Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217E0451999-09-30030 September 1999 Proposed Tech Specs Supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10 ML20211F9511999-08-26026 August 1999 Proposed Tech Specs Pages,Raising Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML20196E6541999-06-21021 June 1999 Proposed Tech Specs Pages for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20195B5531999-05-24024 May 1999 Proposed Tech Specs Correcting Typos & Editorial Errors. Corrections Are Considered to Be Administrative in Nature ML20196L1231999-05-17017 May 1999 Proposed Tech Specs Pages,Revising TS to Include Oscillation Power Range Monitor (OPRM) Sys ML20206G2111999-04-30030 April 1999 Proposed Tech Specs,Incorporating Programmatic Controls in Tech Specs for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20205E8101999-03-29029 March 1999 Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20204J2871999-03-22022 March 1999 Proposed Tech Specs Bases Page B 3/4 8-1d,correcting Editorial Errors ML20204J1291999-03-22022 March 1999 Proposed Tech Specs Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 ML20202B6171999-01-19019 January 1999 Revised TS Bases 3/4.6.1.1,revised to Clarify When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML20198T0281998-12-30030 December 1998 Proposed Tech Specs Re Changes to Flood Protection TS LCO & Associated Action Statements ML20198N3981998-12-28028 December 1998 Proposed Tech Specs Permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys ML20198C9641998-12-16016 December 1998 Proposed Tech Specs Pages,Replacing Accelerated Testing Requirements of TS Table 4.8.1.1.2-1 with EDG Performance Monitoring & Deleting TS 4.8.1.1.3 Requirement to Submit 30- Day Special Rept for Diesel Failures ML20155D3591998-10-22022 October 1998 Proposed Tech Specs Page for Amend to License NPF-57, Establishing More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5871998-10-19019 October 1998 Proposed Tech Specs Section 3.0.4,eliminating Restrictions for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities ML20154L5021998-10-0808 October 1998 Revised Tech Spec Page,Which Corrects Editorial Errors ML20151X7321998-09-0808 September 1998 Proposed Tech Specs Permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4331998-08-25025 August 1998 Proposed Tech Specs,Implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs ML20236F1171998-06-25025 June 1998 Proposed Tech Specs Deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8181998-06-12012 June 1998 Proposed Tech Specs Re Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintain Ultimate Heat Sink Operation within Design ML20247K7381998-05-13013 May 1998 Proposed Tech Specs Page Re Change to Inservice Leak & Hydrostatic Testing Requirements ML20217P9351998-04-28028 April 1998 Proposed Tech Specs Section 3/4.4.2,implementing More Appropriate SRV Setpoint Tolerances ML20216F4541998-03-0606 March 1998 Proposed TS Section 4.2.2 Re Terrestrial Ecology Monitoring ML20197H5941997-12-19019 December 1997 Proposed Tech Specs Pages,Revising TS Section 4.2.2, Terrestrial Ecology Monitoring, by Changing Wording to Include Completion of Salt Drift Monitoring Program ML20211M2401997-10-0303 October 1997 Proposed Tech Specs Pages Associated W/Slmcpr Changes ML20217D3761997-09-29029 September 1997 Proposed Tech Specs Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated ML20211F6201997-09-24024 September 1997 Proposed Tech Specs Section 3/4.5.1,adding Surveillance Requirement to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie-valves ML20211M2641997-08-26026 August 1997 Revised TS Bases Pages for Amend 101 to