Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217N1931999-10-22022 October 1999 Forwards Insp Rept 50-298/99-12 on 990927-30.No Violations Noted.Insp Exam of Activities Under License as They Relate to Emergency Preparedness & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G9261999-10-15015 October 1999 Forwards Insp Rept 50-285/99-10 on 990913-17.One NCV Noted ML20217G2331999-10-14014 October 1999 Forwards Insp Rept 50-285/99-09 on 990913-17.No Violations Noted ML20217G8771999-10-14014 October 1999 Forwards Insp Rept 50-298/99-10 on 990920-24.No Violations Noted ML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 ML20217C2671999-10-0808 October 1999 Forwards Insp Rept 50-298/99-03 on 990823-27 & 0907-10.No Violations Noted.Purpose of Insp to Ensure That Licensee Had Effective Programs for Identifying,Evaluating & Correcting Problems Which Could Impact Safe Plant Operations LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls ML20217B5111999-10-0606 October 1999 Forwards Amend 193 to License DPR-40 & Safety Evaluation. Amend Revises TS Sections 2.10.4,3.1 & Table 3-3 to Increase Min Required RCS Flow Rate & Change Surveillance require- Ments for RCS Flow Rate ML20212K9661999-09-30030 September 1999 Forwards Safety Evaluation Accepting plant-specific Safety Evaluation Rept for USI A-46 Program Implementation at Cooper Nuclear Station ML20216H7231999-09-29029 September 1999 Informs That Util 980325 Response to GL 97-06, Degradation of SG Internals, Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Fort Calhoun Station,Unit 1 ML20216J1081999-09-28028 September 1999 Ltr Contract:Task Order 048, Cooper Safety Sys Design & Performance Capability Insp, Under Contract NRC-03-98-021 ML20212J5061999-09-27027 September 1999 Forwards Insp Rept 50-298/99-07 on 990718-0828.No Violations Noted.Inspectors Focused on Implementation of Licensee Reactor Safety & Emergency Preparedness Programs ML20212L9571999-09-27027 September 1999 Informs That Follow Up Insp for Drill/Exercise Performance Indicator Will Be Conducted During Wk of 991001 LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl ML20212F3641999-09-22022 September 1999 Forwards Insp Rept 50-298/99-09 on 990823-26.No Violations Noted LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves ML20212A6061999-09-14014 September 1999 Forwards Insp Rept 50-298/99-08 on 9900816-20.No Violations Noted.Insp Focused on Implementation & Effective Performance of Access Authorization/Fitness-for-Duty (Behavior Observation) Program & Access Control of Personnel LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters IR 05000285/19990081999-09-0707 September 1999 Forwards Insp Rept 50-285/99-08 on 990907-0811.No Violations Noted.Insp Consisted of Exam of Activities Conducted Under License as Relate to Safety & to Compliance with Commission Rules & Regulations & with Conditions of License ML20211P2581999-09-0303 September 1999 Forwards Insp Rept 50-285/99-06 on 990809-12.No Violations Noted.Insp Consisted of Exam of Activities Under License as Related to EP & to Compliance with Commission Rules & Regulations & with Conditions of License LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211J9231999-09-0202 September 1999 Forwards SE Accepting Licensee 990301 Requests for Relief Re Third 10-year ISI Interval for Plant,Unit 1.Relief Proposed Alternatives to Requirements in ASME B&PV Section XI,1989 Edition,Paragraphs IWA-5242(a) & IWA-5250(a)(2) ML20211L3241999-09-0202 September 1999 Informs That Due to Administrative Error,Page 2-50 of TSs Contained Error on 2.10.2(2) of Amend 192 to License DPR-40 Issued on 990727.Corrected Page Encl ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F4491999-08-25025 August 1999 Forwards Ltr from Ja Miller,Dtd 990819,which Notified State of Iowa of Deficiency Identified During 990810,Fort Calhoun Station Biennial Exercise.One Deficiency Identified for Not Adequately Demonstrating Organizational Capability ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel ML20211F4661999-08-23023 August 1999 Discusses GL 98-01 Issued by NRC on 980511 & NPPD Responses for Cooper Nuclear Station & 990628 & Results of Visit to Plant on 990811-12.Staff Determined That Integrated Contigency Plan Incomplete & CNS Not Y2K Ready LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20210R1491999-08-13013 August 1999 Forwards Insp Rept 50-285/99-07 on 990719-23.No Violations Noted.Nrc Identified One Issue Which Was Evaluated