l

16.11-54 08/01/94 16.11-55 . 08/01/94 16.11-56 08/01/94 16.11-57 08/01/94 16.11-58 08/01/94 16.11-59 08/01/94 16.I1-60 08/01/94 l 16.I1-61 08/01/94 16.11-62 08/01/94 i

16.I1-63 08/01/94 Page 9 of 10 06/07/96

i -

l i

. l O DUKE POWER COMPANY U SELECTED LICENSEE COMMITMENTS MANUAL

, 1 j List of Effective Pages I i

! l6.11-64 08/01/94 -

i a

16.11-65 08/01/94

! Tab 16.12 1

i 2

Tab 16.13 -

l l

16.13-0 12/90 i l i 16.13-1 12/90 1

4 16.13-2 06/07/96 O 16.13-3 06/07/96 i

Tab 16.14 I Tab 16.15 i

Appendix Compliance Function Area Manual, Section 3.8

" Selected Licensee Commitmsnts" i

r I

d i

i O

j Q Page 10 of10 06/07/96

O' CATAWBA NUCLEAR STATION FINAL SAFETY ANAYLSIS REPORT CHAPTER 16.13 SELECTED LICENSEE COMMITMENTS CONDUCT OF OPERATIONS Table of Contents 16.13-1 Fire Brigade 16.13-2 Technical Review and Control 16.13-3 Plant Operations Review Committee l l

l O

Chapter 16.13 Page 16.13-0 06/07/96

. . i; i

i

! 16.13 CONDUCT OF OPERATIONS i

16.13-2 TECHNICAL REVIEW AND CONTROL COMMITMENT. i A Technical Review and Control Program covering the preparation, review, and i approval of documents important to station operation shall be established and I maintained for the site.

l APPLICABILITY: '

This commitment is applicable at all times and applies to the review and control  !

activities described in items a through j as listed below. Personnel performing the I preparation, review, and approval activities covered by this commitment shall meet or exceed the qualifications of ANSI N18.1-1971 (the conformance status for this standard  ;

is as listed in Table 17-1 of the Duke Power Topical Report, Quality Assurance '

Program, Duke-1-A).

a. The preparation, review, and approval of station procedures shall be done in accordance with station Technical Specifications. Individuals responsible for these reviews shall be members of the supervisory staff assigned to the site, be previously designated by the Site Vice President as a Qualified Reviewer, and successfully complete the site Qualified Reviewer training program. Review of environmental radiological analysis procedures, shall be performed by the General Manager, Environmental Services or a designee. Each such review shallinclude a determination of whether or not additional, cross-disciplinary review shall be performed by the appropriately designated site review personnel.
b. Proposed modifications shall be designed and the design reviewed in accordance with station Technical Specifications. The proposed modification design, the design review, and design approval shall be in accordance with ANSI N45.2.11 as described in Table 17-1 of the Duke Power Topical Report, Quality Assurance Program, Duke 1-A. l O Chapter 16.13-2 Page 1 of 4 06/07/96

Proposed modifications to nuclear safety related structures, l

systems, and components shall be approved prior to i implementation by the Station Manager or the Manager of 1

Engineering; or for the Station Manager by a Maintenance Superintendent, the Operations Superintendent, or the Work l Control Superintendent, as previously designated by the l Station Manager. Upon implementation approval, the j

modification shall be implemented in accordance with the Duke Power Nuclear Station Modification Program and approved

} procedures (as discussed in Item a above).

4

, c. Proposed changes to the station Technical Specifications i

shall be prepared in accordance with station Technical j Specifications. Each proposed Technical Specification

change shall be reviewed by the Plant Operations Review l Committee (PORC) and the Nuclear Safety Review Board (NSRB)

! prior to submittal to the Nuclear Regulatory Commission.

! Proposed changes to the Technical Specifications shall be

' approved by the Station Manager, or for the Station Manager 1 by a designated manager or company officer. Technical Specifications submittal cover letters shall be signed by an i officer of Duke Power Company.

i d. Proposed tests and experiments which affect station nuclear safety and are not addressed in the FSAR or Technical Specifications shall be reviewed by the Plant Operations Review Committee (PORC).

e. Incidents reportable pursuant to station Technical Specifications and all violations of Technical Specifications shall be investigated and a report prepared which evaluates the occurrence and which provides recommendations to prevent recurrence. Such reports shall be approved by the Manager, Safety Assurance and provided to the Site Vice President and the Plant Operations Review Committee (PORC).
f. The Manager, Safety Assurance shall assure the performance of special reviews and investigations, and the preparation and submittal of reports thereon, as requested by the Site Vice President. Such reports shall be provided to the Plant Operations Review Committee (PORC).

O Chapter 10.13-2 Page 2 of 4 06/07/96

l

! ' l q

! g. The Manager, Safety Assurance shall assure the performance

! of a review by a knowledgeable individual / organization of

{ every unplanned onsite release of radioactive material to l the environs, including the preparation and fonwarding of '

!' reports covering evaluation, recommendations, and disposition of the corrective action to prevent recurrence to the Site Vice President, and to the Plant Operations  ;

j Review Committee (PORC).

i h. The Manager, Safety Assurance shall assure the performance

! of a review by a knowledgeable individual / organization of j changes to the Process Control Program, Offsite Dose

Calculation Manual (ODCM), and Radwaste Treatment Systems.