License NPF-57 ML20217Q6731997-08-26026 August 1997 Proposed Tech Specs,Requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20198H2471997-08-26026 August 1997 Proposed Tech Specs Implementing Conservative Safety Limit Min Critical Power Ratio for Plant Cycle 7 Core & Fuel Designs ML20217Q3081997-08-25025 August 1997 Proposed Tech Specs Re Ultimate Heat Sink Temp & River Water Level Limits ML20210P3471997-08-20020 August 1997 Proposed Tech Specs Deleting References to Plant Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage ML20211M2531997-07-16016 July 1997 Sanitized Version of TS Page Changes Re SLMCPR ML20149G4301997-07-16016 July 1997 Proposed Tech Specs Implementing Appropriately Conservative Safety Limit Min Critical Power Ratio ML20141C1621997-06-19019 June 1997 Proposed Tech Specs Revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & to Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20140D2201997-05-30030 May 1997 Proposed Tech Specs,Providing marked-up Pages to Address NRC Reviewer Comments ML20141G8291997-05-19019 May 1997 Proposed Tech Specs Revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Issues Related Issues Documented in Hope Creek Corrective Action Program ML20137N6271997-04-0101 April 1997 Proposed Tech Specs 4.6.1.1, Primary Containment Integrity, TS 3/4.6.1.2, Primary Containment Leakage, TS 3/4.6.1.3, Primary Containment Air Locks & TS 4.6.1.5.1, Primary Containment Structural Integrity ML20137M5961997-03-31031 March 1997 Proposed Tech Specs,Representing Changes to TS 2.1.2,action a.1.c for LCO 3.4.1.1 & Bases for TS 2.1 ML20137M1331997-03-31031 March 1997 Proposed Tech Specs Revising TS to Improve Consistency Between TS & Plant Configuration,Operation & Testing & Completing Required CA to Resolve Discrepancies Identified in CA Program ML20135E8101997-03-0303 March 1997 Proposed Tech Specs 3/4.3.1 Re Reactor Protection Sys instrumentation,3/4.3.2 Re Isolation Actuation Instrumentation & 3/4.3.3 Re Emergency Core Cooling Sys Actuation Instrumentation ML20134M0921997-02-11011 February 1997 Proposed Tech Specs 3/4.8 Re Electrical Power Systems ML20134B5511997-01-24024 January 1997 Proposed Tech Specs 3.1.3.5 Re Control Rod Scram Accumulators ML20132F1791996-12-11011 December 1996 Revised Tech Specs Re Changes to TS Bases B 3/4.3.1, Reactor Protection Sys Instrumentation, & B 3/4.3.2, Isolation Actuation Instrumentation ML20135D6851996-12-0404 December 1996 Proposed Tech Specs 3.1.3.5, CR Scram Accumulators, for Improvement & Clarifies Statement of 961025 Initial Request ML20134F3831996-10-25025 October 1996 Proposed Tech Specs 3/4.3.1,3/4.3.2 & 3/4.3.3 Re Reactor Protection Sys Instrumentation,Isolation Actuation Instrumentation & Emergency Core Cooling Sys Actuation Instrumentation ML20134F4311996-10-25025 October 1996 Proposed Tech Specs 3.1.3.5 Control Rod Scram Accumulators ML18102A2561996-07-12012 July 1996 Proposed Tech Specs Re Qualifications of Operations Manager ML18101B3831996-05-22022 May 1996 Proposed Tech Specs,Requesting Approval of Changes to QA Program 1999-09-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217E0451999-09-30030 September 1999 Proposed Tech Specs Supporting Use of ABB-CE Fuel & Reload Analyses Beginning with Upcoming Cycle 10 ML20216E6201999-09-10010 September 1999 Revised Event Classification Guide,Including Rev 14 to Table of Contents & Rev 10 to Attachments 6,7 & 9 ML20211F9511999-08-26026 August 1999 Proposed Tech Specs Pages,Raising Condensate Storage Tank (CST) Low Level Setpoints & Corresponding Allowable Values Associated with Transfer of HPCI & RCIC Pump Suctions from CST to Suppression Pool ML20196E6541999-06-21021 June 