ML20058L885

From kanterella
Jump to navigation Jump to search
Rev 2 to CPSES Glen Rose,Tx ASME Section XI ISI Program Plan Unit 1,Commercial Operation:900813 First Interval
ML20058L885
Person / Time
Site: Comanche Peak Luminant icon.png
Issue date: 04/30/1993
From: Mays R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
Shared Package
ML20058L883 List:
References
PROC-930430, NUDOCS 9305130091
Download: ML20058L885 (300)


Text

- - - - - - - - - - - - - - - - - - - -

i, TU Electric 400 N. Olive St. L.B. 81 G Dallas, TX 75201 COMANCHE PEAK STEAM ELECTRIC STATION GLEN ROSE, TEXAS ASME SECTION XI INSERVICE INSPECTION PROGRAM PLAN REVISION 2 UN!T NO.1 COMMERCIAL OPERATION: AUGUST 13,1990 1ST INTERVAL l l

APRIL 2,1993 Prepared By: 2 h / 4 VJ b # 33093 Supervisor, Mechani Codds 5f S andards Reviewed B becA . ra n / M c_ d 4 . a t 3/!D 4 Manager, QA Approved By: .  ! M/~ 3 Mids Wanager, Mechanical Engineering 9305130091 93050 gDR ADOCK 05000 45 PDR

. . . . . . . . A

O O

O I

%m~ ~~_ __ "' "'-"- - - _ . _ __.__ __ -_. _.

O

1.0 INTRODUCTION

1.1 GENERAL PLANT DESCRIPTION The Comanche Peak Steam Electric Station (CPSES) is a two unit plant having Westinghouse pressurized water reactors each with an electrical output of 1159 MWe.

CPSES was constructed to the ASME Boiler and Pressure Vessel Code, Section lit,1974 Edition, including Summer 1974 Addenda for piping and Winter 1974 Addenda for component supports.

1.2 PURPOSE The purpose of this plan is to provide details pertaining to performance of the Inservice inspection (ISI) at CPSES, Unit 1 (including common and Unit 2 systems required to support Unit 1 operations). This plan demonstrates compliance with the Code of Federal Regulations,10CFR50.55 a(g), and with Technical Specifications paragraph 4.0.5. This &j\ j plan meets the requirements of the 1986 Edition of the ASME Boiler and Pressure '

Vessel Code,Section XI, no addenda and including the Code Cases identified in l Appendix C of this plan (hereafter referred to as the Code).

1.3 RESPONSIBILITY TU Electric (Owner)is responsible for preparation and maintenance of the ten year ISI program plan, including any required reference drawings and bsundary drawings. The owner shall prepare each outage plan which will defir,e the scope of examinations, O determine extent of any examinations, and define the method of each exam. After each outage, the examination plan sha!! be updated by the owner to reflect the completed examinations, and a sumtnary report shall be prepared and submitted to the Regulatory and Entorcement Authorities. The Owner shall be responsible for any associated craft labor required for the inspections including access provisions, insulation removal, weld preparation and other aspects. The Owner shall be responsible for the evaluation of all ISI examination records including indication evaluation and associated corrective actions.

A contractor working under the guidance of the Owner, willin most cases perform the examinations. The contractor will submit procedures for performance of examinations to the Owner for approval. An ISI coordinator and a suitable number of examination teams with the required NDE equipment will be provided to complete all scheduled examinations for the outage. The contractor shall conduct the examinations, review the data and make suitable recommendations to the Owner.

1.4 SCOPE ISt. as used in this plan, is the program of planned examinations of welds, components and their supports, which is implemented during the service life of a commercial nuclear power plant. This plan addresses those examinations to be performed on ASME Class 1, 2 and 3 systems and components as stipulated in the Code and in Code Case N-460.

The testing of pumps and valves as stipulated in subsections IWP and IWV of the Code is not within the scope of this plan.

O 1-1

-_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . J

) .

1.5 ACRONYMS

( ANSI American National Standards institute ASME American Society of Mechanical Engineers CPSES Comanche Peak Steam Electric Station FSAR FinalSafety Analysis Report ISI Inservice lnspection PSI Fre-Service lnspection NDE Non-destructive Examination 1.6 EXEMPTIONS 1.6.1 Code Class 1 The following Code Class 1 cornponents (or parts of components) are exempted from the volumetric and surf ace examination requirements of subar*cle IWB-2500 of the Code by Subsubarticle IWB-1220.

(a) components that are connected to the reactor coolant system and part of the reactor coolant pressure boundary, and that are of such a size and i shape so that upon postulated rupture the resulting flow of coolant from j the reactor coolant system under normal plant operating conditions is l within the capacity of makeup systems which are operable from on-site l emergency power; (b) (1) piping of NPS 1" and smaller and their supports, except for steam generator tubing; (2) components, their supports and their connections in piping of NPS 1" and smaller; (c) reactor vessel head connections and associated piping, and their supports, NPS 2" and smaller, made inaccessible by control rod drive penetrations.

1.6.2 Code Class 2 The following Code Class 2 components (or parts of components) are exempted from the volumetric and surf ace examination requirements of Subarticle IWC-2500 of the Code by Subsubarticle IWC-1220.

1.6.2.1 Components within RHR, ECC, and CHB Systems (or Portions of Systems):

(a) Vessels, piping, pumps, valves, and other components, and their supports, NPS 4" and smaller in all systems except high pressure safety injection systems.

(b) Vessels, piping, pumps, valves, and other components, and their supports, NPS 1 1/2" and smaller in high pressure safety injection systems.

l N

1-2 i

- - _ _ _ - _ _ _ _ _ _ _ _ - - _ _ - . - . }

I, I

(c) Component connections NPS 4" and smaller (including nozzles,

, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size in all systems except

\ high pressure safety injection systems.

(d) Component connections NPS 1 1/2" and sma!!er (including nozzles, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size in high pressure safety injection systems.

(e) Vessels, piping, pumps, valves, other ccm *nd component connections of any size in st.: .,

,urized, passive (i.e., no pumps) safety injection sysem:,.

(f) Piping, other components, and their supports of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating conditions.

1.6.2.2 Components Within Systems (or Portions of Systems) Other Than t

RHR, ECC, and CHR Systems:

(a) Vessels, piping, pumps, valves, other components, and their supports NPS 4* and smaller.

(b) Component connections NPS 4" and smaller (including nozzles, sockets fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size.

Q

(/

(c) Vessels, piping, pumps, valves, other components, and component connections of any size in systems or portions of systems that operate ( when the system function is required) at a pressure equal to or less than 275 psig and at a temperature equal to or less than 200*F.

(d) Piping, other components and their supports of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating conditions.

1.6.2.3 Concrete Encased Components Piping support members and piping support components that are encased in concrete shall be exempted from the examination requirements of Subarticle IWC-2500.

Note: RHR, ECC ard CHR systems are the residual heat removal, emergency f ore cooling, and containment heat removal systems, re!.pectively, and are described as such in section 6 of the FSAR.

1.6.3 The following Code Class 3 cornponents (or parts of components) are exempted from the visual examination equirements of Subarticle IWD-2500 of the Code by Subarticle IWD-1220.

/'%

13 J

~

(a) Integral attachments of supports anti restraints to components that are NPS 4" and smaller within the system boundaries of Examination O, Categories D-A, D-B, and D-C of Table IWD-2500-1 Mall be exempt from the visual examination VT-3, except for Auxiliary Feedwater Systems.

(b) Integral attachments of supports and restraints to components exceeding NPS 4" may be exempted from the visual examination VT-3 of Table IWD-2500-1 provided:

(a) the components are located in systems (or portions of systems) l whose function is not required in support of reactor residual heat removal, containment heat removat, and emerDency core cooling; and 1 (b) the components operate at a pressure of 275 psig or less and at a temperature of 200*F or less.

1.7 REFERENCE SYSTEM Weld areas subject to surface or volumetric examination shall be identifiable through a reference system as specified by Subarticle IWA-2600 and Appendix 111 of the Code. This system shall consist of a combination of physical markings and written direction provided in this plan and in site implementing procedures. Welds within the boundaries of the ISI program are uniquely identified on isometric drawings which provide weld numbers and locations. In those cases where the physical configuration will not provide positive weld location, dimensionalinformation can be obtained from construction isometric drawings or piping f abrication drawings to allow for such positive identification. These documents are maintained as permanent plant records. Welds which were inadvertently not marked or whose marks have been removed shall be marked at the time inservice inspection is s performed. The method of marking these indications on the pipe will be delineated in the I implementing procedures.

1.8 RELIEF REQUESTS Where a particular examination requirement of the Code is determined to be impractical, a request for reEef from the requirement shall be submitted pursuant to the requirement of 10CFR50.55a (g)(6)(i).

Each request for relief shall contain the following information, as a minimum:

(a) Identification of the component (s) for which relief is requested; (b) Code class of the component (s);

(c) Code examination requirements for the component (s);

(d) Basis for the request; (e) Propose attemative examinations,if any; and, (f) Anticipated impact on the overall level of plant quality and safety.

1-4

- _ _ _ - _ - _ i

Requests for relief from impractical Code requirements that are presently known are contained within this plan. These reDef requests are contained in Appendix A. For those O impractical Code requirements that may become apparent in the course of the ISI, a request for relief shall be prepared and submitted to the Regulatory Authorities for approval.

1.9 RECORDS RETENTION Records and documentation of information and examination results wtuch provide the basis for evaluation and facilitate the comparison of examination results from previous and subsequent examinations shall be maintained as permanent plant records at CPSES in accordance with Article IWA-6000 of the Code. As a minimum, this documentation shall include the applicable records described in Subsubarticle IWA-6340.

1.10 AUTHORIZED INSPECTION AGENCY in accordance with Subarticle IWA-1400, paragraph (f), of the Code, TU Electric shall maintain a contract with an Authorized inspection Agency for an Authortzed Nuclear Inservice inspector (ANil) to provide inspection services as described in subarticle IWA-2110 of the Code. The ANilis afforded the opportunity to verify examinations and review the plan, examination procedures, examination records, certification records and other '

associated documents.

1.11 INTERIM CHANGE REQUESTS Changes to the plan may be made prior to the issuance of the next plan revision with the use of Interim Change Requests (ICR's) An ICR may be initiated when any user or holder of the plan identifies a need for a change or clarification to the contents of the plan. The  ;

O process for initiation, review, approval and distribution of ICR's is described in detail in the implementing procedure. An index of ICR's is contained in Appendix B of this plan. l O 1-5

- _ _ _ _ - _ _ _ _ J

I DATE: 03/19/93 CCMCCHE PEAK UNIT 1 PAGE: 1

  • REVISION: 0 INSERVICE INSPECTION SUDMARY FOR THE FIRST INTERVAL SECTION XI SLDMARY WUMBER WLMBER OF COMPONENTS OF COMPONENTS SCHEDULED / COMPLETED / PERCENTAGE OF REQUIREMENT CATEGORY CCMPONENTS REQUIRED FIRST PERIOD SECOND PERICD THIRD PERICD s-A 24 29 1 3 13% 3 0 241 22 0 100%

s-s 8 8 1 2 37% 1 0 50% 4 0 100%

B-0 36 36 10 0 27% 14 0 66% 12 0 100%

s-F 22 22 4 2 27% 7 0 59% 9 0 100%

B-G-1 181 168 55 0 32% $5 0 65% 58 0 100%

B-G-2 69 30 4 5 30% 10 0 63% 11 0 100%

s-M 1 1 0 0 C% 0 0 0% 1 0 100%

B-J 799 212 17 53 33% 63 0 62% 79 0 100%

B-K-1 13 13 0 3 23% 5 0 61% 5 0 100%

B-L 1 4 1 0 0 0% 0 0 0% 1 0 100%

8-L-2 4 1 0 0 0% 0 0 0% 1 0 100%

B-M-2 25 4 1 0 25% 1 0 50% 2 0 100%

B-N-1 2 4 0 1 25% 1 0 50% 2 0 100%

B-N-2 1 1 0 0 0% 0 0 0% 1 0 100%

E-0 25 4 0 1 25% 1 0 50% 2 0 100%

C-A 35 23 1 4 21% 10 0 65% 8 0 100%

9 C-B C-C C-D 13 126 1

14 101 1

0 5 18 1

4 28%

22%

0 100%

44 5

0 0

0 0 100%

64%

66%

5 34 0

0 100%

0 100%

0 100%

C-F-1 2263 181 12 36 26% 58 0 58% 75 0 100%

C-F-2 673 58 7 9 27% 22 0 65% 20 0 100%

C-G 32 6 1 1 33% 2 0 66% 2 0 1001 D-A 178 178 15 44 33% 65 0 69% 54 0 100%

D-B 13 13 4 0 301 4 0 61% 5 0 100%

F-B 859 862 89 165 29% 289 0 62% 319 0 1001 F-C 2057 2080 131 590 34% 638 0 65% 721 0 100%

TOTAL 7464 4051 359 941 321 1253 0 64% 1453 0 100%

/e O Page 4.lb

COMANCHE PEAK UNIT 1 PAGE: 1 DATE: 03/22/93 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD l l

ASME l PERIOD PERIOD PERIOD l SEC. XI l--------------------------------l INSTRUCTIONS

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l N M ER IDENTIFICATION ITEM No METN l1 2 3 1 2 3 1 2 3 l- ** CALIBRATION BLOCK **

REACTOR COOLANT TBX-RCPCRV-01 B-A UT 1- - X - - - X - - 83 2ND CAL. BLOCK RV-7 FROM 000100 Tax-1 1100-1 B1.30 FLANGE SEAL SURFACE. 50%

RV FLANGE TO SHELL WELD PARTIAL IN 1ST PERIOD. TDLR VERIFICATION BOUNDARY.

e.gy.jee 000200 Tax-1-1100-2 B-A UT 1- - - - - - X - - 83 TDLR VERIFICATION BOUNDARY.

RV UPPER TO INTERMEDIATE SHELL B1.11 WELD

    • gy.2**

BA UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV-7 USED FOR s000300 TBx-1-1100-3 RV INVERMEDIATE TO LOWER SHELL B1.11 NEAR SURFACE EXAM. TDLR WELD VERIFICATION BOUNDARY.

    • gy.2**

000400 TBx-1-1100-4 BA UT 1- - - - - - X - - 83 NOTE - 9.6 IN. SHELL SIDE RV LOWER SHELL TO BOTTOM HEAD B1.11 (RV-2),6.3 IN. HEAD SIDE WELD (RV 3). TDLR VERIFICATION 1 BOUNDARY.

    • gy.2**

000500 TBx 1-1100-5 B-A UT 1- - - - - - X - - 82 EXAM CONDUCTED FROM 0.D. AS g

  • RV LOWER HEAD CIRCUMFERENTIAL B1.21 INSTRUMENTATION PRECLUDES 1.D.

WELD EXAM. TDLR VERIFICATIDW B3JNDARY.

eeigx.26**

000600 TBK-1-1100-6 B-A UT 1- - - - - - X - - 83 TDLR VERIFICATION BOUNDARY.

RV UPPER SHELL LONGITLDIhAL B1.12 WELD e gy. gee 1

l t

COMANCHE PEAK UNIT 1 FAGE: 2 DATE: 03/22/93 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD l {

l '

ASME PERICD PERIOD PERIOD l l

SEC. El l ---**--------------~~-----l INSTRUCTIONS

SUMMARY

EXANINAfl0N AREA CATGY NDE l------0UTAGE------l 1 2 3 1 2 3 l **CAllBRATION BLOCK **

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 i

REACTOR COOLANT TBW-RCPCPV-01 t 000700 TEX-1 1100-7 B-A UT 1- - - - - - X - - 83 TDLR VERIFICATION BOUNDARY. l RV UPPER SHELL LONGITLDlhAL B1.12 WELD eegy.jee  ;

i l

000800 TBX-1-1100-8 B-A UT 1- - - - -

  • X - - 83 TDLR VERIFICATION BOUNDARY.

RV UPPER SHELL LONGITLDINAL B1.12 WELD f eeRV.1ee 000900 TBX-1-1100-9 BA UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV-7 USED FOR RV INTERMEDIATE SHELL B1.12 NEAR SURFACE EKAM. TDLR LONGITLDINAL WELD VERIFICATION BOUNDARY.  ;

    • RV- 2" 1
  • 001000 TBx-1-1100-10 B-A UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV-7 USED FOR RV INTERMEDIATE SHELL B1.12 HEAR SURFACE EKAM. TDLR LONGITLDINAL WELD VERIFICATION BOUNDARY.

e.gy.2" [

001100 TBx-1-1100-11 B-A UT 1- - - - - - X - - 83 2HD CAL. BLOCK RV-7 USED FOR RV INTERMEDIATE SHELL B1.12 NEAR SURFACE EKAM. TDLR i LONGITLDINAL WELD VERIFICATION BOUNDARY.

  • egy.gn 6

001200 TBx-1-1100-12 B-A UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV-7 USED FOR RV LOWER SHELL LONGITLDINAL B1.12 NEAR SURFACE EKAM. TDLR ,

WELD VERIFICATION BOUNDARY. ,

    • tv-2**

001300 TBx-1-1100-13 B-A UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV 7 USED FOR RV LOWER SHELL LONGITUDINAL B1.12 NEAR SUkFACE EKAM. TDLR f WELD VERIFICATION BOUNDARY.

eegy.2**

m ,

l 4

i 1

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 3 INSERVICE thSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECT 10N INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERICD PERIOD l SEC. XI l---------------------------------l SUSERY EXAMINATION AREA CATGY NDE l-- ---0UTACE------l INSTRUCTIONS  ;

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK" h

REACTOR COOLANT TBX-RCPCRV-01  ;

f 001400 TBK-1 1100-14 BA UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV-7 USED FOR NEAR SURFACE EXAM. TDLR  !

RV LOKR SHELL LONGITtmINAL B1.12 WELD VERIFICATION BOUNDARY.

    • RV-2**  ;

i 001500 TBX-1-1100-15 B-A UT 1- - - - - - X - - 83 2ND CAL. BLOCK TBX-26 USED RV BOTTOM HEAD MERIDIONAL WELD B1.22 FROM 0.D. AS INSTRUMENTATION LIMITS !.D. ACCESS. TDLR VERIFICATION BOUNDARY.

    • gy.3 e l

l ,

! 001600 TBX-1 1100-16 8-A UT 1- - - - - - X - - 83 2ND CAL. BLOCK TBM-26 USED f RV BOTTOM HEAD MERIDIONAL WELD B1.22 FROM 0.D. AS INSTRUMENTATION I LIMITS !.D. ACCESS. TDLR

( VERIFICATION BOUNDARY.

t

. gy.3ee 001700 TBX-1-1100-17 B-A UT 1- - - - - - X - - 83 2ND CAL. BLOCK TBX-26 USED RV BOTTOM HEAD MERIDIONAL WELD B1.22 FROM 0.D. AS INSTRUMENTAil0N ,

LIMITS 1.D. ACCESS. TDLR VERIFICATION BOUNDARY.

    • RV-3**

001800 TBX-1-1100-18 B-A UT 1- - - - - - X - -

83 2ND EAL. BLOCK TBX-26 USED RV BOTTOM HEAD MERIDIONAL WELD B1.22 TROM 0.D. AS INSTRUMENTATION i1K:TS 1.D. ACCESS. TDLR VERIFICATION BOUNDARY.

eepy.3 e i

001850 TBX-1 1100 OW-2 VT-3 1- - - - - - X - -

83 6 LUGS. TDLR VERIFICATION CORE SUPPORT LUCS B13.60 BOUNDARY.

r

(

l l

l l

l

{

! I i

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 4 INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS  !

INSPECTION INTERVAL,, PLAN STATUS f RESERVICE YEAR l l FIRST SECOC THIRD l L

ASME l PERIOD PERIOD PERIOD l SEC. XI l-----------------------------~~-l t

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCT 10NS [

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l "CAllBRATION BLOCK **  !

REACTOR COOL ANT TBN-RCPCRV-01 001900 TBX-1-1100A-19 B-D UT 1- - X - - - - - - 83 2ND CAL. BLOCK RV-1. TDLR ,

RV OUTLET N0ZZLE TO VESSEL B3.90 VERIFICATION BOUNDARY. ,

WELD e.gy.pe 001910 TBX-1-1100A-19 B-D UT 1- - X - - - - - - 83 2ND CAL. BLOCK UC-1. TDLR RV OUTLET N0ZZLE INNER RADIUS B3.100 VERIFitATION BOUNDARY.  !

    • RV-1**

i k

002000 TBX-1-1100A-20 B-D UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV-1. TDLR RV INLET N0ZZLE TO VESSEL WELD B3.90 VERIFICATION BOUNDARY.

    • RV-7'* ,

f 002010 TBX-1-11DOA-20 B-D UT 1- - - - - - X - - 83 2ND CAL. BLOCK UC-1. TDLR RV INLET N0ZZLE INNER RADIUS 83.100 VERIFICATION BOUNDARY. (

    • RV-1**  !

002100 TBX-1-1100A-21 B-D UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV-1. TDLR RV INLET N0ZZLE TO VESSEL WELD B3.90 VERIFICAfl0N BOUNDARY. l l

    • gy.7*e l

l 002110 TEX-1-1100A-21 B-D UT 1- - - - - - X - - 83 2ND CAL. BLOCK UC-1. TDLR RV INLET N0ZZLE INNER RADIUS B3.100 VERIFICATION BOUNDARY.

    • gy.jee 002200 TEX-1 1100A-22 B-D UT 1- - X - - - - - - 83 2ND CAL. BLOCK RV-1. TDLR RV OUTLET N3ZZLE TO VESSEL B3.90 VERIFICATION BOUNDARY.

WELD

  • egy.pe O

V

DATE: 03/Z2/93 COMANrME PEAK UNIT 1 PAGE: 5 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND THIRD l ASME l PERIOD PERitX) PERl(X) l  ;

SEC. XI l---------------------------------l

  • SUIN4ARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS ,

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

REACTOR COOLANT TBK-RCPCRV-01 i 002210 TBX-1-1100U 22 B-D UT 1- - X - - - - - - 83 2ND CAL. BLOCK UC-1. TDLR >

RV OUTLET N0ZZLE INNER RADIUS B3.100 VERIFICATION BOUNDARY.

    • RV-1**  ?

l 002300 TBx-1-1100A-23 B-D UT 1- - X - - - - - - 83 2ND CAL. BLOCK RV-1. TDLR &

sv OUTLET N0ZZLE TO VESSEL $3.90 VERIFICATION BOUNDARY. i WELD eepy.7ee 002310 Tax-1-1100A-23 B-D UT 1- - X - - - - - - 83 2ND CAL. BLOCK UC-1. TDLR RV OUTLET N0ZZLE INNER RADIUS B3.100 VERIFICATION BOUNDARY. 1 l

e.gy.jee e

002100 Tax-1-1100A-24 B-D UT 1- - - -- - X - - 83 2ND CAL. BLOCK RV-1. TDLR RV INLET N0ZZLE TO VESSEL WELD B3.90 VERIFICATION BOLMDARY.

I t

    • gy.7ee  !

f 002410 Tax-1-1100A-24 B-D UT 1- - - - - -

X - - 83 2ND CAL. BLOCK UC-1. TDLR RV INLET N0ZZLE INNER RADIUS B3.100 VFRIFICATION BOUNDARY.

    • gy.jee l 002500 Tax-1-1100A-25 B-D UT 1- - - - - - X - - 83 2ND CAL. BLOCK RV-1. TDLR RV INLET N0ZZLE TO VESSEL WELD B3.90 VERIFICATION BOUNDARY.

l l

I eeRV.ree D02510 TBx-1-1100A-25 B-D UT 1- - - - - . X - -

83 2ND CAL. BLOCT UC-1. TDLR RV INLET N0ZZLE INNER RADIUS B3.100 VERIFICATION BOUNDARY.

    • RV-1**

w l

[

I 5

i

~-. -.

i l

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PACE: 6

, INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND TNIRD l  ;

l '

ASME PERIOD PERIOD PERIOD l l

) SEC. XI l ----- - =* -- --- **----- -- l

{

SUIMARY EXAMINATION AREA CATGY NDE l------0UTAGE------l IkSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l 1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* ,

l .............................. 1 d

l REACTOR COOLANT TBx-RCPCRV-01 1 002600 TBx-1-1100A 26 B-D UT 1- - X - - - - - - 83 2ND CAL. BLOCK RV-1. TDLR RV OUTLET N0ZZLE TO VESSEL B3.90 VERIFICATION BOUNDARY.

WELD
  • e.gy.y.e i l

i i 002610 TBX-1-1100A-26 B-D UT 1- - X - - - - - - 83 2ND CAL. BLOCK UC-1. TDLR  ;

RV OUTLET N0ZZLE INNER RADIUS B3.100 VERIFICATION BOUNDARY.

e gy.jee j

002700 TBX-1-1100A B-G-1 UT 1- - X X - - X - -

83 1/3 PER PERIOD. TDLR RV FLANGE LIGAMENTS (1/54) 86.40 VERIFICATION BOUNDARY.

I s ..gy.$u I

002800 TBX *-1200A,8 B-N-1 VT-3 1C - - X - - X - - 82 TDLR VERIFICATION BOUNDARY. i RV INTERNALS (ACCESS DURING B13.10 REFUELING)

R157 860RB

' 002805 TBx 1-1200A,8 B-N-1 VT-3 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. ,

6 RV INTERNALS (NO ACCESS DURING B13.10 REFUEL) 003100 TBX-1-1300-1 B-A UT 1C - - X - - X - -

83 1/3 PER PERIOD. TDLR RV CLOSURE HEAD TO FLANGE WELD B1.40 MT VERIFICATION BOUNDARY. SEE RR

~

R155 860RB B-1.

    • TBx-29'*

003200 Tax-1-1300-2 BA UT 1C - - X - - X - - 83 1/3 PER PERIOD. TDLR

, RV CLOSURE HEAD RING TO DISC B1.21 VERIFICATION BOUNDARY.

WELD ,

R155 860RB **TBx-29**

1 l

t

- _ , , , , , , y

COMANCHE PEAK UNIT 1 PAGE: 7 DATE: 03/22/93 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHED/COMPL COMPONENTS l INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l l

ASME l PERICD PERitD PERIOD l SEC. XI l--------------------------------l INSTRUCTIONS SUW ERY EKAMINATION AREA CATGY NDE l------0UTAGE------l 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** ,

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 REACTOR COCEANT TBX-RCPCRV-01 BA UT 1- - - - - - X - - 83 TDLR VERIFICATION BOUNDARY.  !

003300 TBX-1-1300-3  !

RV CLOSURE HEAD MERID10hAL B1.22 r

WELD I

    • TBX-29**

R155 860RB i

003400 TBX-1-1300-4 B-A UT 1- - - X - - - - - 83 TDLR VERIFICATION BOUNDARY.

RV CLOSURE HEAD MERIDIONAL B1.22 l WELD

    • TBX-29**

003500 TBX-1-1300-5 B-A UT 1C - - - - - - - - 83 TDLR VERIFICATION BOUNDARY.

RV CLOSURE HEAD MERIDIONAL B1.22 O WELD

    • TBX-29**  ;

003600 TEX-1-1300-6 B-A UT 1- - - - - - X - - 83 TDLR VERIFICATIDW BOUNDARY.

RV CLOSURE HEAD MERIDIONAL B1.22 l WELD l **TBX-29'*

l l \

003700 TBX 1 1300-75 B-G-2 VT 1 1C - - - - - - - - 84 TDLR VERIFICATION BOUNDARY.

CONOSEAL BOLTING B7.80 R157 860RB

, 003800 TBX-1-1300-76 B-G-2 VT-1 1C - - - - - - - - 84 TDLR VERIFICATION BOUNDARY.

CONOSEAL BOLTING B7.80 R157 860RB 1

l l

l l

l

. _ _ . . . _ _ . . - ._m -_. _, .

=- .. -

i CATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 8 l

INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS PLAN STATUS  !

INSPECTION INTERVAL , _PRESERVICE YEAR '

l FIRST SECOND THIRD l ASME l PERICD PERIOD PERICD l ,

SEC. XI l-------------------------------l i SLNNERY EXAMINATION AREA CATCY NDE l*-----0UTAGE------l INSTRUCTIONS I

CUMBER IDENTIFICATION ITEM No METN l1 2 1 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

REACTOR COOLANT TSY-RCPCRV-01 B-G-2 VT 1 1C - - - - - - - - 84 TDLR VERIFICATION BOUNDARY.  !

003900 TBx-1-1300-77  !

CONOSEAL BOLTING B7.80 '

R157 860RB f,

h l

84 TDLR VERIFICATION BOUNDART. ';

004000 TBx-1-1300-78 B-G-2 VT-1 1C - - - - - - - -

l CONOSEAL BOLTING B7.80  ;

R157 860RB ,

I 4 i i

4 4

750 TBx-1-1300A-67 B-0 PT 1C - - - - - - - - 83 TDLR VERIFICAfl0N BOUNDAL .

CONTROL RCD DRIVE B14.10 [

R155 860RB t

i L

005200 TBx-1-1300A-76 B-0 PT 1- - - X - - - - - 83 TDLk VERIFICAT10N BOUNDARY.  !

CONTROL ROD DRIVE B14.10  ;

F C

0D5250 TBx-1 1300A-77 B-0 PT 1- - - - - - X - - 83 TDLR VERIFICATION BOUNDARY.

CONTROL R00 DRIVE B14.10 ,

t t

4 005300 TBx-1-1300A-78 B-0 PT 1- - - * * - X - - 83 TDLR VERIFICAfl0N BOUNDARY.  !

CONTROL E00 DRIVE B14.10 l l

l 1

c 1

r l

1 CO MNCHE PEAK UNIT 1 PAGE: 9

! DATE: 03/22/93 i

. INSERVICE INSPECTION LONG TERM PLAN

! CLASS 1 SCHED/COMPL COMPONENTS i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l l 1

ASME l PERIOD PERICD PERI 3s l SEC. XI l-------------------------------l ,

INSTRL4TIONS SumARY EXAMINATION AREA CATGY NDE l------0UTAGE------l NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 23 l ** CALIBRATION BLOCK'* l i

REACTOR COOLANT TBX-RCPCRV-01 005400 TBX-1-1400-1 B-G-1 UT 1- - x - - - - - - 82 TDLR YERIFICATION BOUNDARY.

RV STLD B6.30 MT

    • TEX-25** I l

l 005420 TBx-1-1400-2 B-G-1 UT 1- - x - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 NT

    • TBx-25.*  !

I i

005440 TBX-1-1400-3 B-G-1 UT 1- - x - - - - - - 82 TDLR VERIFICATIG BCUNDARY.  ;

RV STLD B6.30 MT  ;

O f

l **TBK 25**  ;

t y >

t 005460 TBK-1 1400-4 B-G-1 UT 1- - X - - - - - - 82 TDLR VERIFICATIDW BOUNDARY. l r

l RV STLD B6.30 MT i

    • TBX-25**

005480 TBx-1-1400-5 B-G 1 UT 1- -

X - - - - - - 82 TDLR VERIFICATION BOUNDARY.

i RV STLD B6.30 MT l l l

    • TB K- 25" i

005500 TBx-1-1400-6 B-G-1 UT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT

    • TBX-25**

i 005520 TBX 1-1400-7 B-G-1 UT 1- - X - - - - - - 82 TDLR VERIFICATI0W BOUNDARY.

f- RV STto B6.30 MT e ygg.25**

i

, t  ;

l j*

ll Ik l

-- -. . . . .. - ~. .

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 10 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS '

v INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l f ASME l PERIOD PERIOD PERIOD- l SEC. xi l ------*--------------*--------l l INSTRUCTIONS S M RY EXAMINATION AREA CATGY NDE l------0UTAGE------l NUMBER IDEWilFICATION ITEM NO METN l1 2 3 1 23 1 2 3 l ** CALIBRATION BLOCK **  ;

....... .............................. ....... .... . ........... ........... ........... . .............................. j r

I g gTOR COOLANT TBK-RCPCRV-01 ,

e t

i 005 % D TBx 1-1400-8 B-G-1 UT 1- - x - - - - - - 82 TDLR VERIFICATION BOUNDARY.  ;

RV Sits B6.30 MT i

..ygg.25** r i

x  !

005560 TBx-1 1400-9 B-G-1 UT 1- - x - - - - - -~ 82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT  !

..ygg.25**  !

1 005580 TBx 1 1400-10 B-G-1 UT 1- - x - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV Site B6.30 MT

    • TBK-25** I f

I I

I 005600 TBX-1-1400-11 B-G-1 UT 1- - x - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV STtD B6.30 MT [

  • eigg.25**

005620 TBx-1-1400-12 B-G-1 UT .1 - - x - - - - - - 82 TDLR VERIFICATION BOUNDARY. i I

RV STtD B6.30 MT 2 1

I

    • TBx 25**

l 1

005640 TBK-1 1400-13 B-G-1 UT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDART.

RV STte B6.30 MT

  • eigg.25**

l l

0D5660 TBX-1-1400-14 B-G-1 UT 1- - x - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV STtD B6.30 MT l

    • TBK-25**

l l

t

a DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 11 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS {

r INSPECTION INTERVAL, PLAN STATUS  !

_PRESERVICE YEAR l FIRST SECOND THIRD l

!, ASME l PERIOD PERIOD PERIOD l l SEC. XI l---------------------------------l I

SUMMARY

EXAM!N4110N AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS i NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK **

REACTOR COOLANT YBX-RCPCRV-01 005680 TBx-1-1400-15 B-G-1 UT 1 - X . - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV Site 96.30 MT erygg.25**

f 005700 TBX-1-1400-16 B-G-1 UT 1- - X - .- - - - - 82 TDLk VERIFICATION BOUNDARY.

RV STts 86.30 MT

    • TBK-25**

005720 TBx-1-140017 B-G-1 UT 1- - X - - - - -- 82 TDLR VERIFICATION BOUNDARY.

RV Site 86.30 MT ,

t t

    • TBK-25**  ;

e 005740 TBK 1-1400-18 B-G-1 UT 1- - X - - - - - - 82 TDLR VERIFICATI0h BOUNDARY.

RV Stim B6.30 MT j

    • TBx-25** ,

005760 TBx-1-1400-19 B-G-1 UT 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV STte 86.30 MT

    • TBx-25**

005780 TBx-1 1400-20 B-G-1 UT 1- - -

X - - - - - 82 TDLR VERIFICATION BOUNDARY.

t RV Silm B6.30 MT

    • TBK-25**

l 005800 TBX-1-1400-21 B-G-1 UT 1- - - k - - - - -

82 TDLR VERIFICATION BOUNDART.

RV STte B6.30 MT

    • TBX-25**

N i

COMANCHE PEAK UNIT 1 PAGE: 12 DATE: 03/22/93 I INSERVICE IESPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL CJMPOWENTS

\

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l

! SEC. XI l-----------------------------l INSTRUCT 100;S

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l

....... .............................. ....... .... . ........... ........... ........... . .............................. l REACTOR COOLANT TBX-RCPCRV-01 005820 TBX-1-1400-22 B-G-1 UT 1- - - x - - - - - 82 TDLR VERIFICATION BOUNDART.

RV STUD B6.30 MT i

    • TBX 25.*

l I

l 005840 TBX-1-1400-23 B-G-1 UT 1- . - x - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV Site B6.30 MT

    • TBX 25**

005860 TBX-1-1400-24 B-G 1 UT 1- - - X - - - - - 82 TDLR VERIFICAT!DN BOUNDARY.

RV Sito B6.30 MT t f

I k **TBX 25**

005880 TBX 1-1400-25 B-G-1 UT 1- - - x- - - - -

82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT ,

    • TBX-25**

005900 TBX-1-1400-26 B-G-1 UT 1- -- x - - - - - 82 TDLR VERIFICATION BOUNDART.

RV STUD B6.30 MT

    • TBX-25**

00f?20 TBX-1-1400-27 B-G-1 UT 1- - -

K - - - - - 82 TDLR YERIFICATION BOUNDARY. ,

RV STLC B6.30 MT l f

    • TBX-25**

i n

005940 TBX-1-1400-28 B-G 1 UT 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 MT

    • TBX-25** P k

l I

DATE: 03/22/93 COMANCHE PEAC UNIT 1 PAGE: 13 l

I -

INSERVICE INSPECTION LONG TERM PLAN

CLASS 1 SCHED/COMPL COMPONENTS i

l INSPECTION INTERVAL , PLAN STATUS ,,PRESERVICE YEAR l FIRST SECOND THIRD l i

ASME l PERIOD PERI D PERIOD l l SEC. x1 l--------------------------------l

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS I

NUMBER IDENTIf! CATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

l l

! REACTOR COOLANT TBM-RCPCRV-01 005960 TBK-1-1400-29 B-G-1 UT 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT l

l **TBK 25**

005980 TBK 1-1400-30 B-G-1 UT 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDART.

RV STUD B6.30 MT

    • TBx-25**

006000 TBx-1-1400-31 B-G 1 UT 1- - - X - - - - - 82 TDLR VERIFICAT!DN BC1JNDARY.

RV STLD B6.30 MT

  • -TBx-25**

I 006020 TBM-1-1400-32 B G-1 UT 1- - - X . - - - - 82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT

    • TBK-25**

f l

006040 TBx-1-1400-33 B G-1 UT 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV STLD S6.30 MT

    • TBK-25**

[ 006060 TBM-1-1400-34 B-G-1 UT 1- - - X . - - - - 82 TDLR VERIFICATION BOUNDARY.

i Rv site 86.30 MT

    • TBx 25**

006080 TBX-1 1400-35 B-G-1 UT 1- - - X - - - - - 82 TCLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT

    • TBK 25**

s

1 i

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 FAGE: 14 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPOWENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR  !

l FIRST SECOND THIRD l >

ASME j PERIOD PERICD PERIOD l f SEC. XI l---------------------------------l {

SLMMARY EXAMINATIDW AREA CATGY WDE l------0UTACE------l INSTRUCTIONS  ;

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAfl0N BLOCK ** j REACTOR COOLANT TBX-RCPCRV-01 f f

006100 TBX-1-1400-36 B-G-1 UT 1- - -

X - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 MT l

  • .ygx.25**

t l

006120 TBX-1-1400-37 B-G-1 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.  ;

RV STtD B6.30 MT j

    • TBx-25**

l 006140 TBX-1-1400-38 B-G-1 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT ,

    • TBX-25** I

. f l i

! I i

006160 TBX-1-1400-39 B-G-1 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. [

RV STLD B6.30 MT l

..TBx.25**  !

006180 TBX-1-1400-40 B-G 1 UT 1- - - - - -

X - -

82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT  !

l l *.ygg.25**

l l

006200 TBX-1-1400-41 B-G-1 UT 1- - - - - - X - - 82 TDLR VERlf! CATION BOUNDARY.

RV STtD B6.30 MT l

    • TBX-25**

006220 TBX 1 1400-42 B-G-1 UT 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT

    • TBX-25**

I i

l l

i l

l 1

i l

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 15 l INSERVICE INSPECTION LONG TERM PLAN {

CLASS 1 SCHED/COMPL COMPONENTS l INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l t ASME j PERICD PERI (X) PERICD ]  !

SEC. xi l.................................l l' SLBMARY EXAMINATION AREA CATGY NDE l------0UTAGE------j' INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l 1

I REACTOR COOLANT TBx-RCPCRV-01 l

t l 006240 TBK-1-1400-43 B-C-1 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

t l

RV SitD B6.30 MT  !

c P

l **TBX-25** '

i f

, 4 i  !

?

1 l 006260 TBX-1-1400-44 B-G-1 UT 1 . . - - - X - - 82 TDLR VERIFICATION BOUNDARY.  ?

RV STLD B6.30 MT l l 1
    • Tax 25** ,
i 006280 TBx-1-1400-45 B-G-1 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

RV STLD B6.30 MT l

. /, i

    • TBX-25** [

t 006300 TBX-1-1400-46 B-G-1 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. i RV STLD B6.30 MT

    • Tgg.25** >

t I

r h

.006320 TBX 1-1400-47 B-G-1 UT 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY. I RV STLD B6.30 MT f

    • TBx-25** .

5 006340 TBK 1-1400-48 B-G-1 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. ,

RV STLD B6.30 MT l I

    • TBx 25**

l i

4 006360 TBX-1 1400-49 B-G-1 UT 1- - - - - - X - -

82 TDLR VERIFICAtl0N BOUNDARY.

RV STLD B6.30 MT I

    • TBX 25** l i

i 1

1 1

1 a

F

= - . .- ., . .

I COMANCHE PEAK UNIT 1 FAGE: 16 DATE: C3/22/93 INSERVICE INSPECTION LONG TERN PLAN CLASS 11CHED/COMPL CCMPONENTS

,,PRESERVICE YEAR I INSPECTION INTERVAL., PLAN STATUS FIRST SECOND THIRD l l l

ASME l PERIOD PER100 PERIG) l l SEC. XI l--------------------------------*l l SUWERY [xAMINATION AREA CATGY NDE l----- 0UTAGE------l INSTRUCTIONS j NUMBER IDENTIFICATION ITEN NO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

....... .............................. ....... .... . ........... ........... ........... . 4 l

REACTOR COOLANT TBK RCPCRV-01 i

006380 TBx-1-1400-50 B-G-1 UT 1- . - - - - K - - 82 TDLR VERIFICATION BOUNDARY.  ;

RV STLD B6.30 MT l

    • TBx-25**  ;

I I

006400 TBx-1-1400-51 B-G-1 UT 1- - - - - - x - - 82 TDLR VERIFICATION BOUNDARY.

RV STLX) B6.30 MT }

! i i

! **TBK-25**

006420 TBK-1 -400-52 B-G-1 UT 1- - - - - - x - - 82 TDLR VERIFICATION BOUNDARY.

RV STUD B6.30 MT [

i

    • TBK-25**

I t

82 TOLR VERIFICATION BOUNDARY. I 006440 TBx-1-1400-53 B-G-1 UT 1- - - - - - X - -

RV STLA) 86.30 MT ,

?

t

    • TBK-25** I l l f

006460 TBx-1-1400-54 B-G-1 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. l Rv STuo B6.30 MT  ;

! **TBK-25** [

1 t

l 006600 TBK-1-1400-1 B-G-1 MT 1- - x - - - - - -

82 TDLR VERIFICAfl0N BOUNDARY. ,

Rv nut B6.10 {

1 i

006620 TBx-1-1400-2 B-G-1 MT 1- - X - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 i

I i

I I

J l

i i

i v - - , - - - . .--,,an-,v ~,-- . -- - , , - , - , .

1 i

COMANCHE PEAK UNIT 1 PAGE: 17 DATE: 03/22/93

. INSERVICE INSPECTION LONG TERM PLAN )

! j CLASS 1 SCHED/CCMPL COMPOWENTS

.i INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l l l

ASME PERIOD PERIOD PERIOD l t l

SEC. KI l ----------- ----- ---- ------*---- l

SUMMARY

EKAMINAfl0N AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS WiMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 j **CALIBRAT10W BLOCK **  !,

REACTOR COOLANT TBF-RCPCRV-01 006640 TBK-1-1400-3 B-G-1 MT 1- - K - - - - -

  • 82 TDLR VERIFICAfl0N BOUNDARY.

RV NUT B6.10 f

I i

006660 TBM-1-1400 4 B-G-1 MT 1* - K - - - * - - 82 TDLR VERIFICATION BOUIDARY.  ;

I RV NUT B6.10 )

i I

006680 TBx-1-1400-5 B-G-1 MT 1- - x - - - - - - 82 TDLR VERIFICAfl0N BOUNDARY. j RV NUT B6.10 t' f

i t

i i

s 006700 TBx-1-1400-6 B-G-1 MT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY. t RV NUT B6.10 [

i i

i i

2 006720 Tex-1-1400-7 B-G-1 MT 1- - X . - - - - -

82 TDLR VERIFICATION BOUNDARY. {

RV NUT B6.10  !

i l

006740 Tex-1-1400-8 B-G-1 MT 1- - x - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 i 1

l l

1 i

l k 006760 TBx-1-1400-9 a-c-1 MT 1- - X - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.90

\

1

~

l  !

i l

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 18 j

' INSERVICE INSPECTION LONG TERM PLAN i i

CLASS 1 SCHED/',0MPL COMPONENTS l l  ;

r s INSPECTION INTERVAL , PLAN STATUS ._PRESERVICE YEAR l FIRST SECOND THIRD  ;

l l ASN5 l PERIOD PERIOD ~ PERIOD l SEC. XI l---------------------------------l }

SUMMARY

EKAMIhATION ARLA CATCY NDE l*-----0UTAGE-- ---l INSTRUCTIONS NJeBER IDENTIFICATION ITEM No METH l1 2 3 1 23 1 2 3 l ** CALIBRATION BLOCK'* i i

i REACTOR COOLANT TBK-RCPCRV-01 l 006780 TBM-1-1400-10 B-G-1 MT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 i f

t I

006B00 TBK 1 1400-11 B-G-1 MT 1- - X - - - - - -

82 TDLR VERIFICATION BGJMDARY.  !

RV NUT B6.10 i l

006820 TBK-1-1400-12 B-G-1 MT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV trJT B6.10 f

i i

I

[

006840 TBM 1-1400 13 B-G 1 MT 1- - X - - - - - - 82 TDLR VERIFICATION mmm m *V. t i

RV NUT B6.10 }

I l

I 006B60 TBE-1-1400-14 B-G-1 MT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDfAY. -I RV NUT B6.10 l 6

4 l

0068B0 TBK-1-1400-15 B-G 1 MT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDART.

RV NUT B6.10 i I i e l

006900 TBK-1 1400-16 B-G-1 MT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDART.

RV NUT B6.10 t

i

, ,- a ,e. m ,---.,-. , ,c e ,, -e,, ,, ,w v.~,,,,. , - .,v- r ,

s i

4 DATE: 03/22/93 CDMAhCHE PEAK UNIT 1 PAGE: 19 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCNED/COMPL COMPONENTS s

l INSPECTIDW INTERVAL , PLAN STATUS _PRESERVICE YLAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERICD l j

.! SEC. XI l-------------------------------l  !

SuetARY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS  ;

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l

.............................. I REACTOR COOLANT TBW-RCPCRV-01 0 i

, 006920 TBX 1-1400-17 B-G-1 MT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY.

b NUT B6.10 i

s i I

006940 TBM-1 1400-18 B-G-1 MT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY. l RV NUT B6.10 l l

I f

006960 TBX-1-1400-19 B-G-1 MT 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 ,

I i

006980 TBK-1-1400-20 B-G-1 MT 1- - -

X - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV KJT B6.10 j r

1 007000 TBK-1 1400-21 B-G-1 MT 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY.

i RV NOT B6.10 i

l 007020 TBx-1-1400-22 B-G-1 MT 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDARY. -

RV WJT B6.10-I l

007040 TBX-1-1400-23 B-G-1 MT 1 -- - - F . . - - 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 l

l l

t 1

1 il

i i COMANCHE PEAK UNIT 1 PAGE: 20 DATE: 03/22/93 INSERVICE INSPECT!DN LONG TERM PLAN ,i CLASS 1 SCHED/COMPL COMPONENTS {

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECONO THIRD l AS8E PERICD PERICC PERICI) l l l l

SEC. K! l ------- ----------'---------l INSTRUCTIONS l

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE------l l

! NUMBER IDENTIFICATION ITEM to METH l1 2 3 1 2 3 1 2 3 l **CALIBRATIDW BLOCK'*

1 . ........... ........... ........... . ..............................

REACTOR COOLANT TBF-RCPCRV-01 l

007060 TBx-1-1400-24 B-G-1 MT 1- - - x - - - - - 82 TDLR VERIFICATION BOUNDARY. t

(

RV NUT B6.10 t I

I l

007080 TBK-1-1400-25 B-G-1 MT 1- - - x - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 007100 TBX-1-1400-26 B-G-1 MT 1- - - X - - - - - - 82 TDLR VERIFICATION BOUNDARY.  !

RV NUT B6.10 k i f

l t

00F120 TBK-1-1400-27 B-G-1 MT 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 ,

l l  !

007140 TBX-1-1400-28 B-C-1 MT 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDARY. j RV NUT B6.10 1

007160 TBK-1-1400-29 .B-G-1 MT 1- - -

X - - - - - 82 TDLR VERIFICATION BOUNDARY. 3 RV NUT B6.10 l l.

I 1

.I l

007180 TBK-1 1400-30 B-G-1 MT 1- - - X - - - - - ' 82 TDLR VERIFICATION BOUNDARY.

RV WJT B6.10 I'

f t I I

,-_---a ~~r .,,e-, n., ,, ., , . , , ,, , . - , , ,,w.ee, , , . ,p,' - , - - , -

CDMANCHE PEAK UNIT 1 PAGE: 21 DATE: 03/22/93 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHEP COMPL

/ COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l i ASME l PERIS PERIOD PERIG) l SEC. XI l---------------------------------l IhSTRUCTIONS SumARY EXAMINATION AREA CATGY NDE l------0UTAGE--- --l NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** ,

REACTOR COOLANT TBx-RCPCRV-01 ,

f 007200 TBK-1-1400-31 B-G-1 MT 1- . - x - - - - - 82 TDLR VERIFICATION BOUNDARY.

l RV NUT B6.10 i

i l i 007220 TBx-1-1400 32 B-G-1 MT 1- - - X - - - - - 82 TDLR VERIFICATION BOUSARY.

RV NUT B6.10 f

l 007240 TBK-1-1400-33 B-G-1 MT 1- - -

X - - - - - 82 TDLR VERIFICATI0W BOUNDARY. i RV NUT B6.10 f i

1 i

007260 TBx-1-1400-34 B-G-1 MT 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY. l RV NUT B6.10 i

f f

007280 TBx-1-1400-35 B-G-1 MT 1- - - x - - - - - 82 TDLR VERIFICATION BOUNDARY. .;

I RV NUT B6.10 f

+

007300 TBK-1-1400-36 B-G-1 MT 1- - - X - - - - - 82 TDLR VERIFICATIDW BOUNDARY.

RV NUT B6.10 5

007320 TBx-1-1400-37 B-G-1 MT 1- - - . - -

x .-

82 -TDLR VERIFICATION BOUNDARY. j RV NUT B6.10 l

l 3

i

-.e . - , , . . . . , , .._---.v. - , - .

l DATE: 03/22/93 COMMCHE PEAK UNIT 1 PAGE: 22 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL CCMPONENTS INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD I l l ASME l PERIOD PERIOD PERIOD l SEC. xl l---------------------------------l Su MARY EXAM!hATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS l WJMBER IDENTIFILATION ITEM NO METN l1 2 3 1 2 3 1 2 3 l "CALIBRAfl0N BLOCK" i

REACTOR COOLANT TBX-RCPCRV-01 007340 TBx-1-1400-38 B-G-1 MT 1- - - - - - x - - 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10  !

l 1

007360 TBx 1-1400-39 B-G 1 MT 1- - - - - - x- -

82 TDLR VERIFICATION BOUNDARY.  !

RV NUT B6.10  :

?

l i

l 007380 TBX-1-1400-40 B G-1 MT 1- - - - - - x- - 82 TDLR VERIFICATION BOUNDARY. j RV NUT B6.10 j A

h 007100 TBK-1 1400-41 B-G-1 MT 1- - - - - - x- - 82 TDLR VERIFICATION BOUNDARY.  ;

RV NUT B6.10  ;

3 007420 TBx-1-1400-42 B-G-1 MT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.  ;

RV NJT B6.10 )

l 007440 TBx-1-1400-43 B-G-1 ' MT 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 i

007460 TBx-1-1400-44 B-C-1 MT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

RV NUT B6.10 l

l i

I DATE: 03/22/93 COMANCHE PEAK UNIT 1 FAGE: 23 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS l l

INSPECTION INTERVAL, PLAN STATUS ,PRESERVICE YEAR ]

l FIRST SECOND THIRD l  ;

ASME l PERICD PERIOD PERIOD l-SEC. XI l---------------------------------l SUINIARY E' AMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS ,

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCr** l

.............................. r REACTOR COOLANT TBX-RCPCRV-01 007480 TBx 1 1400-45 B-G-1 MT 1- - - - - - X - - 82 TDLR VERiflCATION BOUNDARY. l f RV NUT B6.10 l

i l

007500 TBX-1-1400-46 B-G-1 MT 1- - - - - - X - - 82 TDLR VERIFICATIW UduMDARY. -f RV NUT B6.10 t I

i i

I I

007520 TBX-1-1400-47 B-G-1 MT 1- - - - - -

X - - 82 TDLR VERIFICATION BOUNDARY.

i B6.10 RV NUT t

l 007540 TBx 1-1400-48 B-C-1 MT 1- - - - - - X - - 82 TDLR VERIFICAT10N BOUNDARY. -

RV NUT B6.10 '

i Re i

007560 TBX-1-1400-49 B-G-1 MT 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY. I RV NUT B6.10 .

I I

! 007580 Tar-1-1400-50 B-G-1 MT 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY.  ;

RV NUT B6.10  !