Under Risk Significance Determination Process & Was Determined to Be of Low Risk Significance ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210P8991999-08-0909 August 1999 Forwards FEMA Final Rept for 990630 Offsite Medical Drill. No Deficiencies or Areas Requiring Corrective Action Identified During Drill ML20210N1991999-08-0909 August 1999 Informs That as Result of NRC Review of Licensee Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 ML20210P6861999-08-0909 August 1999 Forwards Insp Rept 50-298/99-06 on 990530-0717.No Violations Noted.During Insp,Inspectors Identified Two Issues Categorized as Being Low Risk Significance & within Licensee Response Band ML20210N1331999-08-0606 August 1999 Forwards Notice of Withdrawal of Application for Amend to FOL DPR-46.By Ltr Licensee Withdrew Amend Request Which Would Have Revised Usfar to Reflect as-built Configuration of Reactor Bldg Isolation Dampers LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARLIC-99-0098, Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached1999-10-15015 October 1999 Forwards Revs to Fort Calhoun Station EPIPs & Emergency Planning Forms Manual.Document Update Instructions & Summary of Changes Are Included on Confirmation of Transmittal Form Attached ML20217G7401999-10-14014 October 1999 Forwards MOR for Sept 1999 for Cooper Nuclear Station. Rept Includes Documentation of Challenges to Safety/Relief Valves,Iaw TS 5.6.4 LIC-99-0091, Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util1999-10-0808 October 1999 Submits Suppl Response to GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal, in Response to NRC RAI During 990817 Meeting with Util LIC-99-0097, Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls1999-10-0707 October 1999 Forwards Final RO & SRO License Applications,As Requested in ,Certifying That Training Completed for Six RO Candidates,Three Instant SRO Candidates & One Upgrade SRO Candidate.Without Encls LIC-99-0089, Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl1999-09-24024 September 1999 Forwards Preliminary License Exam Applications for Six Ros, Three Instant SROs & One Upgrade SRO Candidate,Per Preparation for Ro/Sro Licensing Exams to Be Administered on 991025-29 at Fcs.Without Encl LIC-99-0092, Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl1999-09-21021 September 1999 Forwards Revised Epips,Including non-proprietary Rev 8 to EPIP-RR-66,rev 3 to EPIP-EOF-24,rev 14 to RERP-Section F,Rev 11 to RERP-Section I,Rev 12 to RERP-Appendix C & RERP & EPIP Indexes.Proprietary Rev 3 to EPIP-EOF-24,pages 1-3,encl ML20216J8061999-09-20020 September 1999 Forwards Rev 37 to Safeguards Plan,Iaw Provisions of 10CFR50.(p).Rev Withheld,Per 10CFR73.21 LIC-99-0087, Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams1999-09-17017 September 1999 Forwards Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams LIC-99-0080, Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection1999-09-16016 September 1999 Requests Approval of Attached Rev to QAP Contained in App a of Usar,Revising Commitment Re Qualifications of Personnel Performing Quality Control Insps of Activities Affecting Fire Protection LIC-99-0088, Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls1999-09-16016 September 1999 Forwards Documentation Associated with SRO License Renewal Application for Cd Darrow.Applicant Has Satisfactorily Completed Applicable FCS Requalification Program.Without Encls ML20212C4921999-09-15015 September 1999 Forwards Monthly Operating Rept for Aug 1999 for Cooper Nuclear Station.Rept Includes Operating Data Rept,Unit SD Rept & Documentation of Challenges to Safety/Relief Valves LIC-99-0085, Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters1999-09-0808 September 1999 Forwards Revs 18 & 19 to TDB-VI, COLR for FCS Unit 1,IAW TS 5.9.5.Rev 18 Resulted from Reevaluation of Cycle 18 Setpoints & Rev 19 Resulted from Changes in Cycle 19 Refueling Boron Concentrations & Addition of TS Parameters LIC-99-0083, Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase1999-09-0202 September 1999 Requests Participation in internet-based Y2K Early Warning Sys (Yews),As Noted in NRC Info Notice 99-25.Plant Point of Contact Will Be JW Chase ML20211N5271999-09-0202 September 1999 Responds to NRC 990823 RAI Re Y2K Readiness at Cooper Nuclear Station,Per GL 98-01,Suppl 1 LIC-99-0077, Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld1999-08-27027 August 1999 Forwards non-proprietary & Proprietary