1999 Proposed Tech Specs Pages for HCGS License Change Requests H99-02 & H99-05,dtd 990329 & 0524,respectively ML18107A3601999-06-0404 June 1999 Non-proprietary Tech Specs Pages Re Transfer of PSEG Ownership Interests & Licensed Operating Authorities to New, Affiliated Nuclear Generating Company,Pseg Nuclear LLC ML20195B5531999-05-24024 May 1999 Proposed Tech Specs Correcting Typos & Editorial Errors. Corrections Are Considered to Be Administrative in Nature ML20196L1231999-05-17017 May 1999 Proposed Tech Specs Pages,Revising TS to Include Oscillation Power Range Monitor (OPRM) Sys ML20206T8941999-05-12012 May 1999 Revised Event Classification Guide,Including Rev 12 to Table of Contents,Rev 8 to Attachment 8,Rev 8 to Attachment 7 & Rev 8 to Attachment 9 ML20206G2111999-04-30030 April 1999 Proposed Tech Specs,Incorporating Programmatic Controls in Tech Specs for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20206G2281999-03-31031 March 1999 Rev 18 to ODCM for Hope Creek Generating Station ML20205E8101999-03-29029 March 1999 Proposed Tech Specs Incorporating Programmatic Controls for Radioactive Effluents & for Environ Monitoring Conforming to Applicable Regulatory Requirements ML20204J2871999-03-22022 March 1999 Proposed Tech Specs Bases Page B 3/4 8-1d,correcting Editorial Errors ML20204J1291999-03-22022 March 1999 Proposed Tech Specs Bases Pages B 3/4 8-1,B 3/4 8-1a, B 3/4 8-1b,B 3/4 8-1c & B 3/4 8-1d,correcting Editorial Errors That Occurred During Implementation of Hope Creek License Amends 100 & 101 ML20202B6171999-01-19019 January 1999 Revised TS Bases 3/4.6.1.1,revised to Clarify When Verification of Primary Containment Integrity May Be Performed by Administrative Means ML20198T0281998-12-30030 December 1998 Proposed Tech Specs Re Changes to Flood Protection TS LCO & Associated Action Statements ML20198N3981998-12-28028 December 1998 Proposed Tech Specs Permitting Increase in Allowable Leak Rate for MSIVs & Deleting MSIV Sealing Sys ML20198C9641998-12-16016 December 1998 Proposed Tech Specs Pages,Replacing Accelerated Testing Requirements of TS Table 4.8.1.1.2-1 with EDG Performance Monitoring & Deleting TS 4.8.1.1.3 Requirement to Submit 30- Day Special Rept for Diesel Failures ML20155D3591998-10-22022 October 1998 Proposed Tech Specs Page for Amend to License NPF-57, Establishing More Appropriate Minimum Battery Electrolyte Temperature Limits ML20154R5871998-10-19019 October 1998 Proposed Tech Specs Section 3.0.4,eliminating Restrictions for Filtration,Recirculation & Ventilation Sys During Fuel Movement & Core Alteration Activities ML20154L5021998-10-0808 October 1998 Revised Tech Spec Page,Which Corrects Editorial Errors ML20151X7321998-09-0808 September 1998 Proposed Tech Specs Permitting Use of non-class 1E Single Cell Battery Chargers,With Proper Electrical Isolation,For Charging Connected Cells in Operable Class 1E Batteries ML20151S4331998-08-25025 August 1998 Proposed Tech Specs,Implementing Appropriately Conservative SLMCPR for Upcoming Cycle 9 Plant Core & Fuel Designs ML20236F1171998-06-25025 June 1998 Proposed Tech Specs Deleting Requirement to Perform in-situ Functional Testing of ADS Valves Once Every 18 Months as Part of Startup Testing Activities ML20249A8181998-06-12012 June 1998 Proposed Tech Specs Re Increased Operational Flexibility During Periods of Elevated River Water Temp & Maintain Ultimate Heat Sink Operation within Design ML20247K7381998-05-13013 May 1998 Proposed Tech Specs Page Re Change to Inservice Leak & Hydrostatic Testing Requirements ML20216B0641998-05-0101 May 1998 Rev 1 to ECG-ATT 14, Four Hour Rept - NRC Operations & Rev 7 to ECG-HECG-TOC, Hope Creek