! e t  ;

l  !

1 007600 TBx-1-1400-51 B-G-1 MT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

I RV NUT -56.10

! I t . - . ,

,~ _ ., - - , - ,. . - - - . . - . . . - , . - . . . - , .

~

t 5

l l

l i

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 24 i

s INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS l l

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR ,

l FIRST SECOND THIRD l [

ASME l PERIOD PERICC PERIOD l l SEC. x! l+--------------------------------l SUIMARY EXAM! HAT 10N AREA CATGY NDE l------00TAGE- ----l INSTRUCTIONS aueBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

l i

l REACTOR COOLANT TBX-RCPCRV-01 l

l l 007620 TBK-1-1400-52 B-G-1 MT 1 - - - - - x - - 82 TDLR VERIFICATION BOUNDARY. l RV NUT B6.10 ,

t L

f 007640 TBK-1-1400-53 B-G-1 MT 1- - - - - - x-- 82 TDLR VERIFICATION BOUNDARY. ,

RV NUT B6.10 l I e

007660 TBx-1-1400-54 B-G-1 MT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. l RV NUT B6.10 l

I l

007800 TBM-1-1400-1 B-G-1 VT-1 1- - x - - - - - -

82 TDLR VERIFICATION BOUNDARY. j I

RV WASHER B6.50 I

1 i

I 007820 TBx-1-1400-2 B-G-1 VT-1 1- - x - - - - - - 82 TDLR VERIFICATION BOUNDARY.  !

RV WSHER B6.50 007840 TBX-1-1400-3 B-G-1 VT 1 1- . x - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 007860 TBK-1-1400-4 B-G-1 VT-1 1 - x - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER- B6.50 1

1

. - ._ _ , _. _ , .- _,,.1

. - = . - _ -

i l

l l

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 25 I INSERVICE INSPECTION LONG TERM PLAN ,

CLASS 1 SCHED/COMPL COMPONENTS [

6 INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR i l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERim) l l SEC. x! l---------------------------------l }

SUMMARY

EXANINATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS EMBER IDENTIFICATION ITEN NO METH l1 2 3 1 I 3 1 2 3 l ** CALIBRATION BLOCK **  !

REACTOR COOLANT TBK-RCPCRV-01 r

007880 TBx-1-1400-5 B-G-1 VT-1 1- - x - - - - - - 82 TDLR VERIFICATION BOUNDARY. [

RV WASHER B6.50 l e

i I l i l 007900 TBx 1-1400-6 B-G-1 VT-1 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY.

l RV WASHER 86.50 I

l l

l

?

007920 TBx-1-1400-7 B-G-1 VT 1 1- - x - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 >

i i

t 007940 TBx-1-1400-8 B-G-1 VT 1 1- -

X - - - - - -

82 TDLR VERIFICATION BOUNDARY. l RV WASHER B6.50  ;

i i

I 007960 TBx-1-1400-9 B-G-1 VT-1 1- - x - - - - - -

82 TDLR VERIFICATION BOUNDARY. i 1

RV WASHER B6.50 .

l l

1 1

007980 TBx-1-1400-10 B-G-1 VT-1 1- - X - - - - - -

82 TDit VEP!FICATION BOUNDAAY.

RV WASHER B6.50 1

I 008000 TBx-1-1400-11 B-G-1 VT-1 1- - x ' - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50

(

1 i

I DATE: 03/22/93 CDMANCHE PEAK UWlf 1 PAGE: 26 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS 1

l INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR l FIRST SECOND THIRD l l

ASME l PERICD PERICD PERIOD l SEC. XI l -- ------- ----------- ----------- l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE-**---l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCC'*

REACTOR COOLANT TBX-RCPCRV-01 008020 TEX-1 1400-12 B G-1 VT 1 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV WSHER 56.50 i

i 008040 TBK-1-1400-13 B-G-1 VT-1 1- - X - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 .

i i

l 008060 TBX-1 1400-14 B-G-1 vi-1 1- - X - - - - - -

82 TDLR VERIFICAfl0W BOUNDARY. l RV WASHER 86.50 f t

C08080 TBK-1-1400-15 B-G-1 VT-1 1- - X - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER 86.50 008100 TBX 1 1400-16 B-G-1 VT-1 1- - X - - - - - -

82 TDLR VERIFICATION BOUNDARY. j RV WASHER 86.50 '

l 1

1 008120 TBX-1-1400-17 B-G-1 VT-1 1- - X - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER- 56.50 008140 TBK-1-1400-18 B-G-1 VT-1 1- - X - - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50

i DATE: 03/22/93 WNCHE PEAK UNIT 1 PAGE: 27 ;

INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS f

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l [

SEC. XI l--------------------------------l l INSTRUCTIONS

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l 3 NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAtl0N BLOCK ** f

....... .............................. ....... .... . ........... ........... ........... . 3 REACTOR COOLANT TBW-RCPCRV-01 008160 TBX 1-1400-19 B-G-1 VT-1 1- - - X - - - - -

82 TT'4 VERIFICATION BOUNDARY. .

RV WASHER B6.50 e

008180 TBx-1-1400-20 B-G-1 VT-1 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY. ,

RV WASHER B6.50 t 6

i 008200 TBX-1-1400-21 B-G-1 VT-1 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 l

008220 TBx-1-1400 22 B-G-1 VT-1 1- - -

X - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 l 008240 TBX-1-1400-23 B-G-1 VT-1 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDARY.

l RV WASHER B6.50 l l

.008260 TBX-1-1400-24 B-G-1 VT-1 1- - - X - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 008280 TBN-1-1400-25 B-G-1 VT 1 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 i

l l,

e DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 28 l

INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN SinTUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERICD PERIOD l f SEC. El l-------~-----------*==--*-----l SLMMARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS .

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

b

(

P REACTOR COOLANT TBx-RCPCRV-01 1

0C'300 TBx-1-1400-26 B-G-1 vi-1 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDARY.

! RV WASHER 86.50 i

! 008320 TEX-1-1400-27 B-G-1 VT-1 1- - - x - - - - - 82 TDLR VERIFICATION BOUNDARY. i I

RV WASHER B6.50 I

008340 TBx 1-1400-28 B-G-1 VT-1 1- - - x - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER 86.50 l t

k l 008360 TBx-1-1400-29 B-G-1 VT-1 1- - - x- - - - - 82 TDLR VERIFICATION BOUNDARY. i l

RV WASHER B6.50 ,

t 008380 TBM-1-1400-30 B-G-1 VT-1 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER 86.50 l

l 008400 TBx 1-1400-31 B-G-1 VT-1 1- - - x - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 008420 TBx-1-1400-32 B-G-1 VT-1 1- - -

x- - - --

82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 l

i i

l l

l 1

i

, - . - , - ~ . , -. , - - , . . , - - , , ,, ~ . - - , ,._m..w.rw - ,-

l i

i DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 29 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR )

FIRST SECOND THIRD l l l l ASME l PERIOD PER13) PERICS l SEC. x1 l---------------------------------l  ;

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No NETH l1 2 3 1 2 3 1 2 3 l ** CAL!sRATION BLOCr** ,

I REACTOR COOLANT TBX-RCPCRV-01 006440 TBx-1 1400-33 5-G-1 VT-1 1- - - x- - - - - 82 TDLR VERIFICATION BOUNDARY.

RV WSHER B6.50 ,

t l

008460 TBX-1-1400-34 B-G-1 VT-1 1 - - x - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV M SHER B6.50 E

i t

008480 Tex-1-1400-35 B-G-1 VT-1 1- - -

x - - - - - 82 TDLR VERIFICATION BOUNDARY.

RV E SHER 56.50 .  ;

l i

4 008500 Tax 1 1400-36 B-G-1 VT-1 1- - - X - - - - - 82 TDLR VERIFICATION SOUNDARY.

RV ESHER B6.50 f i

008520 Tex-1-1400-37 B-G-1 VT-1 1- - - - '- - x- - 82 TDLR VERITICAfl0N BOUNDARY.  !

i RV ESHER B6.50 008540 TBK-1-1400-38 B-G-1 VT-1 1- - - - - - x-- 82 - TDLR VERIFICATIDW BOUNDARY.

j RV WSHER B6.50 l

008560 Tex-1-1400-39 B-G-1 VT-1 1- - - - - - x- -

82 TDLR VERIFICATION BOUNDARY.

RV W SHER 86.50 j

% j 1

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 30 ,

INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS  ;

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND TNIRD l ASME l PERIOD PERIOD PERICC l l'

$EC. XI l--------------------------------l

SUMMARY

ERAMINAfl0N AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM Wo METN l1 2 3 1 2 3 1 2 3 l **CALIBRAilou BLOCK ** [

REACTOR COOLANT TBx-RCPCRV-01 l 008580 TBx-1-1400-40 B-G-1 vi-1 1- - - - - - x - - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER 96.50 t t

i 008600 TBx-1-1400-41 B-G-1 VT-1 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

r RV WASHER B6.50 i

i l

008620 TBx-1-1400-42 B-G-1 VT-1 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. .j s RV WASHER 86.50 l l

' ' 1 r

008640 TBx-1-1400-43 B-G-1 VT-1 1- - - - - - x- -

82 TDLR VERIFICATION BOUNDARY. [

i RV WASHER 56.50 i l

i i

i 008660 Tax-1-1400-44 B-G-1 VT 1 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 l t

008680 TBx-1-1400-45 B-G-1 VT-1 1- - - - - -

x - -

82 TDLR VERIFICATION BOUNDARY.  ;

RV WASHER B6.50 008700 TBx-1 1400-46 B-G-1 VT 1 1- - - - - -

K - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 l

l I

h

._ - _ ~ _ _ _ _ -. __ _

l l DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 31 INSERVICE INSPECTION LONG TERM PLAN 1 CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l  ;

ASME l PERIOD PERIOD PERIOD l ,

l SEC. XI l--------------------------------l l Su m ARY EKAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM NO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* I REACTOR COOLANT TRY-RCPCRV-01 008720 TBK-1 1400-47 B-G-1 VT-1 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY.

RV M SHER 86.50  ;

i 1

008740 TBX-1-1400-48 B-G-1 VT-1 1- - - - - - X -- 82 TDLR VERif! CATION BGJNDARY. ,

RV W SHER B6.50 i

l 008760 TEX-1 1400-49 B-G-1 VT 1 1- - - - - - X ^- 82 TDLR VERIFICATION BOUNDART.

RV ESMER B6.50 P

008780 TBX-1-1400-50 B-G-1 VT-1 1- - - - - -

X - - 82 TDLR VERIFICATION BOUNDARY. ,

RV WSHER B6.50 t

P r

I 1

1 008800 TBX-1-1400-51 B-G-1 VT-1 - - - - -

X - -

82 TDLR VERIFICATION BOUNDARY. j RV W SHER B6.50 I

i

! 008820 TEX-1-1400-52 B-G-1 VT-1 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 008840 TBK-1-1400-53 B-G-1 VT-1 1- - - - - -

X - - 82 TDLR VERIFICATION BOUNDARY.

I RV W SHER 86.50 i '

t I

l l

l l

l I

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 32 l INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS l I

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR .

l FIRST SECOND THIRD l f ASME l PERIOD PERIOD PERIOD l SEC. XI l--------------------------------l j SulmARY EKAMINATION AREA CATGY NDE' l---- -0UTAGE------l INSTRUCTIONS  :

NJIBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CALIBRA110N BLOCK **

....... .............................. ....... .... . ........... ........... ........... . .............................. i i

REACTOR COOLANT TBX-RCPCRV-01 008860 TBx-1-1400-54 B-c-1 VT-1 1- - - - - - x- - 82 TDLR VERIFICATION BOUNDARY.

RV WASHER B6.50 I REACTOR COOLANT TEX-RCPCPR-01 009000 TEX-1 2100-1 BB UT 1- - - - - - X - - 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER LOWER HEAD To B2.11 SHELL W LD R161A **TBX-1**

i 100 1BX 1-2100-5 B-B UT 1C - - - - - - - - 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER UPPER HEAD To B2.11 SHELL WELD i R161A **TBX-1**

009200 TBx-1-2100-6 B-B UT 1- - - - - -

X - - 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER LONG. WELD (1FT B2.12 ADJ. WELD 1)  ;

R161A **TBR-1** l l

l I

009300 TBX-1-2100-9 B-B UT 1C - - - - - - - -

79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER LONG. WELD (1FT 82.12 ADJ. WELD 5) l R161A **TBX-1**

i 009400 TBK-1-2100-10 B-H UT 1- - - - - - X - -

82 TDLR VERIFICATIDW BOUNDARY.

PRESSURIZER SUPPORT SKIRT WELD 88.20 r

R161A I

    • TBK-40**

k I

I l

i i

i DATE: 03/22/93 CDMANCHE PEAT: UNIT 1 PAGE: 33 INSERVICE IkSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l [

SEC. XI l------------------------------l l SL8 MARY EXAMINATION AREA CATGY WDE l-**-** OUTAGE------l INSTRUCTIONS j NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK ** ,

....... ........-.----.....--......... .--.... .... . ...-....... ........-.- ........... . ..............--.......--..... t

[

REACTOR COOLANT TBM-RCPCPR-01 009500 TBM-1-2100-11 B-D UT 1- - - x- - - - - 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SURGE N0ZZLE TO B3.110 P

VESSEL WELD R161A **TBM-1**

009550 TBX 1-2100-11 B-D UT 1- - - x- - .- - NA TDLR VERIFICATION BOUNDARY.

PRESSURIZER SURGE N0ZZLE INNER B3.120 RADIUS R161A **TBK 1**

009600 TBK-1-2100-12 B-D UT 1- - - x - - - -

79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SPRAY WOZZLE TO B3.110  ;

VESSEL WELD ,

R161A **TBK 1** [

009650 TBX-1-2100-12 B-D UT 1- - - - X - - - - NA TDLR. VERIFICATION BOUNDARY.

PRESSURIZER SPRAY N0ZZLE INNER B3.120 )

RADIUS i R161A **TBK-1**

1 009700 TBK 1-2100-13 B-D UT 1- - - - X - - - - 79 TDLR VERIFICATION BOUNDARY. ,

  • RESSURIZER SAFETY N0ZZLE TO B3.110 l

?ESSEL WELD R161A **TBX 1**

l

\

009750 TBX 1 2100-13 B-D UT 1- - - - X - - - -

NA TDLR VERIFICATION BOUNDARY.

PRESSURIZER SAFETY N0ZZLE B3.120 INNER RADIUS R161A **TBK.t**

I I l

l

009800 TBK-1-2100-14 E-D UT 1- - - - X - - - - 79 TDLR VERIFICATION BOUNDARY. l

! PEESSURIZER RELIEF N0ZZLE To 83.110 VESSEL WELD R161A **TBx.je*

s t-l b

i

,e. , - . , - , , . . , . - - . , , . - . - , - ,, , . , , , ._

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 34 INSERVICE IN$PECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS 4

w INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR .]

l FIRST SECOND TMIRD l ASME l PERIOD PERIOD PERIOD l ,

SEC. x! l--------------------------------l l I

Su MARY EXAMINATION AREA CATGY NDE l------0U1 AGE------l INSTRUCTIONS I

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

REACTOR COOLANT TBK-RCPCPR-01 009850 TBx-1-2100-14 B-D UT 1- - - - x - - - -

NA TDLR VERIFICATION BOUNDARY.

PRESSURIZER RELIEF N0ZZLE B3.120 INNER RADIUS R161A **TBx 1**  ;

i 009900 TBx-1-2100-15 B-p UT 1- - - - x - - - - 79 TDLR VERIFICATION BOUNDARY.

PRESSURIZER SAFETY N0ZZLE TO B3.110 VESSEL WELD ,

R161A **TBK-1**

009950 TBx-1-2100-15 B-D UT 1- - - - X - - - - 79 TDLR VERIFICATION BOUIR)ARY.

PRESSURIZER SAFETY N0ZZLE B3.120

[ INNER RADIUS R161A **TBK-1**

i

?

I l 010000 TBx 1-2100-16 B-D UT 1- . - - x - - - - 79 TOLR VERIFICATION BOUNDARY. i PRES $URIZER SAFETY N0ZZLE TO B3.110 i

I VESSEL WELD R161A **TBx-1** f i

010050 TBx-1-2100-16 B-D UT 1- - - - x - - - -

79 TDLR VERIFICATION BOUNDARY. i PRESSURIZER SAFETY N0ZZLE B3.120 4 INNER RADIUS R161A "TBx-1"  ;

010100 TBK-1-2100 B-G-2 VT-1 1- - - - x - - - -

84 TDLR VERIFICAfl0N BOUNDARY. ,

PRESSURIZER MANWAY BOLTS B7.20 ["

(B1/B16) L R161A l

REACTOR COOLANT TBK-RCPCSG-01 I. 010200 TBK-1 3100-1-1 B-B UT 1- - x - - - - - -

82 TDLR VERIFICATIGN BOUNDARY.

SG1 CHANNEL HEAD TO TUBESHEET B2.40  ;

l t WELD l . A23 ** T BX- 28" i f

i t  ;

l l

. __ , _, - _ ._ _ - . _ . - ~. __

i 1

l i

i DATE: 03/22/93 COMANCNE PEAK UNIT 1 PAGE: 35 l IkSERVICE INSPECTION LONG TERM PLAN i

CLASS 1 SCHED/COMPL COMPONENTS t

r INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l

l FIRST SECOND THIRD l , ;

ASME l PERICD PERIOD PERIOD l [

l SEC. XI l--------------------"-----------l

SUMMARY

EXAMihATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS j l

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

?

REACTOR COOLANT TBX-RCPCSG-01 010300 TBK-1-3100-1A B-D UT 1- - X - - - - - - NA TDLR VERIFICATION BOUNDARY.

SG1 INLET N0ZZLE INNER RADIUS B3.140 [

A23 y

    • TBX 28** [

010400 TBK 1 3100-1B B-D UT 1- - X - - - - - - NA TDLR VERIFICATION BOUNDARY. ,

i l SG1 OUTLET N0ZZLE INNER RADIUS 53.140  ;

j A23

    • TEX-28**

1 r 010500 TBx-1-3100 B-G-2 VT-1 1- - X - - - - - -

84 TDLR VERIFICATION BOUNDARY.

! SG1 HOTLEG MANWAY BGtTING B7.30 I  !

(1-B1/1-B16)

A23 l

010600 TBX-1-3100 B-G-2 VT-1 1- - X - - - - - - 84 TDLR VERIFICATION BOUNDARY.

SG1 COLDLEG MANWAY BOLTING B7.30 j (1 B17/1-B32) l A23 ,

1 l REACTOR COOLANT TEX-RCPCSG-02 1 l I 010700 TBx-1-3100-2-1 B-B UT 1- - -

- X - - - -

82 TDLR VERIFICATION BOUNDARY. i I

SG2 CHANNEL HEAD TO TUBESHEET B2.40 WELD l

A25 **TBx 28" l

! 010800 TBK-1-3100-2A B-D UT 1- - - - X - - - - NA TDLR VERIFICATION BOUNDARY.

! SG2 INLET N0ZZLE INNER RADIUS 53.140 A25

    • TBK-28**

010900 TBK-1 3100-28 B-D UT 1- - - .X - - - '- kA TDLR VERIFICATION BOUNDARY.

SG2 OUTLET N0ZZLE INNER RADIUS B3.140 A25 1

\ **TBx-28** l l

l l _ _

e L

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 36 INSERVICE INSPECT'ON LONG TERM PLAN ,

CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l~--~~---~~----------~~~~~l

SUMMARY

[KAMINAtl0N AREA CATGY NDE l------0UTACE------l INSTRUCTIONS WUMBER IDENTIFICATION ITEMNOMETH'l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLO 2**

REACTOR COOLANT TRY*RCPQQ-pl I

011000 TEX-1-3100 B-G-2 VT.1 1- - - . X . - - - 84 TDLR VERIFICATION BOUNDARY.

SG2 NOTLEG m WWAY BOLTING B7.30 (2-B1/2-816)

A25 011100 TBK-1-3100 B-G-2 VT-1 1- - - - K - - - - 84 TDLR VERIFICATION BOUNDARY.

SC2 COLDLEG ENWAY BOLTING B7.30 (2-817/2-B32)  !

A25 i

l REACTOR COOLANT TBx-RCPCSC-03 11200 TBx-1-3100-3-1 B-B UT 1- - - - - - x - - 82 TDLR VERIFICATION B0UtOARY.

SG3 CHANNEL HEAD 70 TUBESHEET 82.40 WELD {

A27 **TBx-28**

i 011300 TBx-1-3100-34 B-D UT 1- - - - - -

x - - NA TDLR VERIFICATION BOUNDARY. i SG3 INLET N0ZZLE INNER RADIUS B3.140 A27

    • TBK-28**

011400 TBx 1-3100-38 B-D UT 1- - - - - -

x-- NA TDLR VERIFICATION BOUNDARY.

, SG3 OUTLET N0ZZLE INNER RADIUS B3.140 f l A27 I

    • TBK-28**

{

i 011500 TBx-1-3100 B-G-2 VT-1 1- - - - - - X - -

84 TDLR VERIFICATION BOUNDARY. l' SG3 HOTLEG M NWAY BOLTING B7.30 (3-B1/3-816)

A27 A 011600 TBx-1-3100- B-G-2 VT-1 1- - - - --- X - - 84 TDLR VERIFICATION BOUNDARY.

SG3 COLDLEG MANWAY BOLTING B7.30 l

(3-B17/3-832) l w A27 l

. - . . - . . _ ._ , _ . , - _ _ ~ . - , . _ . ,-

l COMANCHE PEAK UNIT 1 PAGE: 37 DATE: 03/22/93 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHED/COMPL COMPONENT $

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR FIRST SECOND THIRD l l

ASME l PERI (X) PERIOD PER!ts l t SEC. XI l---------------------------------l {

INSTRUCTIONS SulmARY EXAMINATION AREA CATGY NDE l------0UTAGE------l  ;

1 2 3 1 2 3 l " CALIBRATION BLOCK" NUMBER IDENTIFICATION ITEM NO METH l1 2 3 .

REACTOR COOLANT TBX-RCPCSG-04 5

BB 1- - - - - - - X - 82 TDLR VERIFICATION BOUNDARY.

011700 TBK-1-3100-4-1 UT t

SG4 CHANNEL HEAD TO TUBESMEET 82.40 WELD l

    • IBK 28** {

l A29 .

1 B-D UT 1- - - - - - - X - NA TDLR VERIFICATION BOUNDARY.

l 011800 TBK-1-3100-4A SG4 INLET N0ZZLE INNER RADIUS 83.140  !

i

( A29 I

    • TBX 28**

{

011900 TBX-1-3100-4B B-D UT 1- - - - - - - X - NA TDLR VERIFICATION BOUNDARY.

SG4 OUTLET N0ZZLE INNER RADIUS B3.140 A29 f f

    • TBX-28**

I i

012000 TBX-1-3100 B-G-2 VT 1 1- - - - - - - X - 84 TDLR VERIFICATION BOUNDARY. i SG4 NOTLEG MANWAY BOLTING B7.30 ,

(4-B1/4 B16) l A29 l

?

012100 TBX-1-3100 B-G 2 VT-1 1- - - - - - - X - 84 TDLR VERIFICATION BOUNDARY. j SG4 COLDLEG MANWAY BOLTING B7.30 (4-B17/4-B32) .

A29 i

I i

REACTOR COOLANT 29-PC-1-001-WEST-1 012200 TBK-1-4100-1 BF UT 1- - X - - - - - - 82 2ND CAL. BLOCK RV-6 USED WITH l RPV N0ZZLE TO SAFE END B5.10 PT AUTOMATED UT TO SUPPLEMENT l A23 827RB MANUAL UT. TDLR VERIFICATION j BOUNDARY.

    • TBK-2**

i

i DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 38 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPOWENTS l INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERICX) PER!OD j SEC. XI l

~--~~------l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l IkSTRUCTIONS ,

NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK ** l l

REACTOR COOLANT 29-RC-1-001-WEST-1 i

012500 TBX 1-4100-4 B-F UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.  !

REDUCING ELBOW TO SG W3ZZLE B5.70 PT SAFE END A23 827RB **TBX-2** f

}

i REACTOR COOLANT 31-RC-1-002-WEST-1 012600 TBX 1-4100-5 B-F UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

SG N0ZZLE SAFE END TO ELBOW B5.70 PT A23 829RB

    • TBM 2**

t [ REACTOR COOLANT 27.5-RC-1-003-WEST-1

(

l 013200 TBM-1-4100-11 B-J UT 1- C - - - - - - - 82 TDLR VERIFICATION BOUNDARY.

RC PUMP DISCKARGE N0ZZLE TO 89.11 PT PIPE l A23 827RB **TBX-2**  !

013500 TBX-1 4100-14 B-F UT 1- - - - - - X - - 82 2ND CAL. BLOCK RV-6 USED WITH  !

SAFE END TO RV N0ZZLE B5.10 PT AUTOMATED UT TO SUPPLEMENT A23 827RB MANUAL UT. TDLR VERIFICATION BOUNDARY. .

    • TBX-2**

f h

REACTOR COOLANT 31-RC-1+002-WEST-1  ;

i 013700 TBX-1-4100-16 B-J PT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.  !

PIPE TO BRANCH CONNECTION B9.32 l A23 816RB 013830 -TBX-1-4100-17 B-J PT 1C - - - - - - - - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO BRANCH CONNECTIDW B9.32 A23 816RB f l

t

l CONANCHE PEAK UNIT 1 PAGE: 39 DATE: 03/22/93 INSERVirE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS I

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR  !

FIRST SECOND THIRD l l

  • ASME PERIOD PERIOD PERIOD l l

SEC. XI l---------------------------------l INSTRUCTIONS l SL88%RY EXAMINATION AREA CATGY NDE l------0UTAGE------l j NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** j

....... .............................. ....... .... . ........... ........... ........... . l l  !

RESIDUAL NEAT REMOVAL 12-RM-1-001-25018-1 l r

- - x ' - - - 82 l 015200 T5x 1-4101-9 B-J UT 1- - -

39.11 PT  ;

P!PE TO ELBOW R154 817Rs

    • T8x-12**

I BJ 1- - - - - X - - - 82 l

015300 T8x-1-4101-10 UT l

EL30W TO P!PE 99.11 PT R154 817RB

    • TBx-12**

I I

i 015400 TEX-1-4101-11 t-J UT 1- - - - - x - - - 82 l PIPE 10 EL90W 89.11 PT ,

, R154 817Rs I **T8x-12**

l t

! 015800 TBx-1-4101-8701A B-G-2 VT-1 1- - x - - - - - - 84 t

VALVE BODY SOLTING 87.70 l

R154 817RB l

i ,

(

I

'015810 Tex-1 4101-8701A B-M-2 VT-3 1- - X - - - - - - 84 GROUP 2 - ONE VALVE WITHIN THE VALVE BODY INTERNAL SURFACES 812.50 GROUP TO SE EXAMINED R154 817RB i

REACTOR COOLANT 10 RC-1-021-2501R-1 016100 TBx-1-4102-3 B-J UT 1C - - - - - - - - 82 PIPE TO ELBOW 99.11 . PT A23 831Rs

    • TBK-9**

/%

(

i e

l i

i

-- . -yw e y y - p ,

. . . ~

)

DATE: 03/?9/93 COMANCHE PEAK UNIT 1 PAGE: 40 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPOWENTS ]

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIto l SEC. XI l-------------------------------l

SUMMARY

EKAMINATION AREA CATCT NDE l--- --0UTAGE------l INSTRUCTIONS WUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

kiACTOR COOLANT 10-RC-1-021-2501R-1 016200 TBx-1-4102-4 B-J UT 1C . . - - - - - - 52 ELBOW TO PIPE B9.11 PT ,

A23 831RB l

    • TBX-9** l SAFETY INJECTION 10-S1-1-179-2501R-1 017100 Tex-1-4102-13 BJ UT 1- C . - - - - - - 82  ;

l PIPE To ELBOW B9.11 PT

. *t A23 820RB

    • TBX-9**  !

i I

17200 TBx-1-4102-14 B-J UT 1C - - - - - - - - 82  !

d ELBOW TO PIPE B9.11 PT  ;

A23 819RB l

    • TBx-9** ,

i 017300 TBX-1-4102-15 BJ UT 1C - - - - - - - - 82

{

PIPE 70 VALVE B9.11 PT j A23 819tB  :

    • TBX-9**  !

l i

h SAFETY INJECTION 6-St-i-089-2501R-1 ,

l 017600 TBX 1-4103-1 B-J UT 1C !; - - - + - - -

85 PARTIAL EXAM RF01. COMPLETED j VALVE TO P!PE 89.11 PT EKAN RF02.

R154 820RB

    • TBK-5**

4 l

i .j i

l l 1 l  !

l -l

, - - - .l

DATE: 03/22/93 COMANCHE PEAC UNIT 1 PAGE: 41 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND TNIRD l ASME l PERIOD PERIOD PERICO l SEC. XI l ------- -~ --- ------- -- ~ ~ ---- l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2'3 1 2 3 l " CALIBRATION BLOCK **

SAFETY INJECTION 6-St-i-089-2501R-1 t 017700 TBX-1-4103-2 BJ UT 1C - - - - - - - - 82 PIPE TO ELBOW 09.11 PT R154 820RB

    • TBX-5** i 017800 TBX-1-4103-3 B-J UT 1C - - - - - - - - 82 ELBOW TO P!PE 89.11 PT R154 820RB
    • TBX-5** j 17900 TBX-1-4103-4 B-J UT 1C - - - - - - - - 82 SEE RR B-2. ,

d PIPE TO MOMENT RESTRAINT B9.11 PT R154 820RB

    • TBX-5** l SAFETY INJECTION 2-SI-1-063-2501R-1 f 018800 TBX-1-4103-13 B-J PT 1- - X - - - - - - 82 l

SOCK 0LET TO PIPE B9.32 R154 820RB  !

1 018900 TBX-1-4103-14 B-J PT 1- - X - - - - - -

82 i PIPE TO SOCK 0LET 99.40 s

R154 820RB 1

! l 1

l 1

019000 TBX-1-4103-15 BJ PT 1- - X - - - - - -

82 VALVE TO PIPE 89.40 R154 820RB 1

I

i }

i i

?

r  !

I J

! DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 42 j INSERVICE INSPECTIDW LONG TERN PLAN CLASS 1 SCHED/COMPL COMPOWENTS INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR I l FIRST SECOND THIRD l [

ASME l PERIOD PERICD PERIOD l l SEC. XI l---------------------------------l l SUMMART EKAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS  !

NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **  !

I REACTOR COOLANT i RC 1-151-2501R-1 t 021400 TBK-1-4106-1 B-J PT 1- - - - - - x-- 82 {

BRANCH CONNECTION TO REDUCER 39.21 {

A23 819RB l

i SAFETY INJECTION 1.5-SI-1-025-2501R 1 l 023800 TBN-1-4107-24 3-J 'T 1- - - - - - X - - 82 l PIPE TO REDUCER B9.21 {

R154 822RB  !

'23900 TBx-1-4107-FLANGE #1 3-G-2 VT-1 1- - X - - - - - - 84 FLANGE BOLTING B7.50 R154 822RB SAFETY INJECTION 2-SI-1-059-2501R-1 l

1 024500 TBK-1-4108-6 B-J PT 9C - - - - - - - -

82

  • PIPE TO TEE 99.21  ;

R154 819tB l

024800 TBX-1-4108-9 B-J PT 1C - - - - - - -

82 TEE TO PIPE 89.21 R154 819RB f

021900 TBK 1-4108-10 5-J PT 1C - - - - - - - - 82 PIPE TO TEE B9.21 R154 819RB l

r i

4 DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 43 l INSERVICE INSPECTION LONG TERM PLAN i CLASS 1 SCHED/COMPL COMPONENTS

' i i

INSPECTION INTERVAL. PLAN STATUS _PRESERVICE YEAR j l FIRST SECOW THIRD l ASME l PERI W PERIOD PEtim l f SEC. XI l--------------------------------l  !

SLAsuRY EKAMINATION AREA CATGY NDE l*-----0UTAGE------l INSTRUCTIONS y NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

{

i SAFETY INJECTION 2-51 1-059-25018-1  ?

I

  • h 025600 TBx-1-4108-17 B-J PT 1- - - X - - - - - 82 l MOMENT RESTRAINT TO PIPE 99.21 1 R154 820RB  !

026000 TBK-1-4108-FLANGE 81 B-G 2 vi-1 1- - - X - - - - - 84  :

FLANGE BOLTING B7.50 R154 820RB l REACTOR COOLANT 2-RC-1-015-2501R-1  ;

TBM-1-4109-2 B-J PT 1C - - - - - - - - 82 926200 PIPE TO ELBOW 39.40 A23 813RR r

i f

I i

1 026300 TEX-1-4109-3 B-J PT 1C - - - - - - - -

82

, ELBOW TO PIPE 89.40 l I

A23 813RB 026400 TEX-1-4109-4 B-J PT 1C - - - - - - - -

82 . 3 PIPE TO COUPLING B9.40 ,

A23 813RB i

1 0265D0 TBX-1-4109-5 B-J PT 1C - - - - - - - -

82 COUPLING TO PIPE 89.40

-A23 813RB

, , ~

,. ... -,-, .+- , , , - , . - - - - , .,,

)

i DATE: 03/22/93 COMANCHE PEAC UNIT 1 PAGE: 44 j r

INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE TEAR l l FIRST SECOND TNIRD l {

ASME l PERICD PERIOD PERICO l l SEC. XI l--------------------------------l f SleeuRT EKAMINATION AREA CATGT IDE l------0UTAGE------l INSTRUCTIONS

{

NUMBER IDENTIFICATION ITEM No METN l1 2 3 1 2.3 1 2 3 l ** CALIBRATION BLOCK **

....... .............................. ....... .... . ........... ........... ........... . .............................. l i

CHEMICAL 8 VOL M CONTROL 1.5-CS-1-248-2501R-1 I

027900 TBK 1-4111-1 B-J PT 1- - - X - - - - - 82 RC PUMP N0ZZLE 10 FLANGE 89.21 A23 830RB l

l 028000 TBK 1 4111-2 B-J PT 1- - - X - - - - - 83 FLANGE TO PIPE B9.21

, A23 8DRB I

l 1

028200 TBx-1-4111-5 B-J PT 1C - - - - - - - - 83 l l PIPE TO REDUCER 89.21 I l A23 8261tB t

i I l i CHEWTCAL E VOLUME CONTROL 2-CS-1-103-2501R-1 I 028300 TBK-1-4111 6 BJ 7 1C - - - - - - - - 82  :

1 REDUCER TO PIPE 39.21 l

A23 826kB i f

i t

I 028400 TBK-1-4111-7 B-J PT 1- - - X - - - - -

82 PIPE TO ELBOW 89.21  ;

A23 826RB  !

(

028500 TBK 1-4111-8 B-J PT 1-- - X - - - - - 82 ELBOW TO PIPE B9.21 A23 826kB r

I I

I  !

l .

)

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 45 INSERVICE INSPECTION LONG TERM PLAN [

CLASS 1 SCHED/CDMPL COMPOWENTS I i

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l t

l FIRST SECOND THIRD l ).

ASsE l PERIOD PERIG) PERICO l l SEC. XI l - ~ ~ ---- - ----- ~ ~--- ------- --- l {

S38ERY EKAMihATION AREA CATGY WE l------0UTACE------l INSTR'tCTIONS i NW1BER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK'* f I

CHENICAL & VOLUME CONTROL 2-CS-1-103-2501R-1 i t

I 028600 Tax-1-4111-9 B-J PT 1- - - x - - * - - 82 ,

PIPE TO TEE B9.21 f' A23 826RB f

i I

B-J 1- x - - - - - 84 l 028700 TBK-1-4111-10 PT - -

t t

TEE TO P!PE B9.21 A23 826aB l

029100 TBM-1-4111-FLANGE #1 B-G-2 VT-1 1- - - x - - - - - 84 j FLANGE BOLTING B7.50 A23 830RB

?

i

)

REACTOR COOLANT 29-RC-1-023-WEST-1 i I

029200 TBK-1-4200-1 B-F UT 1- - x - - - - - - 82 2ND CAL. BLOCK RV-6 USED WITH i RPV N0ZZLE TO SAFE END B5.10 PT AUTOMATED UT TO SUPPLEMENT' i A25 827RS MANUAL UT. TDLR VERIFICATION BOUNDARY.

    • TBK-2**

029500 TBK-1-4200-4 B-F UT 1- - - - x - - - - 85 TDLR VERIFICATION BOUNDARY. ,

REDUCING ELBOW 10 SG N0ZZLE B5.70 PT l SAFE END A25 827RB **TBx-2**

l I

REACTOR COOLANT 31-RC-i-024-WEST-1 029600 TBK-1-4200-5 BF UT . 1- - - - x- - - -

82 TDLR VERIFICATION BOUNDARY.

SG WOZZLE SAFE END TO ELBOW ").70 PT A25 829tB l **TBK-2"  ;

l

% j i

l

i t

i l

t DATE: 03/29/93 CDMANCNE PEAK UNIT 1 PAGE: 46 i INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCNED/COMPL COMPONENTS j r

I INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE TEAR l FIRST SECOND THIRD l . .

ASME l PERICC PERIOD PERito l  ;

SEC. XI l---------------------------------l  !

I

SUMMARY

EKAM!hATION AREA CATCT NDE l------0UTAGE------l INSTRUCTIONS f NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l "CALIBEATION BLOCK ** i 1

I REACTOR COOLANT 27.5-RC-1-025-WEST-1

)

l 030500 TBK-1-4200-14 B-F UT 1- - - - - - X - - 82 2ND CAL. ELOCK RV-6 USED WITH

  • l SAFE END TO RPV N0ZZLE B5.10 PT AUTOMATED UT TO SUPPLEMENT j A25 827RB MANUAL UT. TDLR VERIFICATION j BOUNDARY.
    • TEN-2** >

l l 031000 TBx-1-4200-19 B-J U1 1- - - - X - - - - 82 TDLR VERIFICATION BOUNDARY. 6 PIPE TO BRANCH CONNECT!DN B9.31 PT A25 827RB

! -TBx 2~ ,

f I

l- REACTOR COOLANT 10-RC-1-037-2501R-1 ,

f D C31200 TBK 1-4201-1 B-J UT 1- - - - X - - - - 82  !

l BRANCH CONNECTION TO ELBOW 89.11 PT [

! A25 829RB <

    • TBK-9** l SAFFTT INJECTION 10-SI-1-180-2501R-1 l 4

C32600 TBK-1-4201 15 B-J UT 1- - - - X - - - -

82 PIPE TO WALVE 89.11 PT i A25 823RB

    • TBK-9'*

SAFETY INJECTION 6-SI-1-328-2501R-1 1 l

)

032900 TBX-1-4202-1 BJ UT 1- C'- - - - - - - 82  !

i VALVE TO PIPE B9.11 PT 1

R154 820RB

    • TBK-5**

l

~

l F

e-- .a m.m,, ,., ,+ ,, -< , . - - - . , . ,

r. . , , , , ,. ,w..

. - - -. .~. -. - . . _ _ --

k i i 1 ,

Ih DATE: 03/27/93 COMANCHE PEAK UNIT 1 PAGE: 47  ;

< r

. INSERVICE INSPECTION LONG TERM PLAN

] CLASS 1 SCHED/COMPL COMPOWENTS 2 INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR [

l FIRST SECOND THIRD l }

j ASME l PERIOD PERIOD PERIOD l }

, SEC. XI l-----------------------*----~~--l '

] SUSARY EKAMINATION AREA CATGY NDE l---*--0UTAGE------l INSTRUCTIONS f NUMBER IDENTIFICATION ' FEM NO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** -l l ....... ................. ...... .... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - .............................. i J

l l 1

1 j SAFETY INJECTION M1-i 32t 2501R-1  ;

' t j i

) 033000 TBK-1-42D-2 B-J UT 1- C - - . - -

.- 82  ;

j PIPE TO REDUCER B9.11 PT l R154 820RB l l

..TBx.5.. r i

i  !

a  :

SAFETY INJECTION 8-St-1-090-2501R-1 '[

r t

i 033100 TBM-1-4202-3 8-J UT 1- - - - X - - - - 88  :

REIdi: TO PIPE B9.11 PT  !

R15* c'3RB  !

    • TBK-18**

I 33200 TBX-1 4202-4 B-J UT 1- - - - x - - - -

82 PIPE TO ELBOW 99.11 PT ,t R154 820RB I

    • TBX-18**  !

I 033300 TBX-1-4202-5 B-J UT 1- - - X - - - - 82 l 4

ELhai TO NOMENT RESTRAINT 39.11 PT j

'l R154 820RB

    • TBM-18**

_SffETY INJECTION 2-St-1-065 '501R-1 l i

034700 TBX-1-4202-19 B-J PT 1- -- - - - K - - 82 i PIPE TO TEE B9.40 1 R154 817RB l

t  !

034800 TBx-1-4202-20 B-J PT 1- - - - - - X - - - 82 TEE 10 REDUCING INSERT B9.40 i R154 817tB o

  • - -+$v r-. , ,,-,en e w.. -._,r,--- we m . r w,, . --v ~ , , , , , w- ,y-gr,,--,,r..ve- ,

COMANCHE PEAC UNIT 1 PAGE; 48 DATE: 03/29/93 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS l

INSPECTION INTERVAL , PLAN STATUS j

_PRESERVICE YEAR FIRST SECOND THIRD l [

l l

ASME l PERIm) PERIOD PERIOD l SEC. XI l-------------------------------l )

INSTRUCTIONS

SUMMARY

EKAMINATION AREA CATCY NDE l------0UTAGE------) f NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAfl0N BLOCC** t

....... .............................. ....... .... . ........... ........... ........... . .............................. 4 l

SAFETY INJECTION 2-St-1-065-2501R-1 i

1 034900 TBM-1-4202-21 B-J PT 1- - - - - - x- - 82 ,

TEE TO PIPE B9.40 [

R154 817tB 1

035000 TBK-1 4202-22 B-J PT 1- - - - - - x - - 82 ,

PIPE TO TEE B9.40 j R154 816RB t

i t

035100 TBM-1 4202 23 B-J PT 1- - - - - - X - - 82 j TEE TO REDUCING INSERT 89.40 i R154 816RB f i

l 035200 TBM-1 4202-24 B-J PT 1- - - - - - X - - 82 f

TEE TO PIPE B9.40 [

R154 816RB i h

I i

SAFETY INJECTION 6-SI-1-101-2501R-1 i

{

035500 TBM-1-4203 1 B-J UT 1- C - - - - - - 82 VALVE TO PIPE B9.11 PT R154 823RB }

, **TBx 5**  !

l <

l C36400 TBM-1-4203-89498 B-G-2 VT-1 1- - - -

X - - - - 84 I l VALVE BODY BOLTING B7.70 l

A25 831RB {

I i

(

1 1

'i P

.__ . _ - . . ~ . _ . _ _ _ _ _ , . . _ . _ . _ __ ,- -_ .__

. ~ -. . - . _ - . . . , . . . ..~a _ . _ - . - - - ~ . . . - . . . . - w ., -

l

(

l

[

PAGE: 49 DATE: 03/22/93 COMANCHE PEAK UNIT 1 l INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS i i

l r

INSPELTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST- SECOND THIRD l .  ;

ASINE PERIOD PERIOD PERIOD l l

SEC. XI l---- ----- --*------ - -- --- -

l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRATl0N BLOCK **

SAFETY INJECTION 6-$f-1-101-2501R-1 036410 TBK-1-4203-89498 B-M-2 VT-3 1- - - - X - - - - 84 GROUP 4 - ONE VALVE WITHIN THE VALVE BODY INTERNAL SURFACES B12.50 GROUP TO BE EXAMINED A25 831RB i

i SAFETY INJECTION 1.5-$1-1-200-2501R-1 t

B-J 1- - - - - X - - - 82  :

039100 TEX-1-4205-16 PT L PIPE TO ELBOW 89.40 R154 817RB i

i 9200 TEX-1 4205 17 B-J PT 1- - - - - X - - - 85 )

l ELBOW TO PIPE B9.40 i t

R154 817RB

(

T l r t

! SAFETY INJECTION 1.5-St-1-026-2501R-1

.t

! 040300 TBX 1 4205 28 B-J PT 1- - - - - X - - - 82  ;

r l PIPE TO COUPLING B9.40 [

R154 817RB i

?

t 040400 TBX 1-4205-29 BJ PT 1- - -

- - X - - - 88

! COUPLING TO PIPE B9.40 h i

[ R154 817RB l

l t L

L 040500 TBX-1-4205-30 B-J PT 1- - - - - X - - -

82 i

PIPE TO COUPLING 89.40 i R154 817RB j

i 5

i

- , . - - - - . -- + s a .

)

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 50 l INSERVICE INSPECTION LONG TERM PLAN ,

CLASS 1 SCHED/COMPL COMPONENTS f t

INSPECTION INTERVAL , PLAN STATUS' ,PRESERVICE YEAR f l FIRST .SECOND THIRO l l ASME l PERIOD PERIOD PERltD : l l BEC. XI l--*---*=-*---*-----~--*-----l l StaeERY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS f WUMBER IDENTIFICATION ETEM No METH l1 2 3 1 2 3 1 2-3 l ** CALIBRATION BLOCC'* l SAFETY INJttTION 1.5-$1-1-026-2501R-1  ;

t 040600 TBM 1-4205-31 BJ PT 1- - - - - X * - - 82 j t

COUPLING TO PIPE 89.40 R154 817RB I t

I 040700 TBM 1 4205-32 B-J PT 1- - X - - - - -

R154 817RB j 5

)

i t

040B00 TBx 1-4205-33 B-J PT 1- - x - - - - - -- 82 l COUPLING TO PIPE 89.40 l R154 817RB  !

.L t

t C

040900 TB* 1-4205-34 B-J PT 1- -- X - - - - - - 82  ;

PIPE TO ELBOW 89.40 }

R154 817RB -l t

041000 TBX 1-4205 35 B-J PT 1- - X - - - - - -

82  ;

ELBOW TO PIPE 89.40  !

R154 817RB l 041100 TBx-1-4205-36 BJ PT 1- - x - - - - - 82 PIPE TO ELBOW B9.40 l

Rts4 818RB 041300 TBK-1 4205-38 B-J PT 1- - K - - - - - -

82 PIPE TO REDUCER 39.21 R154 81BRB -

t i

COMANCHE PEAK UNIT 1 PAGE:' 51 l DATE: 03/22/93  !

INSERVICE INSPECTION LONG TERM PLAN .;

CLASS 1 SCHED/C04PL COMPOWENTS -f i

i 4

INSPECTION INTERVAL , PLAN STATUS PRESERVICE YEAR l FIRST SECOND THIRD j *  !

t ASME PERIOD PERIOD _ PERIOD l  ;

l i

SEC. x1 l--------"-----------------------l l SL8 MARY EXAMINATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS {

EMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CALIBRAtl0N BLOCK ** [

[

l  !

I SAFETT INJECTION 1.5-51-1-026-2501R-1  ;

04140a TBx-1-4205-FLANGE #1 B-G-2 VT-1 1- - - - - x - - - 84 TLANGE BOLTING B7.50 R154 818RB ,

r REACTOR COOLANT 2-RC-1-035-2501R-1 041600 TBx-1-4206-2 B-J PT 1- - - - x - - - - 82 l l PIPE TO ELBOW B9.40 I l A25 814RB f i

1700 TBx-1-4206-3 B-J PT 1- - - - x - - - - 82 ELBOW TO P!PE 89.40 A25 814RB ,

l l

CHEMICAL & VOLUME CONTROL 1.5-CS-1-249-2501R-1 043500 TBX-1-4208-FLANGE #1 B-G-2 VT-1 1- - - - x - - - - 85 FLANGE BOLTING B7.50 A25 830RB RE ACTOR COOL ANT 29-RC-1-040-WEST-1 043600 TBx-1-4300-1 B-F UT 1- - X - - - - - - 82 2ND CAL. BLOCx RV-6 USED VITH l

RPV N0ZZLE To SAFE END B5.10 PT AUTOMATED UT TO SUPPLEIENT A27 827RB MANUAL UT. TDLR VERIFICATION BOUNDARY.

    • TBx-2**

043800 TBM-1-4300-3 B-J UT 1- - - x- - - - -

82 TDLR VERIFICATIDW BOUNDARY.  ;

PIPE 70 REDUCING ELBOW 89.11 PT A27 827RB

    • TBx-2**

i

\ i l

i I

l l

l

t DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 52 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERICD l SEC. El l----------- ------- -- --- - ----

l SLMMARY EKAMINATION AREA CATGY NOE l------0UTAGE------l INSTRUCTIONS EMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

r REACTOR COOLANT 29-RC-1-040-WEST-1 j 043900 TBx-1-4300-4 B-F UT 1- - - - - - x - - 85 TDLR VERIFICATION BOUNDARY.

REDUCING ELBOW TO SG N0ZZLE B5.70 PT SAFE END  !

I A27 827RB **TBX-2**

REACTOR COOLANT 31-RC-1-041-WEST-1 044000 TBK-1-4300-5 B-F UT 1- - - - - - X - - 82 TDLR YERIFICATION BOUNDARY. l SG N0ZZLE SAFE END TO ELBOW B5.70 PT A27 829RB

    • TBK-2** I 44200 TBX-1-4300-7 B-J UT 1- - x - - - - - -

82 TDLR YERIFICAT10N BOUNDARY.

j P!PE TO ELBOW 89.11 PT A27 821RB

    • TBX-2**  !

044300 TBx-1-4300-8 B-J UT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY. [

ELBOW TO PIPE 99.11 PT j A27 817RB i

    • TBK-2**

044400 TBX-1-43DD-9 B-J UT 1- - X - - - - - -

82 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBOW 89.11 PT A27 817RB l **TBx 2**

REACTOR COOLANT 27.5-RC-1-042-WEST-1 044700 TBx 1 4300-12 B-J UT 1- - - X - - - - -

82 TDLR VERIFICAT10N BCUNDARY.

PIPE TO ELBOW B9.11 PT A27 827RB

    • TBK-2**

(

l 1

- . . =- . . - -. . . . - .

i i h

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 53 I INSERVICE INSPECTION LONG TERN PLAN )

CLASS 1 SCHED/COMPL COMPONENTS

~

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l l ASME PERIOD PERIOD PERIOD l l l SEC. XI l----*----*=---*-'--------*--~~*-l [

I SL88%RY EXAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH ]1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l t

t REACTOR COOLANT 77.5-RC-1-042-w ST-1 l

i 044800 TBX-1-4300-13 B-J UT 1- - - X - - - -

  • 82 TDLR VERIFICATION BOUNDARY.

