ML20086K057

From kanterella
Jump to navigation Jump to search
Corrected Monthly Operating Rept for May 1995 for BSEP Unit 1
ML20086K057
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 05/31/1995
From: Harrison F
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20086K052 List:
References
NUDOCS 9507190352
Download: ML20086K057 (2)


Text

. .,-

ENCLOSURE 1 BRUNSWICK STEAM ELECTRIC PLANT, UNITS NOS.1 AND 2 l DOCKET NOS, 50-325 & 50-324 l LICENSE NOS. DPR-71 & DPR-62 l PLANT PERFORMANCE DAT,% SYSTEM OPERATING DATA REPORT l BRUNSWICK UNIT 1 CORRECTED COPY - May 1995 Unit 1 Operating Data Report 9507190352 950712 El-1 PDR ADOCK 05000324 R PDR

( CORRECTED COPY CP&L '7'O PLANT PERFORMANCE DATA SYSTEM PAGE 1 31UN DATE 06/23/95 OPERATING DATA REPORT RPD36-000 RUN TIME 12:00:33 BRUNSWICK UNIT 1 DOCKET NO. 050-0325 COMPLETED BY FRANCES HARRISON OPERATING STATUS TELEPHONE (910)457-2756

1. UNIT NAME: BRUNSWICK UNIT 1 NOTES
2. REPORTING PERIOD: MAY 95
3. LICENSED THERMAL POWER (MWT) : 2436
4. NAMEPLATE RATING (GROSS MWE) : 867.0
5. DESIGN ELECTRICAL RATING (NET MWE) : 821.0
6. MAX DEPENDABLE CAPACITY (GROSS MWE) : 791.0
7. MAX DEPENDABLE CAPACITY (NET MWE): 767.0 -------------------------------
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THRU 7) SINCE LAST REPORT, GIVE REASONS:
9. POWER LEVEL TO WHICH RESTRICTED IF ANY (NET MWE) :
10. REASONS FOR RESTRICTION IF ANY:

THIS YR TO CUMUL MONTH DATE ATIVE

11. HOURS IN REPORTING PERIOD 744.00 3623.00 159575.00
12. NUMBER OF HOURS REACTOR CRITICAL 351.34 2516.04 98387.36
13. REACTOR RESERVE SHUTDOWN HRS .00 .00 1647.10
14. HOURS GENERATOR ON LINE 246.86. 2411.56 94368.55
15. UNIT RESERVE SHUTDOWN HOURS .00 .00 .00
16. GROSS THERMAL ENERGY GEN. (MWH) 549339.44 5788567.41 207324294.30
17. GROSS ELEC. ENERGY GEN. (MWH) 172035.00 1914655.00 68074380.00
18. NET ELEC. ENERGY GENERATED (MWH) 163216.00 1854386.00 65453425.00
19. UNIT SERVICE FACTOR 33.18 66.56 59.14 .
20. UNIT AVAILABILITY FACTOR 33.18 66.56 59.14
21. UNIT CAP. FACTOR (USING MDC NET) 28.60 66.73 52.29
22. UNIT CAP. FACTOR (USING DER NET) 26.72 62.34 49.96
23. UNIT FORCED OUTAGE RATE .00 .00 14.61
24. SHUTDOWNS SCHED. OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH) :
25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START UP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION) : FORECAST ACHIEVED INITIAL CRITICALITY -------- --------

INITIAL ELECTRICITY -------- --------

COMMERCIAL OPERATION -------- --------

1.16 - 9

.