Forwards LAR 95-03 to License NPF-86,proposing Change to TS to Relocate Table 3.4-1, RCS PIVs from TS 3.4.6.2, RCS Operational Leakage to Technical Requirements Manual
ML20086R197
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 07/24/1995
From: Feigenbaum T
NORTH ATLANTIC ENERGY SERVICE CORP. (NAESCO)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20086R200 List:
References
NYN-95056, TAC-M92959, NUDOCS 9507310052
Download: ML20086R197 (2)


Text

P I .

I u,,,,

N rth Atlantic Energy Service Corporation o

~ .NOf&. P.o. Box soo -i i-

' Atlantic Seabrook, NH 03874 (603)474-9521, Fax (603)474-2987 The Northeast Utilities System (

Ted C. Feigenbaum  ;

NYN-95056 Senior Vice President & l Chief Nuclear Officer i July 24,1995 -  !

)

United States Nuclear Regulatory Commission i Washington, D.C. 20555 Attention: Document Control Desk  :

Reference:

Facility Operating License No. NPF-86, Docket No. 50-443 f l

Subject:

License Amendment Request 95-03: Revision to Technical Specification 3.4.6.2 Reactor i Coolant System Operational Leakage - Pressure isolation Valve Table, (TAC No.  !

M92959)  ;

i Gentlemen:  :

North Atlantic Energy Service Corporation (North Atlantic) has enclosed herein License Amendment Request 95-03. This License Amendment Request is submitted pursuant to the requirements of 10CFR50.90 and 10CFR50.4.  ;

The purpose of License Amendment Request 95-03 is to propose a change to the Seabrook Station Technical Specifications to relocate Table 3.4-1, " Reactor Coolant System Pressure Isolation Valves" from _l Technical Specification 3.4.6.2, " Reactor Coolant System Operational Leakage" to the Technical  :

Requirements Manual. i i

License Amendment Request 95-03 has been reviewed and approved by the Station Operation  :

Review Committee and the Nuclear Safety Audit Review Committee.

As discussed in the enclosed License Amendment Request,Section IV, the proposed changes do not involve a significant hazards consideration pursuant to 10CFR50.92. A copy of this letter and the  ;

enclosed License Amendment Request have been forwarded to the State of New Hampshire State Liaison Officer pursuant to 10CFR50.91(b). In addition, North Atlantic has determined that License Amendment Request 95-03 meets the criteria of 10CFR51.22(c)(9) for a categorical exclusion from the requirements for an Environmental Impact Statement (see Section VI enclosed). ,

l North Atlantic requests NRC review of License Amendment Request 95-03 and issuance of a' ,

license amendment by November 24,1995 (see Section V enclosed).

1 31C013 g1  ;

9507310052 950724 .

PDR p

ADDCK 05000443 PDR 1\

Un,ited Sta'tes Nuclear Regulatory Commission July 24,1995 Attention: Document Control Desk Page two Should you have any questions regarding this letter, please contact Mr. James M. Peschel, Regulatory Compliance Manager at (603) 474-9521, extension 3772.

Very t yours,

//// A /'

Ted C. Feigenbaum Enclosure TCF:JMPjr cc: Mr. Thomas T. Martin Regional Administrator United States Nuclear Regulatoiy Commission Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Albert W. De Agazio, Sr. Project Manager Project Directorate 1-4 Division of Reactor Projects U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. John II. Macdonald NRC Senior Resident Inspector P.O. Ilox 1149 Seabrook, Nil 03874 Mr. George L. Iverson, Director New ilampshire OfUce of Emergency Management 107 Pleasant Street Concord, Nil 03301