Event Classification Guide Table of Contents/Signature Page ML20217P9351998-04-28028 April 1998 Proposed Tech Specs Section 3/4.4.2,implementing More Appropriate SRV Setpoint Tolerances ML20216F4541998-03-0606 March 1998 Proposed TS Section 4.2.2 Re Terrestrial Ecology Monitoring ML18106A8281998-03-0404 March 1998 Rev 1 to Reactivity Manipulations Documentation Guide. ML20197H5941997-12-19019 December 1997 Proposed Tech Specs Pages,Revising TS Section 4.2.2, Terrestrial Ecology Monitoring, by Changing Wording to Include Completion of Salt Drift Monitoring Program ML20197H8511997-12-0808 December 1997 Rev 0 to IST Program Submittal Interval 2,Dec 21,1997 Through Dec 20,2006 ML20198J6431997-10-10010 October 1997 Rev 0 to 55-WP3/F43TB3-05, Weld Procedure ML20211M6121997-10-0707 October 1997 Cycle 4 Startup Physics Testing ML20211M2401997-10-0303 October 1997 Proposed Tech Specs Pages Associated W/Slmcpr Changes ML20217D3761997-09-29029 September 1997 Proposed Tech Specs Adding Requirement to Perform Weekly Sampling & Monthly & Quarterly Composite Analyses of Ssws When Racs Is Contaminated ML20211F6201997-09-24024 September 1997 Proposed Tech Specs Section 3/4.5.1,adding Surveillance Requirement to Perform Monthly Valve Position Verification for Each of Four Residual Heat Removal cross-tie-valves ML20198H2471997-08-26026 August 1997 Proposed Tech Specs Implementing Conservative Safety Limit Min Critical Power Ratio for Plant Cycle 7 Core & Fuel Designs ML20217Q6731997-08-26026 August 1997 Proposed Tech Specs,Requesting Rev to TS to Clarify Plant Basis for Compliance W/Frvs TS Requirements ML20211M2641997-08-26026 August 1997 Revised TS Bases Pages for Amend 101 to License NPF-57 ML20217Q3081997-08-25025 August 1997 Proposed Tech Specs Re Ultimate Heat Sink Temp & River Water Level Limits ML20198J6541997-08-20020 August 1997 Rev 3 to 55-PQ7001-03, Procedure Qualification Record ML20198J6501997-08-20020 August 1997 Rev 5 to WP3/F43TB3-05, Welding Procedure Specification ML20210P3471997-08-20020 August 1997 Proposed Tech Specs Deleting References to Plant Suppression Pool Water Volume from TS & Supporting Planned Mods to ECCS Suction Strainers in Upcoming Refueling Outage ML20149G4301997-07-16016 July 1997 Proposed Tech Specs Implementing Appropriately Conservative Safety Limit Min Critical Power Ratio ML20211M2531997-07-16016 July 1997 Sanitized Version of TS Page Changes Re SLMCPR ML20141C1621997-06-19019 June 1997 Proposed Tech Specs Revising Sections of TSs to Delete Reference to Rod Sequence Control Sys & to Reduce Rod Worth Minimizer Low Power Setpoint from 20% to 10% ML20140D2201997-05-30030 May 1997 Proposed Tech Specs,Providing marked-up Pages to Address NRC Reviewer Comments ML20141G8291997-05-19019 May 1997 Proposed Tech Specs Revising Ultimate Heat Sink Temp & River Water Level Limits Which Resolve TS Issues Related Issues Documented in Hope Creek Corrective Action Program ML20137N6271997-04-0101 April 1997 Proposed Tech Specs 4.6.1.1, Primary Containment Integrity, TS 3/4.6.1.2, Primary Containment Leakage, TS 3/4.6.1.3, Primary Containment Air Locks & TS 4.6.1.5.1, Primary Containment Structural Integrity ML20137M1331997-03-31031 March 1997 Proposed Tech Specs Revising TS to Improve Consistency Between TS & Plant Configuration,Operation & Testing & Completing Required CA to Resolve Discrepancies Identified in CA Program 1999-09-30
[Table view] |
Text
.. _ _. _ _ _
INSERT l'OR PROPOSED CilANGE TO E!!&TRICAl, POVFR SYSTfMS TECHNICAL, SPJCIFI.CAJ LONS INSERT 1
...shallbepreceded,within5 minutes,byaprelubeperiodandoperati$n at rated load for at least i hour or until operating temperatures have stabilized.