! i. The Manager, Safety Assurance shall ensure the performance l

j of a review by a knowledgeable individual / organization of j the Fire Protection program and implementing procedures and l submittal of recommended changes to the Director, j j Organization Effectiveness Services.

w j J. Reports documenting each of the activities performed under l i this commitment shall be maintained. Copies shall be -

provided to the NSRB.

l i REMEDIAL ACTION:

! Not Applicable i

j BASIS:

i

) a. The requirements contained in this selected licensee commitment were relocated j from the McGuire Technical Specifications with the approval of the U. S. Nuclear

Regulatory Commission. Changes to this SLC shall be considered a change in an NRC commitment and shall be made only in accordance with the approved l Compliance Manual Procedure for the Control of Selected Licensee 3 Commitments and by use of the 10 CFR 50.59 evaluation process.

j b. This SLC implements the review requirements of j ANSI N18.7-1976/ANS-3.2 and ANSI N45.2.11-1974 as referenced in the Duke i Power Company Topical Report, Quality Assurance Program, Duke-1-A.

i i

l O Chapter 16.13-2 Page 3 of 4 06/07/96 i

. . . . I 4

!V TESTING REQUIREMENTS:

Not Applicable i

l i

REFERENCES:

I

1. ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel j 2. ANSI N18.7-1976/ANS-3.2, Administrative Controls and Quality Assurance for

! the Operational Phase of Nuclear Power Plants

3. ANSI N45.2.11-1974, Quality Assurance Requirements for the Design of j Nuclear Power Plants
4. Compliance Manual Procedure for the Control of Selected Licensee Commitments
5. Nuclear System Directive 209,10 CFR 50.59 Evaluations i 6. 10 CFR 50.59
7. Nuclear System Directive 703, Administrative Instructions for Station Procedures k.

4 i

l S

i 1

l 1

i i

d I

O Chapter 16.13-2 Page 4 of 4 06/07/96 f

I i

(- - - . - - - -

i .

1 .. .-

i j .-- .

16.13 CONDUCT OF OPERATIONS

) 16.13-3 PLANT OPERATIONS REVIEW COMMITTEE i

COMMITMENT:

A Plant Operations Review Committee (PORC) shall be established and maintained for i the site. The PORC shall be composed of the Manager of Safety Assurance, the i Station Manager and his/her direct reports most responsible for station operation and l maintenance, the Manager of Engineering and his/her direct reports most responsible

{ for engineering support of station operation and maintenance, or designated attemates.

! The PORC Chairperson, members, and attemate members shall be qualified in l accordance with ANSI N18.1-1971 and be appointed by the Site Vice President. The l quorum necessary for conducting the PORC functions shall consist of the Chairperson,

or his/her designated attemate, and at least three other PORC members including

{ attemates.

l Reports of reviews encompassed by this Selected Licensee Commitment shall be l

! prepared and forwarded to the Site Vice President and the Nuclear Safety Review l Board.

APPLICABILITY:

I l

a. The PORC shall be responsible for reviewing the following prior to final approval:

l a

d. .

! 1. All proposed tests and experiments which affect station nuclear safety and j are not addressed in the FSAR or Technical Specifications; 3

2. Operability evaluations resulting in a Justification for Continued Operation and a proposal for discretionary enforcement; I

! 3. Operability evaluations resulting in the decision that affected systems, j structure or components are OPERABLE but degraded; and j 4. All proposed changes to the station Technical Specifications, Bases, or Facility Operating License.

1 l

j Chapter 16.13-3 Page 1 of 2 06/07/96 a

1 i

i I

~

O b. The PORC shall be responsible for reviewing the effectiveness of corrective actions for.

l

1. Licensee Event Reports and Special Reports made to the NRC; I
2. Violations of Technical Specifications; i
3. Special reviews and investigations as requested by the Site Vice President; and l

4

4. Reports on unplanned onsite releases of radioactive material to the j environs.

I c. The PORC shall review additional piograms, procedures and plant activities as

directed by the Site Vice President.

REMEDIAL ACTION:

Not Applicable BASIS:

i

a. The PORC shall be established to recommend to the Station Manager approval ,

or disapproval of the items listed under APPLICABILITY prior to their final approval.

l

b. The PORC shall report to the Site Vice President on the areas of responsibility specified in this selected licensee commitment.

TESTING REQUIREMENTS:

Not Applicable

REFERENCES:

1. ANSI N18.1-1971, Selection and Training of Nuclear Power Plant Personnel
2. ANSI N18.7-1976/ANS-3.2, Administrative Controls and Quality Assurance for the Operational Phase of Nuclear Power Plants
3. Nuclear System Directive 308, Plant Operations Review Committee O Chapter 16.13-3 Page 2 of 2 06/07/96