Revised EP Forms, Including FC-EPF Index,Pp 1 Dtd 990805,pp 2 Dtd 990812,rev 11 to FC-EPF-9,rev 12 to FC-EPF-10,rev 9 to FC-EPF-11,rev 2 to FC-EPF-12 & Rev 3 to FC-EPF-38.Proprietary EP Withheld 05000298/LER-1999-006, Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl1999-08-26026 August 1999 Forwards LER 99-006-00 for Cns.Commitments Made by Util Encl ML20211F1311999-08-24024 August 1999 Forwards Rev 1 to Calculation Nedc 97-044, NPSH Margins for RHR & CS Pumps, in Support of 990615 Proposed Amend to DPR-46 Re Containment Overpressure Contribution to ECCS Pumps NPSH Requirements 05000298/LER-1999-003, Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel1999-08-23023 August 1999 Informs That Commitment Re Insp Rept 50-298/98-15 & LER 99-003,to Bound Extent of Condition & Take Appropriate C/As Is Now Complete.Addl Time Is Required to Accommodate Training of Engineering Support Personnel LIC-99-0078, Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld1999-08-20020 August 1999 Forwards Rev 16C to FCS Site Security Plan,Per Provisions of 10CFR50.54(p).Rev Has Been Determined Not to Degrade Effectiveness of Current Security Plans.List of Changes, Provided.Encl Withheld LIC-99-0076, Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d)1999-08-20020 August 1999 Forwards fitness-for-duty Program Performance Data for Six Month Period from Jan-June 1999,IAW 10CFR26.71(d) LIC-99-0075, Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required1999-08-13013 August 1999 Forwards Monthly Operating Rept for July 1999 for Fcs,Unit 1,per Plant TS 5.9.1.Revised Rept for June 1999,encl Due to Inadvertent Reporting of Gross Electrical Energy Data When Net Electrical Energy Data Was Required ML20210R0301999-08-12012 August 1999 Forwards Monthly Operating Rept for July 1999 for Cooper Nuclear Station,Iaw Guidance Provided by GL 97-02.Rept Also Includes Documentation of Challenges to Srvs,Per TS 5.6.4 ML20210P6761999-08-10010 August 1999 Requests That Following Changes Be Made to Distribution on NRC Correspondence LIC-99-0072, Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable1999-08-0606 August 1999 Requests That Licensee 990526 Application for Amend & Related Documents,Be Withdrawn.Util Requests That NRC Review Attached Responses to Ensure That Upcoming Submittal Will Be Acceptable LIC-99-0068, Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal1999-08-0202 August 1999 Documents OPPD Response to Requested Actions in GL 99-02, Laboratory Testing of Nuclear-Grade Activated Charcoal ML20210K3811999-08-0202 August 1999 Forwards Listed Info,Which NPPD Believes Demonstrates Ability to Obtain Funds in Amount of $10 Million for Payment of Such Premiums within Specified Three Month Period,Iaw 10CFR140.21 ML20210K6071999-08-0202 August 1999 Submits Withdrawal of Proposed License Amend Re Secondary Containment Isolation Description & Refueling Accident Analysis Results ML20210G5101999-07-28028 July 1999 Forwards fitness-for-duty Program semi-annual Performance Rept for Period of 990101-0630,per Provisions of 10CFR26.71(d) LIC-99-0070, Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program1999-07-28028 July 1999 Requests Reinstatement of SRO License Previously Held by K Grant-Leanna (License SOP-43569).Operator Is Current on All requalification-training Topics & Has Completed License Reactivation Program LIC-99-0040, Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-9903311999-07-28028 July 1999 Forwards Rept of Changes,Tests & Experiments Performed Per 10CFR50.59 & Revs to USAR Other than Those Resulting from 10CFR50.59.Encl Info Covers Period of 981101-990331 LIC-99-0057, Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 0006301999-07-26026 July 1999 Forwards 1999/2000 Statement of Cash Flow from Operations, as Guarantee of Payment of Deferred Premiums for Period of 990630 to 000630 LIC-99-0071, Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates1999-07-26026 July 1999 Informs That Util Expects to Submit Four Licensing Actions in Each of Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates LIC-99-0069, Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld1999-07-23023 July 1999 Forwards non-proprietary & Proprietary Epips,Including FC- Epf Index Page & Page 2 ,rev 0 to FC- EPF-42,EPIP Index (Page 1 of 2) & EPIP-OSC-2, Cover & Pages 19 & 20.Proprietary Encls Withheld LIC-99-0066, Forwards Fort Calhoun Performance Indicators Rept for May 19991999-07-0707 July 1999 Forwards Fort Calhoun