Interim Deficiency Rept DER 84-09 Re Cad Welding for Catholic Protection Ground Connection Occurring W/O Approved Weld Technique or Documentation.Initially Reported on 840229.Final Rept by 840504
ML20088A713
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 03/23/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-29142-BSK, DER-84-09, DER-84-9, NUDOCS 8404130004
Download: ML20088A713 (3)


Text

',

dy o?

Arizona Public Service Company March 23, 1984 ANPP-29142-BSK/TRB

'J. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Interim Report - DER 84-09 A 50.55(e) Potentially Reportable Deficiency Relating to CAD Welding For Cathodic Protection Ground Connection Occurred Without Approved Weld Technique Or Documentation File: 84-019-026; D.4.33.2

Reference:

Telephone Conversation between R. Dodds and T. Bradish on February 29, 1984

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required, an Interim Report is attached. It is now expected that this information will be finalized by May 4, 1984, at which time a complete report will be submitted. ,

Very truly your,s l g c

.L- Ct_LL (dLR m E. E. Van Brunt, Jr.

APS Vice President, Nuclear ANPP Project Director EEVB/TRB:ru Attachment / .10 lh cc: See Page Two il ;;! W/ OE ElH ,3 l'

, GX&:lill

( S m .; - % m.

f

. ~ te-n

Mr. T. W. Bishop DER 84-09 Page Two cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G.. Woods, Jr.

W. E. Ide D. B. Fasnacht A. C. Rogers ,

B. S. Kaplan L. A. Souza J. Vorees J.'R. Bynum P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham

' .- R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson L. - E. Vorderbrueggen G. A. Fiore111

- S..R. Frost J. Self .

D. Canady Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339 e

P W

e

.. . 3 INTERIM REPORT - DER 84-09 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 2

1. Potential Problem BPC Welding Standard WD-1, Rev. 2, Paragraph 2.1 states: "Only the applicable revision of those welding procedures that have been developed and qualified to the rules of the ASME Code,Section IX, by M&QS and that have been specified for use by Project Engineering on the Forr 84C or other applicable Engineering docuemnt shall be used for welding within the jurisdiction of the ASME Code,Section III."

CAD welding on ASME pipe systems for cathodic protection ground connections has occurred utilizing an unapproved weld technique and no weld documentation to document its accomplishment.

II. Approach To and Status of Proposed Resolution Bechtel Engineering is currently reviewing the documentation and the welding installation to determine reportability and technical justification for corrective action.

III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by May 4,1984.

l>

4 I

I' k