ELBOW TO SAFE END 89.11 PT  ;

l A27 827RB

    • TBX 2**

I b

044900 TEX-1-4300 14 B-F UT 1- - - - - - X - - 82 2ND CAL. BLOCK RV-6 USED WITH  ;

SAFE END TO RPV N0ZZLE B5.10 PT AUTOMA1ED UT TO SUPPLEMENT )

A27 827RB MANUAL UT. TDLR VERIFICATION j l

l BOUNDARY. ,

    • TBX-2** i 1

I i

REACTOR COOLANT 31-RC-1-041-E ST-1 1

045100 TBX-1-4300-16 3-J PT 1- - X - - - - - - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO BRANCN CONNECTION 99.32 .

1 A27 816aB t i

045200 TBX-1-4300-17 BJ PT 1- - - - - - X - - 82 TDLR VCRIFICATION BOUNDARY.

PIPE TO BRANCH CONNECT 10N 99.32 A27 816aB f 1

1 RE ACTOR C00LAkT 27.5-RC-1-042-WEST-1 045400 TBX-1-4300-19 B-J UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO BRANCH CONNECTION B9.31 PT A27 827RB eeigx.2**

REACTOR COOLANT 10-RC-1-055-2501R-1 045800 TBX-1 4301-3 3-J UT 1- - . X - . . . . 82 PIPE TO ELBOW 99.11 PT A27 832RB

    • TBX-9** j g

\  !

I i

l l

DATE: 03/22/93 COMANCHE PEAL: UNIT 1 PAGE: 54 1 l

l INSERVICE INSPECTION LONG TERM PLAN O

6 CLASS 1 SCHED/COMPL COMPONENTS l

\

b INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l Sec. x1 l-...-.....-------....--.---.-...l

SUMMARY

EXAMINATIDW AREA CATGY WDE l------0UiAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

REACTOR COOLANT 10-PC-1-055-2501R 1 l 045900 TBx-1-4301-4 B-J UT 1- - - K - - - - - 82 l ELBOW TO PIPE 89.11 PT A27 B32RB

    • TBx-9**

l SMETY IN R CTION 10-SI-1-181-2501R-1 046700 TBx-1-4301-12 B-J UT 1- - - - - - - - X 82 TEE 10 PIPE B9.11 PT A27 829RB

    • TBx-9**

6800 TBx-1-4301-13 B-J UT 1- - - - - - - - K 82 PIPE TO ELBOW 99.11 PT A27 823RB

    • TBx-9**

047000 TBK-1-4301-15 BJ UT 1- - - - - - - - x 82 PIPE TO VALVE 89.11 PT A27 823RB

    • TBx-9**

047100 TBx-1-43V1-8948C B-G-2 vi-1 1- - - - - -

K - - 84 VALVE BODY BOLTING B7.70 l A27 831RB 047110 TBx-1-4301-894BC B-M-2 VT-3 1- - - - - - x - -

84 GROUP 3 - DNE VALVE WITHIN THE VALVE BODY INTERNAL SURFACES B12.50 GROUP TO BE EXAMINED A27 831RB l

SM ETY IN ECTION 6-SI-1-330-2501P-1 7300 TBx-1-4302-1 E-J UT 1- - -

x - - - - - 82 VALVE TO PIPE E9.11 PT R154 816RB

    • TBK 5**

l 2

l

i l

l DATE: 03/22/93 COMANCHE PIAC UNIT 1 PAGE: 55  !

INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS  ;

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR ,

l FIRST SECOND THIRD l l ASIE PERIOD PERIOD PERIOD l f l

SEC. El l---------------------------------l l SUIMARY EXAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS 'l NUMBER IDENTIFICATION ITEM No METN l1 2 3 1 2 3 1 2 3 l **CALIBRATIDW BLOCK'* .

SAFETY INJECTION 6-SI-1-330-2501R-1 l 047400 TBK-1-4302-2 B-J UT 1- - - X - -- - - - 82 6

PIPE TO REDUCER 39.11 PT R154 816tB  ;

    • TBX-5**

i l

SAFETY INJECTION 8-St-1-091-2501R-1 f

047600 Tax-1-4302-4 BJ UT 1- - - - - - - - X 82 I

PIPE TO ELBOW B9.11 PT R154 816RB  !

    • TBK-18**

t I

j 7700 TBx-1-4302 5 B-J UT 1- - - - - - - -

X' 83 l l

ELBOW TO PIPE B9.11 PT R154 816RB

    • TBX-18**

i I

l 047800 TBK 1-4302-6 B-J UT 1 - - - - - -

--x 83 i l PIPE TO MOMENT RESTRAINT B9.11 PT R154 816tB +

    • TBX-18**

l l l  !

l i '

l SAFETY INJECTION 2-SI-1-067-2501R 1 l

! 048600 TBX-1-4302-14 B-J PT 1- - - - - - X - - 82 PIPE TO SOCK 0LET B9.32 R154 816RB l k

04s800 TBx-1-4302-16 B-J PT 1 . x . . . - - . 88 j PIPE TO ELBOW B9.40 l R154 815RB i

f i

3 f I i -

I i

f

I  !

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 56 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHED/COMPL COMPOWENTS ,

t INSPECTIDW INTERVAL , PLAN STATUS _PRESERVICE TEAR l l FIRST SECOND THIRD l ,

ASME l PERIOD PERl(X) PERIOD ] [

SEC. XI l---------------------------------l l I

SuleuRY EXAMINATION AREA CATGV NDE l------0UTAGE------l INSTRUCTIONS ,

MUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1-2 3 l ** CALIBRATION BLOCK'* {

....... .............................. ....... .... . ........... ........... ........... . .............................. 1 SAFETY INJECTION 2-St-1-067-2501R-1 ,

[

048900 TBX 1-4302 17 B-J PT 1- - X - - - - - - 82 ELBOW 70 P!PE 39.40 R154 815RB l

049000 TBX-1-4302-18 B-J PT 1- - - - X - - - - 82 }

PIPE TO TEE 89.40 i R154 815tB 049100 TBX 1-4302-19 B-J PT 1- - - - X - - - - 82 i 5

TEE TO REDUCING INSERT 39.40 R154 815tB i I ,

i h

1 049200 TBK-1-4302-20 B-J PT 1- - - - X - - - -- 82 j TEE TO PIPE b9.40 l R154 815tB  !

I i

l I l

l

, 049300 TBX-1-4302-21 B-J PT 1- - - - - .

' - X - 82 l

l PIPE TO TEE 39.40 R154 815tB 049400 TBX-1-4302-22 B-J PT 1- - - - - - - X - 82 l

l TEE TO REDUCING INSERT 89.40 R154 815RB i

049500 TBX 1-4302-23 B-J PT 1- - - - - - -

X - 82 -

TEE TO PIPE B9.40  ;

i l R154 815RB s.

I 1

I.

- - -__ - __ - , _ - _ . _ . . _. . _ , . . ,, ,m._,.._._ - , . . , . , .

I

)

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 57 l INSERVICE INSPECTION LONG TERM PLAN e

CLASS 1 SCHED/COMPL CCMPOWENTS  !

INSPECTION INTERVAL. PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l [

ASME l PERl(O PERIM) PERICC ' j SEC. XI l


= -- --- -----

---l {

SUMMARY

EXAMIhATION APEA CATGT NDE l------0UTAGE------l INSTRUCTIONS {

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* i SAFETY INJECTION 6-SI-1-102-2501R.i 1

050100 TBK-1-4303-4 B-J UT 1- - - - . - - - x 82  !

PIPE TO ELBOW 99.11 PT A27 823RB

    • TBx-5** ,

050200 TBK-1-4303-5 B-J UT 1- - . . - - - - X 82 ELBOW TO PIPE 09.11 PT A27 823RB l

.*TBx 5**

REACTOR COOLANT 3-RC-1-052-2501R-1 .

I TBK-1-4304-1 B-J PT 1- - - - - - x- - 82  !

C01800 BRANCH CONNECTION TO PIPE 89.21 A27 816tB

)

i 051900 TBx.1-4304-2 B-J PT 1- - - - - - x- -

82 -

PIPE To ELBOW B9.21 .

1 A27 814RB i

i 052000 TBK-1-4304-3 B-J PT 1- - - - - - X - - 82 ELBOW TO PIPE $9.21 )

A27 814RB 052100 TBM-1-4304-4 B-J PT 1- - - x- - - . . 82 PIPE TO ELBOW B9.21 A27 814RB 052200 TBx-1-4304-5 B-J PT 1- - -

x - - - - -

82 ELBOW TO PIPE B9.21 A27 814RB l

~_ .~ , _ _ . _ . , . .

6 OATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 58 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD I l l ASME l PERIS PERI @ PERIOD l SEC. XI l

-- - - -- -~-*------


l l

SUMMARY

EXAMINATION AREA CATGY NDE l-- ---0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK **

i REACTOR COOLANT 3-RC-1-052-2501R-1 ,

t 052300 TBM-1-4304-6 B-J PT 1- - - X * - - - -

82 l

l PIPE 10 ELBOW 89.21 l A27 814RB {

I l

052100 TBX-1-4304-7 B-J PT 1- - - X - - - - -

82  ;

+

i l ELBOW TO PIPE 89.21 A27 814RB i i

4 052500 TBX-1 4304 8 B-J PT 1- - - - - -

X - - 82 l

PIPE 10 ELBOW 89.21 j A27 ,814RB j 1

052700 TBX-1-4304-10 3J PT 1- - - - - - X - - 82

-}

PIPE TO TEE 89.21 l A27 814RB i I

I 052800 TBX-1-4304-11 B-J PT 1- - - - - - X - - 82 l TEE TO PIPE B9.21 A27 814RB f i

i  !

l 053000 TBX-1-4304-13 8J PT 1- - - - - - X - - 82 ELBOW TO PIPE 89.21 Ii A27 814RB ,

I i

-i 1

\

l l

053600 TBX-1-4304 19 B-J PT - - - - - X - -

82 PIPE TO ELBOW 89.21 A27 814RB n

e i

i i

3 i

I

- , , ,,w , - , ..----.o--, -<-r,- , , , , - < c- , , , ,----,,a ., . ---,,rew- , +--w- ,-,-w.,

i ie I

i l

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 59 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPOWENTS f 6

i INSPECTION INTERVAL,, PLAN STATUS _PRESERVICE YEAR  !

8 l FIRST SECOND THIRD l ASME l PERIOD PERICD PERIOD l l SEC. XI l---------------------------------l SUMERY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS

(

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* j CHEMICAL 8 VOLUME CONTROL 3-CS-1-235 2501R-1 054500 TBK-1-4304-27 B-J PT 1- - - - - X - - - 82 PIPE TO VALVE 99.21 R154 826tB l i

i REACTOP COOLANT 1-RC-1*159-2501R-1 j 054800 TSK-1-4305-1 B-J PT 1- - - - - - X - - 82 ,

BRANCH CONNECTION TO REDUCER 99.21  !

A27 817RB i

i SAFETY INJECTION 1.5-St-1-027-2501R-1 l 057600 TBx-1-4306-28 B-J PT 1- - - - - - - X -

82 ,

PIPE To ELBOW 39.40 i

-i R154 815RB 4

I I

057700 TBK-1-4306-29 B-J PT 1- - - - - - - X -

82 ELBOW 70 PIPE B9.40 R154 815RB 1

i 057800 TBx-1-4306-30 BJ PT 1- - - - - - - X - 82 PIPE 70 ELBOW B9.40 R154 815RB 057500 TBK-1-4306-31 B-J PT 1- - - - - - - X - 82 i ELBOW TO PIPE 99.40 l R154 815RB l

l i

w e r. -,e+ w w - -- ~-

e vw

. _. _ _ . . . _ - . . .~. _ . . . _ _ . _ ._.. . ..

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 60 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR j l FIRST SECOND THIRD l .  ;

ASME PERIOD PERIOD PERIOD l l l ,

SEC. x1 l---------------------------------l j SUIMARY EXAMINATION AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS -l NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

]

)

SAFETY INJECTION 1.5-SI-1-027-2501R-1 t

058000 TBK-1-4306-32 B-J PT 1- - - - - - - x- 82  :

PIPE TO TEE 99.40 $

R154 815RB  !

i 058100 TBx-1 4306-33 B-J PT 1- C - - - - - -- 82 f

TEE TO REDUCING INSERT 99.40 }

R154 815RB l i

058200 TBK 1-4306-34 B-J PT 1- C - - - - - -- 82 f TEE TO PIPE B9.40 R154 815RB l

l 058300 Tax-1-4306-35 B-J PT 1- C - - - - - --

82 l l PIPE TO COUPLING 39.40 l R154 815RB i

l 058400 TBx-1-4306-36 B-J PT 1- - - - - - x- - 82 j l COUPLING TO PIPE B9.40  ;

! R154 815RB i

t .

l 058500 TBx-1+4306-37 B-J PT 1- - - - - - X -- 82 PIPE TO COUPLING 89.40 R154 815RB j 058600 TBM-1-4306-38 B-J PT 1- - - - - - x- -

82 l COUPLING 70 PIPE B9.40 j R154 815RB  !

I r

i i i

r

, . . . , . , -myg_ ,_ , - ~ -

97-. ,.~.er w --@

9 '*

COMANCHE PEAK UNIT 1 PAGE: 61 f DATE: 03/22/93 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS N

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR FIRST SECOND THIRD l l

ASME l PERIOD PERIOD PERIOD l SEC. XI l-------------------..-----------l '

l INSTRUCTIONS

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l WUMBER IDENTIFICATION ITEM No METN l1 2 3 123~ 1 2 3 l ** CALIBRATION BLOCK **

i' SAFETY INJECTION 1.5-51-1-027-2501R-1 B-J 1- - - - * - X - - 82 l 058700 TBK-1-4306-39 PT PIPE TO ELB0J 89.40  !

R154 815aB i

060100 TBX-1-4306-53 B-J PT 1- - - X - - - - - 82 f i

i PIPE TO COUPLING B9.40 l'

R154 819tB 060200 TBX-1-4306-54 B-J PT 1- - - X - - - - - 82 COUPLING 10 PIPE B9.40  ;

R154 819RB l l

060500 TBX-1-4306-57 B-J PT 1- - - - - - - X -

82 [

l PIPE TO REDUCER 89.21 R154 819RB l

I 060600 TBX-1-4306-FLANGE #1 B-G-2 VT-1 1- - - - - X - - - 84 l

FLANGE BOLTING B7.50 l R154 817RB l

l REACTOR COOLANT 2-DC-1-053 2501R-1 ,

I

! 060700 TBX 1-4307 1 B-J PT 1- - - - - - X - - 82 TEE TO PIPE 39.21 ,

A27 814RB 060800 TBX-1-4307-2 B-J PT 1- - - - - . X - - 82 PIPE TO ELBOW 89.40 A27 813RB l

l i

l

CCMANCHE PEAC UNIT 1 PAGE: 62 DATE: 03/22/93 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHED/COMPL COMPONENTS i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICO PERIOD PERIOD l

  • Sec. x1 l------..-----------.--------.--..l SL8NERY EKAMINATION AREA CATGY NDE l----- 0UTACE------l INSTRUCTIONS 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l NUMBER IDENTIFICATION ITEM NO METH ]1 2 3 l

REACTOR COOLANT 2-RC-1-053-2501R-1 ,

060900 TBx-1-4307-3 B-J PT 1- - - - - - X - - 82 l

ELBOW TO PIPE B9.40 1 A27 813R8 r

1 CHEMICAL 5 VOLUME CONTROL 2-CS-1-107-2501R-1 ,

063100 TBx-1-4309-FLANGE #1 B-G-2 VT-1 1- - - - - - X - - 84 l I

FLANGE BOLTING B7.50 A27 830RB

[

REACTOR COOLANT 29-RC-1-058-WEST-1 063200 TBK-1-4400-1 B-F UT 1- - X - - - - - - 82 2ND CAL. BLOCK RV-6 USED WITH .

RPV N0ZZLE TO SAFE END B5.10 PT AUTOMATED UT TO SUPPLEMENT l A29 827RB MANUAL UT. TDLR VERIFICATION l BOUNDARY. ,

    • TBX-2**

063500 TBx-1-4400-4 B-F UT 1- C - - - - - - - 85 TDLR YERIFICATION BOUNDARY.

REDUCING ELBOW TO SG N0ZZLE B5.70 PT j SAFE END A29 827RB **TBX-2**

REACTOR COOLANT 31-PC-1-059-WEST-1 I 063600 TBx-1-4400-5 B-F UT 1- C - - - - - - - 85 TDLR VERIFICATION BOUNDARY.

SG N0ZZLE SAFE END TO ELBOW B5.70 PT A29 8292B "TBX-2**

063700 TBX-1-4400-6 B-J UT 1- C - - - - - - 82 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE 89.11 PT A29 826RB

    • TBX 2**

i I

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 FAGE: 63 i

! INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPOWENTS g

I

! INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND THIRD l .

l ASME l PERIOD PERICC PERIOD l f SEC. XI l---------------------------------l l SUMMART EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS  ;

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CAttBRATION BLOCK **

i REACTOR COOLANT 31-RC-1-059-w ST-1 r

063800 TBK-1-4400-7 B-J UT 1- C - - - - - - - 82 TOLR VEklFICATION BOUNDARY.

i P!PE TO ELBOW B9.11 PT A29 821RB

    • TBK-2**  !

r l

1 I D63900 TEK-1-4400-8 B-J UT 1- C - - - - - *.- 82 TDLR VERIFICATI0W BOU SARY.

ELBOW 70 PIPE B9.11 PT I A29 817RB

! **TBx-2**

i 1

l REACTOR C00LANT 27.5-RC-1-060-wST-1 l

! 500 TBX-1-4400-14 B-F UT 1- - - - - - X - -

82 2e CAL. BLOCK RV-6 USED VITN SAFE END TO RPV N0ZZLE B5.10 PT AUTOMATED 8tf TO SUPPLEMEWT f A29 827RB MANUAL UT. TDLR VERIFICATION l BOUNDARY.

    • TBx-2** ,

l REACTOR COOLANT 31-RC-1-059-w ST-1 064800 TBK-1-4400-17 B-J PT 1- C - - - - - - -

82 TDLR VERIFICATION BOUNDARY.

PIPE TO BRANCH CONNECTION 99.32 A29 817RB l

064900 TBX-1-4400-18 BJ PT 1- C - - - - - - -

82 TDLR VERIFICATION BOUNDARY. l PIPE TO BRANCH CONNECTION 89.32 A29 817RB j REACTOR COOLANT 27.5-RC-1-060-w ST-1 065300 TBK 1-4400-22 B-J UT 1- - - - - - X - -

82 TDLR VERIFICATION BOU@ ARY.

PIPE TO BRANCH CONNECTION B9.31 P'T g A29 827RB

/ **tgx.2**

l

~

l l

I j

i COMANCHE PEAC UNIT 1 PAGEs 64 DATE: 03/29/93 ]

I INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPOWENTS l 1

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR {

l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERits l l SEC. XI l---------------------------------l l I SLMMARY EXAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS  !

2 1 2 3 2, 3 l ** CALIBRATION BLOCK'* l CLMBER IDENTIFICATION ITEM NO METH l1 23 1 5

5 RESIDUAL HEAT Rete 0 VAL 12-RH-1-002-2501R 1 l

l 066200 TBM 1-4401-8 B-J UT 1- - - - X - - - 82  ;

P!PE TO ELBOW 89.11 PT l l R154 817RB

    • TBK-12**

I I

f . l l 066300 TBK-1-4401-9 B-J UT 1- - - - X - - - - 82 j f ELBOW 70 P!PE 89.11 PT  ?

R154 817RB l **TBK-12** i 9

066400 TBX-1-4401-10 B-J UT 1- - - -

X.'- - - - 82 PIPE TO ELBOW 89.11 PT R154 817RB

    • TBK-12**

v 066500 TBX-1-4401-11 B-J UT 1- - - - X - - - - 82 ELBOW TO PIPE 89.11 PT i

R154 817RB  !

    • TBK 12**

l a

SAFETY INJECTION 10-SI-1-182-2501R-1 i

068000 TBK-1 4402-12 B-J UT 1- C - - - - - - - 82 ,

TEE TO P!PE 99.11 PT i

?

A29 829RB j

    • TBM-9'* .

?

?

b68100 TBK-1-4402-13 B-J UT 1- C - - - - - - - 82 f

PIPE TO ELBOW 99.11 PT l A29 819RB e

    • TBX-9** i l

r k  ;

t I

t

- . _. ~ .

DATE: 03/22/93 CCMANCHE PEAK UNIT 1 PAGE: 65 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHED/COMPL COMPOWEETS ,

l_ i s

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l  !

ASME l PERIG) PERIOD PERIOD l '

SEC. XI l -- *-- - ----------- -- -- ----- l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUICER IDENTIFICATION ITEM No METH j1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

b r

SAFETY INJECTION 10-51-1-182-2501R-1 i

i 068200 TBx-1-4402-14 B-J UT 1- C - - - - - - - 82 l

ELBOW TO PIPE 99.11 PT  !

A29 819tB

    • TBx-9**

SAFETY INJECTION 6-St-1-092-2501R-1 i

i 068600 TBx-1-4403-1 B-J ut 1- - - - - - x - - 83 ,

VALVE TO PIPE B9.11 PT ,

R154 821RB

  • ergg.$w .

700 TBx-1-4403-2 B-J UT 1- - - - - - X - -

82 ,

PIPE TO MOMENT RESTRAINT 99.11 PT f

R154 821RB

    • TBx-5" s

0690C0 TBx 1-4403-5 B-J UT 1- - - - - - - X - 83 PIPE TO ELBOW 99.11 PT  ;

A29 821RB i eergg.5" i

h i

x-l 069100 TBx-1-4403-6 B-J UT 1- - - - - - -

83 ELBOW TO PIPE B9.11' PT f A29 821RB j

    • Tsx-5*a ,

i 1

069400 TBx 1-4403-9 B-J UT 1- - - - - - x - - 82 PIPE To ELBOW 89,11 PT A29 821RB

    • TBx-5**-  !

l 1

I 069500 TBx-1-4403-10 B-J UT 1- - - - - - X - - 82

( ELBOW TO PIPE B9.11 PT l A29 821RB l eergg.$ee -l l \

r i

_ . _ _ . _ _ . . . _ - ~ . , _ . _

i i

i DATE: 03/22/93 C0pulNCHE PEAK UNIT 1 PAGE: 66  !

INSERVICE INSPECTION LONG TERN PLAN ,

CLASS 1 SCHED/CONPL COMPONEN15  ;

r INSPECTION INTERVAL, PLAN S1ATUS _PRESERVICE YEAR l FIRST SECOND THIRD l f ASME PERIOD PERIOD- PERIOD l l f SEC. XI j-------------------------------l

,l SupeuRY EXAMINATION AREA CATCY NDE l------0UTAGE------l' INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** ,

1 SAFETY INJECTION 2-SI-1-069-2501R-1 i

070000 TBK-1-4403-15 B-J PT 1- - - X - - - - - 82  ;

PIPE TO SOCK 0LET 89.32 f l

R154 820RB >

r i

i t

i SAFETY INJECTION 2-ST-1-086-2501R-1  ;

I 072500 TBx-1 4404-16 B-J PT 1- - - - X - - - 82  !

PIPE TO TEE B9.21 .- [

R154 819RB l i

i i

TBX-1-4404-17 B-J PT 1- - - -

-.X - - -

82  ;

O'T72600 REDUCING INSERT TO COUPLING $9.40 i R154 819tB

)

L l

l  !

l 072700 TBK-1 4404 18 B-J PT 1- - -

- - x - - - 82 COUPLING TO PIPE 89.40 R154 819tB l

l 072800 TBX-1-4404-19 B-J PT 1- - X - - - - - -

82 PIPE TO TEE 89.21 R154 819RB 072900 TBx-1-4404-20 B-J PT 1- - X - - - - - -

82 TEE TO PIPE 89.21 R154 819RB 073000 TBx-1 4404-21 B-J PT 1- - - - - - - X 82 j PIPE 10 TEE 39.21 R154 820RB l

1 .

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGEc 67 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS f INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR  ;

7 l FIRST SEtXmlD THIRD l ASME PERIOD PERIOD PERICC l 4

l SEC. XI l---------------------------------l l SumARY EXAMINATION AREA CATGY NDE l--- --0UTAGE------l INSTRUCTIONS f NUMBER IDENTIFICATION ITEM NO METN j1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **  ;

j SAFETY INJECTION 2-SI-1-086-2501R-1 i

07310s TBX-1-4404-22 B-J PT 1- - - - - - - - X 82  ;

REDUCING INSERT TO COUPLING BC.40 R154 820RB 073200 TBK-1-4404-23 B-J PT 1- - - - - - - - X 82 j COUPLING TO PIPE 39.40 R154 820RB i

e

~!

l 073300 TBX-1-4404-24 B-J PT 1- - - - - - - - X 82 PIPE TO TEE 89.21 R154 820RB ,

i l

i t

l '

073400 TBK-1-4404-25 B-J PT 1- - - - - - - - X 82 i TEE TO PIPE 89.21 R154 820RB i

SAFETY INJECTION 1.5-St-1-202 2501R-1 }

076500 TBX-1-4407-16 B-J PT 1- - - - - - - - X 82 PIPE TO ELBOW 99.40 R154 822RB 076600 TBX-1-4407-17 B-J PT 1- - - - - - - - X 82 ELBOW TO PIPE B9.40

! R154 822RB l

076700 TBX-1-4407-18 B-J PT 1- - - - - - - - X 82 PIPE TO VALVE 89.40 R154 822RB l

i

. ~ , . . - _ , . . _ . , , . - , . . . _ . . ,, - , - ,

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 68 I

I INSERVICE INSPECTION LONG TERM PLAN l

CLASS 1 SCHED/COMPL COMPONENTS v

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD .l SEC. XI l---------------------------------l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE--- --l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METN l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK **

i SAFETY INJECTION 1.5-SI-1-028-2501R-1 076800 TBX-1-4407-19 B-J PT 1- - - - - - - - X 82 s l

VALVE TO PIPE B9.40 R154 822RB r i

I

- - X 077000 TBX-1-4407-21 B-J PT 1- - - - - - 82 FLANGE TO PIPE 89.40 R154 822RB [

077200 TBX-1 4407-FLANGE #1 5 G-2 VT 1 1- - - - - X - - - 84 ,

FLANGE BOLTING B7.50 b R154 822RB ,

i t

l REACTOR COOLANT 2-RC-1-072-2501R-1 ,

l

~

077400 TBX-1 4408-2 B-J PT 1- C - - - - - - - 82 PIPE TO ELBOW 89.40

, A29 813RB ,

r o t

h 077500 TBX-1-4408-3 B-J PT 1- C - - - - - --

82 ELBOW TO PIPE 89.40 A29 813RB  ;

i i

- 077600 TBX-1-4408-4 B-J PT 1- C - - - - - - - 82 PIPE 70 ELBOW B9.40 A29 813RB l

l 077700 TBX-1 4406-5 B-J- PT 1- C - -- - - - -

82 ELBOW TO PIPE 89.40 A29 813RB i

l

-, .s.- .e , . , , , - +_

i l

l COMANCHF PLAK UNIT 1 PAGE: 69 l DATE: 03/22/93

! INSERVICE INSPECTION LONG TERM PLAN l r CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS l

_PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERIts PERIOD l SEC. XI l

  • --* =-~- ----- - -- l .

INSTRUCTIONS SLDMART EXAMINATION AREA CATGY NDE l------0UTAGE------l NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 23 1 2 3 l **CALIBRAfl0N BLOCK'*

CHEMICAL B VOLLMF CONTROL 1.5-CS-1-244-2501R-1 080200 TBK-1-4410 FLANGE #1 B-G-2 VT-1 1- C - - - - - - - 84 l FLANGE BOLTING B7.50 {

A29 BuRB h

i REACTOR COOLANT 14-RC-1-135-2501R-1 080900 TBX-1-4500-7 B-J UT 1- - - - - - - X - 82 TDLR VERIFICATION BOUNDARY. l PIPE TO SAFE END 89.11 PT R161A854RB

    • TBK-19**  !

1000 TBK-1-4500 8 B-F UT 1- - -

X - - - - - 82 TDLR VERIFICATION SOUNDART.

i SAFE END TO PRESSURIZER N0ZZLE B5.40 PT R161A854RB

    • TBK-19" REACTOR COOLANT 6-RC-1-096-2501R-1 081100 TBK 1-4501-1 B-F UT 1- - - . - . - X - 82 ,

PRESSURIZER WOZZLE TO SAFE END B5.40 PT R161A905RB

    • TEX-5" l i

1 081200 TBK-1-d.501-2 B-J UT 1- - - - - - . X - 82 SAFE END TO PIPE B9.11 PT R161A905RB 1

    • TBx-5**

081300 TBx-1-4501-3 B-J UT 1- - - - . - - X -

82 PIPE TO ELBOW B9.11 PT R161A905R9

    • TBx-5**

t I

i l

l COMANCHE PEAK UNIT 1 PAGE: 70 j DATE: 03/22/93 I

INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS f

i INSPECTION INTERVAL. PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERICD l SEC. XI l- ----------------------~~-----l k e

.D84ARY EXAMINATION AREA CATGT NDE l------0UTAGE------l INSTRUCT 10ks i NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* i REACTOR COOLANT 6-RC-1-096-2501R-1 i 081000 TBK 1-4501-4 B-J UT 1- -- - - - - x - 82 ELBOW TO PIPE 99.11 PT R161A906AB eeigx.5**

r i

h 081500 TBX-1-4501-5 B-J UT 1- - - - - - - x - 82 l t

PIPE 70 ELBOW 99.11 PT j R161A907RB  !

    • TBx-5**  ;

e REACTOR COOLANT 6-RC-1-098-2501R-1 l

i 200 TBx-1-4501 12 B-F UT 1- -- - x- - - - 82 l l PRESSURIZER N0ZZLE TO SAFE END B5.40 PT  !

l R16A1905tB

! **TBx-5** i l

082300 TBx-1-4501-13 B-J UT 1- - - - x - -- -

82 SAFE END TO PIPE B9.11 PT  !

R161A905kB

    • T Bx -5" i 4

1 i

082100 TBx-1 4501-14 B-J UT 1- - - - x - - - - 82 i l PIPE TO ELBOW 89.1h PT l I R161A905RB

{ **TBx-5**

I i

082500 TBx 1-4501-15 B-J UT 1- -- - X - -- - 82 ELBOW TO PIPE B9.11 PT R161A906RB

    • Tax-5" 083000 TBx-1-4501-20 B-J UT 1C - - - - - - - - .82 PIPE TO ELBOW B9.11 PT R161A905RB

..TBx.5..

l

l l l i 3

l, ' .

i i

DATE: 03/22/93 CDMANCHE PEAC UNIT 1 PAGE: 71

{

, INSERVICE INSPECTION LONG TERM PLAN -l l

CLASS 1 SCHED/COMPL COMPONENTS  ;

l ,

l l

PLAN STATUS _PRESERVICE TEAR j

INSPECTION INTERVAL _

l FIRST SECOND THIRD l l ASME l PERICC PER!aD PERIOD l l SEC. XI l---------------------------------l -f l

SL88 TART EXAMINATION AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS IAMBER TDENTIFICATION ITEM No METH l1 23 1 2 3 1 2 3 l " CALIBRATION BLOCK ** l' i

i REACTOR COOLANT 6-RC-1-098-2501R-1  !

l 083100 TBK-1-4501-21 B-J UT 1C - - - - - - - - 82 i i

ELBOW TO PIPE 39.11 PT l R161A905RB i

    • TBK-5**  !

f, I

REACTOR CODLANT 6-RC-1-100-2501P-1 083300 TBK-1-4501-23 B-F UT 1- - - -- - X - - - 88 PRESSURIZER N0ZZLE TO SAFE END B5.40 . PT R161A905RB eeygg.$*e f

00 TBx-1-4501-24 B-J UT 1- - - - - X - - - 82  !

l SAFE END TO PIPE 99.11 PT j R161A905RB eeigg.$ e -!I i  ;

I +

083500 TBK-1-4501-25 B-J UT 1- - - -

X - - -

' 88 i PIPE To ELBOW B9.11 PT 'i I

R161A905RB  !

l

    • TBK-5a l

l 083600 TBx-1-4501-26 B-J UT 1- - - - - X - - - 82

! ELBOW 70 PIPE B9.11 PT

! R161A906RB

..TBx.5 083700 TBx-1-4501-27 B-J UT 1- - -

- - X - - - 82 PIPE TO ELBOW B9.11 PT l R161A90?RB i aTBx-5a i

l l

4 I

- - ,-- ,.+<n - . . - . ,

I l

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 72

{

INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERICD PERIN l SEC. XI l---------------------------------l g SUWIAtt EXAMINATION AREA CATGY NDE l-----+0UTAGE------l INSTRUCTIONS {

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l "CAllBRATION BLOCK" f I

I l

i REACTOR COOLANT 6-RC-1-100-2501R-1 J t

064000 Tex-1-4501 30 3-J UT 1C - - - - - - - - 85 i PIPE TO ELBOW 39.11 PT f

R161A907kB  !

f

..ygg.5**

f I i

! t 1 L l

REACTOR COOLANT 6-RC-1 096 2501R-1  ;

I 064500 Tax-1-4501-FLANGE #1 B-G-2 VT-1 1- - - - - - X - - 84 FLANGE BOLTING 87.50 i R161A907R8 REACTOR COOLANT 6-RC-1-096-25018-1 f t

L 084600 Tar-1-4501-FLANGE #2 B-G-2 VT-1 1- - - - - - X - - 84 [

FLANGE BOLTING B7.50 l'

R161A907kt I

l 1

i REACTOR COOLANT 6-RC-1-100-2501P-1 064700 TBK-1-4501-FLANGE #3 B-G-2 VT-1 1- - - - - - x- - 84 FLANGE BOLTING B7.50 R161A907RB REACTOR COOLANT 6-RC-1-096-2501R-1 084800 Tax-1-4501-8010A B-G-2 VT 1 1- - - - ' - - x- -

84 VALVE BODY BOLTING B7.7D i R161A9D8RB l

(-

u..2 -.. .s .-

- m I

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE 73 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/CCMPL COMPONENTS l

l INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME [ PERIOD PERIOD PERIOD l SEC. XI l---------------------------------l l

SUMMARY

EKAM!hATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l l NUMBER IDENTIFICATION ITEN WO METH l1 2 3 1 2 3 1 2 3 [.

  • T.ALIBRAT10N BLOCK" l

l l REACTOR COOLANT 6-RC-1-006-2501R-1 l i 084810 TBK-1-4501-8010A B-n 2 VT 3 1- - - . - - X . . 84 GROUP 1 - ONE VALVE WITHIN THE l VALVE BODY INTERNAL SURFACES 812.50 GROUP TO BE EXAMINED  ;

l R161A908RB  ;

f REACTOR COOLANT 6-RC-1-106-2501R-1 085100 TBK-1-4502-1 3-F UT 1 . - X - - - - -

82 TDLR VERIFICATION BOUNDARY. 6 PRESSURIZER WOZZLE TO SAFE END B5.40 PT l

R161A905RB }

"TBx-5a I i

! 200 TBx-1-4502-2 B-J UT 1- - - - - - - X - 82 TDLR VERIFICATION BOUNDARY.  !

SAFE END TO PIPE B9.11 PT ,

i R161A905RB  ;

    • TBK-5** [

r i

085300 TBx-1-4502-3 B-J UT 1- - . - - - . X - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBOW 59.11 PT [

R161A905tB j

~TBx-5~

085400 TBK-1-4502-4 B-J UT 1- . - . . .

.X .

82 TDLR VERIFICATION BOUNDARY. l l

ELBOW 70 PIPE 89.11 PT  ;

R161A906RB l l **TBx-5" l

RE ACTOR COOL ANT 4-RC-1-075-2501R-1 l 1

089400 TBx-1-4503 10 BJ UT 1- . .

X - . . . .

82  :

PIPE TO REDUCER 89.11 PT

)

R161A905tB

    • TBK-4** l 1

i l

l l 1

DATE: C3/22/93 COMANCHE PEAK UNIT 1 PAGE: 74

]

INSERVICE INS *ECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR ,

l FIRST SECOND THIRD l . l ASME l PERlm PERIOD PERim l l SEC. KI l-------------------------------l l SL85tARY EKAMinATION AREA CATGY NDE l--- --0UTAGE-**---l INSTRUCTIONS ,

Ni21BER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCCd .!

?

REACTts COOLANT 4 kC-1-162-2501R-1 l 090000 TBK-1-4503-16 B-J UT 1- - -

X - - - *

  • 88 PIPE TO PIPE 89.11 PT R161A909tB
  • e*TBX-4**

t I s REACTOR COOLANT 4-RC-1-0BB-2501R-1 j i

090500 TBK-1-4503-21 B-J UT 1- -- - - - X * -

82 ,

l

! PIPE TO REDUCER 99.11 PT  !

I l

r t

R66 913kB  ;

i l **TBK-4**

l l

( REACTOR COOLANT 4-RC-1-091-2501R-1  !

091000 TBK-1-4503-26 B-J UT 1C - - - - - - - - 82 i i

REDUCER TO PIPE 89.11 PT ,

R161A913RB i

    • TBK-4**

i i

i 091300 TBM-1-4503 29 BJ UT 1- - - - - - -

X -

82 PIPE TO PIPE 89.11 PT , .

R161A90BRB

    • TBK-4** ]

091100 TBX 1-4503-30 B-J UT 1C - - - - - - - - 82 SEE RR B-3. ,

PIPE TO SAFE END B9.11 PT R161A907RB l

    • TBK-4**

091500 TBx-1-4503-31 B-F UT 1- - - K - - - - - 82 SATE END TO PRESSURIZER N0ZZLE B5.40 PT R161A907RB

    • TBK-4**

e

.m, _ _ _ >

i l

l l

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAm 75 INSERVICE INSPECTION LONG TERM PLAN CLA$$ 1 SCHED/COMPL COMPOWENTS

\ f a

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR j l FIRST SECOND THIR0 l l l

ASME l PERIOD PERIOD PERIOD l SEC. XI l---------------------------------l \

SUIWWtY Er.v! NATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM Js0 METH l1 2 3 1 2 3 1 23 l ** CALIBRATION BLOCK **

l

)

REACTOR COOLANT 4-RC-1-018-250it-1 r

l 093200 TBM-1-4504-16 B-J UT 1- - - - - - - X -

82 PIPE TO RE!FICER 39,11 PT  !

R161A905tB  !

    • TBX-4** i i

REACTOR COOLANT 4-RC-1-164-2501R-1 t 093700 TBx-1-4504-21 B-J UT 1- - - - - - - X -

82 l.

REDUCER TO PIPE B9.11 PT ,

r R161A90BRB [

    • TBM-4** -

TBM-1-4504-22 B-J UT 1- - - - - - X - - 82 PIPE TO VALVE 89.11 PT  !

A66 90BRB t

    • TBX 4** l i

REACTOP COOLANT 4-RC 1-087-2501R-1  ;

i 093900 TBK-1-4504-23 8-J UT 1- - - - - -

X - - 82 VALVE TD PIPE B9.11 PT R66 90BRB i

    • TBX-4**  !

l 094200 TBK-1-4504-26 B-J UT 1- -- - - X - - - -

82 PIPE TO TEE B9.11 PT R66 914RB eeygg.4ee l

.I REACTOR COOLANT 2-RC 1-132-2501R-1  !

094400 TBM-1-4505-1 B-J PT 1--- - X - - - - - 82 PIPE TO E LDOLET 99.32 .

j R161A913RB t

s I

.I

,, - , , . . . , . _ . , _ . - ._. . , , . - .. . . . . , - . . . . . ~ - . - . -

.- .m. - . _ . . - _ ._

l DATES 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 76 INSERVICE INSPECTION LONG TERM PLAN l

CLASS 1 SCHED/COMPL COMPONENTS l

INSPECTION INTERVAL,, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l l ASME l PERIOD PERIOD PERICD l 3 StC. x1 l---------------------------------l Sum ARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS f NUMBER IDENTIFICATION ITEM WO METH l1 2 3 1 2 3 1 2 3 l "CALIBRAT10N BLOCx" i i

REACTOR COOLANT 2-RC-1-132-2501P-1  ;

i 094500 TBK-1-4505-2 B-J PT 1- - - x - - - - - 82 WELDOLET TO PIPE B9.21 f R161A913RB l

'k CHEMICAL 8 VOLUME CONTROL 2-CS-1-112-2501R-1 f i

096500 TBx-1-4505-22 B-J PT 1- C - - - - - - - 82 l PIPE TO ELBOW 89.21 l R154 819RB >

i l

\

TBK 1-4505-23 8-J PT 1- C - - - - - - - 82 l

ELBOW TO PIPE B9.21

  • I R154 819aB i l

1 t

096700 TBK-1-4505-24 B-J PT 1- - - - x- - - - 82 PIPE TO ELBOW 09.21 R154 821RB {

1 1

096800 TBK-1-4505-25 3-J PT 1- - - - X - - - -

85 ELBOW TO PIPE 09.21 i 6

R154 821RB l

l l

097100 TBX-1-4505-28 B-J PT 1- C - - - - - - - 82 ELBOW TO PIPE 39.21 R155 821RB t

l l

l 097200 TBK-1-4505-29 B-J PT 1- C - - - - - - -

82 PIPE TO VALVE B9.21 R155 821R8 i

-_-..L---------______

e _ . . . , . s e y .,m>..e n, , .nyp.-..-,, u n- -N m-

'g .w r -- yn4-

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 77 INSERVICE INSPECTION LONG TERM PLAW CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATLT l

_PRESERVICE YEMt l FIRST SECOND THIRD l .

l AssE l PERICD PERIOD PERits l  ;

SEC. XI l---------------------------------l j

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICAfl0N ITEM NO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **  ;

t SAFETY INJECTION 3-St-1-303-2501R-1 f 097900 TBX-1-4600-6 B-J PT 1- - - - - - - X - 82 PIPE TO TEE 89.21 R154 823RB i

5 r

l SAFETY INJECT!'JN 3-$1-1 033-2501R-1 098200 TBX-1-4600-9 B-J PT 1- C - - - - - - -

82 -

TEE TO PIPE 39.21 R154 819RB {

i i ,

l 00 TEX-1-4600-10 B-J PT 1- C - - - - - - - 82 ,

PIPE TO TEE 99.21  !

R154 819tB h 098500 TBX-1-4600 '2 B-J PT 1- - - - - - - X -

85 PIPE TO REDUCER 89.21 R154 819RB SAFETY INJECTION 3-SI+1-339-2501R-1 f i

?

098900 TBX-1-4600-16 BJ PT 1- C - - - - - - -~ 82 PIPE TO TEE 89.21 R154 822RB i

i I

099100 TEX-1-4600-18 B-J PT 1- C - - - - + - - 82 i PIPE TO TEE 99.21 l R154 822RB l_____._____.____._. - - . - . - . . ,_ , . _ -m_, ,_ , , , , y ._,7 yy - . . _ , _m,_y y _ i

l DATE: 03/29/93 CDMANCHE PEAK UNIT 1 PAGE: 78 l

l INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS  ;

INSPECTION INTERVAL , PLAN STATUS ,,PRESERVICE YEAR $

l FIRST SECOND THIRD l l ASME l PERIOD PERICS PERIOD l f SEC. x1 l---------------------------------l E i

SLDetARY EXAMINAfl0W AREA CATGV NDE l------0UTAGE------l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM NO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* )

....... .............................. ....... .... . ........... ........... ........... . .............................. j l

I SAFETY INJECTION 3-SI-1-339-2501R-1 l

)

( 099200 TBx-1-4600-19 B-J PT 1- C - . . - - - - 82 i I

TEE TO PIPE B9.21 3 i

R154 822RB i

l >

f 099300 TBx-1-4600-20 B-J PT 1- - - - - - X - - 82 i PIPE TO REDUCER 89.21 i R154 822RB i

l 1 REACTOR COOLANT TBX-RCPCPC-01  !

i t

( 00 TBK-1-5100A B-G 2 vi-1 1- . . - - - - - X 84 TDLR vtRIFICATION BOUNDARY. j f RCPLMP 1 #1 SEAL BOLTING B7.60 1 1 (1 B1/1-B12)  !

A23 l

099900 TBx-1-5100A B-G-1 UT 1- - - - - - - - X 79 TDLR VERIFICATION BOUNDARY.

RCPUMP1 MAIN FLANGE BOLTING B6.180 (1-B1/1-824)

A23 **TBx-25** f 1

l l l 099950 TBx-1-5100A B-G-1 VT-1 1- - - - - - - - X 79 WHEN DISASSEMBLED. TDLR RCPUMP1 MAIN FLANGE SURFACE B6.190 VERIFICATION BOUNDARY.

I A23 100300 Tax-1-5100A B-G-1 VT 1 1- - -- - - - - - X 79 TDLR VERIFICATION BOUNDARY.

RCPUMP1 MAIN FLANGE BOLTING B6.200 (1-B1/1 B24)

A23 100700 TBK 1-5100C-1-1 B-L-1 UT 1- - - - - - - - X ~77 ONLY 1 PUMP REQUIRED,. PUMP 1

,.- RC PUMP 1 CASING WELD B12.10 SELECTED. TDLR VERIFICATION f A23 BOUNDARY. CALIBRAfl0N BLOCK 10 -

BE ORDERED.

DATE: 03/22/93 CDMANCHE PEAS: UNIT 1 PAGE: 79 INSERVICE INSPECTION LONG TERM PLAN b CLASS 1 SCHED/COMPL COMPONENTS IN'PECTION INTERVAL _ PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l {

ASME l PERIOD PERIOD PERitB l 3

--- .----- -=-- --- - -- - l SEC. El l-SlpetARY EKAMIPATION AREA CATGY NDE l- ----0UTAGE------l INSTRUCTIONS '

WUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIDRATION BLOCK **

l

~

RJ M COOLANT TBK RCPCPC 01 ,

101100 TBX-1-5100C B-L-2 VT-3 1- - . . . - - - X TT ONLY 1 PUNP REGUIRED, PUMP 1 j RC PLp4P 1 CASING B12.20 SELECTED. TDLR VERIFICATION j A23 30UNDARY.  ;

i 1

i l

{  !

t i

I h

I f

f t

l 6

r t

J 1

)

i i

,r, -y - ~ .v,..r, .,i,wsmr,,w

1 I.

P f

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 80 INSERVICE Ik3PECTION LONG TERN PLAN CLASS 2 SCHED/COMPL COMPOWEkTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR f l FIRST SECOND THIRD l  !

ASME l PERICX)s PERIOD PERIOD l f SEC. XI l*----*--- *=--------*=------l l SUSIARY EXAMINATION AREA CATGY WDE l------0UTAGE------l INSTRUCTIONS  !

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 " CALIBRATION BLOCK **

l t

MAIN STEAM TSX-RCPCSG-03 i

101500 TBX 2-1100-3-2 C-A UT 1- - - - - - X - - 82 DNLY 1 SG REQUIRED TO BE "

SG3 TUBESNEET TO SHELL WELD C1.30 EXAMINED, SG3 SELECTED. TDLR  ;

A27 VERIFICATION BOUNDARY.  !

    • TBX-27**

l l

101600 TBX-2-1100-3-3 C-A UT 1- - - - - -

X - - 82 ONLT 1 SG REQUIRED TO BE I SG3 LOWER SHELL CIRC. WELD C1.10 EXAMINED, SG3 SELECTED. TDLR l A27 VERIFICATIDW BOUNDARY. {

    • T BX - 27" l

[

i 101700 TBX-2-1100-3-5 C-A UT 1- - - - - -

X - - 82 ONLY 1 SC REQUIRED TO BE t SG3 TRANSITION CONE TO LOWER C1.10 EXAMINED, SG3 SELECTED. TDLR w SHELL WELD VERIFICATION BOUNDARY. f A28 '

    • TBX-27**

i 101800 TBX 2-1100-3-6 C-A UT 1- - - - - -

X - - 82 ONLY 1 SG REQUIRED TO BE SG3 UPPER SHELL TO TRANSITION C1.10 EXAMINED, SG3 SELECTED. TDLR ,

I CONE WELD VERIFICATION BOUNDARY. [

A28

    • TBX-27**  !

(

101900 TBX-2-1100-3 8 C-A UT 1- - - - - -

X - - 82 ONLY 1 SG REQUIRED TO BE {

SG3 NEAD TO $ HELL WELD C1.20 EXAMINED, SG3 SELECTED. TDLR l A28 1 VERIFICATION BOUNDARY.

    • TBX-27**

1 I

102000 TBX-2-1100-3-9 C-B U1 1- - - - - - - -

X 82 ONLY 1 SG REQUIRED To BE SG3 FEEDWATER N0Z2LE TO VESSEL C2.21 MT EXAMINED, SG3 SELECTED. TDLR l WELD VERIFICATION BOUNDARY. i A27

    • TBX-27" 102050 TBK 2-1100-3-9 C-B UT 1- - - - - - X - - NA ONLY 1 SG REQUIRED TO BE SG3 FEEDWATER N0ZZLE INNER C2.22 EXAMINED, SG3 SELECTED. TDLR RADIUS VERIFICATION BOUNDARY.

A27 "TBX-.27" I O

i i

i

h. <

1 1

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 81  ;

INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL~ PLAN STATUS ~PRESERVICE YEAR -

\

! l FIRST SECOND THIRD l [

ASME l PER100 PERIOD PERIOD l l---------------------------------l SEC. XI  !

i SUM 4ARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS WUMBER IDENTIFICAT10W ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

MAIN STEAM Tar-RCPCSG-03 J

102100 TBK-2-1100-3-10 C-B UT 1- - - - - - x - - 82 DNLY 1 SG REQUIRED To BE SG3 aux. FEEDWATER N0ZZLE TO C2.21 MT EKAMINED, SG3 SELECTED. TDLR VESSEL WELD VERIFICATION BOUNDARY.

A28 **TBX-27**

1 102200 TBX-2-1100-3-11 C-B UT 1- - - - - - x- - 82 ONLY 1 SG REQUIRED TO BE SG3 MAIN STEAM N0ZZLE To C2.21 MT EKAMINED, SG3 SELECTED. TDLR VESSEL WELD VERIFICATION BOUNDARY.

A28 **TBx-27**

A 102250 TBx-2-1100-3-11 C8 UT 1- - - - - -

x - - NA DNLY 1 SG REQUIRED TO BE SG3 MAIN STEAM NOIZLE INNER C2.22 EXAMINED, SG3 SELECTED. TDLR

' {

\

RADIUS A28 VERIFICATION BOUNDARY.

I

    • TBM-27**

i CHENICAL & VOLUME CONTPOL TBY-CSAHEL-01 102300 TBx-2-1110-1 C-A UT 1- - - - - -

- x- 82 EXCESS LETDOWN HX HEAD TO C1.20 i FLANGE WELD A03 81DRB **TBX-B**

f 102400 TBK-2 1110-2 C-A UT 1- - - - - -

- X - 84 EXCESS LETDOWN HX SHELL TO C1.10 FLANGE WELD A03 81DRB **TBx 42** f i

102500 TBX-2-1110-3 C-A UT 1- - - - - - - x - 84 .

EXCESS LETDOWN HK HEAD TO C1.20 SHELL WELD '

A03 81DRB **TBX-42** l RESIDUAL HEAT REMOVAL TBx-RHAHRS-01 f~ 102600 Tax-2-1120-1-1 C-A UT 1C - - - - - - - -

83 DNLY 1 HK REQUIRED 70 BE RHR HX1 NEAD To SHELL WELD C1.20 EKAMINED, HX1 SELECTED. SEE RR l R69 790SB C-2.

    • TBx-3D**

_ . _ - . - - _ _ . . _ . . _ . . ~ . _ - - - _ , _ - , . - - _ . .. _ _ . -,

I DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 82 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS ,PRESERVICF YEAR l FIRST SECOND THIRD l ASME l PERICD PERICD PERICD l l

SEC. XI l---.--------.--------------------l >

SUWIARY EXAMIhATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

a q RESIDUAL etEAT REMOVAt TBr-RNAHRS-01  !

i i

102700 TBX-2-1120-1-2 C-A UT 1C - - - - - - - -

83 ONLY 1 HX REQUIRED TO BE RHR HX1 SHELL TO FLANGE WELD C1.10 EXAMINED, HX1 SELECTED. SEE RR f

j R69 790SB C-2. i

    • TBX-30**

t i

102800 TBX-2-1120-1-3 C-B PT 1C C - - - - - - -

83 ONLY 1 HX REQUIRED TO BE .

RNR HX1 INLET N0ZZLE TO SHELL C2.21 UT EXAMINED, HX1 SELECTED. PT ,

WELD COMPLETED FIRST REFUELING, UT R69 '7905B SCHEDULED SECOND REFUELING.