9104150190 910401 PDR ADOCK 05000354 PDR p ,
ELECTRICAL POWER SYSTEMS SURVEILLANCE REQUIREMENT _S (Continued) ,,,_
- 3. Within 2 weeks after fbtaining the sample, verify that the other -
properties specified :n Table 1 of ASTM 0975-77 and Regulatory Guide 1.137 Position 2.a. are met when tested in accordance withASTM0$75-77.
- g. At least once per 2 months, by verifying the buried fuel oil transfer piping's cathodic protection system is OPERABLE and at least once per year by subjecting the cathodic protection syste' to a performance test,
- h. At least once per 18 months #,M during shutdown, bf:
- 1. Subjecting the diesel to an inspection in accJre nce with procedurespreparedinconjunctionwithitsmanufa-turer's recommendations for this class of standby service.
- 2. Verifying the diesel generator capability to rtiect a load of greater than or equal to that of the RHR pump me, ton (1003 kW) for each diesel generator while maiY aining volt 6p at 4160 t 420 volts and frequency at 60 1 1.2 Hz.
- 3. Verifying the diesel generator capability to rejec'. 6 load of 4430 kW without tripping. The generator-voltage shsil not exceed 4580voltsduringandfollowingtheloadrejactie.
4 Simulating a loss of offsite power by itself, and:
a) Verifying loss of power is detected and deenergizstioa of the emer busses, gency busses and load shedding from the emergency b) Verifying the diesel generator starts
- on the auto st.irt signal, energizes the emergency busses with permanentiy connected loads within 10 seconds after receipt of t' < start signal, energizes the autoconnected shutdown loads in'ough the load sequencer and operates for greater than c/ ettual to 5 minutes while its generator is loaded with W shutdown loads. After energization the steady state voltage and frequency of the emergency, busses shall be maintatoed at 188EIT I 4160 t 420 volts and 60 i 1.2 Hz during this test. -
6
'ngs{ j ecl and_s g e g g 0 s,g g
== unaxx- '
- ar m =.r = .m x.: int;un l g" n Z Gil;ZE Li" E Ji' ZT.L""' 'i Z 'Z T "'"'"J m_'" "'
must be loaded in accordance with the manufacturer's recommendations. 4
- The surveillance interval for Emergency Diesel Generators 1AG400 and 1DG400, '
overdue beginning August 19 and 27, 1989 respectively, is extended until October 15, 1989 and the provisions of Specification 4.0.2.a are not applicable for this one-time extension (i.e., this surveillance interval will be considered as an 18-month interval). With regard to the provisions of Specification 4.0.2.b.
the combined time interval accrued for previous consecutive intervals for this surveillance section by all four Emergency Diesti Generators, on a one-time oasis, is considered to be zero upon complettor,, during the second refueling outage, of all 18 month surveillance of this fpecificction.
HOPE CREEK 3/4 8-6 Amendment No.
A)O Cl/MC(7Ill$ l15, INCLUDED fol? Cb"DNUOY' ELECTRICAL POWER SYSTEMS SURVEILLANCE RE0VIREMENTS (Continued)
- 5. Verifying that on an ECCS cetuation test signal, without loss of of fsite power, the diesel generator starts on the auto start signal and operates on standby for greater than o.' equal to
$ minutes. The generator voltage and frequency sha n be 4160 1420 volts and 6011.2 Hz within 10 seconds after the i auto-start signal; the steady state generator voltage and fre- l quency shr.11 be maintained within these limits during this test.
