ML20054G833
| ML20054G833 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 06/14/1982 |
| From: | WISCONSIN ELECTRIC POWER CO. |
| To: | |
| Shared Package | |
| ML20054G796 | List: |
| References | |
| TAC-48538, TAC-48539, NUDOCS 8206220339 | |
| Download: ML20054G833 (1) | |
Text
-
e W
TABLE 15.4.1-2 (Continued)
Test Frequency 14.
Refueling System Interlocks Functioning
'Each refueling shutdown 15.
Service Water System
' Functioning Each refueling shutdown 16.
Primary System Leakage Evaluate
_ Monthly (6) 17.
Diesel Fuel Supply Fuel Inventory Daily 18.
Turbine Stop and Functioning Monthly (6) (9)
Governor Valves l
19.
Low Pressure Turbine Visual and magnetic.
Every five years j
Rotor Inspection (5) particle or liquid penetrant a
20.
Boric Acid System Storage Tank Daily j
Temperature I
21.
Boric Acid System Visual observation Daily of piping temperatures (all 2,145*F 22.
Boric Acid Piping Heat Electrical circuit Monthly Tracing operability (1) A radiochemical analysis for this purpose shall consist of a quantitative measurement of each radionuclide with half life of >30 minutes such that at least 95% of total activity of primary coolant is accounted for.
(2)
E determination will be started when the gross activity analysis of a filtered sample indicates 2,10 p/cc and will be redetermined if the primary coolant gross radioactivity of a filtered sample increases by more than 10 pc/cc.
(3)
Drop tests shall be conducted at rated reactor coolant flow.
Rods shall be i
dropped under both cold and hot conditions, but cold drop tests need not be timed.
4 (4)
Drop tests will be conducted in the hot condition for rods on which j
maintenance was performed.
j (5) As accessible without disassembly of rotor.
]
(6) Not required during periods of refueling shutdown.
(7) At least once per week during periods of refueling shutdown.
(8)
At least three times per week (with maximum time of 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> between samples) i during periods of refueling shutdown.
}
(9)
During periods when reactor coolant system boron concentration is less than 100 ppm, a power reduction to less than 60% specifically to test these valves is not required, l
i 8206220339 820614 PDR ADOCK 05000266 P
_ _ _., _ _. _... _ _ -. - _.,