    • TBX 30** t

?

a i

l 102900 TBX-2-1120-1-4 C-B PT 1C C -

X - - - - -

EA DNLY 1 HX REQUIRED TO BE t RHR HX1 OUTLET WOZZLE TO SHELL C2.21 UT EXAMINED, HX1 SELECTED. PT WELD COMPLETED RF01, UT SCHEDULED ,

l R69 79058 RF02. REPEAT PT SECOND PERIOD. 1

    • TBX-30**

8 103000 TBX-2-1120-1-1WS C-C PT 1- C - - - - - - -

84 ONLY 1 HX REQUIRED TO BE RHR XX1 WELDED SUPPORT C3.10 EXAMINED, HX1 SELECTED R69 790SB 2

i 103100 TBX-2-1120-1-2WS C-C PT 1- C - - - - - - -

84 ONLY 1 HX REQUIRED 10 BE (

RHR XX1 WELDED SUPPORT C3.10 EXAMINED, HX1 SELECTED R69 7905B '

j

.y CHEWICAL 8 VOLUME CONTROL TBr-CSAHLD-01 f

a \

103300 TBX-2-1140-1 C-A UT 1- - X -

. - - - - 82  !

HORZ. LETDOWN HX HEAD TO C1.20 FLANGE WELD R$1 811SB ** TEX-31**

I h

I

b 4

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 83 INSERVICE INSPECTION LONG TERM PLAh f'S CLASS 2 SCHED/COMPL COMPONENTS iN INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE TEAR l FIRST SECOND THIRD l l ASME l PERIOD PERIOD PERIOD l

$EC. XI l-------------*------------------l l

SUMMART EXAMINATION AREA CATCT WDE l------0UTAGE------l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

I C U ! CAL & YOLUME CONTROL TBX-C5ARRG-01 I l 103400 TEX-2-1150-1 C-A UT 1- - - - X - - - -

82 REGENERATIVE MX HEAD TO TEE C1.20 WELD l A09 833RB ** TEX-9**

i 103530 TBX-2-1150-2 C-A UT 1- - - - X - - - -

82 REGENERATIVE HX HEAD TO TEE C1.20 WELD A09 833RB ** TEX-9**

l 103600 TEX-2-1150-3 CA UT 1- - - - X - - - -

82 i REGENERATIVE HX SHELL TO TEE C1.10 WELD AD9 833RB "T EX - 8**

103700 TEX-2-1150-4 CA UT 1- - -

- X - - - -

82 REGENERATIVE KX SHELL TO TEE C1.10 WELD A09 833RB " TEX - 8**

103800 TEX-2-1150-5 C-A UT 1- - -

- X - - - -

82 REGENERATIVE HX SHELL 70 C1.30 1 TUEESHEET WELD  !

A09

  • aB "T EX- 8**

103900 TEX-2-1150-6 C-A UT 1- - -

- X - - - -

82 REGENERATIVE KX SHELL TO C1.30 TUBESHEET WELD A09 833RB **TBX-B**

104000 TEX-2-1150-7 C-A UT 1- - -

- X - - - -

82 REGENERATIVE HX TUBESHEET TO C1.30 N0ZZLE WELD A09 833RB ** T B X- 9**

rw (v)

~

! i l h*

i l i

DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 84 l l INSERVICE INSPECTION LONG TERM PLAN l CLASS 2 SCHED/COMPL COMPONENTS j INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR ,

l FIRST SECOND THIRD l ASME l PERICC PERIOD PERIOD l SEC. XI l -* --- ---- -- == ---- ---* ---= l

SUMMARY

EXAMINAT10N AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS-NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** I CHEMICAL E VOLUME CONTROL TBX-CSAHRG-01 i 104100 TBx-2-1150-8 C-A UT 1- - - - X - - - -

82 REGENERATIVE HK TUBESHEET TO C1.30 l N0ZZLE WELD  !

l A09 833RB **TBK-9** r

! f

! i CHEMICAL & VOLUME CONTROL TBK-1RAHLR-01 ,

i 104200 TBX 2-1160-1 C-A PT 1- C - - - - - -

82 LETDOWN REHEAT HX HEAD TO C1.20 SHELL WELD i R91 833SB ,

t 104300 TBX-2-1160-2 '

C-A PT 1- C - - - - - - -

82 LETDOWN REHEAT MX SHELL TO C1.10 '

FLANGE WELD f

R91 833SB i l

CONTAINMENT SPRAY CP1-CTANCS-02 I t

104500 TBx-2-1180 2-1 C-A UT 1- - - - - X - - -

86 ONLY 1 HK REQUIRED TO BE  ;

CT HX2 HEAD TO SHELL WELD C1.20 EXAMINED, HX2 SELECTED.

R69 795SB

    • TBX-31** I i

104600 TBX-2-1180-2-2 C-A UT 1- - -

- - X - - -

86 ONLY 1 HK REQUIRED TO BE CT HX2 SHELL 70 FLANGE WELD C1.10 EkMINED, HX2 SELECTED.  !

R69 795SB  !

    • TBX-31**

i I

104700 TBX-2-1180-2-3 C-8 UT 1- - - - - X - - -

86 ONLY 1 HK REQUIRED TO BE  ;

CT HX2 INLET N0ZZLE TO SHELL C2.21 PT EXAMINED, HX2 SELECTED. j WELD i R69 795SB **TBK-31**

i

- _ , - ~, ,

_. . ,-. . - - _. _. . _ , . . - - - . - . . . , . . . . . . . . . , . ~ . . . . , _ _ - , . . . -

, i I

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 85 INSERVICE IWSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL CCMPOWENTS INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l  ;

ASME l PERIOD PERIN) PERIG) l l SEC. XI l -----~~-----~~-----------------l l SUIMARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

CONTAINMENT SPRAY CP1-CTANCS-02  !

I r

104750 TBX-2-1180-2-3 C-B UT 1- - - - - X - - - NA DNLY 1 HX REQUIRED 10 SE  !

CT HX2 INLET N0ZZLE INNER C2.22 EXAMINED, HX2 SELECTED. i RADIUS I l R69 795SB **TBX 31** ,

I 104800 TBX-2-1180-2-4 C-B UT 1- -- - - X - - -

NA ONLY 1 HK REQUIRED TO BE i CT HX2 OUTLET WOZZLE TO SHELL C2.21 PT EXAMINED, HX2 SELECTED.  ;

WELD R69 795SB **TBX-31**

104850 TBX-2-1180-2-4 C-B UT 1- --

- - X - - -

NA DNLY 1 HX REQUIRED 70 BE  ;

CT HX2 CUTLET N0ZZLE INNER C2.22 EXAMINED, HX2 SELECTED. i RADIUS l

R69 79558 **TBX 31** l

)

104900 TEX-2-1180-2-1WS C-C PT 1- --

- - X - - -

86 ONLY 1 HX REQUIRED TO K i CT HX2 WELDED SUPPORT C3.10 EXAMINED, HX2 SELECTED. '

R69 795SB l

t 105000 TBX-2-1180-2-2WS C-C PT 1- --

- - X - - -

86 ONLY 1 HX REQUlkED TO BE z CT HX2 WELDED SUPPORT C3.10 EXAMINED, HX2 SELECTED.

R69 795SB i

I MAIN STEAM 32-MS-1-001-1303-2 i

107900 TBX-2-2100-23 C-F-2 1- l MT - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. i SWEEP 0LET C5.81 j R108 877SB l MAIN STEAM 6-2003-2 C 109400 TBX 2-2100-37 C-F-2 UT 1- - -

- X - - - -

82 TDLR YERIFICATION BOUNDARY.

k BRANCH CONNECTION TO FLANGE C5.51 MT R108 878SB

    • TBX-36**

l

i

b. i l

DATE: C3/22/93 CONANCHE PEAK UNIT 1 PAGE: 86 INSERVICE INSPECTION LONG TERM PLAN i CLASS 2 SCHED/COMPL COMPONENTS  ;

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l  ;

SEC. xl l--------------------------------l ,

t"M"'"Y EKAMIKATION AREA CATGY NDE j------00TAGE -----l INSTRUCTIONS  !

NUMBER IDENTIFICATION ITEM Wo METH [1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l FEEDWATER 16-FW-1-075-1303-2 111100 TBX-2-2101-1 C-F 2 UT 1C - . - - - - - -

82 TDLR VERIFICATION BOUNDARY.

N0ZZLE TO REDUCING ELBOW C5.51 MT A23 84DRB ,

    • TBx-20**-

FEEDWATER 18-FW-1-019-1303-2 111200 T&x-2-2101-2 C-F-2 UT 1C - - - - - - - -

82 TDLR VERIFICATION BOUNDARY.

REDUCING ELBOW TO PIPE C5.51 MT A23 838RB

    • TBx 21** .

1 t

112200 TBK-2-2101 12 C-F 2 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.  !

PIPE TO PIPE (PENETRATION) C5.51 NT R155A856RB f

    • TBx 21**

I FEEDWATER 6- FW D95-1303-2

?

f 115900 TBK-2-2102-27 C F-2 UT 1- - -

X - - - - -

82 TDLR VERIFICAT10N BOUNDARY.

PIPE TO PIPE (PENETRATION) C5.51 WT R155A864RB

    • TBX-35**

i f

116600 TBK-2-2102-34 C-F-2 UT 1- - -

x- - - - -

82 TDLR VERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 NT R155A864RB 1

    • TBx-35**

FEEDWATER 6-FW-1-099-1303-2 l

119600 TBx-2-2102-62 C-F-2 UT 1- - - x - - - - -

84 P!PE TO VALVE (FLANGED) C5.51 NT

~

R155A860RB

    • TBx-35**

I DATE: 03/29/93 COMANCHE PEAC UNIT 1 PAGE: 87 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/CCMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICE) PER100 PE'RIOD l SEC. XI l---------------------------------l 3 SL8 MARY EXAMINATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCC**

FEEDWATER 6-FW-1-099-1303-2 .

I 119700 TBx-2-2102-64 C-F-2 UT 1- - - X - - - - -

84 TDLR VERIFICATION BOUNDARY.

VALVE (FLANGED) TO PIPE C5.51 MT l R155A860RB ,

t

    • TBx-35**  !

t I

i MAIN STEAM 32-45-1-002-1303-2 i 121300 TBx-2-2200-3 C-F-2 UT 1C - - - - - - - -

82 TDLR VERIFICATION BOUNDARY. '

. ELBOW TO PIPE C5.51 MT A24 900RB f

    • Tgx.33*e r I

w 121350 TBx-2-2200-3L C-F-2 UT 1C - - - - - - - -

82 TDLR VERIFICATION BOUNDARY. .

LONG. SEAM (2.5T ADJ. WELD 3) C5.52 MT l A24 900RB  !

    • TBx-33** I 122300 TBx-2-2200-12 C-F-2 UT 1- - -

- . x . . .

82 TDLR VERIFICATION BOUNDARY. I PIPE TO ELBOW C5.51 MT I R155A877RB l

    • TBx-33**

I 122350 TBx-2-2200-12L C F-2 UT 1- - -

- - x - - -

82 TDLR VERIFICATION BOUNDARY.

LonG. SEAM (2.5T ADJ. WELD 12) C5.52 MT R155A877RB '

    • TBx-33** I l

122500 TBx-2-2200-14 C-F-2 UT 1- - - - - X - - -

82 TDLR VERIFICATION BOUNDARY.

PIPE TO PIPE (PENETRATION) C5.51 MT 1 R155A277tB ,

l

    • TBx-33**

l I .

I.

DATE: 03/22/93 CDMANCHE PEAC UNIT 1 PAGE: 88 INSERVICE IkSPECTION LONG TERM PLAN CLASS 2 SCNED/COMPL COMPONEkTS N

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERICD PERIOD l SEC. El l--------------------- ----~---*l S'JOERY EKAMIhATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATICMI ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK **

MAIN STEAM 32-MS-1-002-1303-2 122550 TBK 2-2200-14L C-F-2 UT 1- - -

- - x - - -

82 TDLR VERIFICATION BOUNDARY.

LONG. SEAM (2.5T ADJ. WELD 14) C5.52 MT R155A877RB "TBx 33**

122800 TBX 2-2200-17 C-F-2 MT 1- - - X - - - -

82 TDLR VERIFICATION BOUNDARY.

SWEEP 0LET C5.81 R108 877SB MAIN STEAM MS-24 (DRIP POT) 123600 TBx-2-2200-25 C-F-2 UT 1- - - - - - - x - 82 TDLR VERIFICATION BOUNDARY.

PIPE TO CAP C5.51 MT R108 874SB

    • TBX-22**

MAIN STEAM 8-MS-1-240-1303-2 123900 TBX-2 2200 MS-063 C-G MT 1- C - - - - - - -

82 TDLR VERIFICATION BOUNDARY.

VALVE BODY WELD C6.20 GROUP 1 - ONE VALVE WITHIN THE R108 88258 GROUP TO BE EXAMINED.

MAIN STEAM 6-2003-2 124400 TBK-2-2200-32 C-F-2 UT 1- - - - X - - - -

82 -TDLR VERIFICATION BOUNDARY.

SP.AkCH CONNECTION TO FLANGE C5.51 MT R108 878S8 "TBX-36**

FEEDWATER 18-1-FW-035-2003-2 129350 TBK-2-2201-FW-077 C-G MT 1- -

x - - - - - -

82 TDLR VERIFICATION BOUNDARY.

VALVE BODY WELD C6.20 GROUP 2 - ONE VALVE WITHIN THE R100A856SB GROUP TO BE EKAMINED.

s

f.

h DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 89 -

1 INSERVICE INSPEC)l0N LONG TERM PLAN +

CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR i l FIRST SECOND THIRD l l I

ASME l PERICD PERIOD PERIOD l SEC. XI l---------------------------------l '

SUMARY EXAMINATION AREA CATGY NDE

} l------0UTAGE------l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* '

i FEEDWATER 18-1-FW-035-2003-2 l l

I l 129700 TBK-2-2201-34 C-F-2 UT 1C - - - - - - - - 86  !

PIPE TO MOMENT RESTRAINT C5.51 MT R100A856SB

    • TBK-38**

[  !

l f1EDWATER 6-FW-1-092-2003-2 k

130100 TBX-2-2202-FW-205 C-G MT 1- - - - - - - X - 82 GROUP 4 - ONE VALVE WITHIN THE ,

VALVE BODY WELD C6.20 GROUP TO BE EXAMINED.

R100A860$8 130700 TBX-2-2202-9 C-F-2 UT 1C - - - - - - - -

82 PIPE TO VALVE C5.51 MT R100A863SB i

    • TBX 34** l 1

6 i,

FEEDWATER 6-rW-1-0 % 1303-2 131050 TBX-2-2202-FW-193 C-G MT 1- - - - - - - X -

82 TDLR VERIFICATION BOUNDARY.

VALVE BODY WELD C6.20 GROUP 3 - ONE VALVE WITHIN THE R100A8635B GROUP TO BE EXAMINED.

1 132500 TBX-2-2202-27 C-F-2 UT 1- - - - - -

- - X 82 TDLR VERITICATION BOUNDARY.

P!PE TO P!PE (PENETRATION) C5.51 MT R155A864RB

    • TBX-35**

133000 TBK 2-2202-32 C-F-2 UT 1- - - - - - - - X 82 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBOW C5.51 MT R155A864RB

    • TBX-35**

i i

. _ _ . - . . . , . , . . . - . . , - . _ _ _ _ . , , . . , . ,_w

h. ,

t DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 90 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS I

_PRESERVICE YEAR l FIRST SECOND THIRD l l ASME l PER100 PERIOD PER100 l l SEC. XI l---------------------------------l ,

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS i NUMBER IDENTIFICATION ITEM Wo METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK **

FEEDWATER 6-FW-1-D96-1303-2 133100 TBK-2-2202-33 C-F-2 UT 1- - - - - - - - X 82 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE C5.51 MT R155A864RB

    • TBK 35**

133400 TBx-2-2202-36 C-F-2 UT 1- - - - - - - - X 82 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBOW C5.51 MT .

R155A864RB I

    • TBx 35** j 133500 TBx-2-2202-37 C-F-2 UT 1- - - - - - - - X 82 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE C5.51 MT R155A865aB

    • TEX-35**

I i

FEEDWATEP 6-FW-1-100-1303-2 137800 TBK-2-2202 80 C-F-2 UT 1- - -

- X - - - -

84 TDLR VERIFICATION BOUNDARY. '

I VALVE (FLANGED) TO PIPE C5.51 MT l R155A853RB  ;

    • ygg.35**

137900 TBx-2-2202-81 C-F-2 UT 1- - -

- X - . . .

84 TDLR VERIFICATION BOUNDARY.

PIPE TO ELBOW C5.51 MT R155A853RB

    • TBK-35** j

, MAlb STEAM 32-MS-1-003-1303-2 i

139500 TBX-2-2300-3 C-F-2 UT 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY.

ELBOW TO PIPE C5.51 MT A27 900RB

    • TBK-33**

l m e t--- +- y >4,y y m - -rgi= g. yg -r wy-g de-'1F^s- yn wesere--- =--gp-+

_ ._. _ _m. ...

I f 4

l. i l l 1

, DATE: 03/22/95 COMANCHE PEAK UNIT 1 PAGE: 91 INSERVICE IkSPECTION LONG TERM PLAN I'

CLASS 2 SCHED/COMPL COMPONENTS INSPECTION IFTERVAL PLAN STATUS PRESERVICE YEAR

}

l FIRST SECOND THIRD l ASME l PERIOD PERICD PERICD l l 3EC. XI l----------~~---~~---------l SLMMARY EXAMINATION AREA CA1GY NDE l------0UTACE------l INSTRUCTIONS f

N'JMBER IDENTIFICATION ITEM WO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **  !

MafN STEAM 32-MS-1-003-1303-2 ,

i 139550 TBx-2-2300-3L C-F-2 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY.

LONG. SEAM (2.5 ADJ. WELD 3) C5.52 MT A27 900RB

    • TBx-33**

l

?

! i

)

141500 TBx-2-2300-24 C-F-2 UT 1- - -

- - X - - -

82 TDLR VERIFICATION BOUNDARY. f PIPE TO PIPE (PENETRATION) C5.51 MT  !

R155A877RB i

    • TBx-33**  !

141550 TBK-2-2300 24L C-F 2 UT 1- - - - - X - - -

82 TDLR VERIFICATION BOUNDARY.

  • LONG. SEAM (2.5T ADJ. WELD 24) C5.52 MT '

% R155A877RB l t

    • TBx-33**  ;

i L

141700 TBK-2-2300-26 C-F-2 MT 1- - -

- X - - - -

NA TDLR VERIFICATION BOUNDARY.

SWEEP 0LET C5.81 R108 877SB i

MAIN STEAM 8-MS-1-223-1303-2 i I

142800 TBK-2-2300-36 C-F-2 UT 1- - -

- X - . -

  • NA HIGH STRESS WELD. TDLR I BRAN N CONNECTION TO P2PE C5.51 KT VERIFICATION souMDARY.

R108 878S8 j

    • TBK-17** i i

FEEDWATER 18-FV-1-017-1303-2 148700 TBx-2-2301-23 CF2 UT 1- - - X - - - - -

82 TDLR VERIFICATION BOUNDART.

PIPE TO PIPE (PENETRATION) C5.51 NT R155A856RB

    • TBx 21**

I i

1

1 1 .

1

) h*

4 i

j DATE: 03/22/93 COMANCHE PEAK UNIT 1 Pscr: 92 i

INSERVICE INSPECTION LONG TERN PLAN fi CLASS 2 SCHED/COMPL CCMPONENTS  !

- f

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR  !

l FIRST SECOND THIRD l [

ASME l PERIOD PERIOD PERIOD l l

{ SEC. Kl l---*-------- -------- -- --- -

~l +

SL8 MARY EKANINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS {

j WLMBER IDENTIFICATION ITEN NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK"

, ....... .............................. ....... .... . . -........ ........... ........... . .............................. c

l. ,

4 FEEDWTER 18-FW-1-017-1303-2 '

l 149510 TBx 2-2301-31 C-F-2 UT 1- - - - - - x- -

NA TDLR VERIFICATION BOUNDART.

J P!PE TO FLANGE C5.51 NT '

j R155A856RB

    • TBX-21**

i r

1 FEEDWTER 6-FW-1-093-2003-2,

{ 150400 TBx-2-2302-9 C-F-2 UT 1C - - - - - - - -

82  ;

i PIPE TO VALVE C5.51 NT  !

$ R100A863SB i

    • TBX-34**
  • l r FEEDw tER 6-FW-1-097-1303-2 r

'I 152200 TEX-2-2302-27 C-F-2 UT 1- - X - - - - - - I e 82 TDLR VERIFICATION B3UNDARY. .

3 PIPE TO P!PE (PENETRATION) C5.51 NT t

R155A86&RB l 4 **TBX-35'* l i ,

/'

i j 152800 TBx-2-23C2-33 C-F-2 UT 1- - x - - - - - -

85 TDLR VERIFICATION BOUNDARY. I ELB3W TO PIPE C5.51 NT l R155A864RB j "TBx-35** .

FEEDWTER 6.FW-1-101-1303-2 t

156400 TBX-2-2302-69 C-F-2 MT . 1- - x - - - - - -

82 TDLR VERIFICATION BOUNDART. I s

WELDOLET C5.81 i R155A857tB 1

L 156500 TBK-2-2302-70 C-F 2 UT 1- - X - - - - - -

83 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO PIPE C5.51 NT j R155A858RB

    • TBX-35**

l l

i I l l l ) l l .

l l

i i DATE: 03/22/93 CDMANCHE PEAC UNIT 1 PAGE: 93 .

INSERVICE INSPECTION LONG TERM PLAN CL O $ 2 SCHED/COMPL COMPONENTS l t

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l l FIRST CCCoc T!!!R3 l ASME PERICD PERICD  !

l PERICD l SEC. XI l---------------------------------l )

SuetARY EXAM!hATION AREA CATGY IDE l------0UTAGE------l INSTRUCTIONS  !

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

i FEEDWATER 6-FW-1-101-1303-2 i

156800 TBx-2-2302-73 C-F-2 UT 1- - -

X -- - - -

NA TDLR VERIFICATION BOUNDARY. i PIPE TO ELBOW C5.51 MT I

! R155A861RB I l **TBx-35-* I l

i 156900 TBx-2-2302-74 C-F 2 UT 1- - -

X -- - - -

NA TDLR VERIFICATION BOUNDARY.

ELBOW TO P!PE C5.51 MT R155A660RB i

    • TBX-35**

[

157000 TBx 2-2302-75 C-F-2 UT 1- - -

X -- - - -

82 TDLR VERIFICATIDW BOUNDARY. (

PIPE TO ELBOW C5.51 MT R155A854RB

    • TBx-35**  ;

l 157600 TBX-2-2302 81 C-F-2 UT 1- )

X - - 84 TDLR VERIFICATION BOUNDARY.  ;

VALVE (FLANGED) TO PIPE C5.51 MT R155A853RB  :

    • TBX-35** I

{

I i

MAIN STEAM 32-MS-1-004-1303-2 I 160400 TBX-2-2400-17 C-F-2 UT 1- - X - -- - - -

82 TDLR VERIFICATION BOUNDART.  ?

P!PE TO PIPE (PENETRATION) C5.51 MT I I

R155AB77RB

    • TBX-33** l 1

1 161300 TBK-2-2400-26 C-F 2 UT 1- - - - --

- X - ' 82 TDLR YERIFICATION BOUNDARY.

PIPE TO VALVE C5.51 MT R108 8775B

    • TEX-33**

161350 TBx 2-2400-26L C-F-2 UT 1- - - - -- - X - 82 TDLR VERIFICATION BOUNDARY.

LONG. SEAM (2.5T ADJ. WELD 26) C5.52 MT

[ R108 877RB

    • TBX-33**

,. . - - . . ., --- , _ - I

i k4 l

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 94 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS j !NR8'FCTifW INTERVAL, PLAN STATUS.,. , , . _ _PRESERVICE YEAR 3 l l FIRST SECOND THIRD l ASME l PERIOD PERICD PERICD l ,

SEC. XI l---------------------------------l l SlamARY EXAMINATION AREA CATGT KE l------0UTAGE------l INSTRUCTIONS  ;

NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

i MAIN STEAM B-NS-1-274-1303-2 l 161600 TBX-2-2400-29 C-F-2 UT 1- - - - X - - - -

89 TDLR VERIFICATION BOUNDARY.

l BRANCH CONNECTION TO PIPE C5.51 MT HIGH STRESS WELD.

R108 878SB

l 164000 TBX-2-2401-1 C-F-2 UT 1- C - --- - - - -

82 TDLR VERIFICATION BOUNDARY.

N0ZZLE TO ELBOW C5.51 MT A29 841RB

    • TBX-20** f r

h FEEDWATER 18-FW-1 020-1303-2  !

164900 TBX-2-2401 10 C-F-2 UT 1- C - - - - - - -

82 TDLR VERIFICATION BOUNDARY.

P!PE TO PIPE (PENETRATION) C5.51 MT l

R155A856aB l

    • TBX-21**

i FEEDWATER 18-FW-1-037-2003 2 i

f 165300 TBX-2-2401-13 C-F-2 UT 1- - - - - - K - -

82 TDLR VERIFICATION BOUNDARY.

P!PE To VALVE C5.51 MT P

R100A856SB

    • TBX-38**

165400 TBX-2-2401 14 C-F 2 UT 1- - - - - - X - - 82 VALVE TO PIPE C5.51 MT R100A856SB

    • TBX-38** .

i FEEDWATER 18-FW-1-020-1303-2 165710 TBX 2-2401 18 C-F 2 UT 1- - - - - - X - -

82 TDLR VERIFICATION BOUNDARY.

PIPE TO FLANGE C5.51 MT R155AB56tB

( **TBX-21**

h DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 95  ;

INSERVICE INSPECTION LONG TERM PLAN [

CLASS 2 SCHED/CDMPL COMPONENTS

\

INSPECT 10N INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERl(x) PERICD l SEC. x1 l---------------------------------l ,

SLBe4ARY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

FEEDWATER 6-FW-1-098-1303-2 168400 TBK-2-2402-27 C-F-2 UT 1- - - - - - X - - 82 TDLR VERIFICATION BOUNDARY. I PIPE TO PIPE (PENETRATION) C5.51 MT R155A864RB

    • TBX-35**

t 169100 TBx-2-2402-34 C-F-2 UT 1 -- - - - --

x-- 82 TDLR VERIFICATION BOUNDARY. 8 PIPE TO VALVE C5.51 MT R155A864RB

    • TBx-35** ,

FEEDWATER 6-FW-1-102-1303-2 171900 TBx 2-2402-58 C-F-2 UT 1- - - - - -

x - -

83 TDLR VERIFICATION BOUNDARY.

BRANCH CONNECTION TO PIPE C5.51 MT R155A857RB f

    • TBx 35**

172200 TBK-2-2402-61 C-F-2 UT 1- - x - - - -- -

83 TDLR VERIFICATION BOUNDARY.  ;

PIPE TO VALVE (FLANGED) C5.51 MT ,

R155A860RB  !

    • TBX-35**

172300 TBx-2-2402-64 C-F-2 UT 1- - X - - - -- -

84 TDLR VERIFICATIDW BOUNDART.

VALVE (FLANGED) TO P!PE C5.51 MT I R155AB60RB

    • TBX-35**

l RESIDUAL HEAT REMOVAL 12-RH-1-003-601R-2 l

173700 TBx-2-2500-3 C r-1 UT 1 - - - x . . . .

82

PIPE TO PIPE (PENETRATION) C5.11 PT l R154 817RB
    • TBx-11**

l 1

- . . , . ~ ,

i i>

DATE: 03/22/93 f COMANCHE PEAK UNIT 1 PAGE: %

INSERVICE INSPECT]DN LONG TERM PLAN CLASS 2 SCHED/COMPL COMPOWENTS I ,

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR I

l FIRST SECOND THIRD l ASMF l PERIOD PERIOD PERIOD l SEC. XI l ------~ ~ ~~- - ----= ----- ---l SLAS4 ART EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRIK110NS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 ** CALIBRATION BLOCK **

l RESIDUAL HEAT REMOVAL 12-RM-1-003-601R-2 174100 TBx-2-2500-7 C-F-1 UT 1- - X - - - - - - NA PIPE TO ELBOW C5.11 PT R77S 81758

    • TBX-11**

174200 TBx-2-2500-8 C-F 1 UT 1- - X - - - - - - NA ELBOW TO P!PE C5.11 PT I R775 81658

    • TBX 11" 174500 TBx-2-2500-11 C-F 1 UT 1- - - . - - - X - 82 ELBOW TO PIPE C5.11 PT j

% R71 807SB

  • erBx.11u i i

l 174550 TBX-2-2500-11L C-F-1 UT 1- - - - . - - X -

82 {

LONG. SEAM (2.5T ADJ. WELD 11) C5.12 PT l

R71 8075B

    • TBX- 11"  ;

i l

174600 TBX 2-2500 12 C-F-1 UT 1- - - - - - - X - 82 PIPE TO ELBOW C5.11 PT R71 807SB

    • TBK 11**

l 174650 TBx-2-2500-12L C-F-1 UT 1- - - - - - - X - 82 LONG. SEAM (2.5T ADJ. WELD 12) C5.12 PT l

R71 807SB 1

    • TBX-11**

RESIDUAL NEAT REMOVAL 16-RM-1-007-601R-2 176600 TBx-2-2500-32 C-F-1 UT 1- - -

X - + - - - NA l PIPE TO REDUCING ELBOW C5.11 PT f R53 775SB

( **TBX-15**

l 1

1

b4 DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 97 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 SCHED/COMPL COMPOWENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERICM) PERICD l SEC. XI l------------------------------l SulMARY EXAMINATIOM AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS I NUMBER IDENTIFICATION ITEM NO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

RESIDUAL NEAT REMOVAL 16-RM-1-007-601R-2 176700 TBX-2-2500-33 CF1 UT 1- - - X - - - - -

82 REDUCING ELBOW TO N0ZZLE C5.11 PT '

R53 775SB

    • TBX-47**

SAFFTY INJECTION 16-51-1-076-601R-2 176900 TBX-2-2500-35 C-F-1 UT 1- - - X - - - - - 82 PIPE TO ELBOW C5.11 PT j R54 782SB '

    • TBX 15**

t I

s 176950 TBM-2-2500-35L C-F-1 UT 1- - - X - - - - - 82 i

LONG. SEA * !2.5T ADJ. WELD 35) C5.12 PT

)

R54 782SB +

    • TBX-15**

RESIDUAL NEAT REMOVAL 12-RM-1-004-601R-2 178800 TBX-2-2501-3 C-F 1 UT 1- - - -

X - - - -

82 PIPE TO PIPE (PENETRATION) C5.11 PT R154 817RB r r

    • TBX-11**

179100 TBX-2-2501-6 C-F-1 UT 1- C - - - - - - -

85 PIPE TO ELBOW C5.11 PT ,

R77N 8175B

    • TBX-11**

i

, 179200 TBM-2-2501-7 C-F-1 UT 1- C - - - - - - - 82 ELBOW TO PIPE C5.11 PT R77N 816SB

    • TBX-11**

b '

I e

, i

( DATE: 03/22/93 COMANCHE PEAX UNIT 1 PAGE: 98 l INSERVICE INSPECTION LONG TERN PLAN r

( CL ASE 2 SCHED/COMPL COMPONEN15 INSPEC130W INTERVAL , PLAN STATUS ,PRESERVICE YEAR l l FIRST SECOND THIRD l [

ASBE l PERICD PERIOD PERIOD l SEC. XI l----------------------~--------l  !

SUISERY EXAMINATIDW AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCX**

....... .............................. ....... .... . ........... ........... ........... . .............................. i RESIDUAL NE AT RENCNAL 12-RN-1-004-601R-2 i

179600 T8X-2-2501-11 C-F-1 UT 1- - - - - - - - x 82 PIPE TO ELs0W C5.11 PT R64 806Ss  !

    • T8x-11**  !

i 179650 TBX-2-2501-11L C-F-1 UT 1- - - - - - - - x 82 s LONG. SEAM (2.5T ADJ. WELD 11) C5.12 PT [

R64 806Ss i t

    • TBX-11** ,

I 179700 TBX-2 2501 12 C-F-1 UT 1- - - - - - - - X 82 l

{

ELBOW TO PIPE C5.11 PT '

R64 806S8

    • Tax 11**

179750 78X-2-2501 12L C-F-1 UT 1- - - - - - - - x 82 LONG. SEAM (2.5T ADJ. WELD 12) C5.12 PT -

R64 806S8  !

l **TBX 11** i I

I RESIDUAL NEAT REMOVAL 16-RM-1-008-601R-2

  • l 181100 T8X 2 2501 26 C-F-1 UT 1- - - - - - x - -

82 FLANGE TO PIPE C5.11 PT l R51 780S8

    • Tax-15** ,

181150 TBX 2-2531-26L C-F-1 UT 1- - - - - - x - - 82 LONG. SEAM (2.57 ADJ. WELD 26) C5.12 PT R51

    • TBx-15**

181200 TBX-2 2501 27 C-F 1 UT 1- - - - - -

x - - NA P!PE TO FLANGE C5.11 PT

P R51 776S8
    • Tax 15**

i

l l

h a

DATE: C3/22/93 COMANCHE PEAK UNIT 1 PAGE: 99 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL, PLAN STATUS _PRESERVICE TEAR l FIRST SECOND TNIRD l ASME l PERICD PERIOD PERICD l SEC. XI l----~-----------------*----l SumART EKAN! NATION AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS IKMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRA7 ION BLOCK **

RESIDUAL HEAT REMOVAL 16-RN-1-008-601R-2 181250 TBK-2-2501 27L C-F-1 UT 1- - - - - - X - - NA i

13NG. SEAM (2.5T ADJ. WELD 27) C5.12 PT '

R$1 l i

eeigK-15**

(

181300 TBx-2-2501-28 C-F-1 UT 1- - - - - - X - - NA FLANGE TO ELBOW C5.11 PT R51 775S8 "T BK- 15** [

I l 181400 TBX 2-2501-29 C-F-1 UT 1- - - - - -

X - - NA

! ELBOW TO P!PE C5.11 PT R$1 775SB l

i f

    • TBK-15** '

)

181450 TBK 2-2501-29L C-F 1 UT 1- - - - - - X - - NA '

LONG. SEAM (2.5T ADJ. WELD 29) C5.12 PT R51 775SB '

eeygg.g$e. -

I i

181500 TBK-2-2501-30 C-F-1 UT 1- - - - - - X - -

82 '

P!PE TO ELBOW C5.11 PT R51 775SB 5

    • TBK-15**

l 181550 TBx-2-2501-30L C-F 1 UT 1- - - - - - X - - 82 LONG. SEAM (2.5T ADJ. WELD 30) C5.12 PT R51 77558 i

    • TBX-15** ,

i I

t l 181600 TBK-2-2501-31 C-F 1 UT 1- - - - - - K - - 82 ELBOW TO PIPE C5.11 PT l R$1 775SB i

    • TBx-15**  !

I i

i

I

)  !

i l

DATE: 03/22/93 COMANCHE PEAL: UNIT 1 PAGE: 100 i INSERVICE INSPECTION LONG TERM PLAN j CLASS 2 SCHED/CCMPL COMPONENTS f f,

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERICC PERIOD l SEC. x! l-------~--~~--~~-~~-~-~-l  ;

StsetART EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l

meeBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK ** l RESIDUAL HEAT Rete 0 VAL 16-RN-1-008-601R-2 [

l i

181650 TBx-2-2501-31L C-F-1 UT 1- - - - - - X - - 82 LONG. SEAM (2.57 ADJ. WELD 31) C5.12 PT R51 7755B "TBK-15**  ;

i l 181900 TBx-2-2501-34 C F-1 UT 1- - - - - - X - -

82 1 TEE TO P!PE C5.11 PT I R51 782SB  !

l l ** T Bx- 15" >

i f

h SAFETY INJECTION 16-SI-1-075-601R-2

  • 181950 TBK-2 2501-34L C-F-1 UT 1- - - - - - x - - 82  !

LONG. SEAM (2.5T ADJ. WELD 34) C5.12 PT R51 782SB i

    • TBx- 15" B

b 182300 TBx-2-2501-38 C-r-1 UT 1- C . . . . . . . 82 l ELBOW TO PIPE '

C5.11 PT I

R66 788SB

I "T Bx - 15** l i

182350 TBx-2-2501-38L C-F-1 UT 1- C - - . . - - -

82 LONG. SEAM (2.5T ADJ. WELD 38) C5.12 PT  !

R66 788SB '

eergx.15"  !

s

[

RESIDUAL HEAT REse0 VAL 12-RN-1-033-601R-2 186300 TBx 2-2520-24 C-F-1 UT - 1C - - - - - - - -

82 i N0ZZLE TO PIPE C5.11 PT l R69 797SB I

  • ergg.gtee -l 1

i e

- ,. .- - , , - . . -.m-c . . _ . , , -, ,- 4 - - _ . , . ,, . ,

I i

I. ,

I l

t DATE: 03/22/93 COENCHE PEM UNIT 1 PAGE: 101 l l INSERVICE INSPECTION LONG TERN PLAN  !

, CLASS 2 SCHED/ compt CCMPOWENTS

! I INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR  !

l FIRST SECOW THIRD l t ASME l PERICC PERIOD PERIOD l  ;

SWNtARY EKAMINATION AREA SEC. xl l....................-...--.-.....l l CATCY NDE l--.---0UTACE-.-.--l INSTRUCTIONS  !

! NUMBER IDENTIFICATION ITEN No METH l1 2 3 1 2 3 1 2 3 " CALIBRATION BLOCx"

' l l l,

i RESIDUAt HEAT REMOVAL 12-RM-1-033-601R-2  ;

l 186350 ftX-2-2520-24L C-F.1 UT 1C - - - - . - - -

82

! LONG. SEM (2.5T ADJ. WELD 24) C5.12 PT R69 797S8 f

    • Tax 11**

l l

r SAFETY INJECTION 10 $1-1-095-2501R-2 i I

_ 207000 TBx-2-2530 29 C-F-1 UT 1- - x - . - - . -

82 PIPE TO VALVE C5.11 PT RTTS 81258

    • Tax-9** I f

I 207100 TBK 2-2530 30 C-F-1 UT 1- - X - . - . . .

I 82 .

VALVE TO PIPE C5.11 PT  !

R775 812Ss i

    • T8x-9**  !

t SAFETY INJECTION 10-st-1-082-2501R-2 l

215500 Tax-2-2533-3 C-F 1 UT 1- - - - - - . . x 82 TEE TO PIPE C5.11 PT I i

R154 820Rs  !

i

    • TBx-9'* i l

215600 TBx-2-2533-4 C-F-1 UT 1- - . - . . - . x B2 PIPE TO REDUCER C5.11 PT ,

e R154 820Rs '

  • eigg.p e SAFETY INJECTION 6-St-1-304-2501R-2 '

i 215700 TBK-2-2533-5 C-F 1 UT 1- - - - . -

- X - 82 l REDUCER 70 PIPE C5.11 PT i i

R154 820Rs

[

    • TBx-5** ,

t b

h i- i L

w - m e -- y ,-

f -.,--m -.2--.-,, ,-,-,y o,,- , - , , , mm, 3w-.vy- w.-,,rn- -.--e w. w-m

3 i

i I

t DATE: 03/22/93 CDMANCHE PEA 8: UNIT 1 PAGE: 102 '

INSERVICE INSPECTION LONG TERM plt.P CLASS 2 SCHED/COMPL COMPONENTS l

INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICO PERICD PERIOD l {

SEC. xI l ---- -~ -- ----------- -------~--- l l SUNMARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS }

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK ** j SAFETY INJECTION 6-St-1-304-2501R-2 f l

t 215800 TBx-2-2533-6 C-F 1 UT 1- - - - - - - X - NA i PIPE TO VALVE C5.11 PT 1

R154 820RB

    • TBM-5" f

r i

SAFETY INJECTION 8-SI-1 087-2501R-g 215900 TBE-2-2533-7 C-F-1 UT 1- - - - - - - X - 84 REDUCING TEE 70 P!PE C5.11 PT I R154 820RB #

    • TBM-18**

SAFETY INJECTION 10-SI-1-083-2501R-2 i

\ '

217100 TBx-2-2534-1 C-F-1 UT 1- - - - - - - - x 82 -

PIPE TO PIPE (PENETitATION) C5.11 PT I R154 821RB  !

    • TBX-9"  ;

i f

^

217300 TEX-2-2534-3 C-F-1 UT 1- - - - - - - - X 82 TEE TO PIPE \

C5.11 PT

  • R154 821RB l
    • TBx-9**

+

217400 TBx-2-2534-4 C-F-1 UT 1- - - - - -

- - x NA PIPE TO REDUCER C5.11 PT R154 821RB

    • TBx-9** ) i SAFETY INJECTION 6-51-1-305-2501R-2 -

e 217500 TBx-2-2534-5 C-F 1 UT 1- - - - x- - - - NA REDUCER TO PIPE C5.11 PT

]

R154 821RB l

    • TBK-5** 4 I

2 I

j i

.- - - - - , --, -. . .. . .-_ - . . . . - - . . ., ~ , . . .- ,- ,

j

, h.  ;

l l l 1 l

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 103 l j INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS j l

! t  !

INSPECT 10W INTERVAL , PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND TNIRD l )

ASDE l PERl(E PERIN PERl(2 l l SEC. xl l----- ---==---*-=---*-------l i

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS  !

NUMBER EDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAfl0N BLOCK'*  !

i SAFETY INJECTION 6-Sf-1-305-2501R-2 217700 TBK-2-2534-7 C-F-1 UT 1- - - - X - - - - NA PIPE TO VALVE C5.11 PT l R154 821R8

    • TEX 5**  !

~!

l SAFETY INJECTION 8-St-1-088-2501R-2 1 217800 Tex-2-2534-8 C-F-1 UT 1- - - - - - - X - 82 TEE TO PIPE C5.11 PT l R154 821Rs

    • TBK-18**

1 L i 218300 Tax 2-2534-13 C-F 1 UT 1- - - - - - - x . NA r P!PE TO ELBOW C5.11 PT  !

R154 Sins l

    • TBK-18** )

l 218400 TBK-2 2534-14 C-F-1 UT 1- - - -+ - . x- 82 ELBCw TO PIPE C5.11 PT R154 817Rs

    • T8X-18**

SAFETY INJECTION 6 St-1-329-2501P-2 219100 TEX-2-2534-21 C-F-1 UT 1- - - -X - - - -

82 REDUCER 70 PIPE C5.11 PT R154 816Rs

    • TsK-5**

219200 TBK-2-2534-22 C-F-1 UT 1- - -

- X - - - -

82 PIPE 70 VALVE C5.11 PT R154 $16Rs

    • T8X 5**

_ .__ . _ . _ . _ = . _ . - ._

_ ~

k, t

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 104 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS ,

INSPECTION INTERVAL, PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERitD PER!m) l l l------------------------------~~-l SEC. XI SL88mRT EXAMINATION AREA CATCY NDE l------0UTACE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO NETH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

i 1

SAFETY INJECTf0N 6-SI-1-171-2501R-2  !

l 220900 TBX-2-2535-17 C-F-1 UT 1- - - - - - - X - 82 I ELBOW TO PIPE C5.11 PT l R154 823RB  !

    • TBX 5
  • i i

?

I l CONTAINMENT SPRAY 16-CT-1-002-151R-2 '

221600 TBX-2-2536-8 C-F-1 UT 1C - - - - - - - -

82 l PIPE TO ELBOW C5.11 PT l R62C 788SB i

    • TBX-48**
  • i r 221650 TBX-2-2536-8L i

C-F-1 UT 1C - - - - - - - - 86  !

LONG. SEAM (2.5T ADJ. WELD 8) C5.12 PT R62C

    • TBX-48** i t

221700 TBX-2-2536-9 C-F 1 UT 1C - - - - - - - - 82 ELBOW 70 PIPE C5.11 PT

{

R62C 788S8

    • TBK-48** ,

i 221750 TBX 2-2536-9L C-F-1 UT 1C - - - - - - - -

86  !

LONG. SEAM (2.5T ADJ. WELD 9) C5.12 PT  !

R62C 78858 l

    • TBX-48**

i i

CONTAINMENT SPRAY 16-CT-1-001 151R-2  !

i 222400 TBX-2-2537-5 C-F-1 UT 1- - - - X - - - -

82 ELBOW TO PIPE C5.11 PT l

R65 80358 l

    • TBX-48**

1 t

. , _ - - - - - - - - y-,. -,emm. y . . . . . , , , . . , - . . ow, , y,.,..-.,.w.,.. .~,%.,--, ..-,~.,,.<,p,.,,#. # e.--

e Y

}8

\

l l

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 105 f INSERVICE INSPECTIDW LONG TERM PLAN i CLASS 2 SCHED/COMPL C(MPONENTS l l

1 INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR {

l FIRST SECOND THIRD l l AssE l PERIOD PERICD PERIOD l l SEC. xl l-------------- *- -- ------ ~

l  ?

SumARY EXAMINATION AREA CATGY IDE l------0UTAGE------l INSTRUCTIONS ,

NUMBER IDENTIFICATION ITEM No feETH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK'* I l ....... .............................. ....... .... . ........... ........... ........... . .............................. .

i CONTAfMMENT SPRAY 16-CT-1-001-151R-2

[

(

222450 TBx-2-2537-5L C-F-1 UT 1- - - -x - - - -

86  ;

LONG. SEAM (2.57 ADJ. WELD 5) C5.12 PT ,

R65 803SB

    • TBx-48a

(

e i

222500 TBx-2-2537-6 C-F-1 UT 1- - - - x - - - -

82 i PIPE TO ELBOW C5.11 PT R65 803SB

    • TBx-48**  ;

222550 TBx-2-2537-6L C-r 1 UT 1- - - - x - - - -

86 LONG. SEAM (2.5T ADJ. WELD 6) C5.12 PT ,

R65 $^.3:3 '

..TBx.48.. ,

l 222600 Tex-2 2537-7 C-F-1 UT 1 - - - x - - - -

82 ELBOW TO PIPE C5.11 PT  ?

i R65 8035B -

    • IBK-48** '

I a

222650 TBX 2-2537-7L C-F-1 UT 1- - -

- x- - - -

86 LONG. SEAM (2.5T ADJ. WELD 7) C5.12 PT R65

.eygg.43..

i CONTAINMENT SPRAY 10-CT-1-010-301R-2 224750 TBx-2-2538-1CT-060 C-G PT 1- - -

x -- - - -

89 GROUP 5 - ONE VALVE WITHIN THE VALVE BODT WELD C6.20 GROUP TO BE EXAMINED.

R62F 7875B 225050 TBX-2-2538-1CT-065 C-G PT 1- - -

X - - - - -

89 GROUP 6 - ONE VALVE WITHIN THE VALVE BCEY WELD C6.20 GROUP 70 BE EXAMINED.

R69 787S8 l

l

h.

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 106 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPOWENTS

\s I

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l f!RST SECOND THIRD l ASME l PERICD PERIOD PERIOD l ,

SEC. XI l--------------------------------l i SUDMARY EKAMINATION AREA CATGT NDE l------00TAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK **

CONTAINMENT SPRAY 16-CT-1-0?4-301R-2 226100 TBx-2-2538 30 C-F-1 UT 1- - -

X - - - - - 86 PIPE TO ELBOW C5.11 PT R69 788SB

    • TEX-48**

226150 TBx-2-2538 30L C-F-1 UT 1- - - x - - - - - 86 LONG. SEAM (2.5T ADJ. WELD 30) C5.12 PT R69

    • TBX-48**

226200 TBx 2-2538-31 C-F-1 UT 1- - + x - - - - -

86 ELBOW TO PIPE C5.11 PT F R69 78858 "TBX-48**

226250 TBx-2-2538-31L C-F-1 UT 1- - - X - - - - -

86 LONG. SEAM (2.5T ADJ. WELD 31) C5.12 PT R69 788SB "TBx-48" 226300 TBx 2-2538-32 C-F-1 UT 1- - -

X - - - - -

86 P1FE TO N0ZZLE C5.11 PT R69 788SB

" T B X - 48**

226350 TBx-2-2538-32L C-F-1 UT 1- - -

X - - - - -

86 LONG. SEAM (2.5T ADJ. WELD 32) C5.12 PT R69 788SB

    • TBx-48**

SAFETY INJECTION 2-SI 1-055-2501R-2

( 265900 TBx-2-2560-33 C-F-1 PT 1- C - - - - - - -

NA l PIPE TO ELBOW C5.30 l Lp) R154 820RB  ;

t

r  !

)

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 107 ,

INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l f '

ASME l PERIOD PERIOD PERIOD l SEC. XI l-------------------------------l ,

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICAfl0N ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK'*  ;

....... .............................. ....... .... . ........... ........... ........... . ...-.......................... j i

SAFETY INJECTION 2-SI-1-055-2501R-2 i

266000 TBX-2-2560-34 C-F-1 PT 1- C - - - - - - -

82 ELBOW TO PIPE C5.30

  • R154 820RB L

i I

SAFETY fWJECTION 4-SI-1-300-1501R-2 l

267500 TBX 2-2561 10 C-F-1 UT 1C - - - - - - - -

82 PIPE TO ELBOW C5.21 PT R62F 78958  !

    • TBX-45**

l l

1  ;

t 267600 TBX-2-2561-11 C-F-1 UT 1C - - - - - - - -

82 .

ELBOW TO PIPE C5.21 PT r

R62F 78958 '

    • TBX-45** i l

l' SAFETY INJECTION 4-SI-1-044-1501R-2 269600 TBX-2-2561-30 C-F-1 UT 1- - X - - - - - -

NA I PIPE TO ELBOW C5.21 PT t

RTTS 812SB ~

    • TBX-45** i

\

270900 TBX-2-2562-4 C-F-1 UT 1- - -

X - - - - -

82

[

REDUCING ELBOW TO PIPE C5.21 PT R62 775SB ]

    • TBX 45**

f 1

SAFETY INJECTION 3-SI-1-297-1501R-2 273200 TBX-2-2563-1 C-F-1 UT 1- - - X - - - - -

NA N0ZZLE (FLANGED) TO PIPE C5.21 PT R60 775SB

    • TBX-44**

._ -- , , , , , . - . . - -- . , , . . -- , , . ~ , . . - . . - - . -

.. . ._ = . _ . - - - . . .- .. - - - - . ~ . _ _ - . . -

[,

I  !

I.

DATE: 03/22/93 COMANCHE PEAX UNIT 1 PAGE: 108 f

INSERVICE INSPECTION LONG TERN PLAN  ;

CLASS 2 SCHED/COMPL COMPONENTS ,

I I

, , INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR

[

l FIRST UCOND THIRD l ASBE l PERIOD PERICD PERIOD l {

SEC. XI l - --------- -- -------- ---------- l ~

SUNNARY EKAMINATION AREA CATCY 30E l------0UTACE- ----l INSTRUCTIONS l NUNsER IDENTIFICATION ITEN No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCX**

E l

SAFETY INJECTIou 3-St-1-297-1501R-2 i

273300 TBX-2-2563-2 C-F 1 UT 1- - - X - - - - - 82 PIPE TO REDUCING EL90W C5.21 PT R60 775SS

    • TSX-44** i i

h t

SAFETY INJECTION 4-St-1-039-1501R-2 273400 TBK-2 2563-3 C-F 1 UT 1- - -

X - - - - -

82 .l REDUCING ELBOW TO PIPE C5.21 PT I R60 775SS .