Performance Indicators Rept for May 1999 LIC-99-0060, Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld1999-07-0101 July 1999 Forwards Proprietary & non-proprietary Revs to Fort Calhoun Station Emergency Plan Forms (Epf),Including FC-EPF,FC-EPF-1 & FC-EPF-17.Proprietary Info Withheld LIC-99-0063, Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 9906241999-07-0101 July 1999 Requests Termination of License Held by MR Anderson (License SOP 43812) for Fort Calhoun Station.Anderson Ended Employment Effective 990624 ML20209B7851999-07-0101 July 1999 Forwards Corrected Occupational Radiation Exposure Repts, for Cys 1996 & 1997.Util Stated That Repts Did Not Properly Tabulate Number of Personnel Receiving Exposures Less than 100 Mrem by Work & Job Functions in CY96 & CY97 05000298/LER-1999-005, Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl1999-07-0101 July 1999 Forwards LER 99-005-00 for Cns.Commitments Made by Util Encl LIC-99-0061, Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl1999-06-30030 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20209B5451999-06-28028 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 05000298/LER-1999-004, Forwards LER 99-004-01.Commitments Made by Util Are Encl1999-06-28028 June 1999 Forwards LER 99-004-01.Commitments Made by Util Are Encl ML20196H0331999-06-24024 June 1999 Informs NRC of Deletion of 1991 Commitment Contained in Ltr Re Feedwater Nozzle Bypass Leakage Monitoring at Plant ML20209A7221999-06-23023 June 1999 Submits Revised Pages to Proposed Change to Plant TS Previously Submitted in ,Per 990615 Telcon with NRC ML20196F5331999-06-22022 June 1999 Forwards Examination Summary Rept for FW Nozzle Examinations Performed During 1998 Fall Refueling Outage at Cooper Nuclear Station.Rept Covers Past Examinations Up to & Including 1998 Fall Refueling Outage LIC-99-0059, Provides Formal Notification to NRC of Plans Re Renewal of Operating License DPR-40 for Unit 1.Util Will Continue to Inform NRC of Decisions Relative to License Renewal in Order to Facilitate NRC Resource Planning1999-06-22022 June 1999 Provides Formal Notification to NRC of Plans Re Renewal of Operating License DPR-40 for Unit 1.Util Will Continue to Inform NRC of Decisions Relative to License Renewal in Order to Facilitate NRC Resource Planning LIC-99-0056, Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-061999-06-22022 June 1999 Forwards Rev 2 to EA-FC-90-082, Potential Over- Pressurization of Containment Penetration Piping Following Main Steam Line Break in Containment, to Facilitate Review of Response to GL 96-06 ML20196B4681999-06-17017 June 1999 Forwards TS Bases Changes Made at Plant Subsequent to Receipt of License Amend 178,dtd 980731,for Conversion to Its,Through 990610.List of Effective Pages for TS Bases, Encl ML20195H8891999-06-14014 June 1999 Forwards Response to NRC 990315 RAI Re GL 95-07, Pressure Locking & Thermal-Binding of SR Power-Operated Gate Valves, 180-day Response Submitted by District on 960213 ML20195E2351999-06-0808 June 1999 Forwards Response to NRC 990517 RAI Re Util Proposed Change to TS Re Calibr Frequency of Reactor Recirculation Flow Transmitters Associated with APRM LIC-99-0054, Forwards Manual Containing Description of Fort Calhoun Station 1999 Emergency Preparedness Exercise, to Be Conducted on 9908101999-06-0808 June 1999 Forwards Manual Containing Description of Fort Calhoun Station 1999 Emergency Preparedness Exercise, to Be Conducted on 990810 1999-09-08
[Table view] Category:UTILITY TO NRC
MONTHYEARLIC-90-0745, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-32.Corrective Actions:Enhancements Made to Facility Mod Procedures & Engineering Instructions1990-09-17017 September 1990 Responds to NRC Re Violations Noted in Insp Rept 50-285/90-32.Corrective Actions:Enhancements Made to Facility Mod Procedures & Engineering Instructions LIC-90-0705, Forwards Suppl to 900906 Application for Amend to License DPR-40,making Administrative Changes to Tech Specs. Justification & NSHC Analysis for Changes Encl1990-09-17017 September 1990 Forwards Suppl to 900906 Application for Amend to License DPR-40,making Administrative Changes to Tech Specs. Justification & NSHC Analysis for Changes Encl LIC-90-0717, Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-071990-09-13013 September 1990 Forwards Operator Licensing Natl Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 LIC-90-0716, Forwards Ref Matl for Preparing Reactor Operator