- 6. Simulat'ng a loss of offsite puwer in conjunction with an ECCS actuation test signal, and:
a) Verifying loss of power is detected and deenergization of the emergency busses and load shedding from the emergency -
busses, b) Verifying the diesel generator starts
- on the auto start signal, energizes the emergency busses with permanently connected loads within 10 seconds af ter receipt of the start signal, energizes the autoconnected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the emergency loads. After energization, the steady state voltage and frequency of the' emergency busses shal_1 be main-tained at 4160 1 420 volts and 60 i 1.2 Hz during this test.
- 7. Verifying that all automatic diesel generator trips, except engine overspeed, generator differential current, generator overcurrent, bus differential current and low lube oil pressure are automatically bypassed upon loss of voltage on the emergency bus concurrent with an ECCS actuation signal.#
- 8. Verifying the diesel generator operates for at least 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
During the first 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br /> of this test, the diesel generator shall be loaded to between 4300 and 4400 kW** and during the remaining 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of this test, the diesel generator shall be loaded to between 4800 and 4873 kW. The generator voltage and
- This diesel generator start (10 sec) and subsequent loading (130 sec) from ambient sonditions may be preceded by an engine prelube period and/or other warmup procedures recommended by.the manufacturer so that mechanical stress-and wear on the diesel engine is minimizedi
- This band is meant as guidance to avoid routine overloading of the engine.
Loads in excess of this band shall not invalidate.the test; the loads; however, shall not bp less than 4300 kW nor greater than 4873.kW.
- Generator differential current, generator overcurrent, and bus differential.
current is two-out-of-three logic and low lube oil pressure is two-out-of-four logic.
~
HOPE CREEK 3/4 8-7 1
1 ., __ _.._. _ ___ _ - _ _ _ . - . _ _ . _ _ _.
I ELECTRICAt POWER SYSTEMS SURVEILLANCE REQUIREMENTS (Continued) frequency shall be 4160 1 420 volts and 60 1 1.2 Hz within 10 seconds after the start signal; the steady state generator intained within these limits voltage ttring_this et and f requegMH&:
. . . . . . . _ . . . -'e,mg ... . .... p, , 3. . u. , . o g z. .mm , . _ _ _ r . a p . . . ,. n . a.,y. . . ... . . . .
. . . o . s. .,,
- 9. Verifying that the auto-connected loads to each diesel generator do not exceed the continuous rating of 4430 kW.
- 10. Verifying the diesel generator's capability to:
a) Synchronize with the offsite power source while the generator is loaded with its emergency loads upon a simulated restoration of offsite power, b) Transfer its loadt, to the offsite power source, c) Be restored to its standby status, and d) Diesel generator circuit breaker is open.
- 11. Verifying that with the diesel generator operating in a test mode and connected to its bus, a simulated ECCS actuation signal overrides to standby the test mode operation, and by((1) returning energizes
- 2) automatically the dieselthe generator emergency loads with offsite power.
- 12. Verifying that the fuel cil transfer pump transfers fuel oil from each fuel storage tank to the day tank of each diesel via the installed cross connection lines.
- 13. Verifying that the automatic load sequence timer is OPERABLE with the interval betw4en each load block within i 10% of its design interval.
- 14. Verifying that the following diesel generator lockout features prevent diesel generator starting only when required:
a) Engine overspeed, generator differential, and low lube oil pressure (regular lockout relay, (1) 86R).
b) Backup generator differential and generator overcurrent (backup lockout relay, (1) 86B) c) Generator ground and lockout relays-regular, backup and test, energized (breaker failure lockout relay, (1) 86F) j
~
le "If4ueve4444 nee-Regeleement 4.8.1rl.-2n%4rb}-i; .ct ut4&f4stoM4y comp!sted, ib-46-not-necessaey-le-eepeat-the-precee4r.g 24 heue-4esrt. lesteadv4he-
-d i e ssi-gene r a to r-may4e-ope ra ted-a t-between-4300-kw-e nd-4400-kw-fe e-ene-hour-
.-or-unt44-operat4ng-tempeeetere has stebi44 red-pf4er-te npcat4eg4erve444ance 469u4r ^ :nt ^ .- Sv4,1,2. h. ' . b) s%whve
%N unor corry 3/4 8-8
________.