    • TBX-45**

I i

273700 ?!x-2-2563-6 C-F-1 UT 1- - . x-. - - . - - 82 l PIPE 70 ELeaW C5.21 PT R60 786S8  !

    • Tax-45** ,

SAFETY INJECTION 4-St-1-001-2501R-2 ,

i 276200 TBX-2-2564 3 CF1 UT 1C - - - - . . . - NA l PIPE TO ELBOW C5.21 PT i R203 814A8  !

    • TBx-4** l l

l 1

1 q

276300 TBx 2-2564-4 C-r 1 UT 1C - - - - - - - - NA l ELBOW TO PIPE C5.21 PT I R203 814AB eeigg.4ee SAFETY INJECTION 4-SI-1-021-2501R-2 280100 78x-2-2564-42 C-F 1 UT 1- - - - - X - - - 82 ELBOW 70 P!PE C5.21 PT R77S 81258

% **TBK-4**

1

_ , . _, - - - - _ , _ . - . , . -. - , . - , - , _ . . _ . , ,- w .- - ac -

e w -++N--* i,vmww* ' * * ~""-Wes'-~ '

l l )

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 109 INSERVICE INSPECTION LONG TERM PLAN t

CLASS 2 SCHED/COMPL COMPONENTS s t INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME j PERIG) PERim) PER!m) l SEC. XI l----------- -- --* * ---

-***--l SUMART EXAMINATION AREA CATGY NDE l------00TAGE------l INSTRUCTIONS ,

NLMBER EDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

t

~

SAFETY INJECTION 4-51-1-008-2501R-2 280400 TBX-2-2564-45 C-F-1 UT 1- - -

- - X - - - 83 P!PE To ELBOW C5.21 PT R77$ 812SB '

.eygg.4.. i f

i r

I l 280500 TBX-2-2564-46 C-F-1 UT 1- - - - - X - - - 82 -

t ELEat TD PIPE C5.21 PT  ;

R77S E1258  !

    • TnX-4**  !

r i

r SAFETY INJECTION 3-St-1-050-1501R-2 l i

282700 TEX-2-2565-36 C-F-1 UT 1- - X - - - - - - NA I t

PIPE TO REDUCER C5.21 PT l R67 79258

    • TBX-44**

i 8

SAFETY INJECTION 4-SI-1-060-256tR-2 l

?

283100 TBX 2-2566A-2 C-F-1 UT 1- - - - - X - - -

82 r

PIPE To ELBOW C5.21 PT F RTTS 812S8 f

.. igx.4.e l

r 283200 TBX-2-2566A-3 C-F 1 UT 1- - -

- - X - - - 82 ELBOW TO PIPE C5.21 PT I

RTTS 812SB

    • TBX-4** i P

i

. SAFETY INJECT!au 4-SI-1-306-2501R-2  !

285400 TBX-2-2566-25 C-F 1 UT 1- - - - X - - - - NA ,.

PIPE TO REDUCER C5.21 PT l

R154 817RB j

..tsX.4..

I I

l i

f I

- . . . . . - _ .- ..~_ . - . - _ =

I h.

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 110 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE TEAR l FIRST SECOND THIRD l j ASME l PERIOD PERIts PERIOD l SEC. El l--*---------------------------l SlasMRT EKAM!hATION AREA CATCT NDE l------0UTAGE------l INSTRUCTIONS '

l NUMBER IDENTIFICATION ITEM No NETH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** )

f SAFETY INJECTION 2-St-1-066-250ip 2  !

l l

286400 TBK-2-2566-35 C-F-1 PT 1- C - - - - - - -

82 PIPE TO ELDOW C5.30 i

R154 815Rs lI l

1 s

286500 TEK 2-2566-36 C F-1 PT 1- C - - - - - - -

82 ELBOW 70 PIPE C5.30 f

R154 815Re  !

SAFETY INJECTION 2-SI-1-062-2501R-2

( 28720u Tar-2 2566A 43 C-F-1 PT 1- C - - + - - * - 82  ;

PIPE TO Ett0W C5.30 R154 820Rs

[

l l

3 o

L 287300 TEK-2-2566A-44 C-F-1 PT 1- C - - - - - - -

82 .

! ELBOW TO PIPE C5.30 i R154 820RB i l \

i f

i SAFETY INJECTION 2-$1-1-064-2501R-2 I t

I b

290500 TsK-2-2566-76 C-F-1 PT 1- C - - - - - - -

82  !

ELBOW TO PIPE C5.30 f

1 R154 813RB '

I I

SAFETY INJECTION 4-SI-1-045-1501R-2 295600 TsK-2-2567-50 C-F-1 UT 1- - -

- - K - - -

82 -

PIPE 10 ELBOW C5.21 PT R775 812SB

    • TsK-45**

2 4 e i

~

9 -r- , ' , -- -.rc'*- r * 'T w =&9--+=e w't *v-*'w '*-**w+w~~** -e*e- -r-e--- ww+--v- a new~ e *- w"->-=>W~-.we *+-s-

I DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 111 INSERVICE INSPECTION iJNG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERICD l SEC. x! l--*-*------*---------*--* - l SLSemRY EXAMINATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK'*

....... .............................. ....... .... . ........... ........... ........... . .............................. i SAFETY INJECTION 4-51-1-045-1501R 2 f

295700 TBM-2-2567-51 C-F-1 UT 1- - - - - x - - -

82 i ELBOW TO PIPE C5.21 PT l R775 812SB 4

    • TBx-45**

t I

i SAFETY INJECTION 4-St-1-052-2501R-2 l i

298300 Tar-2-2568-24 C-T-1 UT 1- - - - - - - - -

82 ELBOW TO PIPE C5.21 PT R77N 820S8

  • eygg.4ee SATCTT INJECTfou 4-St-1-039-1501R-2 298900 TBK-2-2568-30 C-F-1 UT 1- - - . - x - - - 82 PIPE TO ELBOW C5.21 PT R77N 81258 I
    • TBM-45** '

i ,

! 299000 TBx-2-2568-31 C-7-1 UT 1- - -

- - x . - -

82  ;

ELBOW TO PIPE C5.21 PT

! R77N 812SB l

i

    • TBK-45**

299100 TBM-2-2568-32 C-F-1 UT 1- - - - - x - - - 82 l PIPE TO ELBOW C5.21 PT l R77N 820SB

    • 1gx-45** l t

CHEMICAL E V0llME CONTROL 4-CS-1-076-2501R-2 301600 TBx-2-2569-5 C-7-1 UT 1C - - - - - - - - NA

! ELBOW TO PIPE C5.21 PT R200 818AB

    • TBX-4**

{

i l

I

-- , , --, , - - - - - , . . , - ~ , , , ,,-,,.--.,--n, - ,-~, , , . , - +.--,v.

I O P

i DATE: 03/22/93 COMANCHE PEAE UNIT 1 PAGE: 112 ,

i INSERVICE INSPECTION LONG TERM PLAN t CLASS 2 SCHED/COMPL COMPONENTS INSPECT 10N INTERVAL _ PLAN STATUS ,PRESERVICE YEAR j l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD 5 l

SEC. XI l ----- ----- ---------- ----------- l '

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS  ;

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 j **CALIBRAT10N BLOCK **

  • l r

CHEuf CAL 8 V0tUME CONTROL 4-CS-1-344 2501R-2 '

i 303200 TEK-2-2569-21 C-F-1 UT 1C - - - - - - - - NA  !

PIPE TO TEE C5.21 PT l R203 81BAB

    • TBX-4**  !

l i

303300 TBx 2 2569-22 C-F-1 UT 1C - - - - - - - - NA TEE TO PIPE C5.21 PT R203 818A8 i

    • T8X-4** l l

CHEMICAL 8 VOLUME CONTROL 3-CS-1 625-2501R-2 l

\

3D5500 Tax-2 2569-44 C-F-1 UT 1- - - - - - X - - NA PIPE TO REDUCER C5.21 PT '

, R203 818AB

    • TBX-3**

i.

CHEMICAL 8 Volume CONTRut 2-CS-1-630- 2501R-2 l 305700 TBN-2-2569-46 C-F-1 PT 1- - - - - - X - - NA i

l PIPE To ELBOW C5.30 R203 818A8 '

\

l l

3D5B00 TBX-2 2569-47 C-F-1 PT 1- - - . - - X - - NA I

1 ELBOW 70 PIPE C5.30 R203 818As l

l CHEMICAL 8 VOLUME CONTR0t 4-CS-1-085-2501R-2 307200 Tex 2-2570-1 C-F-1 UT 1- - - - - -

X - - NA FULL PENETRATION TEE JOINT NDZZLE TO FLANGE C5.21 PT R201 816As eeygg.4ee i

I l

l

i I

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 113 ,

INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS j

(. INSPECTION INTERVAL, PLAN STATUS _PRESERv!CE YEAR i l FIRST SECOND THIRD l ASME l PERICD PERICO PERIOD l SEC. El l---------------------------------l  ;

SLseWti EXAMINATION AREA CATGT NDE l---- -0UTAGE------l INSTRUCTIONS i NLMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 ** cat!BRATION BLOCr**  ;

l CHEMICAL 8 VOLUME CONTROL 4-CS-1-085-2501R-2 307500 TBK 2-2570-4 C-F-1 UT 1- - - - - - X - - NA  !

PIPE TO ELBOW C5.21 PT R201 818AB

    • TBx-4**

i 307600 TBK-2-2570-5 C-F 1 UT 1- - - - - - X - - NA ELBOW TO PIPE C5.21 PT f

R201 818AB '

eergx.4*e i

CHEMICAL & VOLUME CONTROL 4-CS-1-346-2501R-2 303:00 TEX 2-2570-17 C-F-1 UT 1- - - - - - X - - NA  ;

VALVE TO PIPE C5.21 PT i (

R203 818AB i

( **TBK-4**

309100 TBx-2-2570-20 C-F 1 UT 1- - - - - - X - - NA l P!PE TO ELBOW C5.21 PT R203 818AB I l r

    • TBK-4**

i I

309200 TBK-2-2570-21 C-F-1 UT 1- - - - - -

X - -

hA ELBOW TO PIPE C5.21 PT P203 818AB f

mergg.4.*

l l >

l l

CHEMICAL & VOLUME CONTROL 4-CS-1-110-2501R-2 310300 TBK-2-2570-32 C-F-1 UT 1C * - - - - - - -

kA SEE RR C-3.

PIPE TO ELBOW C5.21 PT R203 814AB "TBX 4** i i

h i

I i

f

-- -, o s . . .-. ~m.

- . _. , _ . . . . - . . . _ _ . - , . . . - -- _~ .. .- , . . . - - - - .

h.

DATE: C3/22/93 CDMANCHE PEAK UNIT 1 PAGE: 114 INSERVICE INSPECT 10N LONG TERN PLAN i CLASS 2 SCHED/COMPL COMPONENTS l l

INSPECTION INTERVAL, PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l )

SEC. XI l---------*--~=-----*--------*~*l

SUMMARY

EKAMINATION AREA CATCY NDE l------0UTAGE------l INSTRUCT 10NS l NUMBER IDENTIFICATION ITEM WO METH l1 2 3 1 2 3 1 2 3 l **CAllBRAT10N BLOCK ** l l

t CHEMICAL & VOLUME CONTR0t 4-CS-1-110-2501R-2 3 310400 TEK-2-2570-33 C F-1 UT 1C - - - - - - - -

NA SEE kR C-3.

ELBOW TO PIPE C5.21 PT ,

R203 814AB

    • T8X-4**

f I

CHEMICAL 8 VOLUME CONTROL 2-CS-i-483-2501P-2  !

F I

3110D0 Tax-2-2570-39 C-F 1 PT 1- - - - - -

X - - NA l TEE TO PIPE C5.30 i t

R203 818AB '

t t

?

i 311100 Tax-2-2570-40 C-F-1 PT 1- - - - - -

X - - NA j

PIPE TO VALVE C5.30 '

R2D3 818AB i CHEMICAL 8 VOLUME CONTROL 2-CS-1-946-2501R-2 311200 Tar-2-2570-41 C-F-1 PT 1- - - - - - X - -

NA TEE TO PIPE C5.30 R2D3 818AR t

I l CONTA!MMENT SPRAY 16-CT-1-013-301R-2 t

1 313200 TBK-2-2571-1 C-F-1 UT 1- - -

- X - - - - NA L l WDZZLE TO PIPE C5.11 PT R69 79758

    • TBX-48**

f-313250 Tex-2-2571-1L C-F-1 UT 1- - -

- K - - - -

NA LONG. SEAM (2.5T ADJ. WELD 1) C5.12 PT R69 7975B

    • TBK-48**

i i

l l

l ,

- _ _ _ m _

I<

I i

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 115 j INSERVICE INSPECTION LONG TERM PLAN I CLASS 2 SCHED/COMPL COMPONENTS  !

I INSPECTION INTERVAL _ PLAN STATUS ,,PRESERVICE YEAR l FIRST SECOND THIRD l  ;

ASME l PERim PERIOD PERI @ l SEC. XI l--------------------------------l

  • SLDMART EXAMINATION AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS  !

NUMBER IDENTIFICATION ITEM No METN l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK **

I CONTAINMENT SPRAY 16-CT-1-013-301R 2 314700 TBK-2-2571-16 C-F-1 UT 1- - X - - - - - -

NA i

P!PE TO ELBOW C5.11 PT R775 81758

    • TBX-48**

1 314750 T8x-2-2571-16L C-F-1 UT 1- - X - - - - - -

NA LONG. SEAM (2.5T ADJ. WELD 16) C5.12 PT >

R77S 817SS

    • TBX-48** 3 t

t 314800 TBX-2-2571-17 C-F-1 UT 1- - X - - - - - -

NA l ELBOW TO PIPE C5.11 PT i

R775 818SB  !

"TBK-48**

314850 T8x-2-25?1-17L C-F-1 1-

~

UT - X - - - - - - '

NA LONG. SEAM (2.5T ADJ. WELD 17) C5.12 PT RT75 E?8SS

    • TSX-48**

\

315000 TBX-2-2571-19 C-F 1 UT 1- C - - - - - - -

NA  !

PIPE To ELBOW C5.11 PT R775 818SB eetag.43ee-l l

315050 TBX-2-2571-19L C-F-1 UT 1- C - - - - - - -

NA LONG. SEAM (2.5T ADJ. WELD 19) C5.12 PT R775 818SB

    • TBX-48**

315100 TsX-2-2571-20 C-F-1 UT 1- C - - - - - - - NA PlPE TO ELBOW C5.11 PT R77S 818S8

    • TBK-48**

I.

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 116 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS l b I INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR i l FIRST SECOND THIRD l l ASME l PERIOD PER12 PERICD l ,

SEC x1 l--------------------------------l SulMARY Ex4MINATIDW AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 j ** CALIBRATION BLOCK'*

{

r f

CONTAINMENT SPRAY 16-CT-1-013-301R-2 f

315150 TBx-2-2571-20L C-F-1 UT 1- C - - - - - - - NA LONG. SEAM (2.5T ADJ. WELD 20) C5.12 PT I R77S 818SB f

    • TBx-48**

316600 TBK-2 2572-13 C-F-1 UT 1- - - - - - - x- NA PIPE TO VALVE C5.11 PT  ;

R35 834RB

    • TBx-48** l I

316650 TBX-2-2572-13L C-F-1 UT 1- - - - - - - x- NA  !

LONG. SEAM (2.5T ADJ. WELD 13) C5.12 PT R35 834RB [

    • TBx-48** i t

i CONTAINMENT SPRAY 16-CT-1-014 301R-2  ;

319500 TBX-2-2574-9 C-F 1 UT 1- - - x- - - - - NA i VALVE TO PIPE C5.11 PT ,

R35 826RB

    • TBx 48**

i 319550 TBx-2-2574-9L C-F 1 UT 1- - - X - - - - - NA f LONG. SEAM (2.5T ADJ. TO WELD C5.12 PT [

9). [

R35 826RB **TBx-48** [

l i t 31 % 00 TBK-2-2574-10 C-F-1 UT 1- - - x - - - - - NA PIPE TO ELBOW C5.11 PT R35 826RB

    • TBx-48**

l 31 % 50 Tex-2-2574-10L C-F-1 UT 1- - -

x - - -- - NA '

LONG. SEAM (2.5T ADJ. TO WELD C5.12 PT ,

10).

R35 826RB **TBx-48** i l

h.

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 117 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ,

ASME l PERIOD PERIOD PERIOD j ,

SEC. XI l ----------- ---------" ----------- l  ;

SuledRY EXAMINAfl0N AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

h t

I CONTalNMENT SPRAY 16-CT-1-014-301R-2

~

l 319700 TBX-2-2574-11 C-F-1 UT 1- - -

X - - - - -

NA ELBOW TO PIPE C5.11 PT R35 827RB

    • TBX 48** i 319750 TBX-2-2574-11L C-F-1 UT 1- - -

X - - - - - NA LONG. SEAM (2.5T ADJ. TO WELD C5.12 PT 11).

R35 827RB **TBX-48**

CONTAINMENT SPRAY 16-CT-1-003-151R-2 321600 TBX-2-2575 18 C-F 1 UT 1- - - - - -

- X - NA i PIPE TO ELBOW C5.11 PT R76 80258

    • TBX-48**

321650 TEX-2-2575-18L C-F-1 UT 1- .- - - - - X - NA .;

LONG. SEAM (2.5T ADJ. WELD 18) C5.12 PT R76 802SB

    • TBX-48**

321700 TBX-2-2575-19 C-F-1 UT 1- - - - - - - X -

NA ELBOW TO PIPE C5.11 PT R76 802S8

    • TBX-48**

321750 TBX-2-2575-19L C-F-1 UT 1- - - - - - - X -

kA LONG. SEAM (2.57 ADJ. WELD 19) C5.12 PT R76 802SB

    • TBX-48**

321800 TBX-2-2575-20 C-F-1 UT 1- * - - - - -

X - NA PIPE TO VALVE C5.11 PT R76 802SB

    • TEX-48**

l l

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . - . ~ , , . . , , _ . _ _ . . . . , . . . , . _ . . _ . . . , , . ..._, . . . . , .

h4 DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 118 l INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS i l

i INSPECTION INTERVAL, PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND ' THIRD l ,

ASME l PERICD PER!m) PERIOD l 1 SEC. El l


*---- ------=*--

--*--*----l SisewtY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK" CONTAINMENT SPRAY 16-CT-1-003-151R-2 321850 Tax-2-2575-20L C-F-1 UT 1- - - - - - -

X - NA f LONG. SEAM (2.5T ADJ. TO WELD C5.12 PT j 20). '

R76 60258 **TBX-48**

i I

CONTAINMENT SPRAY 12-CT-1-005-151R-2 l 323000 Tar-2-2576-6 C-F-1 UT 1- - -

X - - - - -

NA PIPE TO ELBOW C5.11 PT R54 783S8 l

"TBR-11**

i l

t 323050 78K-2-2576-6L '

C-F 1 UT 1- - -

x - - - - -

NA LONG. SEAM (2.5T ADJ. WELD 6) C5.12 PT R54 783Se  !

" Tax 11 a  :

i 323100 78x 2-2576-7 C-F-1 UT 1- - -

X - - - - -

NA ELBOW 70 PIPE C5.11 PT R54 78158

    • TBX-11**

l 323150 TBK-2-2576-7L C F-1 UT 1- - - X - - - - -

NA LONG. SEAM (2.57 ADJ. WELD 7) C5.12 PT RS4 78158

    • T8X 11**

l l CONTAINMENT SPRAY 12-CT-1-006-151R-2 t

325400 TBX-2-2576-30 C-F-1 UT 1- - - x - - - - - NA PIPE TO ELBOW C5.11 PT R54 781SB

    • T8X-11" l

O l O \

l

I a

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 119 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS

\

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l l FlkST SECOND THIRD l 't ASE l PERim PERIOD PEtim l l SEC XI l--------~~-----------------------l

SUMMARY

EKMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 ** CALIBRATION BLOCK **

l f

CONTAINMENT SPRAY 12-CT-1 006-151R-2 325450 TBx-2-2576-30L C-F-1 UT 1- - - X - - - - - h4 LONG. SEAM (2.57 ADJ. E LD 30) C5.12 PT R54 781$8 i I

    • TBK-11**

i i 325500 TBx-2 2575-31 C-F-1 UT 1- - - X - - - - - NA ELBOW TO PIPE C5.11 PT '

R54 781SB t

    • TBX-11**

e i

325550 TBK-2-2576-31L C-F-1 UT 1- - -

X - - - - - NA ,

l LONG. SEAM (2.5T ADJ. WELD 31) C5.12 PT R54 781$8

    • TBX-11**

CONTAINMENT SPRAY 12-CT-1-008-151R-2

  • 329400 TBx-2-2578-15 C-F-1 UT 1- - - - - - - - X mA PIPE TO ELBOW C5.11 PT I R51 777S5 ,
    • TBX.11** ,

l 329450 TBX-2-2578-15L C-F-1 UT 1- - - - - -

- - X NA  !

LONG. SEAM (2.5T ADJ. WELD 15) C5.12 PT R51 777$8

    • TBX-11**

I 329500 TBx-2-2578-16 C-F-1 UT 1- - - - - - - - X NA l ELBOW TO PIPE C5.11 PT R51 776SB '

    • TBK-11** ,

r 329550 TBx 2-2578-16L C-F-1 UT 1- - - - - - - - X hA LONG. SEAM (2.5T ADJ 70 E LD C5.12 PT r

16).

R51 776SB '

    • TBx-11**

- - . , , -- ,.-.-...- ,. -. . - . . , _ - . . . - _ _ - - - . .a

i lI<

l f

i 5 i DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 120 l l

INSERVICE INSPECTION LONG TERM PLAN {

I '

l CLASS 2 SCHED/COMPL COMPONENTS i I

L i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YE.AR j l FIRST SECOND THIRD l i ASME l PERIOD PERIOD PERIOD l SEC. Kl l--- ------ - - - ---- ----- - --

l 1 SL8stARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS I NUMBER IDENTIFICATION ITEM NO METN l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK **

f CONTAINMENT SPRAY 12-CT-1-008-151R-2 I 329600 TBx-2-2578-17 C-F-1 UT 1- - - - - -

- - X NA >

PIPE TO N0ZZLE C5.11 PT i R$1 T/6S8 estag.11** i 329650 Tax-2-2578-17L C-F 1 UT 1- - - - - - - - X NA  !

LONG. SEAM (2.5T ADJ. TO WELD C5.12 PT 17).

R51 776SB **TBX-11" I

CONTAINMENT SPRAY 12-CT-1-007-151R-2 331200 Tax 2-2578-33 C-F-1 UT 1- - - - - - - - X NA '

PIPE TO ELBOW C5.11 PT .

l RS1 77758 l

j **TBK 11" l .

! (

( 331250 Tax-2-2578-33L C-F-1 UT 1- - - - - - - -

X NA I LONG. SEAM (2.5T ADJ. ELD 33) C5.12 PT  !

I R$1 777S8  !

1

    • Tax-11**  !

i l 1 331300 TBx-2-2S78-34 C-F-1 UT 1- - - - - - - - X NA ELBOW TO PIPE C5.11 PT RS1 776$8

    • TBx-11**

331350 TRX-2-2578-34L C F-1 UT 1- - - - - - - - X NA LONG. SEAM (2.5T ADJ. WELD 34) C5.12 PT R51 77658

    • TBX 11" i

1

! SAFETY INJECTION 24-$1-1-901-151R 2 334900 Tex-2-2580-3 C-F-1 UT 1- C - - - - - - -

NA PIPE TO VALVE C5.11 PT R85D 814YD

" Tar-50**

i l

.. . . _ _ , _ , . _ . , . . , _ - . . . . m , _ _ . . . . . _ . _ _ . . . . _ . . . . _ . . - __ .

I e

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 121 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERl(XI PERI @ l SEC. xl l-------***------ *~*----*--l SL8etARY EXAMINATION AREA CATGY IDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 '1 2 3 "CAllBRATION BLOCK" l

SAFETY INJECTION 24-St-1-901-151R-2 334950 TBK 2-2580-3L C-F-1 UT 1- C - - - - - - - NA LONG. SEAM (2.5T ADJ. TO WELD C5.12 PT 3).

R850 814YD **TBx-50**

SAFETY INJECTION 24-SI-1-029-151R-2 336200 TBM-2-2580-16 C F-1 UT 1- C - - - - - -- NA PIPE TO ELBOW C5.11 PT R850 803YD

    • TBx-50**

336250 TBx-2-2580-16L C-F-1 UT 1- C - - - - - --

NA LONG. SEAM (2.5T ADJ. WELD 16) C5.12 PT R85D 803YD

    • TBK 50**

336300 IBM-2-2580-17 C-F-1 UT 1- C - - - - - -- NA ELBOW TO PIPE C5.11 PT R850 803YD "TBx-50" 336350 TBM-2-2580-17L C-F-1 UT 1- C - - - - - -- NA LONG. SEAM (2.5T ADJ. WELD 17) C5.12 PT RBSD 803YD

    • Tax-5D" SAFETY INJECTION 18-51 1-342-1S1R-2 338200 TBK-2-2581-4 C-F-1 UT 1- - K - - - - -- NA PIPE TO REDUCER C5.11 PT R70 803SB "TBx-49"

b 1

DATE: 03/22/93 COMANCNE PEAK UNIT 1 PAGE: 122 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS ,

INSPECTION INTERVAL _ _ PLAN STATUS _PRESERVICE YEAR ,

FIRST

~

l SECOND TNIRD l ASME l PERIOD PERIOD PERIG) l ,

SEC. XI l--------------------------------l  !

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE--.---l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 ** CALIBRATION BLOCK **

l SAFETY INJECTION 18-St-1-342-151R-2  !

t t

338250 TBK-2-2581-4L C-F 1 UT 1- - X - - - - - -

NA  !

LONG. SEAM (2.5T ADJ. E LD 4) C5.12 PT '

R70 803S8

    • TBX 49**

l  !

SAFETY INJECTf 0N 14-St-1-197-151R-2

(

340100 TBK-2-2581-23 C-F-1 UT 1- - - - - -

- - X WA

. ELBOW TO PIPE C5.11 PT R70 79358

.. igx.46**

340150 TBX-2-2581-23L C-F-1 UT '1- - - - - - - - X #A' LONG. SEAM (2.5T ADJ. E LD 23) C5.12 PT R70 7935B I

    • TBX-46** s 340200 TBx-2-2581-24 C-F-1 UT 1- - - - - - - - X NA PIPE TO VALVE C5.11 PT R70 79358 j
    • TBX-46** l 340250 TBx 2-2581-24L C-F-1 UT 1- - - - - -

- - X NA LONG. SEAM (2.5T ADJ. E LD 24) C5.12 PT R70 793SB

    • TBx-46** l SAFETY INJECTION 12-SI-1-031-151R-2 341000 TBX-2-2582-1 C-F-1 UT 1- - - - - -

- X -

kA PENETRATION TO ELBOW C5.11 PT R850 813TD

    • TEX-11**

f

(

l

. -. - . . - . . .~.

I

)*  :

l l

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 123 )

INSERVICE INSPECTl0N LONG TERM PLAN I CLASS 2 SCHED/COMPL COMPONENTS i

INSPECTION IETERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l---------------------------------l SulMARY EXAMINATION AREA CATGV IDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3~ l **CAlleRAT10N BLOCK ** ,

P SAFETY INJECTION 12-St-1-031-151R-2 341050 TBX-2-2582-1L C-F-1 UT 1- - - - - - - X - kA LONG. SEAM (2.5T ADJ. WELD 1) C5.12 PT R85D 813fD

    • tex 11** I 341500 TBX-2-2582-6 C-F-1 UT 1- - - - ' - - - X - NA PIPE TO ELBOW C5.11 PT R85D 804TD
    • TBX 11** i i 341550 TBX-2-2582-6L C-F-1 UT 1- - - - - - - X - EA LONG. SEAM (2.5T ADJ. WELD 6) C5.12 PT R850 804rD
    • TBX 11** L e

341600 T8X-2-2582-7 C-F-1 UT 1- - - - - -

- X - WA ELBOW TO PIPE C5.11 PT  !

l R85D 803fD  ;

l **TgX-11**

t i

341650 TBX-2 2582-7L C-F-1 UT 1- - - - - - - X -

kA LONG. SEAM (2.5T ADJ. WELD 7) C5.12 PT R850 803r0 ,

    • TBX-11** l l

342700 TBX 2-2582-18 C-F 1 UT 1- - - - - - - X - WA I PIPE To ELBOW C5.11 PT R85D Sc3fD I

    • TBX 11**

342750 T8X-2-2582-18L C-F-1 UT 1- - - - - -

- 'X -

NA LONG. SEAM (2.5T ADJ. WELD 18) C5.12 PT RBSD 603fD

    • T8X 11**

I n a i

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 124 i INSERVICE INSPECTION LONG TERM PLAN l l

CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l--------------------------------l SuletARY EXAMINATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS >

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l l ....... .............................. ....... .... . ........... ........... ........... . ..............................- ,

l SAFETY INJECTION 12-SI-1-031-151R-2 i

( 348400 TBX-2-2583-38 C-F-1 UT 1- - -

X - - - - -

NA >

PIPE TO TEE C5.11 PT '

R207S811AB

    • TBX-11**

i i 1 I

348450 TBX-2-2583-38L C-F 1 UT 1- - -

X - - - - - NA LONG. SEAM (ADJ. TO WELD 38). C5.12 PT f

I R2075811AB

    • TBX-11**
  • I SAFETY INJECTION 12-SI-1-322-151R-2 348500 TBX-2-2583-39 C F-1 UT 1- - -

X - - - - -

NA i TEE TO REDUCER C5.11 PT l

R207S812AB '

    • TBX-11**

i i

RESIDUAL HEAT REMOVAL TBK-RNAPRN-31 400000 TBX-2-3100-1-1WS C-C PT 1- - -

X - - - - -

83 DNLY 1 PUMP REQUIRED TO BE RNR PUMP #1 WELDED SUPPORT C3.30 EXAMINED, PUMP #1 SELECTED i R53 1

400010 TBX-2-3100-1-2WS C-C PT 1- - -

X - - - - -

83 DNLT " MJMP REQUIRED TO BE RHR PLMP #1 WELDED SUPPORT C3.30 EXAMINED, PUMP #1 SELECTED RS3 400020 TBX-2-3100-1-3WS C-C PT 1- - -

X - - - - -

83 DNLY 1 PUMP REQUIRED TO BE RNR PUNP #1 WELDED SUPPORT C3.30 EXAMINED, PUMP #1 SELECTED R53 j

.-= , - - . _

._~ - - -. .~-

I E

DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 125 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS I

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. xl l---------------------------- -l

SUMMARY

EXAMINATION AREA CATGY NDE l--- --0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM Wo METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK **

CHEMICAL 8 VOLUME CONTROL TBX-CSAPCH-01 400200 TBX-?-3110-1-1WS CC PT 1- C - - - - - - -

82 ONLY 1 PUMP REQUIRED TO BE i CENTRIFUGAL CHARGING PUMP #1 C3.30 EXAMINED, PUMP #1 SELECTED WELDED SUP.

R200 400210 TBx-2-3110-1-2WS C-C PT 1- C - - - - - - -

82 ONLY 1 PUMP REQUIRED TO BE i CEN1RIFUGAL CHARGING PUMP #1 C3.30 EXAMINED, PUMP #1 SELECTED WELDED SUP.

. R200 400220 TBx 2-3110-1-3WS C-C PT 1- C - - - - - - -

82 ONLY 1 PUMP REQUIRED TO BE CENTRIFUGAL CHARGING PUMP #1 C3.30 EXAMINED, PUMP #1 SELECTED WELDED SUP.

R200 400230 TBx-2-3110-1-4WS C-C PT 1- C - - - - - - -

82 .ONLY 1 PUMP REQUIRED TO BE j CENTRIFUGAL CHARGING PUMP #1 , C3.30 EXAMINED, PUMP #1 SELECTED ,

WELDED SUP. I R200 SAFETY INJECTION TBX-SIAPSI-02 r

400400 TBx-2-3140 C-D UT 1- - x - - - - - -

82 ONLY 1 PUMP REQUIRED TO BE St PUMP #2 BOLTING C4.30 EXAMINED, PUMP #2 SELECTED.

(2-B1/2-432) CAllBRATION BLOCK TO BE R52 ORDERED.

i

,e.

__ _ _ _ . _ _ _ _ _ _ _ _ _ . .._._ _m - - - - - . - - - - - -

-7 I 'l r

i I

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 126  !

INSERVICE INSPECTION LONG TERM PLAN.

f CLASS 1 SCHED/COMPL COMPONENTS I i

f INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR j l FIRST SECOND THIRD l l ASME l PERIOD PERIOD PERICD l f SUIB4ARY EXAMINATION AREA SEC. xn l..--..--.-...---.--.--........l  !

CATGY NDE l--- --0UTAGE------l INSTRUCTIONS  !

8TJMBER IDENTIFICATION ITEM No METH l1 2 3 1.2 3 1 2 3 ** CALIBRATION BLOCK'*

l l CHEMICAL 8 VOLUME CONTROL 3 CS-1-080-2501R-1 i i

?

650000 TBX 1-4105-M1 F-C VT-3 1- C - - - - - - -

NA SPRING l

! CS 1 080-002-C41S NOTE 1 '

R23 829tB f

CHEMICAL 8 VOLUME CONTRot 3-CS-1-081-2501R-1 f

?

650100 Tex-1-4405-H1 F-C VT-3 1- - -

- x - - - -

NA SPRING CS-1-081-002-C415 NOTE 1 R29 828RB 1

CHEMICAL 8 VOLUME CONTROL 2-C5-1-103-25018-1  ;

I t

650200 TBX-1 4111-H4 F-8 VT 3 1C - - - - - - - -

NA BOX

^

CS-1 103-700-C41R NOTE 1 R23 826RB t

l CHEMICAL 8 VOLUME CONTROL 2-CS-1-105-2501R-1 650400 TBX-1-4208-H4 F-C VT-3 1- - - - x - - -

  • kA SNUBBER CS-1-105-700-C41K NOTE 1 R25 826RB I

650500 TBX-1-4208-H5 F-C VT-3 1- - -

- x - - *

  • NA SPRING CS-1-105-701-C415 NOTE 1 R25 826RB 650600 TBx 1-4208-H3 F-C VT-3 1- - -

x- - - - -

NA $NUBBER CS-1-105-702-C41K NOTE 1 R32 826RB l

l

, _ ~ . . - ... . . . .-. .-. . . - ~ . . . - .

)

DATE: 03/22/93 COMANCHE PEAK 1, NIT 1 PAGE: 127 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS k

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERICO l SEC. XI l---------------------------------l SUISERT EKAMINATION AREA CATGY NDE l------0UTAGE- ----l INSTRUCTIONS NUMBER IDENTIFICATIDW ITEM No METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION SLOCK** ,

CHEMICAL & VOLLME CONTROL 2-CS-i 107-2501R-1 ,

650700 TBK-1-4309-M1 F-5 VT-3 1- - - - - - X - - NA BOK

, CS-1-107-701-C41R WOTE 1 R27 828tB f i

CHEMICAL 8 VOLUME CONTROL 2-CS-1-109-2501R-1 650$00 TEX 1 4410-N3 F-C VT-3 1- - - - X - - - - h4 SNUB 8ER CS-1-109-700-C41K NOTE 1 R29 826tB i

l 650900 TBX-1-4410-N4 F-C VT-3 1- - -

- x - - -

  • NA STRUT I CS-1-109-701-C41R WOTE 1 R29 826RB  !

i CHEMICAL & VOLUME CONTROL 2-CS-1 112-2501R-1 651000 TBx-1-4505-N2 FC VT-3 1- - -

- - x - - -

NA SNUBBER I

CS-1-112-700-C71K NOTE 1 R39 898RB 651100 TBX-1 4505-H35 F-C VT-3 1- - - x - - - - - NA SNUBBER CS-1-112-702-C41K WOTE 1  ?

R31 821RB 651200 TBX-1-4505 N36 F-C VT-3 1- - - X - - - - -

NA SPRING CS-1-112-703-C415 NOTE 1 R31 821RB l

.. . . . _ = . - . . . - . -. .- - - ~

t i

)

i DATE: 03/22/93 CDMANCHE PEAK UNIT 1 FAGE: 128 !

INSERVICE INSPECTION LONG TERM PLAN j CLASS 1 SCHED/CCMPL COMPONENTS l j

i INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR i l FIRST SECOND THIRD l l ASIE l PERIOD PERIOD PERICx) l f SEC. xl l--~--------------------------l SL88tARY EXAMINATION AREA CATGY NDE l------0UTACE----**l INSTRUCTIONS NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l "CALIBRAT10N BLOCK **

I CHEMICAL 8 VOLUME CONTROL 2-CS-1-112-2501R-1 i f

651300 TBx-1-4505-64 F-B VT-3 1- - -

x- - - - -

NA Box CS-1 112-704-C41R WOTE 1 j

R31 821RB 651400 TBx 1-4505-H33 F-8 VT-3 1- - -

x- - - - - NA BOX

CS-1-112-705-C41R NOTE 1  !

1 5

i R31 818RB i

i i

651500 Tax-1-4505-H32 F-B VT-3 1- - -

x - - - - - NA Box

  • CS-1-112-708-C41R WOTE 1 i R31 818RB t

651600 TBx-1-4505-H31 F-8 VT-3 1- - - X - - - - - NA Box i CS-1 112-709-C41R NOTE 1 l

R31 818Ra r

i' 651700 TBx-1-4505-H30 F-C VT-3 1- - -

X - - - - -

NA STRLti CS 1-112-711 C41R NOTE 1 R31 818RB 651800 TBx-1-4505-H29 FB VT-3 1- - - - - - X - -

NA Box CS-1-112-712-C41R NOTE 1 R34 818RB 651900 TBx-1-4505-H28 F-C VT-3 1- - - - - - X *

  • NA STRUT CS-1 112-713-C41R WOTE 1 R34 818RB l

l t

l l i

< l

I  !

i DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 129  !

INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS -

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YELR  !

l FIRST sECOS THIRD l .(

ASME l PERIOD PERitX PERl(X) j I sEC. XI ]---------------------------------l SUW4ARY EXAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS MUNBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK'*

I CHEMICAL & V0ttBIE CONTRot 2-CS-1-112-2501R-1 652000 TBM-1-4505-M27 F-C VT-3 1- - - - - - X - - NA STRUT CS-1-112-714-C41R NOTE 1 i

R34 818RB '

f t

652100 TBx-1-4505-H25 F-B VT-3 1- - - - - - X - - NA Box CS-1-112-715-C41R NOTE 1 q}4 stpeB 1 4

l i

652200 TBx-1-4505-H26 F-C VT 3 1- - - - - - X * - NA SNUBBER f CS-1-112-716-C41K NOTE 1 '

s R34 818RB f 652300 TBx 1-4505-H24 F-C Vr 3 1- - - - . - X - . Na SPRING l Cs-1-112-717-C41$ NOTE 1 i R34 818RB

}

1 h

652400 IBx-1 4505-N23 F-C VT-3 1- - - - x - - - -- NA SNUBBER CS-1 112-718 C41K NOTE 1 i R29 819RB j 652500 TBx 1-4505 H21 F-B VT-3 1- - - -

X - - - - NA Box CS-1-112-719-C41R NOTE 1 R29 820RB 652600 TBx-1-4505-H22 F+B VT-3 1- - -

- X - - - -

NA ANCHOR Cs-1-112-720 C41A NOTE 1 R29 833RB f

~-

i ,

t DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 130 ,

INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS t

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR

{

l FIRST SECOND THIRD l }

ASNE l PERits PERI (2 PERIOD l f Sec. xI l.-..---...-..--...-.........-.---l  ;

SL882RY EXAMINATION AREA CATGY NDE l------0UfAGE------l INSTRUCTIONS .

NUMBER IDENTIFICATION ITEM NO NETH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK" [

....... .............................. ....... .... . ........... ........... ........... . .............................. j CHEMICAL & VOLUME CONTROL 2-CS-1-112-2501R-1 j f i i t

652650 TBK-1-4505 H22 B-K 1 PT 1- C - - - - - - - NA 6" $160 SLEEVE. j CS-1-112-720-C41A B10.10 [

R29 833RB

{

! l 652700 TBK-1-4505-M19 T-C VT-3 1- - - - X - - - - NA STRUT l CS-1 112-721 C51R NOTE 1  !

R29 846RB 6 l l 652800 TBx 1-4505-M18 F-B VT-3 1- - -

- x - - - - NA BOK CS-1-112-722-C51R NOTE 1 I

it29 847RB  ;

t 652900 TBK-1-4505-N17 F-B vi-3 1- . x . . . . . . NA Box CS-1-112-723-C51R NOTE 1 R30 857RB e

I 653000 TBX-1-4505 N16 F-B vi-3 1- - x - - - - - -

NA B0x  !

I CS 1-112-724-C51R NOTE 1 '

R30 859tB $

1 653200 TBx-1 4505-H15 F-B VT-3 1- - - - - x - - - NA BOX CS-1-112-726 C61R NOTE 1 R14 871R8 653300 TBK-1 4505-M14 F-C vi 3 1- - - - . x - - -

NA SPRING CS-1 112-727-C61S NOTE 1 R20 874RB

... . . . - . . . . . , . . , ~ -

l I ,

l DATE: 03/22/93 j CDMANCHE PEAK UNIT 1 PAGE: 131 ;

INSERVICE INSPECTION LONG TERM PLAN  !

CLASS 1 SCHED/COMPL COMPONENTS i i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR j l FIRST SECOND THIRD l l ASINE l PERIOD PERI (XI PERIOD l {

SEC. xl l---------------------------------l l SuleuRY EXAMINATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS EMBER IDENTIFICATION ITEM Wo METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*  ;

CHEMICAL & VOLVME CONTROL 2-CS-1-112-2501R-1  ;

653400 TBK-1-4505-N13 F-C VT-3 1- - - - - x - - - NA STRUT CS-1-112-728-C61R WOTE 1 R39 874RB e i

l 4

653500 TBx-1 4505-N12 F-C VT-3 1- - -

- - x - - -

NA SNUBBER {

CS-1-112-729-C61K NOTE 1 R39 874RB l

i r

i r

653600 TBK-1-4505-M11 F-C VT 3 1- - -

- - x -- - NA SNUBBER l CS-1-112-730-C61K NOTE 1 R39 874RB 653700 TBK-1-4505-M10 F-C VT 3 1- - - . . X - - -

NA SPRING CS-1-112-731-C61S NOTE 1 R39 874RB l l

t I

i 653800 TBx-1-4505-9 F-B VT 3 1- - - - - x - - -

NA Box  !

CS-1-112-732-C61R NOTE 1  !

R39 874RB l i

653900 TBx-1-4505-N8 F-8 VT 3 1- - - - - X - - -

NA Box i CS-1 112-733-C61R NOTE 1  !

R39 875RB l l

i 654000 Tax-1-4505-H7 F-B VT-3 1- - - - - X - - ' - NA Box CS-1 112-734-C612 NOTE 1 R39 884RB

4- b, e " a Wh,, ,

.-s--+-

i I

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 132 l INSERVICE INSPECTION LONG TERM PLAN )

CLASS 1 SCHED/COMPL COMPONENTS l l

l INSPECTION INTERVAL , PLAN STATUS ,,PRESERVICE YEAR i' l FIRST SECOND THIRD l AS=E l PER 00 nRim - nRim l  :

SEC. xi l---------------------------------l  !

SumARY EXAMINATION AREA CATGY MDE l -----0UTAGE------l INSTRUCTIONS  ;

buMBER IDENTIFICAfl0N ITEM NO METH l1 2 3 1 2 3 1 2 3 l "CALIBRATIow BLOCK"

{

l CHEMICAL S VOLUME CONTROL 2-CS-1-112-2501R-1 654100 Tax-1-4505-H6 F-8 VT-3 1- - - - - x - - -

NA Box CS-1-112-735-C71R NOTE 1 f

R39 885RB i

I l

654200 TBx-1-4505-NS F-B vi-3 1- - -

- - x - - -

NA B0x '

CS-1-112-736-C71R NOTE 1 R39 895RB I l

l l

654300 TBx-1-4505-H4 F-B vi-3 1- - - - - x - - -

NA B0x 1 l CS-1-112-737-C7tt NOTE 1 l R39 896RB i l

i 654400 TBx-1-4505-M3 F-C VT-3 1- C - - - - - - -

NA SPRING CS-1-112-738-C715 NOTE 1 R16 898tB 654500 TBX-1-4505-M20 F-B VT-3 1- - -' - - 'x - - -

NA BOX CS-1-112-739-C51R NOTE 1 R38 839tB 1

CHEMICAL 8 VOLUME CONTRot 3-CS-1-235-2501R-1 '

654600 TBK-1 4304-M21 F-C VT-3 1- - - - - - X - - NA $NUBBER CS-1 235-067-C41K NOTE 1

! R27 826RB i

t CHEMICAL & VOLUME CONTROL 1.5-CS-1-244-2501R-1 l

654700 TBK-1-4410 M1 F-C VT-3 1- - - - X - - - -

NA STRUT CS-1 244-700-C41R NOTE 1 R29 830RB i

I

i

)-

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 133  !

INSERVICE INSPECTION LONG TERM PLAN f

CLASS 1 SCHED/COMPL COMPONENTS j i

INSPECTION INTERVAL , PLAN STATUS ,,,PRESERVICE YEAR l FIRST SECOND THIRD l ASME PERIOD PERICE) PERIOD I l l SEC. El l----------------- * -~

--l St.80mRY [KAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS f

RSIBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK"

}

l CHEMICAL E VOLUME CONTROL 1.5-CS-1-244-2501R-1 654800 TBx 1-4410-H2 F-C VT-3 1- - - - X - - - -

NA SNUBBER CS-1-244-701-C41K NOTE 1 e R29 826Rs [

1 I

i CHEMICAL & VOLUME CONTROL 1.5-CS-1-248-2501R-1  ;

4 654900 T8X-1-4111-H3 F-C VT-3 1C - - - - - - - -

NA SNUBSER CS-1-248-701-C41K NOTE 1 R23 827RB l i'

655000 Tax-1-4111 H2 F-C VT-3 1C - - - - - - - -

NA SNUBBER l CS-1-248-702-C41K NOTE 1 I R23 82sts  !

l

?

s 655100 Tax 1-4111-N1 F-C VT-3 1C * - - - - - - -

NA $NUBBER CS-1-248-703-C41K NOTE 1 I t

R23 830Rs l

l

?

i CHEMICAL E VOLUME CONTROL 1.5-CS-1-249-2501R-1 l

655200 Tar-1-4208-N2 F-C VT-3 1- - - - - *

  • x -

NA SPRING $

CS-1-249-700-C415 NOTE 1 R25 830RB i

I 655300 Tex-1 4208-N1 F-C VT-3 1- - - - - - -

NA SNUBBER X -

f CS-1-249-701-C41K NOTE 1 l R25 830Rs  !

?

I

)

I J

t I

l ,

h i

I

. . - -. . . _ . == . . . . . - - - . _ - -

I ha DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 134 I INSERVICE INSPECTION LONG TERM PLAN j CLASS 1 SCHED/COMPL COMPONENTS l l

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR F l FIRST SECOND THIRD l  !

ASME l PERIOD PERICD PERIG) l [

SEC. XI l---------------------------------l l SLM ERY ERAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10W BLOCK" l

[

REACTOR COOLANT 12-RC-1-007 2501R-1 655400 TBx-1-4101-N2 F-C VT-3 1- - - - - - - X - WA STRUT RC-1-007-001-C41R WOTE 1 R23 819RB l

I r

655500 TBK-1-4101-M1 F-C VT-3 1- C - - - - - - -

NA SNUBBER '

l RC-1-007-002-C41K WOTE 1 i R23 820RB l

i i

RE ACTOR COOL ANT 6-RC-1-008-2501R-1 l

655600 TBx-1-4104-H1 F-C VT-3 1- - - - - x - - -

NA SPRING RC-1-008-002-C41S NOTE 1 ~f R24 826aB '

i I

J REACTOR COOLANT 2-RC-1-015-2501R-1 655700 TBK-1-4109-N1 F-C VT-3 1C - - - - - - - - NA SNUBBER RC-1-015-700-C41K WOTE 1 R23 814RB i

l l 655800 TBX-1-4109-H8 F-C VT-3 1C C - - - - - - - NA SNUBBER. PARTIAL EXAM RF01.

RC-1-015-701-C41K WOTE 1 COMPLETED EKAM RF02.

R23 813RB 655900 TBK-1-4109-N9 F-C VT-3 1C C - - - - - - - NA SPRING. PARTIAL EEAM RF01.

RC-1-015-702-C41S NOTE 1 COMPLETED EXAM RF02. i R23 814RB l

i i

.l

,,, . ,. - - - , . - . , . - - .- - - - - - - . - . - . . . . . ~.,., .,~. -

l

_ _ _ _ _ _ . - - -_ _ . _ . _ _ m _ . -. . -.

I l

l DATE: 03/29/93 COMANCHE PEAC UNIT 1 PAGE: 135 (

INSERVICE INSPECTION LONG TERN PLAN j CLASS 1 SCHED/COMPL COMPONENTS i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR (

l FIRST SECOND THIRD l l ASME l PERIOD PERIOD PERIOD l l SEC. KI l------------------ -----------l l SteeWtY EKAMINA110N AREA CATCT NDE l------0UTAGE--*---l INSTRUCTIONS ,

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

[

I REACTOR COOLANT 2-RC-1-015-2501R-1 l

I 656000 TBK-1-4109-N6 F-C VT-3 1C C - - - - - - - NA $NUBBER. PARTIAL EXAM RF01. I RC-1-015-703-C41K NOTE 1 COMPLETED EKAM RF02.  !

R23 813RB

! I I t

! t i

l 656100 TBK-1-4109-H3 F-C VT-3 1C'C - - - - - - -

NA SPRING. PARTIAL EKAM RF01. -

l RC 1-015-704-C41S NOTE 1 COMPLETED EKAN RF02. i l R23 813RB  !

i l

l

}

656200 T.'v-1-4109-N4 F-C VT-3 1C C - - - - - - - NA SNUBBER. PARTIAL EKAN RF01.  !

t RC-1 015-705-C41K NOTE 1 COMPLETED EKAM RF02.  ;

I R23 513RB I i

i 656300 TBK-1-4109-N5 F-C VT-3 1C C - - - - - - - NA SMUBBER. PARTIAL EKAN RF01.

RC-1-015-706-C41K NOTE 1 COMPLETED EKAM RF02. j R23 813RB 6 I

1 i

656400 TBK-1-4109-M10 F-C VT-3 1C C - - - - - - -

NA SNUBBER. PARTIAL EXAM RF01.

1 RC-1-015-707-C41K NOTE 1 COMPLETED EKAN RF02. t R23 813RB  !

656500 TBK 1-4109-N11 F-B VT-3 1C C - - - - - - - NA BOK. PARTIAL EKAM RF01.

RC-1-015-708-C41R NOTE 1 COMPLETED EKAM RF02.

R23 813RB I i

f 656600 TBK 1-4109-H7 F-C VT 3 1C C - - - - - - - NA SMUBBER. PARTIAL EKAM RF01. ,

RC-1-015-709-C41K NOTE 1 COMPLETED EKAM RF02. }

R23 813RB i

f 5

9 t

i t

_ _ , , _ . . , , . ._,.,_,._m.m. . . . , . , , .,,y, o.,- _J

) .

DATE: 03/29/93 CDMANCHE PEAK UNIT 1 PAGE: 136 INSERVICE INSPECTION LONG TERM PLAN N CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECONO THIRD l ASME l PERICD PERIOD PERIOD . l SEC. xi l--.----------------------------l

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK'*

REACTOR COOL ANT 2-RC-1-015-2501R-1 656700 TBX-1-4109-H2 F-C VT-3 1C - - - - - - - -

NA SNUBBER RC-1-015-710-C41K NOTE 1 R23 813RB REACTOR COOLANT 4-RC-1-018-2501R-1 656800 TBx-1-4504-H10 F-C VT-3 1- - -

- - x - - -

NA SPRING RC-1-018-008-C615 NOTE 1 R24 9%RB 656900 TBX-1-4504-N25 F-C VT-3 1- C - - - - - - - kA STRUT RC-1-018-016-CB1R NOTE 1 R16 904RB )

l i

I 657000 TBx-1-4504-u26 F-C VT-3 1- C - - - - - - -

NA STRUT RC-1-018-017-C81R NOTE 1 R16 90$RB 657300 TBK-1-4504-H23 F-c vi 3 1- C - - - - - - - NA STRUT RC-1-018-020-C71R NOTE 1 R16 888RB I

\

i l )

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 137 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS

+

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR  ;

l FIRST SECOND THIRD l [

ASME l PERIOD PERIOD PERIOD l SEC. XI l--------------------------------l  ;

SLMMARY EKAMINATION AREA CATGY MDE l------0UTACE------l INSTRUCTIONS  !

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

I REACTOR COOLANT 4-RC-1-018 2501R-1  ;

I 657400 TBX-1 4504-H24 F-C VT-3 1- C - - - - - - - NA STRUT  !

RC-1-018-021-C71R NOTE 1

[

R16 888RB  !

657700 TBx-1 4504-H2O F-C VT-3 1- -

X - - - - - -

NA STRUT RC-1-018-026-C61R NOTE 1 ,

R30 872RB 8

657800 Tax-1-4504-H19 F-C VT-3 1- - X - - - - - - NA STRUT RC-1-018-027-C61R NOTE 1 R30 871RB l l

657900 TBx-1-4504-H17 F-C VT-3 1- - X - - - - - -

kA STRUT RC-1-018-029-C61R WOTE 1 R30 864RB I

i 658000 TBX 1-4504-H15 F-C VT 3 1- -

X - - . - - -

NA $NUBBER RC-1-018-031-C61K NOTE 1 R30 862RB 658100 TBK-1-4504-M13 F-C VT 3 1- - X - - - - - -

NA STRUT RC-1-018-032-C61R NOTE 1 R30 862RB 658200 TBK-1 4504-H11 F-C VT 3 1- - X - - - - - -

NA $NUBBER RC-1-018-033-C61K NOTE 1 430 862RB I

i 1

J

- - . _ - - _ . - - - - - .,. , ,-.n ,. ,-,.c._- , . . . , , , , ,, n

I

{I  !

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 138 INSERVICE INSPECTION LONG TERN PLAN ,

CLASS 1 SCHE 0/COMPL COMPONENTS l INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR 3 l FIRST SECOND THIRD l .

ASME l PERIOD PERICD PERIOD l SEC. x1 l---------------------------------j SteeERY EXAMIhATION AREA CATGY NDE l -----0UTAGE------l INSTRUCTIONS f

NL81BER IDENTIFICAfl0N ITEM No METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK **

t REACTOR COOLANT 4-RC-1-018-2501R-1  :

[

658300 TBE-1-4504-N8 FC VT 3 1- . - - - x - - - NA SNUBBER -

t RC 1-018-034-C61K NOTE 1 ,

R24 862RB  !

l l

t

! I i

658400 TBx 1-4504-H9 F-B VT-3 1- - - - - x - - - WA Box RC-1-018-035-C61R NOTE 1  !

R24 862RB l

658500 TBx-1-4504-H7 F-C VT-3 1- - -

- - x - - -

NA SNUBBER +

RC-1-018-036-C61K NOTE 1  !

R24 860RB 4

658600 TBK-1-4504-N5 T-C VT 3 1- - -

- - x - - . NA STRUT RC-1-018-037-C51R NOTE 1 R24 859tB I l

l 658700 TBx-1-4504-N6 F-C VT-3 1- - -

- - x - - -

h4 SNUBBER RC-1-018-038-C51K NOTE 1 I R24 853RB i 658800 TBx-1-4504-N18 F-C VT-3 1- - x - - - - - - h4 - STRUT i RC 1-018-045-C61R NOTE 1 R30 864RB 658900 TBx-1-4504-H4 F-C VT-3 1- - - - - X - - -

hA SNUBBER RC-1-018-046-C51K NOTE 1 R24 850RB

. . - . _ . . _ - - , .- . _ . . . ,, ~._ . . , _ . . . _ _ - , - , _ - , _ . - - , , . . - . _ , _ - - - - ,

I 1

I e

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 139 f' INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS r INSPECTION INTERVAL , PLAN STATUS ,,PRESERVICE YEAR F

] FIRST SECOND THIRD l f ASME l PER12 PERIOD PERI @ l )

SEC. XI l ---------- ----------- -- -------- l [

SumARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* ,

....... .............................. ....... .... . ........... ........... ........... . .............................. I t

REACTOR COOLANT 4-RC-i-018-2501R-1 l 6

f 659000 TBX-1-4504-N3 VT-3 1 '

F-C - -

. . X . . -

h4 SPRING RC 1-018-047-C515 NOTE 1 R24 850RB 659100 TBX-1-4504-M16 F-C VT-3 1- - X - - - - - -

NA SNUBBER f RC-1-018-049-C61K NOTE 1 R30 862RB P

i 659200 TEX-1-4504-H2 F-C VT-3 1- - - - - X - - -

NA SNUBBER RC-1-018-050-C51K NOTE 1 R24 842RB v

659300 TBX-1-4504-M1 F-C VT-3 1- - -

- - X - - -

NA StJBBER RC-1-018-051-C51K NOTE 1 R24 842RB l

t 659400 TBX-1-4504-M14 F-C VT-3 1- - X - - - - - -

NA STRUT RC-1-018-052-C61R NOTE 1 I R30 862RB 659500 TBX-1-4504-M12 F-C VT-3 1- - X - - - - - -

NA SPRING RC-1-018-053-C615 NOTE 1 R30 862RB 1

1 659600 TBX-1-4504*H22 7-C VT-3 1- - X - - - - - -

NA STRUT RC-1-018-054-C61R NOTE 1 R30 883RB 1

1 t I

i i l

t DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 140  !

l i

INSERVICE INSPECTION LONG TERM PLAN +

i CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE TEAR l FIRST SECOND THIRD l i ASSE l PERICE PERICD PERits l SEC. El l----- -= - -*


l \

SLMMART EKAMINATION AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS  ;

NLMBER IDENTIFICAfl0N ITEM No METH l1 2 3 1 2 3 1 2 3 l "CAllsRATION BLOCK ** l REACTOR COOLANT 4-RC-1-018-2501R-1 l

659700 TBK-1-4504-N21 F-B VT-3 1- - X - - - - - -

NA ANCHOR RC-1-018-055-C61A NOTE 1 R30 883Rt l

659750 TBX-1-4504-N21 B-K 1 PT 1- - - - - - - x - NA 5/8" 360 SADDLE.

RC-1-018-055-C61A B10.10 R30 883RS '

l

, i l t REACTOR COOLANT 2-RC-1-035-2501R-1  !

659800 Tax-1-4206 H4 F-8 YT 3 1- - - - - - - X -

NA SOK i l RC-1-035-700-C41R NOTE 1 R25 813Rs i

- t 4

?

659900 Tax-1-4206-N1 F-C VT-3 1- - - - - - - X -

NA SPRING  ;

RC-1 035-702 C415 NOTE 1 R25 814RB P

i 660000 TBK-1-4206-N2 F-C VT-3 1- - - - - - - X - NA SNusSER RC 1-C35-703-C41K NOTE 1 l R25 814RB l 1

1 660100 TBM-1-4206-N3 F-B VT-3 1- - - - - - - X - NA tax RC-1-035-704-C41R NOTE 1 R25 813Rs REACTOR COOLANT 3-RC-i-052-2501R-1

'[ 660200 TBK-1-4304-M3 F-C VT-3 1- - - - - - X - - NA SPRING RC-1-052-001 C41S NOTE 1 R27 814Rs

l

)4 DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 141 l INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR '

l FIRST SECOND THIRD l  ;

ASME l PERIOD PERits PERIOD l SEC. XI l---------------------------------l Stas 44RY EXAMINATION AREA CATGY NDE l--*---0UTAGE------l INSTRUCTIONS WUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

REACTOR COOLANT 3-RC-1-052-2501R-1 f

I 660300 TBx-1 4304-H9 F-C VT 3 1- - . - - . X - -

NA SPRING ,

RC-1-052-003-C41S NOTE 1 R27 814RB +

i I

i 660400 TBx-1-4304-M1 F-C VT-3 1- - - - - -

X - - NA $NUBBER l RC-1-052-004-C41K NOTE 1 R27 814RB f

i 660500 TBx-1-4304 H4 F-C VT 3 1- - - - - - X - - NA SNUBBER '

RC-1-052-005-C41K NOTE 1 l R27 814RB l'

\

660600 TBx-1-4304-H2 F-C VT-3 1- - - - - -

x- - NA $NuBBER j RC-1-052-008-C41K NOTE 1 R27 814RB j

l I  !

660700 TBX-1-4304-H5 F-C VT-3 1 - - - - - X - - hA SWJBBER i RC-1-052-009-C41K NOTE 1 R27 814RB f

t i

s 660800 TBx-1 4304-H7 F-C VT-3 1- - - - - -

X - - NA SrJBBER ,

RC-1-052-010-C41C WOTE 1 R27 814RB ]

1 660900 TBK-1-4304-N8 F-C VT 3 1- - - - - -

X - - NA SNUBBER RC-1-052-012-C41K NOTE 1 R27 814RB

{

\

.- , , - - ~ - - . vw , , , . . - - , --4,-_2--ee -r .==r.- wee,-..--ea + - - --e. . - - - - - . + = - - - -

i  !

r

-h*

4 e

I DALE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 142 INSERVICE INSPECTION LONG TERM PLAN C CLASS 1 SCHED/COMPL COMPONENTS ,

t INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR  !

] l FIRST SECOND THIRD l l ASME l PERIOD PEkl0D PERIOD l ,

j SEC. El l--*-------------*-- ------*---l

[ SUWIARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM WO METH l1 2 3 1 2 3 1 2 3 " CALIBRATION BLOCK" l l REACTOR COOLANT 3 RC-1-052-2501R-1 1 i i

, 661000 TBM 1-4304-H10 FC VT-3 1- - - - - - X - - NA SNUBBER i RC-1-052-013-C41C NOTE 1 R27 814RB l

i

l I

b 661100 TBK-1-4304-N6 F-C VT-3 1- - - - - - x - - NA SNUBBER RC-1-052-014-C41C NOTE 1 R27 814RB b

661200 TBX-1-4304-M12 FC VT-3 1- - - - - - X - -

NA SNUBBER l RC-1-052-015-C41K NOTE 1 i R27 815RB

. f 661300 TBK-1-4304-M13 F-C VT-3 1- - . . . . x. - NA SNUBBER '

RC 1-052 016-C41K NOTE 1 '

R27 816RB i I

661400 TBX 1-4304 M14 F-C VT-3 1- - - - - - X - - NA SPRING  !

RC-1-052 018-C415 NOTE 1 i s

R27 820RB 1

i 661500 TBx-1-4304-H2O F-C vi-3 1- - - - - - x- -

NA STRui  :

RC-1-052-019-C41R NOTE 1 I R27 826tB I

i 661600 TBx-1-4304 H15 FC VT-3 1- - - - - - X - - NA SWuBBER  ;

RC-1-052-020-C41K NOTE 1 1

, R27 821RB i i

t

}

1 i

i i

i L

, . _ _ - . , , , w , . - - - , - 7,,-. - , . - . - . , .-r.f- - . , , , m ._

.,4 .-.,..,,.v-, , , - . ,,-.,,-,,-,y -,--m-c . . , ,n-+,. - , ,,__my...

I.

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 143 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE TEAR l FIRST SECOND TN!RD l ASME l PERICO PERICO PERICC l SEC. xi l.....---..------.--.--....-.-----l SupetART EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAllsRATION BLOCK'*

{

l REACTOR COOLANT 3-RC-1-052-2501R-1 i

i 661700 TBX-1-4304-M16 F-C VT-3 1- - . . - . x - - NA SNUBBER RC 1-052-021-C41C WOTE 1  !

i R27 824RB i

661800 Tax-1-4304 M17 F-C VT-3 1- - - - - - x - - NA SNUSBER RC-1-052-022-C41C NOTE 1 ,

R27 826Rs '

i 661900 TBx-1-4304-H18 F-C VT 3 1- - - - - - x - -

WA SNUBBER RC-1-052-023-C41K NOTE 1 f

( R27 826RS 662000 T8X-1-4304-M19 FC VT-3 1- - - - - - x - - WA SNussER RC-1-052-024+C41K WOTE 1  ;

R27 826Rs  ;

662100 TBX-1-4304-H11 F-C VT 3 1- - - - . -

x . -

NA SNussER  !

E0-1-052-026-C41K WOTE 1 R27 814RB [

REACTOR COOLANT 2-RC-1-053-2501R-1  ;

662200 TBx-1-4307-N1 FC VT-3 1- - - - - -

x - -

NA SPRING RC-1-053-700-C41S NOTE 1 I R27 813RB '

I i

REACTOR COOLANT 12-RC-1-069-2501R-1 i

% 662300 TBM-1-4401-H2 FC VT-3 1- - - - X - - - -

NA SNUBBER l RC-1-069-001-C41K WOTE 1 R29 820R8  !

I b

f

- ., , n - , - + , . . , , ., ,,v, s~ . - , - , - ~ , - - ~ ~ ~ - - ~ - - - ~ - ~ ~ -

! I l

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 144 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS l 1

\  !

INSPECTION INTERVAL _ PLAN STATUS ,,PRESERVICE YEAR l FIEST SECOND THIRD l ASE l PERIOD PERIOD PERIOD l  ;

SEC. xi l.................................l  ;

StacuRT EXAMINATION AREA CATCT NDE l------0UTAGE-*----l INSTRUCTIONS

{

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK'*

l REACTOR COOLANT 12-RC-1-069-2501R-1 662400 TBX-1-4401-N1 F-C VT-3 1- - -

- x - - - - NA STRUT .

RC-1-069-002-C41R NOTE 1  !

R29 821kB l I

REACTOR C00LAET 6-RC-1-070-2501R-1 j 662500 TBM-1-4404-M1 F-C VT-3 1- - - - x - - - -

NA SPRING RC-1-070-002-C415 NOTE 1 R29 826RB l

l i

l REACTOR COOLANT 2-RC-1-072-2501R-1 l l

i l 662600 TBM-1-4408-N2 F-C VT-3 1- - - - x - - - -

hA SPRING l RC 1-072-701-C415 NOTE 1 R29 813RB 662700 TBM-1-4408-N3 F-C VT-3 1- - -

x - - - -

NA SuuBBER RC 1-072-702-C41K WOTE 1 R29 813RB 662800 TBK-1-4408-N1 F-C VT-3 1- - - -

x- - - -

NA SNUBBER RC-1-072-703-C41K NOTE 1 R29 813RB-662900 TBX-1-4408 H4 F-C VT-3 1- - - -

x- - - -

NA STRUT RC-1-072-707-C41R NOTE 1 R29 813RB I

i b

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 145  !

INSERVICE INSPECTION LONG TERM PLAN h CLASS 1 SCHE 0/COMPL COMPONENTS

?

INSPECTION INTERVAL,, PLAN STATUS _PRESERVICE YEAR  !

l FIRST SECOND THIRD l  ;

ASME l PERIG) PERIOD PERIOD l j SEC. XI l ----------- ----------- ---------- l j

SUMMARY

EMAMINATIDW AREA CATGY NDE l------0UTAGE------l INSTRUCT 10NS l

IRMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l "CALIBRAir0W BLOCK"  !

j REACTOR COOLANT 4-RC-1-075-2501R-1 663000 TBx-1-4503-M17 F-C VT-3 1- - X - - - - - - #A STRUT RC-1-075-004-C61R NOTE 1 i R30 882RB f

i 663100 TBK-1-4503-M13 FC VT 3 1- . X - - - - - -

hA SPRING RC-1 075-006-C615 NOTE 1 R30 863RB 663150 TBx-1-4503-M13 B-K-1 PT 1- - - - - - - X - NA 4-1" LUGS. f RC 1-075-006-C615 B10.10 R30 863RB I 1

4

)

f 663200 TBx-1-4503-K20 F-C VT-3 1- C - - - - - - -

hA STRUT I RC-1-075-018-C81R NOTE 1 R16 905tB i

663400 TBx-1-4503-M14 F-C VT-3 1- -

X - - - - - - NA STRUT l RC-1-075-027-C61R NOTE 1 l

R30 873RB l

l l

663500 TBr-1-4503 H10 F-B VT-3 1- - X - - - - - -

mA BOX RC-1-075-029-C51R NOTE 1 R30 857RB l

I l

663600 TBK-1-4503-H6 F-C VT-3 1- - X - - - - - -

NA $NUBBER RC-1-075-031-C51K NOTE 1 l- R30 848aB

I4 DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 146 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHED/COMPL CONPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERIOD PERIOD l SEC. x1 l---------------------------------l SLBmART EXAMINATION AREA CATGT NDE l------0UTAGE -----l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

REACTOR COOLANT 4-RC-1-075-2501R-1 663700 TBx-1 4503-N3 F-C VT-3 1- . x . - - - - -

NA SNUBBER RC 1-075-034-C51K WOTE 1 R30 846RB 663800 TBx-1 4503-H6 F-C VT-3 1- - x - - - - - -

NA SNUBBER RC-1-075-041-C51K NOTE 1 R30 846RB 663900 TBx-1-4503-H5 F-C VT-3 1- - x - - - - - -

NA SPRING RC '-075-042-C51S NOTE 1 R30 846RB l

i 664000 TBx-1-4503-H2 F-C VT-3 1- - x - - - - - -

NA $NUBBER RC-1-075-043-C51K WOTE 1 i i

R30 842RB '

664100 TBx-1-4503 H1 F-C VT 3 1- -

x - - - - - -

NA SNUBBER RC-1-075-044-C51K NOTE 1 I R30 842RB l

l l

664200 TBx-1-4503-H9 F-C VT-3 1- - x - - - - - -

NA SNUBBER l RC-1-075-045-C51K NOTE 1 I R30 849tB 664300 TBM-1-4503-N12 F-C VT-3 1- - X - - - - - -

NA STRUT RC-1-075-046-C61R NOTE 1 R30 872RB s

m - .-

d 4 I.

j e

1 DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 147 l INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS f _PRESERVICE YEAR l l l FIRST SECOND THIRD l AS8E l PERICD PERl(X) PERIOD l l SEC. XI l--------------------------------l ,

N 8Y EXAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS ,

j NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK

1 3 ,

i REACTOR COOLANT 4-AC-1-075-2501R-1  ;

k j 666400 TBK-1-4503-H11 F-C VT-3 1- - X - - - - - - NA STRUT RC-1-075-047-C51R NOTE 1 i 60 EMB I

ll 664500 TBX-1-4503-H7 F-C VT-3 1- - X - - - - - - NA SNUBBER I

$ RC-1-075-048-C51K NOTE 1 t I

R30 846kB i

j 4

664800 TBx-t-4503-H4 F-C vi-3 1- - x . - - - - -

NA SNUBBER l' Y

RC-1-075-051-C51K NOTE 1 R30 846aB t'

i 664900 TBX-1 4503-M19 F-C VT-3 1- C - - - - - - -

NA SNUBBER

[ RC-1 075-052-C61K NOTE 1 R16 885tB ,

665000 TBX-1-4503-H18 F-C VT 3 1- C - - - - - - -

NA STRUT  !

RC-1-075-053-C61R NOTE 1 R16 884RB I i

4 665100 TBK-1-4503-M16 FC VT-3 1 -

x - - - - - -

NA STRUT 4

RC 1-075-054-C61R NOTE 1 R30 882RB 665200 TBX-1-4503-H15 F-B VT-3 1- - X - 1 - - - - NA ANCHOR RC-1-075 056-C61A NOTE 1 R30 882RB i

a 1r n +,,,.,----y -,,w n,-- ee e-,,m 4 m,v,so mw- e w-- - ,eweq

i I-l I

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 148 ;

INSERVICE INSPECTION LONG TERM PLAN I CLASS 1 SCHED/COMPL COMPONENTS j i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE TEAR ,

l FIRST SEC0ec THIRD l l ASME l PERICO PERIOD PERIOD l SEC. XI l ----------- ---------- ----------- l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

REACTOR COOLANT 4-RC-1-075-2501R-1 665250 TBx-1-4503-H15 B-K-1 PT 1- - - - - - - X - NA 3/4" 360 SADDLE.

RC-1-075-056-C61A B10.10 R30 882RB .

i I

REACTOR COOLANT 4-RC-1-087-2501R-1  !

665300 TBK-1-4504-K34 F-C VT 3 1- C - - - - - - -

NA SPRING ,

RC-1-087-001-C315 NOTE 1 R21 908tB  ;

t i i

i 665400 TBx-1-4504-H37 F-C VT-3 1- C - - - - - - -

NA SNUBBER l

l RC-1-087-003-C81K WOTE 1 l R21 913RB I I t 665600 TBx 1-4504-K38 F-C VT-3 1- C - - - - - - - NA SNUBBER 3 RC-1 087-005-C81K WOTE 1 5 R21 913RB .

l I

s f

665700 TBK-1-4504-H36 F-C VT-3 1- C * - - - - - -

NA $NUBBER I RC-1-087-007-C81K NOTE 1 R21 910RB '

[

665800 TBx-1-4504-H35 F-C VT-3 1- C -

NA $NUBBER RC-1-087-700-C81K NOTE 1 R21 910RB REACTOR COOLANT 4-RC-1-088-2501R-1 665900 TBX-1-4503-H35 FC VT-3 1- C - - - - - - -

NA SNUBBER RC 1-088-005-C81K NOTE 1 R21 913RR

I ,

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 149 l, INSERVICE INSPECTION LONG TERN PLAN  :

r CLASS 1 SCHED/COMPL COMPONENTS r

l INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR i l FIRST SECOND THIRD l l ASME l PERIOD PERIOD PERIOD l l SEC. XI l ---------- ----------- ----------- l i SUIMARY EXAMINAfl0N AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS f NUMBER IDENTIFICATION ITEM NO NETH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

REACTOR COOLANT 4-RC-1-088-2501R-1 l

666000 TBK-1-4503-M33 F-C VT-3 1- C - - - - - - -

NA SNUBBER 5 RC-1-088-006-C81K NOTE 1

! R21 913RB +

l l

l 666100 TBx-1-4503-H31 F-C VT-3 1- C - - - - - - - NA SNUBBER  !

RC 1-088-008-C81K NOTE 1

! R21 911RB  ;

666200 TBX 1-4503-H34 F-C VT-3 1- C - - - - - - - NA SNUBBER RC-1-088-009-C81K NOTE 1 I R21 913RB

\

i 666300 TBx-1 4503-K30 F-C VT-3 1- C - - - - - - - NA SPRING RC-1-088-010-C81S NOTE 1 R21 909RB I 666400 TBx-1-4503-H32 F-C VT-3 1- C,- - - - - * - NA SNUBBER RC-1-088-700-C81K NOTE 1 R21 912RB REACTOR COOLANT 4-RC-1-091-2501R-1 666500 TBx-1 4503-H40 F-C VT-3 1- C - - - . . - -

NA SNUBBER RC-1-091-001-C81K NOTE 1 R16 912RB

)

)

REACTOR COOLANT 3-RC 1-111-2501R 1 666600 TBx-1-4502-N1 F-C VT-3 1- C - - - - - - -

NA SNUBBER.TDLR VERIFICATION RC-1-111-002-C81K NOTE 1 BOUNDART.

R16 907RB

)

i

. _ . . _ , . . , - . . . - _.-,._,e__, . . . ~ . . ..~.. ...~ ~. r ._

I 4

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 150 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL, PLAN STATUS ,PRESERVICE YEAR i l FIRST SECOND THIRD l j ASME l PERIOD PERIOD PERIOD l  ;

SEC. x1 l-------------------------------l i SUWERY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

{

l REACTOR COOLANT 3-RC-1-111 2501R-1 666700 TBK 1-4502 H3 F-C VT-3 1- C - - - - - - -

NA $NUBBER.TOLR VERIFICATION 1 RC-1-111-003-C81K NOTE 1 BOUNDARY.

R16 907RB 666800 TBx-1-4502-N2 F-C VT-3 1- C - - - - - - - NA SPRING.TDLR VERIFICATION RC-1 111-004-C81S NOTE 1 BOUNDARY. [

R16 907RB i

REACTOR COOLANT 2-RC-1-132-2501R-1

- 666900 TBK-1-4505-N1 F-B VT-3 1- - - - - x - - -

NA Box RC-1 132-700 C71R NOTE 1 R39 903RB i

REACTOR COOLANT 14-RC-1-135-2501R-1 667000 TBK-1-4500-H2 F-C VT*3 1- - -

- X - - - -

NA SPRING.TDLR VERITICATION RC-1-135-401-C41S NOTE 1 BOUNDARY.

R29 832RB  ;

i i

667200 TBx-1-4500-N4 F-C V1-3 1- - - - - - - - x kA SPRING.TDLR VERIFICATION i RC-1 135-007-C41S NOTE 1 BOUNDARY.  !

R8 832RB b

667300 TBK-1-4500-N3 F-C VT 3 1- - - - - - - - x NA SuuBBER.TDLR VERIFICATION RC-1 135-008-C41C NOTE 1 BOUNDARY.

R8 832RB ,

)

i l

l l

1 1

- - ~-. -, .,.--n.- - - - , , - - - , -++a- .~ . - , , ~ , - - - ,.,,n ~ .. - . - -

l l

I l I

I l

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 151 I INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS f

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICX) PERIOD PERIOD l  ;

SEC. XI l--------------------------------l  ;

SLNNARY EXAMINAfl0W AREA CATGY NDE l------0UTACE------l INSTRUCTIONS IRNBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK'*  ;

REACTOR COOLANT 14-RC-1-135-2501R-1 l

1 L

667400 TBx-1-4500-H5 F-C VT-3 1- . - .. - - - X NA STRUT TDLR VERIFICATION RC-1-135-009-C51R NOTE 1 BOUNDARY. i R44 843RB l

667500 TBX 1-4500-H1 F-C VT-3 1- - - - X - - - -

NA SNUBBER.TDLR VERIFICATION ,

RC-1 135-010-C41K NOTE 1 BOUNDARY.

R29 832RB REACTOR COOL ANT 3-RC-1-146-2501R-1 i 667600 TBx-1-4502-H6 F-C VT-3 1- C + - - - - - -

NA SPRING.TDLR VERIFICATION

{

g RC-1-146-001-C81$ NOTE 1 BOUNDARY. (

R16 907RB l

i 667700 TBx-1-4502-H7 F-C VT 3 1- C - - - - - - -

NA SNUBBER.TDLR VERIFICATION  :

RC-1-146-002-C81K NOTE 1 BOUNDARY. f R16 907RB l i

i 667800 TBx-1-4502-H5 F-C YT-3 1- C -- - - - - - -

NA SNUBBER.TDLR VERIFICATION I RC-1-146-003-C81K NOTE T BOUNDARY. i R16 907RB t I

i l l l

l l

l 667900 TBx-1-4502-H4 F-C VT 3 1- C - - - - - - -

NA SNUBBER.TDLR VERIFICATION RC-1-146-004-C81K NOTE 1 BOUNDARY.

R16 908RB REACTOR COOLANT 6-RC-1-147-2501R-1 l[*

668000 TBx-1-4503-H36 F-C VT 3 1- C - - - - - - -

NA SPRING RC-1 147-003-C81$ NOTE 1 R21 913RB l

_ ._ - _ _ _ ,- . . _ . . ~ _ ~_

i I DATE: 03/29/93 CDMANCHE PEAK UNIT 1 PAGE: 152 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPOWENTS

\

INSPECT 10N INTERVAL , PLAN STATUS J RESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l t

l SEC. RI l ------------------------~--'-l SUPDMRY EKAMINATION AREA CATCY NDE l------0UTAGE- ----l IkSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 ! l ** CALIBRATION BLOCK **

REACTOR COOLANT 6-RC-1-147-2501R-1 668100 TBx-1-4503-H39 F-C VT-3 1- C - - - - - - -

NA SNUBBER RC-1-147-007-C81K NOTE 1 R16 913RB 668200 TBx-1-4503-H38 F-C VT-3 1- C - - - - - - -

NA SPRING RC-1-147-009-C815 NOTE 1 R16 913RB 668300 TBx-1-4503 H37 F-C VT-3 1- C - - - - - - - NA SNUBBER RC-1-147-010-C81K NOTE 1 A R16 913RB k

REACTOR COXANT 6-PC-1-161 2501R-1 668400 TBK-1-4503-H25 F-C VT-3 1- C - - - - - - -

KA SNUBBER RC-1-161 001-C81K NOTE 1 R16 909RB 668500 TBK-1-4503-H24 7-C VT 3 1- C - - - - - - - kA SPRING RC-1-161-002-C815 NOTE 1 R16 909RB 668600 TEX-1-4503-H22 F-C VT-3 1- C - - - - - - -

NA SNUBBlW RC-1-161-004-C81K NOTE 1 R16 909RB t

1 l

, I i

i DATE: 03/22/93 C0KANCHE PEAK UNIT 1 PAGE: 153

, INSERVICE INSPECTION LONG TERM PLAN S

l CLASS 1 SCHED/COMPL C0KPONENTS i

l INSPECTION INTERVAL , PLAN STAT *JS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICO PERICD PER100 l SEC. El l


l SLMMARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK ** j REACTOR COOLANT 6-PC-1-161-2501R-1 I  !

( 668700 TBX-1-4503-H23 FC VT-3 1- C - - - - - - - NA $NUBBER RC-1 161-005-C81K NOTE 1 R16 909RB 668800 TBx-1-4503-H21 F-C VT-3 1- C - - - - - - - NA STRUT RC-1-161-006-C81R WOTE 1 R16 907RB REACTOR COOLANT 4 RC-1-162-2501R-1 668900 TBK-1-4503-H29 F-C VT-3 1- C - - - - - - -

NA SNUBBER

' ( *w s

RC-1-162-001-C81K NOTE 1 R21 909RB 669000 TBK-1-4503-H28 F-C VT-3 1- C - - - - - - -

NA SNUBBER RC-1-162-002-C81K NOTE 1 R21 909RB i i

669100 TBx-1-4503-H27 F-C VT-3 1- C - - - - - - -

kA SPRING RC-1-162-003 C81S NOTE 1 R16 909RB l

)

l 669200 TBx-1-4503-H26 F-C VT-3 1- C - - - - - - -

NA SNUBBER RC-1-162-004-C81K WOTE 1 R16 909tB l.

I REACTOR COOLANT 6-RC-1-163-2501R-1 j p 669300 TBX-1-4504 H27 F-C VT-3 1- C - - - - - - -

NA SNUBBER

( RC-1-163-003-C81K WOTE 1 R16 908RB I

h, ,

DATE: 03/29/93 COMANCHE PEAK UNIT 1 PACE: 154 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS  !

i

~

INSPECTION INTERVAL PLAN STATUS PRESERVICE TEAR ,

l FIRST SECOND THIRD l  ;

ASME l PERICD PERIOD PERIOD' l l SEC. XI l--------------------------------l l

SUMMARY

EKAMINATION AREA CATGY NDE l-- ---0UTACE--- --l INSTRUCTIONS f' NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK **

t REACTOR COOLANT 6-RC-1-163-2501R-1 l 669400 TBx-1-4504-H30 F-C VT-3 1- C - - - - - - -

NA STRUT j RC-1-163-004-C81R NOTE 1 R16 908RB 669500 TBx-1-4504-H29 F-C VT 3 1- C - - - - - - - NA SNUBBER ,

RC-1-163-008-C81K NOTE 1 ,

R16 908RB l i

669600 TBX-1-4504-H28 F-C VT-3 1- C - - - - - - -

NA SPRING  !

RC-1-163-009-CB1S NOTE 1 >

R16 908RB l l

REACTOR COOLANT 4 RC-1-164-2501R-1 669700 TBx-1-4504-H32 F-C VT 3 1- C - - - - - - - NA SNUBBER RC-1-164-001-C81K NOTE 1 R21 908AB ,

669800 TBX-1-4504-H33 F-C VT-3 1- C - - .- - - -

NA SNUBSER ,

RC-1-164-003-C81K NOTE 1 R21 908tB l

l 669900 TBK-1 4504-H31 F-C VT 3 1- C - *A * * -

RC-1-164-700-C81K NOTE 1 R16 906AB RESIDUAL NE AT REMOVAL . 12-RM-1-001-2501R-1 670000 TBX 1-4101 n10 F-C VT-3 1C C- - - - - - - NA SPRING. PARTIAL EKAM RF01.

RH-1 001-001-C41S NOTE 1 COMPLETED EXAM RF02.

R31 817RB i

.. _m _ __ .. - . _

I I-  !

t DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 155 l INSERVICE INSPECTION LONG TERM PLAN l CLASS 1 SCHED/COMPL COMPONENTS [

i l

INSPECTION INTERVAL. PLAN STATUS ,,PRESERVICE YEAR  ;

l FIRST SECOND THIRD l  !

ASME l PERIOD PERIOD PERIOD l  !

SEC. Kl l - -------- --- -- --- ----------- l l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS j MlMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK ** i RESIDUAL HEAT REMOVAL 12-RN 1-001-2501R-1 670100 TBK-1-4101-H3 F-C VT 3 1- C - - - - - - -

NA SPRING i RM-1-001-004-C41s NOTE 1 R23 817RB i

i

( 670200 TBx 1-4101-H9 F-C VT-3 1C C - - - - - - - NA SNUBBER. PARTIAL EXAM RF01.

f I RN-1-001-005-C41K NOTE 1 COMPLETED EXAM RF02. L l R31 817RB  !

l i l

i 670300 Tax-1-4101-H6 F-C VT-3 1- C - - - - - - -

NA SNUBBER ,

! RM-1-001-007-C41K NOTE 1 i

R23 817RB i

l

[

i 670400 TBX-1-4101-H7 F-C VT-3 1C C - .- - - - - - NA SPRING. PARTIAL EXAM RF01.

RH-1 001-011 C41$ NOTF 1 COMPLETED EXAM RF02.

f R31 817RB  !

E i

I 1

+

670500 TBK-1-4101-H4 F-C VT-3 1- C - - . . - - . NA SPRING b r

P4-1-001-012-C415 le0TE 1 i i

RZ3 817RB l

i r

670600 TBX-1-4101-H8 F-C. VT-3 1C C - - - - - - -

NA S wSBER. PARTIAL EKAM RF01. l RH-1-001-013-C41K NOTE 1 COMPLETED EXAM RF02.  !

R23 817RB  !

i

}

l h

i l

5 I i l .. _ _ _ . . . _ . _ _ , _ . . _ .. _ _ _ _ _ . _ _ _ _ . . . . _ , . . . _ ._, _. . _ . _ , .

(

) 1 t

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 156 {

INSERVICE INSPECTION LONG TERM PLAN [

CLASS 1 SCHED/COMPL COMPONENTS i INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND -THIRD l f ASME l PERIOD PERIOD PERIOD l l SEC. XI l---------------------------------l SU44ARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS .

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **  !

RESIDUAL HEAT REMOVAL 12-RN-1-001-2501R-1 t

670700 TBX-1-4101-H5 F-C VT-3 1 C - . . - - - - NA SNUBBER  !

RM-1-D01-014-C41K NOTE 1 l R23 81?RB l RESIDUAL HEAT REMOVAL 12-RH-1-002-2501R-1 i 670800 TBX-1-4401-H9 F-C VT-3 1 - . . . - X - - NA SPRING j RH-1-002-001-C41S NOTE 1  !

R34 81TRB f i

I l

670900 TBX-1-4401-K3 F-C VT 1 - - - - - - X - - NA SPRING  ;

RM-1-002-004-C415 '

NOTE 1 R34 817RB ,

l I

i 671200 TBX-1-4401-H7 F-C VT-3 1- - - - .- X - - NA . SPRING RH-1-D02-010-C41S NOTE 1 R34 817RB t

j 671300 TBX-1-4401-h6 FC VT-3 1- - -

- X - - - -

NA SPRING j RN-1-D02-011 C41S NOTE 1  !

l R29 817RB l

671400 TBX-1-4401-H5 F-C VT-3 1- - -

X - - - - NA ENUBBER  !

RM 1-002-012-C41K NOTE 1~

R29 817RB  ;

t l

s=mr t 0

- ,- s , , - -e - .m n ,..nn.,. -..n.v-,w.,,-ng - - - - ..w+., n-,,., a ~-m.. p. ,..

a ,

i

)e t

i DATE: 03/22/93 COMANCHE PEAC UNIT 1 PAGE: 157 I INSERVICE IkSPECTION LONG TERN PLAN

{

CLASS 1 SCHED/CDMPL COMPONENTS ,

I INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR

  • l FIRST SECO@ THIRD l ASME l PERIOD PERIOD PERIOD l [

SEC. KI l


l l S'JEERY EKAMINATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS )

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 23 l **CAllBRATION BLOCK'* l I

RESIDUAL NEAT REMOVAL 12-RN-1-002-2501R-1 i f

671450 Tex-1-4401-N5 B-K 1 PT 1- C - - - - - - - NA 1" SADDLE.

RM-1-002-012-C41C B10.10 l l ,

l R29 817RB l I

i 671500 TBx 1-4401-H8 F-8 VT-3 1- - - - - -

X - -

NA 80X l

RM-1-002-013-C41R WOTE 1 l R34 817RB t

f 5

671600 TBx-1-4401-H4 F-C VT-3 1- - - - X - - - -

NA SNUBSER RM-1-002-014-C41K WOTE 1  !

R29 817Rs

)

?

t

?

SAFETY INJECT 10N 1.5-SI-1-025-2501e-1 671700 TBX-1-4107-H16 F-B VT-3 1- - - - - - X - - NA BOX  ;

SI-1-025-701-C41R WOTE 1  !

i R34 822RB i

671800 Tax-1 4107-M15 F-B VT-3 1- - - - - X - - - NA E0x  !

SI 1 025-702-C41R NOTE 1 R31 822RB 671900 TBx-1-4107-N14 F-B VT 3 1- - - - - X - - -

NA 80X

.SI 1-025 703-C41R NOTE 1 R31 822RB SAFETY INJECTION 1.5-SI-1-026-2501e-1 672200 Tax-1 4205-K38 F-C VT-3 1- - -

- - X - - - NA STRUT SI-1-026-701 C41R WOTE 1 R31 819RB

I '

i i

)

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 158 l INSERVICE INSPECTION LONG TL u PLAN I CLASS 1 SCHED/COMPL COMPONENTS l

l IkSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR  !

l FIRST SECOND THIRD l l ASME l PERIOD PERIOD PERIOD l {

SEC. XI l-------~---------~*~-~~~-l l SLBMART EXAMlhATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS {

WuMBER IDENTIFICATION ITEM No METN l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK **

l i

SAFETY ikJECTION 1.5-$1-1-026-2501R-i [

672300 Tax-1-4205-u37 F-s vi-3 1- - - - - X - - -

ha 50x l

S!-1-026-702-C41R NOTE 1 t

R31 819ts  !

i i

i 672400 T8x-1-4205-M36 F-C VT-3 1- - - - -

X - - -

kA SPRING [

SI-1-026-703-C415 NOTE 1 I I R31 819ts l

[

1 672500 Tax-1-4205-N35 F-C VT-3 1- - -

- - X - - -

NA SNUBBER I l SI-1-026-705-C41K WOTE 1

  • R31 818tB l

i i

672600 TBx-1-4205-K34 F-C VT-3 1- - - - - X - - -

NA STRUT l SI-1-026-706-C41R WOTE 1  !

R31 817kB i i

i l

I 672700 TBK-1-4205-N33 F-C VT 3 1- - -

- - X - - -

NA . STRUT S! 1-026-707-C41R NOTE 1 R31 817tB i l

1 672800 Tax-1-4205-us2 r-C vi-3 1- - . . . X . - .

mA SuusaER  !

SI-1-026-709-C41K NOTE 1 R31 817Rs 672900 T8x-1-4205-M31 F-B VT-3 1- - - - - X - - -

NA BOK SI-1-026-710-C41R NOTE 1 R31 817Rs s

s

t l

l l

DATE: 03/22/93 CO ENCHE PEAK UNIT 1 PAGE: 159 ,

1 a

INSERVICE INSPECTION LONG TERN PLAN 1 CLASS 1 SCHED/COMPL COMPONENTS j i INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND THIRD l ASME l PERICS PERIts Petits l SEC. XI l---------------------------------l

%20ERT EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS  ;

NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK" W

SAFETY INJECTION 1.5-$1-1-026-2501R-1 f d

i J

673000 TBx-1-4205-N30 FB VT-3 1- - - - - X - - - NA Box l.

SI-1-026-711-C41R NOTE 1 [

R31 817tB ,

4 673100 TBx 1-4205 N29 F-5 VT-3 1- - - - - X - - - NA Box

$1-1-026-712-C41R NOTE 1 R31 817RB f

673200 TBx-1-4205-H28 F-C VT-3 1- - - -

-X - - -

NA SNUBBER  !

a SI-1-026-714-C41K NOTE 1  !

, R31 817RB  ;

1 I

[

673300 TBX-1-4205 N27 F-B VT-3 1- - - - - X - - -

NA BOX SI-1-026-715-C41R NOTE 1 R31 817RB  !

i i

673400 TBK 1-4205-H26 FC VT-3 1- - - - - X - - -

NA STRUT  :

SI 1-026-716-C41R WOTE 1 l t

R31 817RB i

i  ;

a r

673500 TBK-1-4205-N25 F-B VT 3 1- - - - - X - - -

NA BOX [

SI 1-026-717-C41R NOTE 1 l

R31 817kB i i

l I

673600 tex 1-4205-N24 F-C VT 3 1- - - - - X - - -

NA STRUT  ;

SI-1-026-718-C41R NOTE 1 l

R31 817RB

l i i i

) l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 160 1 INSERVICE INSPECTION LONG TERM PLAN  !

CLASS 1 SCHED/COMPL COMPONENTS g INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR  !

l FIRST SECOND TNIRD l  !

ASME PERIOD PER100 PERIOD l l l SEC. XI l---------------------------------l [

l

SUMMARY

EXAMINATION AREA CATGT NDE l------0UTAGE--- --l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK'* '

SAFETY INJECTION 1.5-St-1-026-2501R-1 673700 TBX-1-4205-N23 F-B VT-3 1- - - - - X - - - NA BOX  ;

l SI-1-026-719-C41R NOTE 1 R31 817RB I A

673800 TBK-1-4205-H22 F-C VT-3 1- - - - - X - - -

NA STRUT I St 1-026-721-C41R NOTE 1 R31 817RB i

673900 TBK-1-4205-H21 F-C VT-3 1- - - - - X - ---

NA STRUT j SI 1-026-723-C41R NOTE 1 l R32 817RB f

674000 TBK-1-4205-H20 F-B VT-3 1- - - - - X - - -

NA BOX SI-1-026-724-C41R WOTE 1 )

R32 817RB I

i 674100 TBK-1-4205 H19 F-8 VT-3 1- - -

- - X - - -

NA BOX SI-1-026-725-C41R NOTE 1 R32 817RB 674200 TBX-1-4205-H18 F-C VT-3 1- - - - - X - - -

NA SNUBBER SI-1-026-726-C41K NOTE 1 R32 817RB 674300 TBX-1-4205-H17 F-B VT-3 1- - -

- - X - - - NA BOX SI-1-026-727-C41R NOTE 1 R32 817RB I

l I

l i

i

, , . - , , . - - . . . . , , . , . . . - - , . . , - . . , - , .c. ..-,,,, - , , - - , ~ , - , , - , - , , - , ,

- -. ~~ . _ , _ . _ . . - . . - . .-. - -

I

h.  :

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 161 l INSERVICE INSPECTION LONG TERM PLAN >

CLASS 1 SCHED/COMPL COMPONENTS j INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR i l FIRST SECOND THIRD l ASME l PERICD PERI (2 PERI (D l l SEC. XI l--------------------------------l l

  • " T EXAMINATION AREA CATCT NDE l------0UTAGE------l INSTRUCTIONS  !

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK" SAFETY IN.1ECTION 1.5-51-1-026-2%D1R-1 .

L 674400 TBX-1-4205-M16 FC VT-3 1- - - - - X - - -

NA STRUT SI-1-026-728-C41R NOTE 1 i R32 817RB 674500 TBX-1-4205-H15 F-C VT-3 1- - -

- - X - - -

NA STRUT -

SI 1 026-729-C41R NOTE 1 6 R32 817tB 674600 TBx-1-4205-H14 F-C VT-3 1- - - - - X - - - NA STRUT l SI-1-026-730-C41R NOTE 1 R32 818aB 674700 TBM-1-4205-H13 F-C VT-3 1- - - - - X - - -

NA STRUT SI-1-026-731-C41R NOTE 1 R32 818RB i

SAFETY INJECTION 1.5-s!-1-027-2501R 1 674800 TBX-1 4306-H40 F-C VT 3 1- - - - - - X - -

NA STRUT SI-1 027-702-C41R NOTE 1 R34 819tB 674900 TBK 1-4306-N39 FC VT 3 1- - - - - - X - -

NA STRUT SI 1-027-703-C41R NOTE 1 R34 819RB 675000 TBK-1-4306-M38 F-C VT-3 1- - - - - -

X - - NA STRUT SI 1 027-704-C41R NOTE 1 R34 819RB

,. . - , - .. - _ - . . . . . . _ , , . . . , _ . , , ~ . - - - - . - - - , _ _

?

I DATE: 03/22/93 C04ANCHE PEAK UNIT 1 PAGE: 162 INSERVICE INSPECTION LONG TERM PLAN f I

class 1 SCHED/COMPL COMPONENTS i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR [

l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l j SEC. XI l--------------------------------l l

SUMMARY

EXAMINATION AREA CATCY NDE l------0UTAGE-------l INSTR'CTIONS J  ?

NUMBER IDENTIFICATION ITEM Wo METH j1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

SAFETY INJECTION 1.5-51-1-027-2501R-1  !

l t

675100 TBx-1-4306*H37 F-8 VT 3 1- - - - - - X - - NA Box 1 SI-1-027-705-C41R NOTE 1 R34 819tB i

675200 TBx-1-4306-H36 F-C VT-3 1- - - - - - - - X NA STRUT st-1-027-706-C41R NOTE 1 R6 819RB ,

t i

t 4

I 675300 TBK-1-4306-H35 F-B VT-3 1- - - - - - - - X NA Box FI 1-027-707-C41R NOTE 1

  • r R6 819RB r

I t

I 675400 TBK-1-4306-H34 F-B VT-3 1- - - - - - - - x NA B0x l SI-1-027-708-C41R NOTE 1 ,

R6 819RB  !

675500 TBx 1-4306 H33 F-C VT-3 1- - - - - - - - x NA STRUT SI 1-027-709-C41R WOTE 1 R6 819aB l

675600 TBK-1-4306-H32 F-C VT 3 1- - - - - -

E - -

kA STRUT

! 51-1-027-710-C41R NOTE 1 R34 819tB 675700 TBK-1-4306-M31 F-B VT-3 1- - - - - - x - -

NA BOK SI-1-027-711-C41R NOTE 1 R34 817RB l _ _ . . __ --_.. _ . . _ . - - , , _ . . . . . _ . . _ , ----,.- .-.--- - - . ----. --. -- - ,- -

T

!) 1 a  !

i h

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 163 l

INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SchED/COMPL COMPONENTS )

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECO2 THIRD l  ;

ASME l PERIOD PERI (2 PERICC l l SEC. x! l*----*=~----------------*--------l l Su MARY EXAMINATION AREA CATCT NDE l------0UTAGE---.-.l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

i f

SAFETY INJECTION 1.5-St-1-027-2501R-1 675800 TBK-1 4306-N30 F-B VT-3 1- - - - - -

x- - NA BOX  :

i SI-1-027-712-C41R NOTE 1 l

R34 817tB  !

l t

E 675900 Tax 1-4306 N29 F-B VT-3 1- - - - - -

x - - NA BOK {

l $1 1-027-713-C41R NOTE 1  !

l R34 817RB l  ;

i i

i i l

676000 TBK-1-4306-H28 F-C VT-3 1- - - - - - X - - NA SNUBBER l

51 1-027-714 C41K NOTE 1 i R34 815kB l 676100 TBK-1-4306-N27 F-C VT-3 1- - - - - - x + -

NA STRUT  ;

SI-1-027-715-C41R NOTE 1  ;

R34 815aB 676200 TBx-1-4306-N26 F-B vi-3 1- - - - - - x- -

NA Box SI-1-027-716-C41R NOTE 1 R34 815RB 676300 TBx-1-4306-N25 Fb VT-3 1- - - - - - x - - NA B0x SI-1-027-717-C41R NOTE 1 R34 815aB 676400 TBM-1-4306-N24 F-B VT-3 1- - - - - -

X - - NA Box SI 1-027-718-C41R NOTE 1 l R33 815aB i

l l

_. ~ _ __ _

l <

i DATE: 03/22/93 CDMANCHE PEAK UNIT 1 - FAGE: 164 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPOWENTS INSPECTION INTERVAL, PLAN STATUS ,PRESERVICE YEAR  ;

l FIRST SECOlO THIRD l l ASME l PERIOD PERIOD PERIOD l SEC. El l-------~-- *- ---- - ---- --- -

l l SW MARY EXAMINAfl0N AREA CATGY NDE l------0UTA0E------l INSTRUCT!DNS f WUMBER IDENTIFICATION ITEM No METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

SAFETY INJECTION 1.5-$1-1-027-2501R-1 676500 TBx-1-4306 M23 F-5 VT 3 1- - - - - - X - - WA Box SI 1-027-719-C41R NOTE 1  !

I l R33 815R8 i

l l

676600 TBX-1-4306-H22 F-8 VT-3 1- - - - - - X - - NA 80X f SI-1-027-720-C41R NOTE 1  !

R33 815Rs t

676700 Ter-1-4306-H21 F-C VT-3 1- - - - - - x- -

NA SNUBBER  !

SI-1-027-721-C41K NOTE 1 R33 815RB

( f l

67600 TBX-1-4306-H2O F-B VT 3 1- - - . - - x* -

NA 50X SI-1-027-722-C41R NOTE 1 1

R33 815R8 l

1 676900 TBK-1-4306-H19 F-C VT-3 1- - - - - -

x- -

NA STRUT SI-1-027-723-C41R NOTE 1 R33 815RB 677000 T8X-1-4306-H1B F-8 VT 3 1- - - - - - x- -

NA Box

$1-1-027-724-C41R NOTE 1 R33 818RB l

677100 TBK-1-4306-H17 F-8 VT 3 1- - - - - -

x. - NA sox  ;

I SI-1-027-725-C41R NOTE 1 R33 818Rs

i I. ,

ti DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 165 INSERVICE INSPECTION LONG TERM PLAN  !

CLASS 1 SCHED/COMPL COMPONENTS i

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR  ;

l FIRST SECOND TN!RD l l ASME l PERIOD PER!(x) PERIOD l l SEC. xl l*--- -- - --------- --- --

-l l SUMMART EXAMINATION AREA CATCY NDE l------0UTAGE------l INSTRUCTIONS l' NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK" .

l SAFETY INJECTION 1.5-$f-1-027-2501R-1

  • l 677200 Tax-1-4306-M16 F-C VT 3 1- - - - - - x- -

NA STRUT l SI 1-027 726-C41R NOTE 1 >

R33 818R8 i

f i

I l 677300 TBx-1-4306-M15 F-C VT 3 1- - - - - -

x - - NA STRUT  !

SI 1-027 727-C41R NOTE 1 t

R33 818RB 5 i

l 677400 Tax-1-4306-H14 F-s VT-3 1- - - - - -

x - - NA B0x SE-1 027-728-C41R NOTE 1

! N R33 818RB -

i i

v 677500 Tax-1-4306-M13 F-B VT-3 1- - - - - - x- -

NA 80x SE-1-027-729-C41R NOTE 1 '

R27 818RB

  • 1 l

677600 TBx-1-4306-H12 F-B VT 3 1- - - - - -

x - -

NA sox SE-1-027-730-C41R NOTE 1 '

R27 Blaas I l

! l SAFETY INJECTION 1.5-SI-1-028-2501R-1 677800 TBx-1 4407-H14 F-B VT-3 1- - - - - - x- -

NA Box SI-1-028-701-C41R NOTE 1 R34 822RB 677900 Tax-1 4407-N13 F-8 VT-3 1- - - - - -

x- -

NA sox SI-1-028-702-C41R NOTE 1 R34 822Rs I

l _. _ _. __ __ - ___ ., _ _ _ _ _ . _ . _.-

). +

I f

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 166 i INSERVICE INSPECTION LONG TERM PLAN ,

CLASS 1 SCHED/COMPL COMPONENTS '

i l

INSPECTION INTERVAL , PLAN STATUS , ,PRESERVICE YEAR l l FIRST SECOND THIRD l l ASME l PERIOD PER100 PERICD l  ;

SEC. XI l ----*-- --- ------ --- -- - ------ l }

SLNetART EX4MINATION AREA CATGY NDE l------00TAGE -----l INSTRUCTIONS

  • NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CALIBRAfl0N BLOCK'*

u t

SAFETY INJECTION 1.5-51-1-028-2501R-1  !

678000 TBX-1-4407-M12 F-8 VT-3 1- - - - - - X - -

NA BOX l SI-1-028-703-C41R NOTE 1 R34 822RB ,

SAFETY INJECTION 3-$1-1-033-2501R-1 i

678100 TBX-1-4600-N4 F-C VT-3 1- - - - - - X - - NA STRUT f

l SI 1-033-001-C41R NOTE 1 R34 819tB i

678200 TBX-1-4600-H6 F-C VT 3 1- - - - - -

X - - NA $NUBBER SI 1 033-003-C41K NOTE 1 l

R34 819ms 1

678300 TBM-1-4600-H5 F-C VT 3 1- - - - - -

X - -

NA SNUBBER SI-1-033-004-C41K NOTE 1 R34 819tB 678400 TBM-1-4600-N3 FC VT-3 1- - -

X - - - - -

NA SPRING SI-1-033-005-C41S NOTE 1 R31 819RB SAFETY IMJECTION 2-St-1-059-2501R-1 678500 TBX 1-4108-H6 F-C VT-3 1C - - - - - - - -

NA SNUBBER SI-1-059-700-C41K NOTE 1 R23 819RB i

i 1

4 l

i i

I

_,&..m e.tJJ J ,- -

I I*

DATE: 03/22/93 COMANCHE PEAK UElf 1 PAGE: 167 l INSERVICE INSPECTION LONG 1ERN PLAN [

CLASS 1 SCHED/COMPL COMPONENTS [

l INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERIOD PERIOD l SEC. XI l -------- -- ---------- ----------- l SuletARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 23 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

SAFETY INJECTION 2-St-1-059-2501R-1 l 67B600 TBK-1-4108-M7 F-B VT 3 1C - - - - - - - - NA BOK i SI-1-059-701-C41R NOTE 1  !

R23 819tB l i

t i

i 678700 TEX-1-4108-H5 F-B VT 3 1C - - - - - - - -

NA 80K e SI-1-059-702-C41R NOTE 1  !

R23 819RB l l.

i t

678500 TBK-1-4106-N3 F-C VT-3 1- C - - - - - - -

NA SPRING f-SI 1-059-703-C41$ NOTE 1 I R23 819tB i

I l  ;

f l 678900 TBK-1-4108-H1 F-C VT-3 1- C - - - - - - - NA $NUBBER  !

SI-1-059-704-C41K NOTE 1 <

i R23 821RB j l

679000 TBK-1-4108-N2 F-C VT 3 1- C - - - - - - -

NA STRUT l SI-1-059-705-C41R NOTE 1 R23 821RB 679200 TBK-1-4108 N4 F-C VT-3 1- C - - - - - - -

NA SNUBBER

$1-1 059-708 C41K NOTE 1 R23 819tB l

1

.-._, ,..,.m.,.. . . . . . . , . . .,_.....,.,,.......,.,..m.,__ ., . , . - -

-. - -... ~. .. . . . . .. .-.. _ _ .. = . . - . . - _ _ - _ , - _

t

h I r
  • l i

l i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 168 .

l l INSERVICE INSPECTION LONG TERM PLAN i I f i CLASS 1 SCHED/COMPL COMPONENTS l ,

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FlkST SECOND THIRD l ASME l PERIOD PERICE PERIOD l l SEC. Mi l----------- *---- -- ---

-=~~l t SLANERV EX4MINATION AREA CATGT NDE l------0UTACE------l INSTRUCTIONS  !

WLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK **

1 SAFETY INJECTION 2-SI-1-065-2501R-1 679300 TBX-1-4202-H5 F-8 VT-3 1- - - X - - - - - NA Box l SI-1-065-700-C41R WOTE 1  !

i

' R32 819RB  !

t i

i f

SAFETY INJECTION 2 31-1-067-2501R-1 679400 TBx-1-4332-N6 F-B VT-3 1- - - - - - x * -

WA B0x i SI 1-067-700-C41R NOTE 1 R33 815RB I

t 679500 TBx-1-4302-N7 F-C VT 3 1- - - - - - X - -

NA SNUBBER I SI-1-067-701-C41K WOTE 1  ;

it33 815RB i

l ,

SAFETY INJECTION 2-51 1-069-2501R-1 679600 TBx 1-4403-H5 F-B VT-3 1- . - - - -

x-. NA Box SI 1-069-701-C41R NOTE 1 .

R34 821RB ,

t i

?

?

SAFETY 1NJECT10N 2-51-1-086-2501R-1 679700 TBx 1-4404-M10 F-C VT 3 1- - - - x- . . -

NA SNuBsER .

SI-1-086-700-C41K WOTE 1  !'

R29 819RB t

679800 TBK-1-4404-H11 F-8 VT-3 1- - - - x - - - .

NA Box I I

SI-1-086-701-C41R NOTE 1 i R29 819RB i

e

?

1

, _ , - vy, -~_...m. ,y. ,,.-,,.m,......-..... u,.,,~,-_.,, ,,m_-m-,r_,-. r., r4,,-e.....,me,,-,..,m .,.m. .m. ..w, - -. F '

. . - .- - - - .- . . . . - . _=. . . - _ , _ . - - .~ - . . - - . . .-

I l

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 169 I

INSERVICE INSPECTION LOhG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASIE l PERl(X) PERICC PERICD l .

SEC. XI l-------------------------------l f

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE -----l INSTRUCTIONS NUMBER IDENTIFICATI0W ITEM No METH l1 2 3 1 2 3 1 2 3 ** CALIBRATION BLOCR**

l

?

SAFETY INJECTION 2-St-1-086-2501R-1 I

-I i

679900 TBX-1-4404-NB F-C VT-3 1- - - - X - - - - NA- SerJBBER  !

SI-1-086-702-C41K WOTE 1 i

R29 819tB 1 i

I.

i

\

680000 TBK-1-4404-N9 F-5 VT-3 1- - -

- X - - - - NA BOX

}

SI 1 086-703-C41R NOTE 1

  • R29 819R8 i l

i l c I

A 680100 TBK 1-4404 H7 F-C VT-3 1- - -

- X - - - -

NA SPRING SI-1-086-704-C41S NOTE 1 R29 819RB l

{

i l t i

i 1

680200 TBM-1-4404-H6 F-5 VT-3 1- - - - X - - - - NA BOK SI-1-086-705-C41R WOTE 1 i i

R29 821RB l i

l i

l 680300 TBK-1-4404-H5 F-C VT-3 1- - - -

X - - - -

NA SNUBBER SI-1-086-706-C41K f

WOTE 1 i

R29 821RB i i

l 1

680400 TBK 1-4404-H4 F-C VT-3 1- - - - X - - - -

NA SNUBBER SI-1-086-707-C41K NOTE 1 R29 826RB 1

SAFETY INJECTION 6-$1-1-089-2501R-1  ;

t 650500 TBX-1-4103*H2 F-C VT-3 1C - - - - * - - -

NA SNUBBER

{

SI-1 089-003-C41K NOTE 1 R23 820RB i

i i

)

b e'

, . ~, , - - -

w - .- ,, . , . , , , . - . , - . ~ , - . , , . - . - , . . .c.~. . ~ . .. ~..-.- . - - , - - . .

r

)4 9

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 170 INSERVICE INSPECTION LONG TERN PLAN CLASS 1 SCHE 0/COMPL COMPONENTS ,

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERI (X) PERIOD PERIOD l SEC. XI l ----------- --- --- -- ----------- l SUMMART EXAMINATION AREA CATGT NDE l------0UYACE------l INSTRUCTIONS i NLMBER IDENTIFICAfl0N ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** i

....... .............................. ....... .... . ........... ........... ........... . .............................. r SAFETT INJECTION 6-St-1-089-2501R-1 680600 TBX-1-4103-H4 F-C VT 3 1C - - - - - - - -

NA SNUBBER

! SI-1-089-004-C41K WOTE 1

! R23 826tB l

680700 TBX-1-4103-H3 F-C VT-3 1C - - - - - * - - NA SNUBBER SI-1-089-006-C41K WOTE 1

! R23 820RB l

l .

t, 680800 TEX-1-4103-N6 F-C VT-3 1C - - - - - . - - NA SPRING SI-1-089-007-C415

( R23 827RB NOTE 1 680850 TBX 1-4103-N6 B-K-1 PT 1- - - X - - - - - NA 4-1* LUGS.

SI-1-089-007-C415 810.10 R23 827RB 680900 TBX-1-4103-RS F-C VT-3 1C - - - - - - - -

NA SNUBBER SI-1-009-008-C41C WOTE 1 R23 826aB 681000 TBX-1-4103-H1 F-C VT-3 1C - - - - - - -

  • NA SPRING SI-1-089-009-C41S NOTE 1 R23 820RB

\

i I

f I

s l

l l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 172 .

! 1NSERVICE INSPECTION LONG TERM PLAN i l

l CLASS 1 SCHED/COMPL COMPONENTS 6

INSPECT 10N INTERVAL, PLAN STATUS _PRESERVICE YEAR  !

l FIRST SECOND THIRD l ASME l PERIOD PERIOD PER100 l SEC. xx l---.----..--------------------l  ;

SUMMARY

EKAMINATION AREA CATCY NDE l+-----0UTAGE------l INSTRUCTIONS 4 WUMBER IDENTIFICATION ITEM No METH l 1. 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** ,

SAFETY INJECTION B-51-1-091-2501R-1 I I

i 681700 TBX-1-4302-H2 F-C VT-3 1- - - - - - X - -

NA SNUBBER l SI-1-D91-010-C41K NOTE 1 l R27 819RB t

I I

r 681800 TBx-1-4302-H5 F-C VT-3 1- - - - - - X - - NA SNUBBER f

SI 1-091-011 C41K NOTE 1  !

R27 826RB 2

681900 TBK-1-4302-K3 F-C VT-3 1- - - - - -

X - - NA SNUBBER

$1-1-D91-013-C41K l NOTE 1 t

! R27 819tB ,

I l

I i l SAFETY INJECTION 6-St-1-D92-2501R-1 j 682000 TBX-1-4403-N4 F-C VT-3 1- * -

  • X - - - -

NA SPRING SI 1-D92-003-C415 NOTE 1 f'

R29 829tB i

I i

i 682100 TBX 1-4403-H3 FC VT 3 1- - - - X - - - -

kA SNUBBER j SI 1-D92-007-C41K NOTE 1 R29 822RB I 682200 TBx-1 4403-H2 F-C VT-3 1- - - -

X - - - -

NA SNUBBER SI-1-D92-0DB-C41K NOTE 1 R29 822RB 682300 Tex-1-4403-H1 F-C VT-3 1- - - -

x. - - -

kA SNUBBER SI-1-D92-009-C41K NOTE 1 R29 820RB 1

lh*

l l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 171 l INSERVICE INSPECTIDW LONG TERM PLAN j l CLASS 1 SCHED/COMPL COMPONENTS l

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR i

l FIRS 1 SECONO TNIR0 l ASME l PERIOD PERIOD PERIOD l sEC. El l -- -- --- ----


l SupeuRY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CALIBRATIDW BLOCK ** j SAFETY INJECTION 8-51-1-090-2501R-1 j i

I 681100 TBX-1-4202-H2 F-C VT-3 1- - - - - - - X -

NA SNUBBER I SI-1-090-004-C41K NOTE 1  !

R25 825tB  !

t 681200 TBX-1-4202-H1 F-C VT-3 1- - - - - - - X - NA $NUBBER

$1-1-090-006-C41K WOTE 1 R25 820RB i l 681300 TBX-1-4202-H4 F-C VT-3 1- - - - - - - X -

NA SPRING l $1-1-090-007-C41s NOTE 1 R25 825aB ,

I 681350 TBx 1-4202-H4 B-K-1 PT 1- - - - X - - - -

NA 4 1" LUGS.  !

SI-1 090 007-C415 B10.10 i R25 825tB r

I i

i 681400 TBX-1-4202-N3 F-C VT-3 1- - - - - - - X -

NA SNUBBER {

SI-1-090-008-C41K NOTE 1 r 1

R25 825RB '

i i

SAFETY INJECTION 8-St-1-091-2501R-1  ;

681500 TBx 1 4302 H1 F-C VT-3 1- - - - - - X - -

NA STRUT tl-1-091 001-C41R NOTE 1  !

R27 816RB r

681600 TBK 1-4302-H4 F-C VT-3 1- - - - - - X -

  • hA SNUBBER SI 1-091-009-C41K NOTE 1 R27 825RB

. - -- - - . . . . . . -. . . . - . . .~ .-

I 4 i I

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 173 l INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS l INSPECTION INTERVAL _ PLAN STATUS ,,,PRESERvlCE YEAR l FIRST SECOND THikD l ASE l PERICO PERIN PERIOD l i SEC. El l

-l ,

SUWERY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAfl0N BLOCK **

SAFETY INJECTION 6-SI-1-101-2501R-1 ,

682400 TBK-1-4203-H3 F-C VT-3 1- - - - - -

- X -

NA SPRING l SI-1-101-003-C41$ NOTE 1 l

R25 827Rs  ;

i 682450 TSX-1-4203-H3 3-K-1 PT 1- - - - X - - - -

NA 4-3/4" LUCS.

51 1-101-003-C41S 310.10 '

R25 827ts i

I r

682500 TRK-1-4203-H2 F-B VT-3 1- - - - - - - X -

NA BOX i SI 1-101-006-C41R NOTE 1 f R25 823R8 l

l l

682600 TBM-1-4203-h4 F-C VT-3 1- - - - - - - x- NA SNussER  !

SI-1-101-010-C41K NOTE 1 R25 831RB l i

682700 TBK-1-4203-H1 F-C VT-3 1- - - - - -

X - - kA STRUT SI 1-101-011-C41R NOTE 1 R33 823RB SAFETY INJECT 10N 6-St-1-102-2501R-1 682800 TBX-1-4303-H3 F-C VT-3 1- - - - - -

X - - NA SPR]NG SI-1-102-003-C415 NOTE 1 R27 827RB 682850 TBX-1-4303-H3 s-K-1 PT 1- - - - - - x. - NA 4-1a LUGS.

51-1 102-003-C41$ 310.10 R27 827R8 1

1 w , wy w wwwm<wswi--y-'V'wwW v

, - - _. . ~ _ - ..-. - ~ . - = . . _ - - . . - . - ._ . .-

j I.

l i

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGEr 174 l INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l  ;

ASME l PERIOD PERIOD PERIOD l l---------- =-~-----l SEC. XI ---* -- -

SLBetARY EXAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l **CAllBRATION BLOCK'* f j

i i

SAFETY INJECTION 6-51-1-102-2501R-1 i

682900 TBX 1-4303-M1 F-C VT 3 1- - - - - - X - - NA STRUT Sl-1-102-007-C41R NOTE 1

! R33 823RB j i

683000 TBX-1-4303-N2 F-C VT-3 1- - - - * - X - -

NA SNLSBER {

SI-1-102-006-C41K NOTE 1  ;

R27 823RB I

(  ?

l

! 683100 TBX-1-4303-H4 F-C VT-3 1- - - - - - X + - NA SNUBBER

$1-1-102-010-C41K NOTE 1 R27 823RB l 1

t SAFETY INJECTION 6-51 1-148-2501R-1 683200 TBX-1-4104-N2 F-C VT-3 1- C - - - - - - -

NA SNUBBER ,

SI-1-148-002-C41K NOTE 1 R23 826RB l

l 1

SAFETY INJECTION 6-$1-1-172-2501R-1 )

i 683300 TBX-1-4404-N2 F-C VT 3 1- - - - X - - - - NA SNUBBER Sl-1-172-002-C41K NOTE 1 R29 826RB 683400 TBX-1-4404-N3 FC VT 3 1- - - - X - - - -

NA SNUBBER SI-1-172-003-C41K NOTE 1 R29 8264B e ~ - - * -v'-~ -r-~~'w*~~ -~~ ~ ~*-v v " *'Y - '

k' 4

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 175 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL CONPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOe0 THIRD l ASME l PERIOD PERIMI PERICC l SEC. XI l---------------------------------l SuletARY EKAMINATION AREA CATCY NDE. l------0UTACE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEN NO METH l1 2 3 -1 2 3 1 2 3 l " CALIBRATION BLOCK" SAFETY INJECTION 10-St-1-179-2501R-1 683500 Tex-1-4102-H1 F-C VT 3 1C - - - - - - - - NA SNUBBER i SI 1 179-004-C41K I NOTE 1 '

i R23 821Rs j 1

683600 TBx-1-4102-H4 F-C VT-3 1- C - - - - - - - NA STRUT SI-1-179-006-C41R NOTE 1 R23 819tB 683700 TBK-1-4102-H2 F-C VT-3 1C - - - - - - - - NA SNUBSER SI-1-179-007-C41K NOTE 1 R23 821RB

)I 1

J 683800 T5X-1-4102-H3 F-C VT 3 1C - - - - - - * * * * . SPRING SI-1-179-008-C415 NOTE 1 R23 828Rs 683850 TBK-1 4102-H3 3K1 PT 1- - -

x - . - - - NA 4-1= Luts.

$1-1 179-D08-C41S B10.10 R23 828R8 683900 Tex-1-4102-H5 F-B VT-3 1- - - - - - .

x- NA BOX SI-1 179-400-C41R NOTE 1 R25 832R8 l

h 4

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 176 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR f l FIRST SECOND THIRD l j ASME l PERIOD PERIOD, PERIOD l {

SEC. El l----------****---*=---**-----l l SLBMART EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS

{

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l "CALIBRAfl0N BLOCK'*

l .

I SAFETY INJECTION 10-SI-1-180-2501R-1 i t ,

684000 TBK-1-4201-H1 F-C VT-3 1- - - - - - - X - NA $NUBBER .

SI-1 180-004-C41K NOTE 1 I

R25 828RB l i

i, 684100 TBK-1 4201-N2 F-C VT-3 1- - - - - -

- X - NA SNUBBER SI 1-180-006-C41K WOTE 1 R25 827RB j l

l 684200 TBK 1-4201-N4 F-C VT-3 1- - - - - - - x -

NA SPRlWG ,

SI-1-180-007-C415 NOTE 1 R25 826tB

+

684250 TBM-1-4201-N4 B-K 1 PT 1- - - - X - - - - NA 6-1" LUGS. f SI-1-180-007-C415 B10.10 l' R25 826R8 ,

t 684300 TBX-1-4201-N3 F-C VT-3 1- - - - - - - x -

NA STRUT  ;

SI-1-180 008-C41R NOTE 1 R25 824RB ,

SAFETY l h , 1w 10-SI-1-181-2501R-1 f i

684400 TBM-1-4301-H2 F-C VT-3 1- - - - - .

X - - NA SNUBBER SI-1-181-003-C41K WOTE 1 l R27 826RB t

f r

684450 TBM-1 4301-H2 B-K-1 PT 1- - - - - - X - - NA 6" S160 STANCH 10N.  ;

$1-1-181-003-C41K B10.10 R27 826RB

.. . -.... --. . - . - .-- _. . .. .~. ~- + - . . ~ . - .

fI l

DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 177

[ INSERVICE INSPECTION LONG TERM PLAN f CLASS 1 SCHED/COMPL COMPOWENTS l

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOND TH!kD l ASME l PERI (B PERIOD PERIOD l SEC. XI l---------------------------------l

SUMMARY

EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

SAFETY INJECTION 10-St-1 181-2501R-1 h l

684500 TBX-1-4301-H1 F-C VT-3 1- - - - - - X - - NA STRiJT t

! $1 1-181-005-C41R NOTE 1 i l

I R27 824RB 1 I

i i

SAFETY INJECTION 10-sf-1-182-2501R-1  !

i

, 684600 TBX-1-4402-H4 F-C VT-3 1- - - - X - - - -

NA SNUBBER l l SI-1 *82-003-C41K NOTE 1 I l R29 824RB  !

i  !

r I

r i i 684700 TBK-1 4402-H2 F-C VT-3 1- - -

- X - - - -

NA SPRING F l

$1-1-182-005-C415 NOTE 1  ;

R29 827RB  !

I 684750 TBx-1-4402-H2 B-K-1 PT 1- C - - - - - - - NA 4-1* LUGS.  !

SI-1-182-005-C41S B10.10 R29 827RB i

t 684800 TBx-1-4402-H3 F-C VT-3 1- - - - X - - - -

NA SNUBBER l SI 1-182-006-C41K NOTE 1  ;

R29 824RB l 4

684900 TBX-1-4402-H1 F-B VT 3 1- - - - X - - - - NA Box )

SI-1 182-400-C41R NOTE 1  !

R29 832RB 4

s 5

x 5

t k

- .__ - . . . - _ , , . . . . ... - .c , , . - - , . ~ , , - . , n.

. , , = - - . . - -. .

I I l )' l DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 178 {

INSERVICE INSPECTION LONG TERM PLAN {

i CLASS 1 SCHED/COMPL COMPOWENTS I

INSPECTION INTERVAL,, PLAN STATUS _PRESERVICE YEAR i l FIRST SECOND 1HIRD l f ASME l PERIOD PERIOD PERIOD l {

SEC. XI l---------------------------------l l Sul#ERT EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS [

IRMBER IDENTIFICATION ITEN No METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK **

f

)

i SAFETY INJECitoW 1.5-St-1-199-2501R-1 L

i 685000 TBM-1-4107 M11 F-C VT-3 1- - - X - - - - -

NA SNUBBER l SI-1-199-703-C41K NOTE 1 j R31 822RS I 685100 TBR-1 4107-M10 f-C VT-3 1C - - - - - - - -

NA STRUT l SI-1 199-704-C41R NOTE 1 i R23 822R8

{

1 i t

! 685200 TBK 1-4107-H9 F-C VT-3 1C - - - - - - - - NA STRUT f

$1-1 199-706-C41R NOTE 1 f l R23 822RB '

?

! }

l I

i 685300 TBX-1-4107-H6 F-C VT-3 1C - - - - - - - -

NA SNUBBER l

$1-1 199-707-C41K NOTE 1 i R23 822RB l t

I I

i 685400 Tex-1-4107-H7 F-B VT 3 1C - - - - - - - - NA 80x SI 1 199-708-C41R WOTE 1 }

R23 822RB l t

I 685500 TBX-1-4107-H5 F-B vi-3 1C - - - - - - - . NA 30x '

SI-1 199 709-C41R NOTE 1 i R23 822RB O

I e

. , , . - . - , .,m.,,- ,-,4- . ~ ~ . . - . - , , , . . . - . , , , . . . ,,,.,,m., -,_....,w...,,.

. -. .. =. . . - - . - _ _. - _ .

i l

l DATE: 03/22/93 CONANCHE PEAK UNIT 1 PAGE: 179 4

INSERVICE INSPECTION [0NG TERM PLAN 1

l CLASS 1 SCHED/COMPL COMPONENTS i i

INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR l FIRST SECOND TNIRD l ASME l PERIOD PERIOD PERIOD l ,

SEC. El l-------------- *--- ---- ----- l SUMMART EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK" f

l SAFETY INJECT 10N 1.5-$1-1-199-2501R-1

{

685600 TBr-1-4107-N4 F-B VT-3 1C - - - - - - - -

NA BOX l

SI 1 199-710-C41R WOTE 1 i R23 823RB E 685700 TBM-1-4107-H3 F-C VT-3 1C - - - - - - - -

WA SNUBBER  ?

i St-1-199-711-C41K WOTE 1

~

R23 827RB

?

9 t

i 685800 TBK-1-4107-H1 F-C VT-3 1C - - - - - - - -

NA SNUBBER  !

SI-1-199-712-C41K NOTE 1 i R23 829tB [

t l

e I

i 685900 TBK-1-4107-H2 F-C VT-3 1C - - - - - - - - WA STRUT f 5

SI 1-199-713-C41R NOTE 1 ,

R23 829RB I;

686000 TBN 1 4107-NB F-C VT-3 1C - - - - - - - -

NA STRUT SI-1-199-715-C41R NOTE 1 t R23- 822RB .

i r

i i

686025 TBx-1-4107-H13 F-B VT-3 1- - - X - - - - - NA B0x  !

SI-1-199-716-C41R NOTE 1 '

R31 822RB  !

?

i i

I e

i

- - , - - . - -- - ~ . - , , ..,~,,,-e , . , . - - v,---,r,n-n- -v- ,~.m~ ,--~- , -wwn---- v-- s- - = - > = ~ -

. . . .- . .. . . _ . . . - _ ~ _

'),

l DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 180 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS ,PkEEERVICE YEAR _,

l FIRST SECOND THIRD l j A9E l PERIOD ' PERIOD- PERICD l l SEC. xl l--------------------------------l l SUMMART EXAT.! NATION AREA CATGY NDE l----.-0UTAGE------l INSTRUCTIONS NtmBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l 1

SAFETY INJECTION 1.5-St-1-199-2501R-1 686050 TBK-1-4107-M12 F-C VT 3 1- - - x- - - - -

NA SNUBBER SI-1 199-717-C41K NOTE 1 I R31 822RB i

i i

SAFETY INJECTION 1.5-SI 1-200-25018-1 j l  !

! 686100 TBx 1-4205-H12 F-B VT-3 1- - - X - - - - - NA BOX S 1-200 1-C41R NOTE 1 l

l i

1 I

i 686200 TBX-1-4205-M11 F-B VT-3 1- - - x - - - - -

NA Box j SI 1 200-702-C41R NOTE 1 l R32 818aB j i

l 686300 TBx-1-4205 H10 F-C VT-3 1- - -

x- - - - -

NA STRUT  !

SI-1-200-703-C41R NOTE 1 .

t R32 818aB  !

1 686400 TBx-1-4205-M9 FC VT 3 1- - - - - - - x- NA STRUT SI-1-200-704-C41R NOTE 1 R25 818tB 686500 TBX-1-4205-H8 F-C VT-3 1- - - - - - - X - NA STRUT SI 1-200-705-C41R NOTE 1 R25 818aB 686600 TBx-1-4205-H7 F-B VT-3 1- - - - - -

- x- NA Box SI-1 200-706-C41R NOTE 1 R25 819Ei 1

. 4 '

!)

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 181 r INSERVICE INSPECTION LONG TERM PLAN  !

CLASS 1 SCHED/COMPL COMPOWENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE TEAR l FIRST SECOND THIRD l ASME l PERIOD PERICC PERIOD l r SEC. XI l---------------------------------l SlamARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** f SAFETY INJECT!0N 1.5-St-1-200-2501R-1 6867D0 TBX-1-4205-H5 FC VT-3 1 - - - - - - X -

NA SNUBBER ,

S!-1-200-707-C41K NOTE 1 R25 828aB i 4

t i

686B00 TBx-1-4205-N4 F-C VT 3 1- - - - - - - X -

NA SNUBBER SI-1-200-708-C41K NOTE 1 R25 828RB

{

h L

686900 TBX-1-4205-N6 F-8 VT-3 1- - - - - -

- X - NA BOX l SI 1-200-709-C41R WOTE 1  !

i i

R25 821RB j

687000 TEX-1-4205-N2 F-C VT-3 1- - - - - - -

X

$1-1-200-710-C41K NOTE 1 R25 829RB j

6871D0 TBX-1-4205-N3 F-B VT 3 1- - - - - - - X -

NA BOX ,

51-1-200-711-C41R NOTE 1 i R25 829tB i

i 687200 TBX-1-4205-H1 F-C VT-3 1- - - - - - -

X -

NA SNUBBER SI-1-200-712-C41K NOTE 1 R25 829RB SAFFTY INJECTION 1.5-S!*1-201-2501R-1 687300 TBX-1 4306-H1 F-C VT-3 1- - - - - - X - -

NA SNUBBER SI-1-201 7DD-C41K NOTE 1 R27 829RB

4 I

I I

l DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 182 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHE 0/COMPL COMPONENTS INSP[CTION INTERVAL, PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND TMIRD l l ASME l PERIOD PERIOD PERIOD l l SEC. XI l------------------------------l l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS i NUMBER IDENTIFICATION ITEM NO METN l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK **

....... .............................. ....... .... . ........... ........... ........... . .............................. r I

SAFETY INJECTION 1.5-s!-1 201-2501R-1  !

687400 TBK 1-4306-H11 F-B VT-3 1- - - - - - X - - NA BOX SI-1-201-701-C41R NOTE 1 R33 818RB

{

I i

[ t I

j 687500 TBX-1-4306-M10 F-C VT-3 1- - - - - - X - - NA STRUT l SI 1-201-702-C41R N01E 1 R33 8189B  !

687600 TBX-1-4306-H9 F-C VT 3 1- - - - - - X - - NA STRUT .

SI 1 201-703-C41R NOTE 1 I p R27 818RB l (*

5 i

687700 TBX-1-4306-NB F-C VT-3 1- - - - - - X *

  • NA STRUT SI 1-201 704-C41R NOTE 1 f

R27 819RB t

687800 TBK-1-4306-H7 F-C VT-3 1- - - - - . X - - NA STRUT SI-1-201 705-C41R NOTE 1 L R27 820RB 3

)

687900 TBX-1-4306-N4 F-C VT-3 1- - - - - - X - -

NA SNUBBER SI-1-201-706 C41C NOTE 1 R27 828RB 688000 TBK-1-4306-H5 F-C VT-3 1- - - - - -

X - - NA SNUBBER SI 1-201 707-C41K NOTE 1 R27 828tB

U I.

I DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 183 j INSERVICE INSPECTIDW LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l-------*-- **

--*------------l ,

SUMMART EXAMINATION AREA CATCT NDE l- ----0UTAGE -----l INSTRUCTIONS j NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

t SAFETY INJECTION 1.5-SI-1-201-2501R-1 f

688100 TBK-1-4306-N3 F-B VT-3 1- - - - - -

X - -

NA BOX  !

SI 1-201 708-C41R NOTE 1 R27 829RB i 6

1 1 688200 TBX-1-4306-H2 F-B VT-3 1- - - - - -

X - - NA BOX l SI 1-201-709-C41R NOTE 1 .

R27 829tB f

i 688300 TBX-1-4306-H6 F-C VT-3 1- - - - - - X - - NA SNUBBER I SI-1-201-711-C41K NOTE 1 R27 823RB  !

SAFETY INJECTION 1.5-51-1-202-2501R-1 688400 TBK-1-4407-H1 F-C VT-3 1- - - - X - - - - NA $NUBBER SI-1-202-700-C41K NOTE 1 R29 829aB 688500 TBX-1-4407-H2 FC VT-3 1- - - - X - - - -

NA STRUT S!-1-202-701-C41R NOTE 1 I R29 829RB 688600 TBX-1-4407-H10 F-C VT 3 1- - - - - - X - - NA STRUT SI-1-202-703-C41R NOTE 1 i

R34 822RB 688700 TBK-1-4407-H9 F-C VT 3 1- - -

- X - - - - NA STRUT SI-1-202-704-C41R NOTE 1 l

s C R29 822RB k

4

,i i

. . . .~. . . . _ . . . . _ . -.. . .. .

l I

he s

l l

[ DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 184 i

INSERVICE INSPECTION LONG TERM PLAN I l CLASS 1 SCHED/COMPL COMPONENTS r

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR

{

l FIRST SECOND THIRD l  ;

ASME l PERICO PERIOD PERIts l l SEC. KI l-------------------~---------~--l l

SUMMARY

EXAMINATION AREA CAT 0Y NDE l------0UTAGE------l INSTRUCTIONS WUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'* ,

....... .............................. ....... .... . ........... ........... ........... . .............................. i i

i SAFETY INJECTION 1.5-51-1-202-25018-1  !

i 688800 TBX-1-4407-N8 F-C VT-3 1- - - - X - - - - NA STRUT l SI-1 202-705-C41R WOTE 1  !

R29 822RB  !

k I

I t

688900 TBK-1-4407 H7 F-B VT-3 1- - -

- x- - - -

NA Box l SI 1-202-706-C41R NOTE 1 f

R29 822RB }

f I

l 689000 TBK-1-4407-N6 F-B VT-3 1- - -

- K - - - - WA BOX [

l SI-1-202-707-C41R NOTE 1 R29 822RB t

i e l

~

I 689100 TBM-1-4407-N5 F-B VT-3 1- - - - X - - - -

NA BOX j SI-1-202-708-C41R NOTE 1 i R29 822RB  :

689200 TBM-1-4407-N4 FB VT-3 1- - - - x - - - - NA BOX SI-1-202-710-C41R NOTE 1

  • R29 823RB i t

689300 TBK 1-4407-H3 F-C VT-3 1- - - - X - - - -

NA SNUBBER i SI 1-202 711-C41K NOTE 1 R29 827RB i

689325 TBK-1-4407-H11 FB VT 3 1- - - - - - ' X - - NA BOK SI-1 202-712-C41R NOTE 1 .

R34 822RB i

i i

. _ _ , . _ . . - _ _ . , , . _ . _ . . _ _., . .., , , . , ._,,,.m._.. _I

. _ _ . . . . _ . _ . - - . . _ _ _ m-._ _ . _ _ . . .- .___ ..___ . -

I .

I. 1 1

l DATE: 03/22/93 COMANCHE *EAC LW!T 1 PAGE: 185 1 INSERVICE INSPECTION LONG TERN PLAN  !

CLASS 1 SCHED/COMPL COMPONENTS l INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR i l FIRST SECOND' THIRD l  ;

ASME l PERIOD PERICD PERIOD l l SEC. XI l--------------------------------l l SultuRY EXANINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS i IKMBER IDENTIFICATION ITEM No METW l1 2 3 1 2 3 1 2 3 l "CALIBRATIDW BLOCK" SAFETY INJECTION 3-SI-1-303-2501R-1 l

689350 TBX-1-4600-N1 F-C VT-3 1- - - X - - - - -

NA SPRING  ;

SI 1-303-001-C415 NOTE 1 R31 823R0 i i

i

! i 689375 TBX-1-4600-H2 F-C VT-3 1- - - X - - - - -

NA STRUT f

$1-1 303-002-C41R NOTE 1 l R31 823RB h

l l SAFETY INJECTION 3-51-1-339-2501R-1 689400 TBX-1-4600-H7 F-B VT-3 1- - - - - - X - - NA ANCHOR SI-1-339-001-C41A NOTE 1 .

i R34 822RB l

REACTOR COOLANT TBX-RCPCPR-01 689600 F-B VT-3 1- -- X - - - - - -

NA REACTOR VESSEL SUPPORTS.

f TBX-RCESRV-01-R1 NOTE 1 1457F27. TDLR VERIFICATIDW RD1 859tB BOUNDARY.  !

t 689625 F-B VT-3 1- - X - - - - - -

NA REACTOR VESSEL SUPPORTS.

TBX-RCESRV-02-R2 NOTE 1 1457F27,TDLR VERIFICATIDW RD1 859RB BOUNDART.

l l

68 % 50 F-B VT-3 1- - X - - - - - -

NA REACTOR VESSEL SUPPORTS.

j TBX RCESRV-03-K3- NOTE 1 1457F27.TDLR VERIFICATION RD1 859aB BOUNDARY.

i l

i l

I r-rg - *,sw + e w ,py.p.->t---.-27

. ~ - . - -- - - - .

I i

I4 DATE: 03/22/93 COMANCHE PEAX UNIT 1 PAGE: 186 INSERVICE INSPECTION LONG TERN PLAN p CLASS 1 SCHED/COMPL COMPONENTS f

D INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR {

l FIRST SECOND TNIRD l ASME l PERIOD PERICD PERIOD l '

SEC. XI l...........--.....-........-....l SulmARY EXAMlWATION AREA CATGY NDE l--....OUTACE-.-.--l INSTRUCTIONS _

NUMBER IDENTIFICAfl0N ITEM NO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** l REACTOR COOLANT TBr-RCPCPR-01 689675 F-8 VT-3 1- - X - - . - - -

NA REACTOR VESSEL SUPPORTS. 3 TBX-RCESRV-04-R4 NOTE 1 1457F27.TDLR VERIFICATION }

R01 859RB BOUNDARY.

REACTOR COOLANT TBx-RCPCSG-01 l

689700 TBK-1-3100 F-C VT 3 1- C . - - . - - . WA S.G. COLUMN SUPPORT. ,

TBX-RCESSG-01-51 NOTE 1 1457F29.TDLR VERIFICATION l A23 812RB BOUNDARY.

8 689725 TBX-1-3100 F.C VT-3 1- C - . . - . - - WA S.G. COLUMN SUPPORT. l TBX-RCESSG-01 52 NOTE 1 1457F29.TDLR VERIFICATION  ;

A23 812RB BOUNDARY.

I i

9 t

689750 TBX-1-3100 F-C VT-3 1 C - - - - - - - WA S.G. COLUMN SUPPORT.

TBX-RCESSG-01-53 NOTE 1 1457F29.TDLR VERIFICATION A23 812RB B0uMDARY.

689775 TBM-1-3100 F-C VT-3 1 C - - - . . -

  • WA S.G. COLUMN SUPPORT.

TEX-RCESSG-01-S4 NOTE 1 1457F29.TDLR VERIFICATION A23 812RB BOUNDARY.

689800 TBX-1-3100 FB VT-3 1- C - - - - - . - WA S.G. LOWER LATERAL TEX-RCESSG-01 L1 NOTE 1 SUPPORT.1457F31.LB-1.TDLR A23 835RB VERIFICATION BOUNDARY.

1

)4 DATE: 03/22/93 COMNCHE PEAK UNIT 1 PAGE: 187 INSERVICE INSFECTION LONG TERN PLAN ,

CLASS 1 SCHED/COMPL COMPONENTS

) INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR  !

l FIRST SECOND THIRD l

  • ASME l PERICC PERICO PERIG) ] 1 SEC. XI l---------------------------------l

SUMMARY

EKAPINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS f NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK'* t

]

REACTOR COOLANT TBX-RCPCSG-01 (

689625 TBX 1 3100 F-B VT-3 1- C - - - - - - - NA S.G. LOWER LATERAL 3

TBX-RCESSG-01-L2 NOTE 1 SUPPORT.1457F31.LS-1.TDLR l A23 835RB VERIFICATION BOUNDARY.

1 3

689850 TBX-1-3100 FB VT-3 1- C - - - - - - -

NA S.G. LOWER LATERAL TBX-RCESSG-01-L3 NOTE 1 SUPPORT.1457F31.LS-3.TDLR  :

A23 835RB VERIFICATION BOUNDARY.

j 689900 F-8 VT-3 1- - - - - X - - - NA S.G. UPPER LATERAL d

TBX-RCESSG-01-U1 NOTE 1 SUPPORT.1457F34.US-1.TDLR A24 859RB VERIFICATION BOUNDARY.

4 I

l 689920 F-5 VT-3 1- - - - - X - - - NA S.G. UPPER LATERAL  !

TBX-RCESSG-01-U2 NOTE 1 SUPPORT.1457F34.US-2.TDLR l 9

, U4 859RB VERIFICATION BOUNDARY.

1 1

689940 F-B VT-3 1- - - - - X - - - NA S.G. UPPER LATERAL TBX-RCESSG-01-U3 NOTE 1 SUPPORT.1457F35. RING.TDLR A?4 859RB VERIFICATION BOUNDARY.

689980 F-C VT-3 1- - -

- - X - - - NA S.G. HYD. SNUBBER.PD14856.TDLR TBX-RCESHS-01 SN1 NOTE 1 VERIFICATION BOUNDARY.

A24 859EB 689990 F-C VT-3 1- - - - - X - - - hA S.C. NYD. SNUBBER.

TBX-RCESHS-01 SN2 NOTE 1 PD14856.TDLR VERIFICATION A24 859RB BOUNDARY.

).

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 188 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS ,PRESERVICE YEAR

, l FIRST SECOND THIRD l l ASME l PERIOD PERI @ PERI @ l l.................................l sgc, Xg

SUMMARY

EXAMINATION AREA CATGY NDE l.--... OUTAGE-.----l INSTRUCTIONS NUMBER IDENTIFICATIDW ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

( REACTOR COOLANT TBX-RCPCSG-02 l

690000 F-C VT-3 1- . . - - .

- X . NA S.G. COLLMW SUPPORT.

TBX-RCESSG-02-51 NOTE 1 1457F29.TDLR VERIFICATION A25 812RB BOUNDARY.

690025 F-C VT-3 1- . - - . . - X - kA S.G. COLUMN SUPPORT. 1457F29.

TBX-RCESSG-02-52 NOTE 1 TDLR VERIFICATION BOUNDARY.

A25 812RB 690050 F.C VT-3 1- - - - - - . X - NA S.G. COLUMN SUPPORT. 1457F29.

TBX-RCESSG-02-53 NOTE 1 TDLR VERIFICATION BOUNDARY.

A25 812RB 690075 FC VT-3 1- - - - - .

- X . NA S.G. COLUMN SUPPORT. 1457F29 TBX-RCESSG-02-54 NOTE 1 TDLR VERIFICATION BOU@ ARY.

A25 812RB 690100 F-B VT.3 1- . . . . .

. X -

NA S.G. LOWER LATERAL SUPPORT.

TBX-RCESSG-02-L1 NOTE 1 1457F31. LB-2. TDLR A25 835RB VERIFICATION BOUNDART.

690125 F-B VT-3 1- - - - - . . X . NA S.G. LOWER LATERAL SUPPORT.

- TBX-RCESSG-02-L2 NOTE 1 1457F31. LS-2. TDLR A25 835RB VERIFICATION BOUNDARY.

690150 F-8 -VT-3 1 . - - - - - X .

NA S.C. LOWER LATERAL SUPPORT.

TBX-RCESSG-02-L3 NOTE 1 1457F31. LS-4.TDLR A25 835tB VERIFICATION BOUNDARY.

s

)

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 189 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERIOD PERIOD l SEC. XI l------~~~---------------------*--l l

SUMMARY

EKAMINATION AREA CATGY NCE l------0UTAGE------l INSTRUCTIONS  !

WUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** i REACTOR COOLANT TBX-RCPCSG-02 ,

i I

690200 F-B VT-3 1- - - - - - - X - WA S.G. UPPER LATERAL SUPPORT.

TBX-RCESSG-02-U1 NOTE 1 1457F34. US-1. TDLR A26 859tB VERIFICATION BOUNDARY.

l l r i 690220 F-B vi-3 1- - - - - - - X - NA S.G. UPPER LATERAL SUPPORT. i TBX-RCESSG-02-U2 NOTE 1 1457F34. US 2. TDLR

A26 859RB VERIFICATION BOUNDARY.

I l

t 690240 F-B VT-3 1- - - - - *

  • X - NA S.G. UPPER LATERAL SUPPORT.

TEX-Ra SSG-02-U3 NOTE 1 1457F35. RING. TDLR l A26 859RB VERIFICATION BOUNDARY. k 690280 F-C VT-3 1- - - - - - - X - NA S.G. HYD. SHOCK SUPRESSORS  !

TBX-RCESNS-02-SW1 NOTE 1 I A26 859RB l i

690290 F-C VT-3 1- - - - - - -

X - NA S.G. NYD. $NUBBER. PD14856.

TBz+ :t SHS-02-SN2 NOTE 1 TDLR VERIFICATION BOUNDARY.  ;

A26 r>9RB '

REACTOR COOLANT TBX-RCPCSG-03 690300 FC VT-3 1- - - - - - K - - NA S.G. COLUMN SUPPORT. 1457F29.

TBX-RCE SSG-03-51 NOTE 1 TDLR VERIFICATION BOUNDARY.

A27 812RB 690325 FC VT-3 1- - - - - - X - - WA S.G. COLUMN SUPPORT. 1457F29.

TBX-RCESSG-03-52 NOTE 1 TDLR VERIFICATION BOUNDARY.

A27 812RB

._ m . _ _ _

l i h

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 190 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPOWENTS f i

PLAN STATUS i INSPECTION INTERVAL _ _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIG) PERICD PERICD l }

SEC. El l------------------------------l  ;

SL88uRY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS I

EMBER IDENTIFICAfl0N ITEN NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

REACTOR COOLANT TBx-RCPCSG-03 690350 FC VT-3 1 - - - - - x - - NA S.G. COLUMN SUPPORT. 1457F29.

TBM-RCESSG-03-53 NOTE 1 TDLR VERIFICATION BOUNDARY.  ;

A27 812RB j 690375 F-C VT-3 1- - - - - - X - - NA S.G. COLUMN SUPPORT. 1457F29. [

TBX RCESSG-03-54 NOTE 1 TDLR VERIFICATION BOUNDARY. l A27 812RB  ;

l 690400 F-B VT-3 1- - - - - - X - - NA S.G. LOWER LATERAL SUPPORT. f TBX-RCESSG-03-L1 NOTE 1 1457F31. LB-1. TDLR  !

! A27 835RB VERIFICATION BOUNDARY. l

t

! 690425 F-B VT-3 1- - - - - - x - - NA S.G. LOWER LATERAL SUPPORT. l TBX-RCESSG-03-L2 NOTE 1 1457F31. LS-1. TDLR A27 835tB VERIFICATION BOUNDARY. ,

i

\

i, 690450 F-B VT-3 1- - - - - - x- - NA S.G. LOWER LATERAL SUPPORT.

TBK-RCESSG-03-L3 NOTE 1 1457F31. LS-3. TDLR  !

A27 835RB VERIFICATION BOUNDARY. i l

690500 F-B VT-3 1- - X - - - - - - NA S.G. UPPER LATERAL SUPPORT. j TBX-RCESSG-03 U1 NOTE 1 1457F34. US-1. TDLR A28 859RB VERIFICATION BOUNDARY.

l l

l 6905Z2 F-B VT-3 1- - X - - - - - - NA S.C. UPPER LATELAL SUPPORT.

l TBK-RCESSG-03-U2 NOTE 1 1457F34. US-2. TDLR A27 859RB VERIFICATION BOUNDARY.

l r

--,-e ,-r-- ,,-e ,cve - ,-a,-- r -y,- --.e< ~, 4, .y.m,- ,-wg ep-py-

I I

{

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 191 INSERVICE INSPECTION LONG TERM PLAN  ;

CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOW THIRD l j ASIE l PERIOD PERIOD PERICD l  ;

SEC. El l -- - ---- -~- *- = -- -- - l  ;

SUIMARY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l L'JMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l "CALIBRAT10N 4LCCK** [

REACTOR COOLANT TBX RCPCSG-03 f

690540 F-8 VT-3 1- - X - - - - - - NA S.G. UPPER LATERAL SUPPORT.

, TBX-RCESSG-03-U3 NOTE 1 1457F35. RING. TDLR ,

A27 859tB VERIFICATION BOUNDARY.

I

?

690580 F-C VT-3 1- - X - - - - - -

NA S.G. HYD. SNUBBER. PD14856.  !

TBX RCESHS-03-SN1 NOTE 1 TDLR VERIFICATION BOUNDARY.  !

l A28 859RB .

l )

l 690590 F-C VT-3 1- - X - - - - - - NA S.G. NYD. SNUBBER. PD14856.  !

TBX-RCESMS-03-St'2 NOTE 1 TDLR VERIFICATION BOUNDARY.

i A28 859RB  :

REACTOR COOLANT TBX-RCPCSG-04 f

690600 F-C VT 3 1- - - - X - - - -

NA S.G. COLUMN SUPPORT. 1457F29.  !

TBX-RCESSG-04-S1 NOTE 1 TDLR VERIFICATION BOUNDARY. ,

A29 812RB l i

690625 F-C VT-3 1- - -

- X - - - - NA S.G. COLUMN SUPPORT. 1457F29.

TBK-RCESSG-04-S2 NOTE 1 TDLR VERIFICATION BOUSARY.

A29 812RB '

i i

690650 r-C vi 1 1- - -

- x- - - - NA S.G. COLUMN SUPPORT. 145 M 29.

TBX-RCESSG-04-S3 NOTE 1 TDLR VERIFICATION BOUNDARY.

A29 812RB i

690675 FC VT*3 1- - - -

x- - - - NA S.G. COLUMN SUPPORT. 1457F29.

TBX-RCESSG-04-S4 NOTE 1 TDLR VERIFICATION BOUNDARY.

A29 812RB i

1

I 4

' DATE: 03/22/93

  • COMANCHE PEAK UNIT 1 PAGE: 192 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND TNIRD l ASME j PERIOD PERIOD PERIOD l SEC. XI l-------------------------------l SUWIARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRL,tfl0NS NUMBER IDENTIFICATION 1 23 1 2 3 -

ITEM NO METN l1 2 3 l ** CALIBRATION BLOCK **

REACTOR COOLANT TBX-RCPCSG-04 690700 F-B VT.3 1 - - - X - - - -

NA S.G. LOWER LATERAL SUPPORT.

, TBX-RCESSG-04-L1 NOTE 1 1457F31. LB-2. TDLR i l A29 835RB VERIFICATION BOUNDARY. f i I l

690725 F-8 VT-3 1- - - - X - - - -

NA S.G. LOWER LATERAL SUPPORT.. l TBX-RCESSG-04-L2 NOTE 1 1457F31. LS-5. TDLR A29 835RB VERIFICATI0W BOUNDARY.

l 690750 '

F-B VT-3 1- - - - X - - - - NA S.G. LOWER LATERAL SUPPORT.

TBX-RCESSG-04-L3 NOTE 1 1457F31. LS-6. TDLR l A29 835RB VERIFICATION BOUNDARY.

\

690800 F-B VT-3 1- - - - - - X - - NA S.G. UPPER LATERAL SUPPORT.

TBX-RCESSG-04-U1 NOTE 1 1457F34. US-1. TDLR A30 859RB VERIFICATIDW BOUNDARY.

690820 F-B VT-3 1- - - - - - X - - NA S.G. UPPER LATERAL SUPPORT.

TBX-RCESSG-04-U2 NOTE 1 1457F34. US-2. TDLR  !

A30 859tB VERIFICATION BOUNDART.

690840 F-B VT-3 1 - - - . . X - - NA S.G. UPPER LATERAL SUPPORT.

TBK-RCESSG-04-U3 NOTE 1 1457F35. RING. TDLR A30 859RB VERIFICATION BOUNDARY.

690880 F-C VT-3 1- - - - - - X- -

NA S.G. HYD. SNUBBER. PD14856.

TBX-RCESHS-04-SN1 NOTE 1 TDLR VERIFICAfl0N BOUNDARY.

A30 859RB

I DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 193 INSERVICE INSPECTION LONG TERM PLAN ,

CLASS 1 SCHED/COMPL CONPONENTS INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR [

j l FIRST SECOND TNIRD i l

ASME l PERIOD PERIOD PERIOD l l SEC. XI l---------------------------------l i l

1

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS j NLMBER !DENTIFICATION ITEM NO METN l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

REACTOR COOLANT TBX-RCPCSG-04 +

690890 F-C VT-3 1- - - - - - X - - NA S.G. NYD. SNUBBER. PD14856.

TBX-RCESHS-04 SN2 NOTE 1 TDLR VERIFICATION BOUNDARY.

A30 859RB I I

REACTOR COOLANT TBX-RCPCPC-01 i

690900 F-C VT-3 1C - - - - - -- -

NA RC PUMP COLLMN SUPPORTS.

TBK-RCESPC-01-P1 NOTE 1 1457F29. TDLR VERIFICATION i A23 812RB BOUNDARY.

690930 F-C VT-3 1C - - - - - - - -

NA RC PUMP COLUMN SUPPORTS.

TBM-RCESPC-01-P2 NOTE 1 1457F29. TDLR VERIFICATION

. A23 812RB BOUNDARY. i'

)

i i

690960 F-C VT-3 1C - - - - - - - -

NA RC PUMP COLUMN SUPPORTS.

TBX-RCESPC-01-P3 NOTE 1 1457F29. TDLR VERIFICATION A23 812RB BOUNDARY.

1 1

691000 F-C VT 3 1C - - - - - - - -

NA RC PUMP TIE RODS.1457F33.

TBK-RCESPC-01 T1 NOTE 1 TR-1. TDLR VERif! CATION A23 830RB BOUNDARY.

i

)

691030 FC VT-3 1C - - - - - - - -

NA RC PLMP TIE RODS.1457F33.

TBX-RCESPC-01 T2 NOTE 1 TR-2. TDLR VERIFICATION A23 830kB ScuNDARY.

l

e I

1 I l l

I DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 194 l

INSERVICE INSPECTION LONG TERM PLAN j CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND TNIRD l )

ASME l PERIOD PERIOD PERIOD. l SEC. XI l--------------------------------l l SLBMARY EKAM!hATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS i NUMBER IDENTIFICATION ITEM NO ME1H l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK" I

REACTOR COOL ANT TBX-RCPCPC-01 i 691060 F-C VT-3 1C - - - - - - - -

NA RC PUMP TIE RODS.1457F33.  ;

TBX-RCESPC-01-T3 NOTE 1 TR-3. TDLR VERIFICATION ,

A23 830RB SOUNDARY.

i REACTOR COOLANT TBX-RCPCPC-02 t

491100 F-C VT-3 1- - - - - -

- X - NA RC PUMP COLUMN SUPPORTS.

TBX-RCESPC-02-P1 NOTE 1 1457F29. TDLR VERIFICATION ,

t A25 812RB BOUNDARY.  ;

i f

i 691130 F-C VT-3 1- - - - - -

- X -

NA RC PUMP COLUMN SUPPORTS. f TBX-RCESPC-02-P2 NOTE 1 1457F29. TDLR VERIFICATION [

A25 812RB BOUNDARY. t t

691160 F-C VT-3 1- - - - - - -

X - NA _ RC PUMP COLUMN SUPPORTS. l TBX-RCESPC-02-P3 NOTE 1 1457F29. TDLR VERIFICATION i A25 812RB BOUNDARY.

l l

l 691200 '

F-C VT-3 1- - - - - - -

X - NA RC PUMP TIE RODS. 1457F33. i l TBM RCESPC-02-T1 NOTE 1 TR-1. TDLR VERiflCATION l A25 830RB BOUNDARY.

i l

, 691230 F-C VT-3 1- - - - - - - X -

NA RC PUMP TIE RODS.1457F33.

l TBX RCESPC-02-72 NOTE 1 TR 2. TDLR VERIFICATION A25 830RB BOUNDARY.

i l

l l

l l

4 l?

i i

t DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 195 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS I

{

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l .

ASME l PERIOD PERIOD PERIOD l SEC. X1 l--------------------------------l SUWIARY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS WUMBER IDENTIFICAfl0N ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

....... .............................. ....... .... . ........... ........... ........... . .............................. i REACTOR COOLANT TBK-RCPCPC-02 r

691260 F-C VT-3 1- - - - - - - X - NA RC PUMP TIE RODS. 1457F33.

TBK-RCESPC-02-T3 NOTE 1 TR-3. TDLR VERIFICATION A25 830RB BOUNDARY.  !

I REACTOR COOLANT TBX-RCDCPC-03 691300 F-C VT-3 1- - - - - - X - - NA RC PUMP COLUMN SUPPORTS.

TBX RCESPC-03-P1 NOTE 1 1457F29.TDLR VERIFICATION A27 812RB BOUNDARY.

691330

{ TBX-RCESPC-03 P2 F-C NOTE 1 VT-3 1- - - - - -

X - - NA RC PUMP COLLMN SUPPORTS.

1457F29. TDLR VERIFICATION I A27 812RB BOUNDARY.

I i

691360 FC VT-3 1- - - - - - X - - NA RC PUMP COLUMN SUPPORTS.

TBX RCESPC-03-P3 NOTE 1 1457F29. TDLR VERIFICATION l A27 812RB BOUNDARY.

l 691400 F-C VT-3 1- - - - - - X - - NA RC PUMP TIE RODS.1457F33.

TBX RCESPC 03-T1 NOTE 1 TR 1. TDLR VERIFICATION A27 830RB BOUNDARY.

l 1

l 691430 F-C VT-3 1- - - - - - X - - NA RC PUMP TIE RODS. 1457F33.

~

TBX-RCESPC-03-T2 NOTE 1 TR-2. TDLR VERIFICATION A27 830RB BOUNDARY. (

691460 F-C VT-3 1- - - - - -

X - - NA RC PUMP TIE RODS. 1457F33.

TBX-RCESPC-03-T3 NOTE 1 TR-3. TDLR VERIFICATION

A27 830RB BOUNDARY.

l l

I '

l DATE: 03/22/93 l CCMANCHE PEAC UNIT 1 PAGE: 1% l INSERVICE ikSPECTION LONG TERM PLAN  !

CLASS 1 SCNED/COMPL COMPOWENTS  !

l INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR ,

l FIRST SECOND THIRD l ]

ASME l PERICD PERIG) PERIOD l l SEC. xi l.................................l l St#8%RY EXAMINATION AREA CATGY NDE l l------0UTACE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 ** CALIBRATION BLOCK'*

l I

I REACTOR COOL ANT TBK-RCPCPC-04 l l

l 691500 F-C VT-3 1- - -

- X - - - -

NA RC PUMP COLUMN SUPPORTS. l TBX-RCEf?C-04-P1 NOTE 1 1457F29. TDLR VERIFICATION l A29 812RB BOUNDARY.

l j 691530 F-C vi-3 1- - - - X - - - -

NA RC PUMP COLUMN SUPPORTS.

l TBX RCESPC-04-P2 NOTE 1 1457F29. TDLR VERIFICATION l A29 812RB BOUNDARY. -

1 f

i t

l 691560 F-C VT-3 1- - - - X - - - -

NA RC PUMP COLUMN SUPPORTS.

l TBX-RCESPC-04-P3 NOTE 1 1457F29. TDLR VERIFICATION ,

A29 812RB BOUNDARY. .

l i r I

I 691600 F-C VT-3 1- - -

- X - - - -

NA RC PUMP TIE RODS. 1457F33.

TEX RCESPC-04-T1 NOTE 1 TR-1. TDLR YERIFICATION ,

A29 830RB BOUNDARY.

(91630 F-C VT-3 1- - -

- X - - - -

NA RC PUMP TIE RODS. 1457F33.

TBK-RCESPC-04-T2 NOTE 1 TR-2. TDLR VERIFICATION A29 830RB BOUNDARY.

l 691660 F-C VT-3 1- - - - X - - - -

NA RC PUMP TIE RODS. 1457F33.

TBX-RCESPC-04-T3 NOTE 1 TR-3. TDLR VERIFICATION A29 830RB BOUNDARY.

REACTOR COOLANT TBX-RCPCPR-01 091700 TBX-1-2100 F-B VT-3 1- C - - - - - - -

NA PRESSURIZER UPPER LATERAL TBX-RCESPR-01-W1 NOTE 1 SUPPORTS. 1457F36. S-1. TDLR A16 VERITICATION BOUNDARY.

t i

_ . _ _ _ . . _ _ _ _ _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~ - " * "

)

f4 DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 197 INSERVICE INSPECTION LONG TERN FLAN

{

CLASS 1 SCHED/CCMPL COMPONENTS i

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND TNIRD l ASME l PERIOD PERI (2 PERICD l SEC. XI l ---------- -------- -- -- - --~--- l l

SUMMARY

EXAMINATION AREA CATCY WE l------0UTAGE------l INSTRUCTIONS WUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK ** j REACTOR COOLANT TBX-RCPCPR-01 1 691725 TBX 1-2100 F-B VT-3 1- C - - - - - - -

NA PRESSURIZER LPPER LATERAL TBX-RCESPR-01-W2 NOTE 1 SUPPORTS. 1457F36. S-2. TDLR A16 VERIFICATION BOUNDARY.

691750 TBX-1 2100 F-B VT-3 1- C - - - - - - -

NA PRESSURIZER UPPER LATERAL TBX-RCESPR-01-W3 NOTE 1 SUPPORTS.1457F36. 5-3. TDLR A16 VERIFICATION BOUNDARY. '

\ I l

l I

l 691775 TBX-1-2100 F-B VT-3 1- C - - - - - - -

NA PRESSURIZER UPPER LATERAL I TBX-RCESPR-01-W4 NOTE 1 SUPPORTS. 1457F36. S-4. TDLR A16 VERIFICATION BOUNDARY.

t 691800 TBX-1-2100 F-B VT-3 1- C - - - - - -

  • kA PRESSURIZER LOWER SUPPORT. l TBX-RCESPR-01 NOTE 1 TDLR VERIFICATION BOUNDARY.

I A16 1

i i SAFETY INJECTION 2-St-1-059-2501R-1 l

691900 F-B VT 3 1- - - X - - - - -

NA MOMENT RESTRAINT. 51 0538-10 I CP1-$1SS4W-01 NOTE 1

! R31 820RB SAFETY INJECTION 2-SI-1-086-250'R-1 692000 F-B VT-3 1- - - - - - X - -

NA MOMENT RESTRAINT. 51-0538-11 CP1-SISSMR-02 NOTE 1 R34 820RB 1

i l

l 1

i I

)'

\

l DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 198 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SE COND THIRD l ASME l PERIOD PERICD PERIOD l Sec. ul l---.-----------------------------l

SUMMARY

EKAMINATION AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS NU EER IDENTIFICAfl0N ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

SAFETY INJECTION 6-SI-1-101-2501R-1 692100 F-B VT 3 1- - - - - - -

X -

NA MOMENT RESTRAINT. 51-0538-06 CP1-51SSMR-03 NOTE 1 R25 823RB SAFETY INJECTION 6-51-1-102-2501R-1 692200 F-B VT-3 1- - - - - -

X - -

NA MOMENT RESTRAINT. 51-0538-06 CP1-$1SSMR-04 NOTE 1 R27 823RB SAFETY INJECTION 6-51-1-089-2501R-1 692300 F-B VT-3 1- - - X - - - - -

NA MOMENT RESTRAINT. 51-0538-02 CP1-SISSMR-05 NOTE 1 R31 820RB SAFETY INJECTION 8-ST-1-090-2501R-1 692400 F-B VT-3 1- - -

x-- - - -

NA MOMENT RESTRAINT. 51-0538-03 CP1 SISSMR-06 NOTE 1 R32 820RB SAFETY INJECTION B-51-1-091-2501R-1 692500 F-B VT-3 1- - - - - - X - - NA MOMENT RESTRAINT. $1-0538-05 CP1-SISSMR-07 h0TE 1 R33 816RB SAFETY INJECTION 6-SI-1-092-2501R-1 692600 FB VT-3 1- - - - - - X - -

NA MOMENT RESTRAINT. 51-0538 04

) CP1 SISSMR-08 R34 820RB NOTE 1

I DATE: 03/22/93 COENCHE PEAK UNIT 1 PAGE: 199 INSERVICE INSPECTION LONG TERM PLAN CLASS 1 SCHED/COMPL COMPONENTS l 1

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOW THIRD l ,

ASME l PERIOD PERIOD PERl(S l l SEC. XI l-------------------------------*l l SupeuRY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** i I

I SAFETY 1NJECTION 3-SI-1-303-2501R-1 i 692700 F-8 VT-3 1- . - - - - -X - -

NA NOMENT RESTRAINT. 51-0538-13 ,

CP1-SISSINt-09 NOTE 1 I 1

R34 823RR i I

E i .  !

l i

4 i

f l

l B

1 I

I i

+

l i

I l

1 l

t l

l l

l q- --e-- y  % -r -rm e- ye-w-p m -y-o,-- y .p g- W-n-- ----w-+-w-g- +m---.,-m-, r--g-g- w.v- --y w w --y,e w ym--ygy,w-

i' r

[

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 200 l INSERVICE INSPECTION LONG TERM PLAN I CLASS 2 SCHED/COMPL COMPONENTS

[

INSPECTION INTERVAL , '

PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERIOD PERIOD PERIOD l SEC. RE l--------------------*----------l [

SU M RT EXAMINATION AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 ** CALIBRATION BLDCK**

l i

CMENICAL & VOLtME CONTROL 3-Cs-1-075-2501R-2 l 700300 TBx-2-2569-H9 F-C VT-3 1C - - - - - - - - NA STRUT l l

i CS 1-075-705-A42R NOTE 1 i

R203 813AB l

i

?

CHEufCAL & VOLUME CONTROL 4-CS-1-076-2501R-2 i 700500 TBx-2-2569-w5 F-C vi 3 1C - - - - - - - -

NA STRui CS-1-076-003 A42R NOTE 1 i

R203 818AB j i

700600 TBx-2-2569-H4 F-C VT-3 1C - - - - -~ NA STRUT f

CS-1-076-004-A42R NOTE 1 l R203 818A8 700700 TBx-2-2569-K3 F-8 vi-3 1C - - - - - - - - WA Box CS-1-076-005-A42R NOTE 1 R203 81849

-I 700800 TBx-2-2569-H2 F-C VT-3 1C - - - - - - -

NA STRUT CS-1-076-008 A42R NOTE 1 R200 81848 700900 TBx-2-2569 H1 F-C VT-3 1C - - - -- - - -

WA STRUT CS-1-076-009-A42R NOTE 1 R200 818AB

- . - - - - ,- ,- , , - - - - , , ,, ., ,, , . , , , . , , , , . . . _ , , , . , - , , ,.c , -

l k.

t i

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 201 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INT [RVAL_ PLAN STATUS ,,PRESERVICE YEAR ,

l FIRST SECOND THIRD  !

, l ASME l PERICD PERIOD PERIOD l l SEC. KI l------------*----------~~----l SLSDWtf EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS f NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

CNENICAL & VOLUME CONTROL 4-CS-1-085-2501R-2 701000 TBx-2-2570-H2 F-C VT 3 1- - - - - X - - -

NA SNUBBER CS-1-085-003-A42K NOTE 1 R201 818AB l

i 701100 TBx-2-2570-H1 F-C VT-3 1- - - - - X - - -

NA SNUBBER CS-1-085-004-A42K NOTE 1  !

R201 818AP 701200 TBK-2-2570-H3 I F-C VT-3 1C - - - - - - - -

NA STRUT l CS-1-085-701-A42R NOTE 1 R203 818AB f 4 l w .

i I

CHEMICAL & VOLUME CONTROL 4-CS-1-110-2501e-2 701300 TBK-2-2570-H9 F-C VT-3 1C - - - - - .- - - NA STRUT CS-1-110-001 A42R NOTE 1 j R203 813AB <

i 701400 TBx-2-2564 M1 F-B VT-3 1C - - ' - - - - - -

NA Box l CS-1-110-002-A42R NOTE 1  !

R203 813AB 4

701425 TBx-2-2570-H8 F-C VT-3 1C - - - - - - *

  • NA STRUT

, CS-1 110-003-A42R NOTE 1 R203 815AB

{

i

). i l

I DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 202 l

INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR )

l FIRST SEC0ec THIRD l  !

ASME l PERIOD PERIOD PERIOD l l SEC. El l


~


*-----------------l l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS  !

NUMBER EDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CALIBRAT10N BLOCK ** r i

CHEMICAL 1 VOLUME CONTROL 4-CS-1-110-2501R-2 l 701450 TBX-2-2570-H7 F-C VT 3 1C - - --- - - -

NA STRUT CS-1-110-004-A42R NOTE 1 R203 815AB I l

701500 TBK-2-2569-H8 F-B VT-3 1C - - - - - - - -

WA BOX CS-1-110-701-A42R NOTE 1 R203 815AB i I

CHEMICAL 8 VOLUME COWtROL 4-CS-1-344-2501R-2 j 701600 TBX-2-2569-H7 F-C VT-3 1C - - - - - - - -

WA STRUT CS-1-344-003-A42R NOTE 1 i R203 818AB t

701700 TBX-2-2569-N6 F-8 VT-3 1C - - - - - - - -

NA BOX CS-1 344-004-A42R NOTE 1 i R203 8184B l CHEMICAL & VOLUME CONTROL 4-CS-1-346-2501R-2 701800 TBX-2-2570-H5 F-C VT-3 1C - - - - - - - -

NA SNUBBER CS-1-346-002-A42K NOTE 1 R203 817AB l

l l

I

_ - _ . . _ _ . --~ . - _

h i 4

DATE: 03/29/93 CDMANCHE PEAK UNIT 1 PAGE: 203 INSERVICE INSPECTION LONG TERM PLAN l

CLASS 2 SCHE 0/COMPL COMPONENTS j i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR  !

l FIRST SECOND THIRD l l ASME l PERICD PERIOD PER1(D l  !

SEC. XI l---------------------------------l SUIMART EXAMINATION AREA CATGY NDE l------0UTACE------l INSTRUCTIONS i NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l "CALIBRAf tow BLOCK" l CHEMICAL 8 VOLUME CONTROL 4-CS-1-346-2501R-2 i 702100 tex-2-2570-84 F-C VT 3 1C - - - - - - - -

NA STRUT l CS-1-346-701-A42R NOTE 1 l

R203 818AB  !

l t

l 702200 Tax-2 2570-86 F-C VT-3 1C - - --- - - - -

NA STRUT i CS-1-346-703-A42R NOTE 1 J

R203 816AB l

f CHEMICAL 8 VOLtME CONTROL 3-CS-1-628-2501R-2  ;

702300 TBx-2-2569-H11 F-C VT-3 1C C - - - + - - - NA STRUT. PARTIAL EKAM RF01.

CS-1-628-700-A42R WOTE 1 COMPLETED EXAM RF02.

R203 818AB t

702400 TBx-2-2509-M12 F-B VT-3 1C C - - - - - - - NA BOX. PARTIAL EKAM RF01.

CS-1-628-701-A42R NOTE 1 COMPLETED EXAM RF02.

{

R203 818AB h

CHENf CAL 8 VOLUME CONTROL 3-CS-1-629-2501R-2  !

4 702500 TBx 2-2570-H14 F-C VT-3 1C - - - - - - - -

NA STRUT  !

CC-1-629-700-A42R NOTE 1 R203 818AB l

t l I l

i

- n , ,.~,,we ,,.,.-rn- - -,,.,ner--m---,- ,

I.

DATE: 03/29/93 CDMANCHE PEAK UNIT 1 PAGE: 204 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l ASME l PERICD PERIOD PERl(B l SEC. X1 l--------------------------- l SuomRY EXAMINATION AREA CATGT NDE l--.---0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

CHEMICAL & VOLUME CONTROL 3-CS-1-629-2501R-2 702600 TBX-2-2570-M13 F-C VT-3 1C - - - - - - - - NA SNUBBER CS-1-629-701-A42K NOTE 1 R203 818AB CHEMICAL & VOLUME CONTROL 2-CS-1-483-2501R 2 702700 TBX-2-2570-H10 F-8 VT-3 1C - - - - - - - -

NA BOX CS-1-AB-001-001-2 NOTE 1 R203 813AB CMENICAL & VOLUME CONTROL 2-CS-1-482-2501R-2 702800 TBX-2-2569-M14 F-8 VT-3 1C - - - - - - - -

NA BOX CS-1-AB 001-002-2 NOTE 1 R203 818AB CHEMICAL & VOLUME CONTROL 2-CS-1-630-2501R-2 702900 TBX-2-2569-H13 FB VT-3 1C C - - - - - - - NA BOX. PARTIAL EXAM RF01.

CS-1-AB-006A-005-2 NOTE 1 COMPLETED EXAM RF02.

R203 818AB CHEMICAL & VOLUME CONTROL 2-CS-1-343-2501R-2 703000 TBX-2-2569 M10 F-C VT 3 1C C - - - - - - - NA STRUT. PARTIAL EXAM RF01.

CS-1-AB-205-001 NOTE 1 COMPLETED EXAM RF02.

R203 818AB

). "

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 205 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS i INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRD l f ASME l PERICD PERIOD PERIDO l  ;

SEC. KI l - - -- - - --- -= =---- -*-l \

Su MARY EXAMINATION AREA CATGY WE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** p

....... .............................. ....... .... . ........... ........... ........... . .............................. j CHEMICAL B VOLUME CONTRot 2-CS-1-946-2501R-2 703100 TBX-2-2570-H11 F-B VT 3 1C - - - - - - - -

NA BOK CS-1-AB-241-001-2 NOTE 1 R203 822AB 703200 TBx-2 2570-M12 F-B VT-3 1C - - - - - - - -

kA BOX ,

CS-1-AB-241-002-2 NOTE 1 R203 823AB l

(

CHEMICAL & VOLUME CONTROL 2-CS-1-945-25019-2 l

t '

703300 TBx-2-2569 H15 F-B VT-3 1C - - - - - - - -

NA Box CS-1-AB-242-001-2 NOTE 1 R203 822AB

[

i e

703400 TBX 2-2569-H16 F-B VT-3 1C - - - - - - - -

NA BOX I CS-1-AB-242-002-2 NOTE 1 R203 823AB i I

i t

CONTAINMENT SPRAY 16-CT-1-001-151R-2 I

\

703500 TBX 2-2537-H3 F-C VT-3 1- - - - - -

- - X NA SPRING >

CT-1-001-001 S32S NOTE 1 1 R65 803SB l i

i I

703600 Tex-2-2537-N4 F-C VT 3 1- - - - - - - - X NA SNUBBER l CT-1-001-002-522K NOTE 1 l R65 879S8 l 1

l l

I DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 206 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECON0 THIR0 l ASME l PERIOD PERICD PERIOD l SEC. El l---------------------~--------l SLMMARY EXAMINATIud AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER 10ENTIFICAfl0N ITEN WO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** j CONTAINMENT SPRAY 16-CT-1 002-151R-2 5 t

703700 TBK-2-2536-N2 F-C VT-3 1C - - - - - - - - NA STRUT, SEE RR C-4.

l CT-1-002-003-532R NOTE 1 j R63 796Ss l

t b

703750 Tex-2-2536-H2 C-C PT 1C - - - - - - - - NA 8-1" LUGS-CT 1-002-003-532R C3.20 i R63 796Ss ,

iI L

l 703800 TBK-2-2536-M1 F-C VT-3 1- - - - -- - - X NA STRUT i CT 1-002-004-532R NOTE 1 f R63 m se

+

i 703900 TBX 2-2536-N3 F-C VT-3 1- - - - - - - - X NA STRUT  !

CT-1-002-005-$32R WOTE 1 $

R63 792S8

[

i

, CONTAINMENT SPRAY 16-CT-1-003-151R 2 t

f 704000 TBK-2-2575 H3 F-C VT-3 ,1 - - - - - - - - X NA STRUT. .

r

! CT-1-003-001-532R NOTE 1  !

) -

R67 79258  !

h r

704100 TBK-2-2575 H4 F-C VT-3 1- - - - - - - - X NA STRUT  !

L CT-1-003-002-532R NOTE 1 l

R67 802Ss  ;

r 1

r

I

) e DATE: 03/22/93 CONANCHE PEAK UNIT 1 PAGE: 207 INSERVICE INSPECTION LONG TEKil PLAN

{

CLASS 2 SCHED/COMPL COMPONENTS P

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l f!RST SECOND THIRD l ,

ASME PERIOD PERICD PERIOD l l l SEC. El l--*----------=--------- =----l r SLBOLARY EEAMINATION JJtEA CATCY NDE l------0UTAGE-**---l INSTRUCTIONS f

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** j CONTAfMMENT SPRAY 16-CT-1-003-151R-2 704200 TBK-2-2575-N5 F-C VT-3 1C - - - - - - - - NA STRUT CT-1-003-003-532R NOTE 1 -

R76 802S8 1

k l

I i

704300 Tex-2-2575-H6 F-B VT-3 1C - - - - - - - -

NA ANCHOR P

CT-1-003-005-532A NOTE 1 R76 802SB l

704350 TBK-2-2575-H6 C-C PT 1- - -

X - - - - - NA ,

CT-1-003-005-532A C3.40 R76 80258 l l

l CONTAINMENT SPRAY 16-CT-1-004-1518-2 '

704400 TBX-2-2577-H4 F-C VT-3 1- - - - - - - - X NA STRUT CT-1-004-001-532R NOTE 1 '

R66 793SB l

l 704600 TBX-2 2577-K3 F-C VT-3 1- - - - - - - - X NA STRUT '

CT 1-004-010-S32R NOTE 1 R66 795SB 704700 TBX-2-2577-M1 F-8 VT-3 1C - - - - - - - -

NA BOX CT 1-004-011-S32R WOTE 1 R75 803SB 1

i i

2

,%. p.--n-,n. ,-.% m.g~ g ,..v,a, ,pe --

7.~,,,,_,.me..,g

E, I

l )  !

j .  !

i I  ;

i DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 208

INSERVICE INSPECTION LONG TERM PLAN i 4

< CLASS 2 SCHED/COMPL CCMPONENTS .,

5 j INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR  ;

l FIRST SECOND THIRD l AS8E l PERl(B PERl(B PERICD l SEC. XI l--------------------------------l l SL88WtY EXAMINATION AREA CATGT NDE l------0UTAGE------l INSTRUCTIONS  !

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 **CAtlBRATION BLOCK **

l ,

I

....... .............................. ....... .... . ........... ........... ........... . .............................. l CONTAINMENT SPRAY 16-CT-1-004-151R-2 704800 TBx-2-2577-H2 F-C vi-3 1- - - . - . - - X NA SPRING )

CT-1-004-012-5325 NOTE 1 R66 803SB F

f CONTAINMENT SPRAY 12-CT-1-005-151R-2 I 704900 TBX-2-2576-H2 F-C VT-3 1- - * - - . - - X NA SPRING CT-1-005-001-522S NOTE 1 R67 7875B t

705000 TBK-2-2576-H4 F-C VT-3 1C - - - - - - - . NA SPRING ,

CT-1-005-002-522S NOTE 1 R54 78158

(

?

I r

t 705100 TBx-2 2576-N5 F+C VT-3 1C - - - - - - - -

NA SPRING f CT-1-005-003-5225 NOTE 1 5 R54 7815B f 5

l 1

?

705200 TBx 2-2576-H1 F-C VT-3 1- - - - - - ' + - X NA SNUBBER  !

CT-1 005-004 522K NOTE 1  !

R67 7ar$8  !

P l

70530n TBx-2-2576-H3 F-C vi 3 1C - - - . - - - -

NA SNUBBER  !

CT-1-005 006-522C NOTE 1 I R54 781SB i

i

I i

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 207 l INSERVICE IkSPECTION LONG TERN PLAN f CLASS 2 SCHED/COMPL COMPONENTS i

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND THIRD l l ASME l PERICE PERICS PERICD l i SEC. XI l----------.----------------------] [

SuleuRY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS [

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

l

....... .............................. ....... .... . ........... ........... ........... . .............................. t CONTAINMENT SPRAY 12-CT-1-005-151R 2  ;

705400 TBX-2 2576-N6 F-C VT-3 1C . . - - - - . -

NA SerJBBER i CT-1-005-009-S22K NOTE 1 i RS4 781SB I L

i i

I 705500 TBX-2-2576-H7 F-C VT-3 1C - . - . - - - -

NA SPRING  ;

CT-1-005-700-522S NOTE 1 I R54 779S8 '

i i

I CONTAINMENT SPRAY 12-CT-1-006-151R-2  ;

OE 705600 TBX-2-2576-H9 F-C VT-3 1- - - - - - - - X NA SPRING l

[

t CT-1-006-001-S22S NOTE 1 R67 7875B f

705700 TBX 2-2576-10 F-C VT-3 1- - - - - - - - X NA SNUBBER f CT-1 006-003-522K NOTE 1 I R67 787SB l

i i

i 705800 TBX-2-2576-H8 F-C VT-3 1C - - - - - - - -

NA SNUBBER CT-1-006-004-S22K NOTE 1 A62F 787SB h

i 705900 TBX 2-2576 H11 F-C VT-3 1C - - - - - - - -

NA SNUBBER CT-1-006-008-S22K NOTE 1 l

R54 781SB i

I s

.i t

t

! DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 210 INSERVICE INSPECTION LONG TERM PLAN l CLASS 2 SCHED/COMPL COMPONENTS l

INSPECTION INTERVAL _ PLAN STATUS ,PRESERVICE YEAR ,

l FIRST SEcole THIRD l ASME l PERIOD PERIOD PERIOD l SEC. XI l-----------~~------------------ l t SIAewtY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS i NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK" f l

t r

CONTAINMENT SPRAY 12-CT-1-006-151R-2 i

706000 TBX-2-2576-H13 F-C VT 3 1C - - - -- - - - NA STRUT CT 1-006-701-522R NOTE 1 R54 78058 I i r I

1 l i 706100 TEX-2-2576-M12 F-C VT-3 1C - - - - - - - -

NA SPRING CT 1-006-702-$225 NOTE 1 '

R54 .781SB '

l

! ~

t 706200 TBX-2-2576-M14 F-C VT-3 1C - - - - - - - -

NA SPRING CT 1 006-703-5225 NOTE 1 RS4 77658  !

t CONTAINMENT SPRAY 12-CT 1-007 151R-2 I

)

706300 TBX-2-2578-M11 F-C VT-3 1- - - - - - - - X NA SPRING CT-1-007-001-522S NOTE 1 '

R66 787S8 8 i

?

I 706400 TBX-2-2578-H15 F-C VT-3 1C - - - - - - - -

NA SPRING j CT-1-007-003-S22S NOTE 1 l R51 78158 l I

5 P

706500 TBK-2-2578-H19 F-C VT-3 1C - - - - - - - -

NA SPRING CT 1-007-004-S22S NOTE 1 R51 779st i

\ \

i l

l

)

i

t l

r I

i DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 211 l

INSERVICE INSPECTION LONG TERM PLAN l

i. class 2 SCHED/COMPL COMPONENTS l

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR l FIRST SECOND THIRO l ASME l PERI @ PERICC PERIOD l sEe. xi l.................................l ,

sumARY EKAMINATION AREA CATGY NDE l------0UTAGE*-----l INSTRUCTIONS  !

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l " CALIBRATION BLOCK ** [

i CONTAfMMENT SPRAY 12-CT-1-007-151R-2 l t

706550 TBK-2-2578-H19 C-C PT 1- - - x- - - - - NA 8 CT 1-007-004-522s C3.40 R51 779st 706600 TBK-2-2578-H18 F-C VT 3 1C - - - - - - - -

NA STRUT CT-1-007-005-s22R WOTE 1 [

R51 781sB I

t i

706700 TBK-2-2578-H17 F-C VT 3 1C - - - - - - - -

NA -STRUT t CT 1-007-006-s22R NOTE 1 '

R51 781st i 706800 TBK-2-2578-H14 F-C VT-3 1C - - --- - - -

NA STRUT f CT-1 007-007 522R WOTE 1 l R51 781st l l

l I

I 706900 TBx-2-2578 H13 F-C vi 3 1C - - - - - - - -

NA SNUBBER {

CT 1-007-008-522K NOTE 1 L R51 782SB i

[

707000 TBK-2-2578-H12 F-C VT-3 1C - - - - - - - -

NA STRUT CT-1-007-009-s22R WOTE 1 R51 782SB I I

l i

l i

, . ,a.,, _ . - ..,-,..r-- - - ,,, ,.- , ,. ,, ,,,.n ,. . - - . - ,-, ,

.. ~ ._ - - _ - - . _ _ - .

i I l .

i i

DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 212 INSERVICE INSPECTIDW LONG TERM PLAN CLASS 2 SCHED/COMPL C0KPONENTS i l

l l

l INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR l l FIRST SECOND THIRD l l ABME l PERIOD PER100 PERIOD l l SEC. xl l


**------*-----l I

SUMMARY

EKAMINATION AREA CATGY MDE l------0UTACE------l ENSTRUCTIONS NUMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

i

?

CONTAINMENT SPRAY 12 CT 1-007-151R-2

,i 707100 TBX-2-2578-H10 FC VT 3 1- - - - - - - - X kA STRUT CT 1-007-c10-522R WOTE 1 R66 787SB 1

l  !

707200 TBx-2-2578-N9 F-C VT-3 1- - - - - - - - x WA STRUT CT-1-007-011-$22R NOTE 1 R66 787SB i

l 707300 TBM-2-2578-H16 F-C VT-3 1- - - - - -

- - X NA SNUBBER h CT-1-007-012-522K WOTE 1 R66 781SB I t

CONTAINMENT SPRAY 12-CT-1-008-151R-2 707400 TBK-2-2578 H8 F-C VT-3 1C - - - - - - - -

NA SPRING I CT-1-008-001-$22s NOTE 1 f

R51 778SB l

I i

i 707450 TBK-2-2578-H8 C-C PT 1- - -

X - - - - - WA 4-1.5x1.5 PIPE LUCS i CT-1 006-001-$22S C3.40 1

R51 778SB 1 7075 00 TBX-2-2578-H3 T-C VT-3 1- - - - - - - - X NA SPRING CT 1-006-D03-522S NOTE 1 l

R66 78&SB i h

i n ~ . - , - r---m- .- ,-- - - ,,, ,, - , -

,=- ,v.--*- ,r

i I

h.

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 213 INSERVICE INSPECTION LONG TERN PLAN CLASS 2 SCHED/CtMPL COMPONENTS l

INSPECTION INTERVAL PLAN STATUS PRESERVICE YEAR '

l FIRST SECOND THIRD l l ASIE l PERI (D PERI (2 PERIts l j l SEC. XI l---------------------------------l g StatuRY EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS l

NLMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK'*

t CONTAINIENT SPRAY 12-CT-1-008-151R-2 707600 Tex 2 2578 N7 FC VT-3 1C - - - - - - -- NA STRLif 6

CT-1-006-004-522R WOTE 1 i R51 781Ss 1 i

t l

707700 TBx-2-2578-H6 F-B VT-3 1C - - - - - - - -

NA 80x l CT-1-006-005-522R NOTE 1 i R51 78158 I

r L

i 707800 TBx-2-2578-H5 F-C vT-3 1C - - - - - - - - NA $NUBBER i CT-1-005-007-522K WOTE 1 k R51 783Se i

(

L I

?

i t

707900 Tax-2-2578-H4 F-C vi-3 1C - - - - - - - -

kA SNUBBER I CT-1-008-008-522K WOTE 1 RS1 783SB I i

i P

r I

708000 TBK 2-2578-H2 F-C ' VT-3 1- - - - - - - X NA SNUBBER CT-1-006-009 522K NOTE 1 i

R66 788SB I h

708100 Tar-2 2578-u1 F-s vi-3 1- - - - - - -- x ma aux  !

CT-1-008-010 522R WOTC 1  :

R66 788S8

[

k s .

i E

i b

I f

p

! t 1

I DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 214 INSERVICE INSPECTION LONG TERM PLAN l CLASS 2 SCHED/COMPL COMPONENTS t

INSPECTION INTERVAL , PLAN STATUS _PRESERYlCE YEAR l FIRST SECOMO THIRD l  ;

ASME l PERIOD PERIG) PERIOD l SEC. XI l-----------~~---------------l '

SL8stARY EXAMINATION AREA CATCT NDE l------0UTAGE-----*l INSTRUCTIONS l IK8EBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

l

! CONTAINMENT SPRAY 16-CT-1-013-3018-2 i 1

l 708300 TBK-2-2572-H2 F-C VT-3 1- C - - - - - - -

NA STRUT CT-1 013-001 $42R NOTE 1  !

R775 818SB i

708450 TBx-2-2571-H8 F-C VT-3 1- - - - - - - - X NA SPRING '

CT-1-013-004-S325 NOTE 1 R67 798SB 708500 TBK-2-2571-N2 F-C VT-3 1- - - - - - . - X NA SPRING CT-1-013-006-S225 NOTE 1 -

R69 787SB 708600 TBx-2-2571-H1 F-C VT-3 1- - - * - - - - X NA STRUT >

CT-1-013-007-S22R NOTE 1 -

R69 787SB  !

l 708700 TBX-2-2571-H4 F-C VT-3 1- - - - - - - - X NA $NuBBER  !

CT 1-013-008-S22K NOTE 1 R69 787SB 708800 TBK-2-2571-H3 FC VT-3 1- - - - - - - - X NA SNUBBER CT-1-013-009-522K NOTE 1 l

R69 787SB >

708900 TBX-2-2571-M5 F-C VT 3 1- - - - - - - - X NA STRUT l CT 1-013-011-S22R NOTE 1 l R67 787SB I

i 9

i f

. . - - - , r -,+-- -

1 1

a j DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 215 j INSERVICE INSPECTION LONG TERM PLAN i

CLASS 2 SCHED/COMPL COMPONENTS a INSPECTION INTERVAL , PLAN STATUS ,,,PRESERVICE YEAR l FIRST SECOND THIRD l  !

ASME l PERI @ PERIOD PERI (X) l l SEC. XI l---------------------------------l 53NIART EKANINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NLMsER IDENTIFICATION ITEN NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCx**

CONTAINMENT SPRAY 16-CT-1-013-301R-2 g l

709000 Tax-2-2571-H7 FC VT-3 1- - - - - - - - X NA STRUT f

CT 1-013-012-$32R NOTE 1 i R67 795Se fi I

709100 Tax-2-2571-H9 F-C VT 3 1- - - - - - - - X NA SNUssER CT-1-013-013-532K NOTE 1  ;

RL7 804S8 l

lt

[

' l 709200 Tax-2-2571-H6 F-s VT-3 1- - - - - - - - x NA Box  ;

CT-1-013-014-552R NOTE 1- I R67 794Ss

?

r 709300 Tex-2-2571-M11 T-C VT-3 1- t - - - - - - X NA STRUT

-, CT-1.013-015 532R NOTE 1  !

R65 304Se  :

l I

i 709400 Tax 2-2571-N10 F-C VT-3 1- - - - - - - - X NA STRUT i I

CT-1-013-016-532R NOTE 1 ,

l '

R65 a04Se '

l t

i i

709500 Tex-2-2571-H12 F-C VT 3 1- - - - - - - - x NA SNUssER CT-1-013-017-S32K NOTE 1 R65 807ss j

l 709600 Tex-2-2571-H13 F-C VT-3 1- C - - - - - - -

NA STRUT CT-1-013-018-$42R NOTE 1 l

R775 814Se l I

i I

I J

l i

__ - _ _ _ _ _.____ _ _. _ __ _ _ m-=

In f DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 216 f INSERVICE INSPECTION LONG TERM PLAN

{

CLASS 2 SCHED/COMPL COMPONENTS  !

INSPECTION INTERVAL , PLAN STATUS ,PRESERVICE YEAR  !

l FIRST SECOND THIRD l l ASME l PERIOD PERIOD PERIOD l l SEC. Ki l *--------*----=*-----*=------l l

SUMMARY

EKAMINATIDF AREA CATGY NDE l-**-** OUTAGE------l INSTRUCTIONS  !

EUMBER IDENTIFICAfl0N ITEM No METH l1 2 3 1 2 3 1 2 3 l **tALIBRATION BLOCK ** i i

CONTAINMENT SPRAY 16-CT-1-013-301R-2 ,

i I

709700 TBx-2-2571-H14 F-C VT-3 1- C - - - - - - -

NA SNUBBER i i

CT-1-013-019- S42K NOTE 1 R77S 816SB I f

709800 TBX-2-2571-N15 F-C VT 3 1- C - - - - - - - NA STRUT '

CT-1-013-020-$42R WOTE 1 i RT7S 818S8 l

709900 TBx 2-2571-H16 F-C VT-3 1- C - - - - - - - NA STRUT  !

CT-1-013-021-$42R NOTE 1 R775 818SB f

t 7100D0 TBK-2-2572-H1 FC VT-3 1- C - - - - - - -

NA SNUBSER ,

CT-1-013-022-$42K NOTE 1 ,

R77S 818SB f

710100 TBX-2-2571-H17 F-C VT-3 1- C '- - - - - - -

NA SNussER 7 CT-1-013-023-$42K NOTE 1 R778 81858 f

I 7118D0 TBX-2-2572-K3 F-C VT 3 1- - - - -

x - - -

NA STRUT OT-1-013-427-C52R NOTE 1 R35 834Rs 1

CONTAINMENT SPRAY 16-CT-1-014 301R 2 712D00 TBK-2-2573-N6 F-C VT 3 1- - - - - - - - X NA SPRING CT-1-014-001-S22S NOTE 1 R66 787SB l

I i

1. -

f v--, -- , ,w , , 4, m- , , ,- -

-. . , , wyr .--r,. , , .-r m y- --w,,,-

- - . ~ - - - . x- .

i l I 1

i .1 i

l $

l DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 217 -j l

INSERVICE INSPECTION LONG TERM PLAN l I

CLASS 2 SCHED/COMPL COMPONENTS f

INSPECTION INTERVAL , PLAN STATUS _PRESERVICE YEAR f l FIRST SECOND THIRD l l ASME l PERIOD PERIED PERIOD l l SEC. KI l---------------------------------l f SUStARY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS  ;

NUMBER IDENTIFICATION ITEM NO METH l 1.2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK ** (

t CONTAINMENT SPRAY 16-CT-1-014-301R 2  !

l 712100 TBK-2-2573-N14 FC VT-3 1- C + - - - - - -

NA SPRING  !

CT 1-014-003-542$ NOTE 1 '

R77N 8175B e

712150 TBK-2-2573-H14 C-C PT 1- C - - - - - - - NA 4-2K3.25 PIPE LUGS t CT 1-014-003-S42S C3.40 I

h 877N 8175B f

I 1

712200 TBK-2 2574 H3 F-C VT-3 1- C - - - - - - - NA STRUT' f CT-1-014-004-542R WOTE 1

{

R77N 820SB l

l 1

712300 TBK-2-2573-N2 FC VT-3 1- - - - - - - - K NA SPRING CT-1-014-005 532S NOTE 1 R68 781SB i

[

t 712400 TBK-2-2574-H1 F-C YT-3 1- C - - - - - - -

NA STRUT  !

CT 1-014-006-542R WOTE 1 1

R77N 820SB

)

l 1

t

}L 712500 TBK-2-2574-H2 F-C VT-3 1- C - - - - - - -

NA SNUBBER CT-1-014-008-542K WOTE 1 R77N 820SB 5 l

712550 TBK-2-2574 H2 C-C PT 1- C - - - - - - -

NA 8 2K2 PsPE LUCS CT-1-014-008-542K C3.40 R77N 820SB 1

.- . - _ _ _ -__ _ , . _ ..,,_ _. , _ - _ - . . _ ,. ._____._a

~~ . . - . - . . . .- . . . . -

k4 DATE: 03/29/93 COMANCHE PEAK UNIT 1 PAGE: 218 INSERVICE INSPECTION LONG TERM PLAN i CLASS 2 SCHED/COMPL COMPONENTS l

INSPECTION INTERVAL , PLAN STATUS _PRESERV!CE YEAR l l FIRST SECOND THIRD l ASME l PER!m PERIOD PERIOD l j SEC. xl l-------------------------------l  !

SUWIARY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS [

NUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

CONTAINMENT SPRAY 16-CT-1-014-301R-2 712600 TBK-2-2573 H17 F-C VT-3 1- C . - - - - - -

NA SPRING CT 1-014-009-542S NOTE 1 RT7N 820SB I 6

l t

712700 TBx-2-2573-M15 F-C VT-3 1- C - - - - - - -

NA SNUBBER CT 1-014-010-S42K NOTE 1 b R77N 82058 f 712750 TBx-2-2573-H15 C-C PT 1- C - - - - - - -

NA 12-1.75K3.75 PIPE LUGS l CT-1-014-010-542K C3.40 i

( R77N 820$B g

i l

712800 TBK-2-2573-H16 F-C VT-3 1- C - - - - - - - NA SNUBBER CT 1-014-011-S42K NOTE 1 f R77N 82DSB r i

i

?

712900 TBK-2 2573-H13 F-C VT-3 1- C - - - - - - -

NA SNUBBER CT-1-014-013-S42K NOTE 1 f

R77N 814SB f

l 713000 TBX-2 2573-N12 F-C VT-3 1- - - - - -

- - X NA SNUBBER CT-1-014-015-S32K NOTE 1 R63 804SB e l

I 1

713100 TBX-2-2573-N11 F-C VT-3 1- - - - - - - - x NA $NuBBER l CT 1-014-016-532K NOTE 1 i R63 804SB

(

l I

I .. J

i l> .

i

+

. DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 219 ,

INSERVICE INSPECTION LONG TERM PLAN ,

i CLASS 2 SCHED/COMPL COMPONENTS  ;

INSPECTION INTERVAL _ PLAN STATUS _PRESERVICE YEAR g l FIRST SECOND THIRD l ASsE l PERIS PERI @ PERIS l j SEC. XI l---------------------------------l l SulNIARY EKANINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NLMBER IDENTIFICATION ITEM No METH l1 2 3 1 2 3 1 2 3 l ** CALIBRATION BLOCK **

i i

CONTAINMENT SPRAY 16-cT-1-014-301R-2 l

713200 TBK-2-2573-H10 F-C VT-3 1 - - - - - - - x NA SNUBBER CT-1-014-017-532K NOTE 1 e i R63 804Se f l

4 l '

t i

713300 TBK-2-2573-H9 F-C VT-3 1- - - - - - - - x NA STRUT ,

CT 1-014-018-S32R WOTE 1 R66 804S8 i

k 713400 T8K-2-2573-n7 F-C VT-3 1- - - - - - - -

x NA SNUBBER i CT-1-014-019-S32K JioTE 1 i R66 793SS I h

713500 T8K-2 2573-N8 F-8 VT-3 1- - - - - -

- - K NA BOK CT 1-014-020-532R NOTE 1 R66 793SS 713600 TBK-2-2573-H4 F-C VT 3 1- - - - - - - - X NA SNUBBER ,

CT-1-014-021-$22K WOTE 1  !

R68 781$8 I 713700 TBK-2 2573 H5 F-C VT 3 1- - - - . - - . K NA SNUBBER CT-1-014-022-S22K NOTE 1 R68 7B2SP 713800 T8K-2-2573 M3 F-C VT-3 1- - - - - - - - x NA SNUBBER CT-1-014-024-S22K NOTE 1 R68 781$8 l

i I

l

. -. . - - .- - _ = . . . _ ~ _ -- . . , . . _ _ - .- --

I.

DATE: 03/22/93 COMANCHE PEAK UNIT 1 PAGE: 220 INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS INSPECTION INTERVAL , PLAN STATUS _PRESTs CE YEAR l FIRST SECOND THIRD l ASME l PERIm) PERICE PERICD l SEC. KI l-------------------- --------*-l l SulmARY EKAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS 1 l NtalBER IDENTIFICATION 1 2 3 1 2 3 I ITEM No METH l1 2 3 l ** CALIBRATION BLOCK **

l CONTAINMENT SPRAY 16-CT-1-014-301R-2 I

l 713900 TBK-2-2573-M1 F-C VT-3 1- - - - - - -- X NA $NUBBER l

CT-1 014-025-S32K NOTE 1 l R68 794SB j 7f4700 TBM-2-2574-N4 F-C VT 3 1- - - - - X - - -

NA STRUT CT-1 014-408-C52R NOTE 1  ;

R38 835AB 714800 TBR-2-2574-H5 F-C VT-3 1- - - - - X - - - NA STRUT CT-1-014-410-C52R NOTE 1 l

R38 836RB j

s s

1 CONTAINMENT SPRAY 16-CT-1-024-301R-2 716400 TBX 2-2538-H17 F-C VT 3 1C - - - - - - - - NA STRUT ,

CT-1-024-003 522R NOTE 1 i R69 78758 l

716450 Tex-2-2538-M17 C-C PT 1C - - - - - - - - NA 8-1" LUGS, SEE RR C-1. [

CT-1-024-003-S22R C3.20 i

, R69 787SB I'

l I

l r  !

l l

I i

716500 TBK-2-2538-H2 F-C VT-3 1- - - - - - -

-x NA SNUBBER l

! CT-1-024-007-S22K NOTE 1 R69 78758 i t

I l

a  :

}

i

.= ~. . -- .- .. _ _ - - - _ _ - _

! I. j i

, i DATE: 03/22/93 CDMANCHE PEAK UNIT 1 PAGE: 221  :

INSERVICE INSPECTION LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS

INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR ,

l FIRST SECOND THIRD l l ASME l PERIOD PERIOD PERIOD l l

SEC. XI l--------------------------------l

)

SUMMARY

EXAMikATIDN AREA CATGY MDE l------0UTAGE------l INSTRUCTIONS  ;

j MUMBER IDENTIFICATION ITEM NO METH l1 2 3 1 2 3 1 2 3 l **CAtlBRATIDN BLOCK'*

5

! CONTAINMENT SPRAY 16-CT-1-024-301R-2 -

. i 716600 TBX-2-2538-H4 F-C VT-3 1- - - - - - - - X NA STRUT {

CT-1-024-D09-522R NOTE 1 i R69 78958 [

t i

. f j i 716700 TBX 2-2538-H1 F-C VT 3 1- - - - - - - - X NA SPRING P

.; CT-1-024-011-S22S NOTE 1 i R69 787SB 1

i' r

i j

716800 TBX-2-2538-K3 F-C VT 3 1- - - - - -

- - X NA SPRING CT-1-024-012-522S NOTE 1 i

{ R69 7875B l

s~.

CONTAIMMENT SPRAY 16-CT-1-025-301R-2 i

l 716900 TBX-2-2539-H1 F-B VT-3 1- - - - - - - - X NA BOX  !

CT-1-025-D03-S22R NOTE 1 I

R68 787SB h

f 717000 TBK 2-2539-H2 F-C VT-3 1- - - - - - - - X NA SNUBBER i CT-1-025-DD5-S22K NOTE 1 j R68 787S8 1

I a

717100 TBX-2-2539-N3 F-C VT-3 1- - - - - - - - X NA SNUBBER  !

CT-1-D25-007-S22K NOTE 1  !

4 R68 7875B  !

1 717200 TBX-2-2539-k4 F-C VT-3 1- - - - - - - - X NA SPRING {

t 4 CT 1-025-0DB-S22S NOTE 1  ;

j R68 7875B f

i E

I r

,m -

I

) i f J DATE
03/22/93 PAGE: 222 COMANCHE PEAK UNIT 1

)

INSERVICE INSPECTICN LONG TERM PLAN CLASS 2 SCHED/COMPL COMPONENTS l INSPECTION INTERVAL, PLAN STATUS _PRESERVICE YEAR l FIRST SECOND THIRO l  ;

ASME l PERICD PERI'J PERICD l l SEC. XI l--------------------------------l

SUMMARY

EXAMINATION AREA CATGY NDE l------0UTAGE------l INSTRUCTIONS NUMBER IDENTIFICAfl0N ITEM