Licensing Exams Scheduled for 901113.W/o Encls1990-09-13013 September 1990 Forwards Ref Matl for Preparing Reactor Operator Licensing Exams Scheduled for 901113.W/o Encls LIC-90-0740, Forwards Rev 0 to EA-FC-90-062, Diesel Generator Upper Temp Operating Limits,Engineering Analysis. Both Generators Operable & Will Perform Safety Function Consistent W/ Specified Ambient Air Temp Limits1990-09-12012 September 1990 Forwards Rev 0 to EA-FC-90-062, Diesel Generator Upper Temp Operating Limits,Engineering Analysis. Both Generators Operable & Will Perform Safety Function Consistent W/ Specified Ambient Air Temp Limits ML20064A6891990-09-12012 September 1990 Forwards Evaluation of Environ Qualification of Okonite T95/35 Tape Splices in Instrumentation Applications at Facility,Per 900813 Request.Tape Splices Fully Qualified for Use in Plant Instrumentation Circuits in Harsh Environ LIC-90-0741, Submits Plan for Replacement of Remaining Two Control Element Assemblies Which Contain All B4C Pellets1990-09-0707 September 1990 Submits Plan for Replacement of Remaining Two Control Element Assemblies Which Contain All B4C Pellets LIC-90-0440, Forwards Application for Amend to License DPR-40,revising Tech Specs to Make Administrative Changes1990-09-0606 September 1990 Forwards Application for Amend to License DPR-40,revising Tech Specs to Make Administrative Changes LIC-90-0667, Responds to NRC Re Violations Noted in Insp Rept 50-285/90-30 Re Inadequate post-maint Testing Instructions. Corrective Actions:Maint Work Order Written & Performed to Tighten Actuator Diaphragm Bolts on 9005291990-09-0404 September 1990 Responds to NRC Re Violations Noted in Insp Rept 50-285/90-30 Re Inadequate post-maint Testing Instructions. Corrective Actions:Maint Work Order Written & Performed to Tighten Actuator Diaphragm Bolts on 900529 LIC-90-0712, Forwards fitness-for-duty Program Performance Data for Period of Jan-June 19901990-08-31031 August 1990 Forwards fitness-for-duty Program Performance Data for Period of Jan-June 1990 ML20028G9041990-08-28028 August 1990 Forwards Fitness-for-Duty Program Performance Data for Jan-June 1990.Util 900705 Ltr Provided Addl Info to NRC Re Panel of Drugs Included in Testing Program.Info Re Cutoff Levels for Benzodiazepine in Ltr Incorrect NLS9000369, Forwards Endorsement 80 to Maelu Policy MF-70 & Endorsement 96 to Nelia Policy NF-200,reflecting Shutdown Credit for Most Recent Outage for Nuclear Liability Insurance for Plant1990-08-27027 August 1990 Forwards Endorsement 80 to Maelu Policy MF-70 & Endorsement 96 to Nelia Policy NF-200,reflecting Shutdown Credit for Most Recent Outage for Nuclear Liability Insurance for Plant LIC-90-0683, Forwards Responses to Recommendations in SALP Rept 50-285/90-24.Util Currently Developing Corporate Level Procedure to Provide Guidance on Operability Determinations1990-08-27027 August 1990 Forwards Responses to Recommendations in SALP Rept 50-285/90-24.Util Currently Developing Corporate Level Procedure to Provide Guidance on Operability Determinations LIC-90-0673, Retransmits Original Response of Util Responding to Violations Noted in Insp Rept 50-285/90-25.W/o Encl1990-08-22022 August 1990 Retransmits Original Response of Util Responding to Violations Noted in Insp Rept 50-285/90-25.W/o Encl LIC-90-0670, Forwards Fort Calhoun Station Performance Indicators for Jul 19901990-08-22022 August 1990 Forwards Fort Calhoun Station Performance Indicators for Jul 1990 LIC-90-0662, Forwards Rev 1 to Monthly Operating Rept for June 1990 for Fort Calhoun Station Unit 1,for Proper Distribution1990-08-22022 August 1990 Forwards Rev 1 to Monthly Operating Rept for June 1990 for Fort Calhoun Station Unit 1,for Proper Distribution LIC-90-0627, Responds to Generic Ltr 89-19 Re USI A-47 on Safety Implications of Control Sys in Lwrs.Util Reconsidered Original Commitment Noted in & Does Not Plan to Implement Automatic Steam Generator Overfill Protection1990-08-22022 August 1990 Responds to Generic Ltr 89-19 Re USI A-47 on Safety Implications of Control Sys in Lwrs.Util Reconsidered Original Commitment Noted in & Does Not Plan to Implement Automatic Steam Generator Overfill Protection LIC-90-0636, Forwards Results of 1990 Refueling Outage Inservice Insp & Rept for Repairs or Replacement1990-08-13013 August 1990 Forwards Results of 1990 Refueling Outage Inservice Insp & Rept for Repairs or Replacement LIC-90-0591, Provides Info Re RCS Leak Detection Sys to Detect Leaks from Primary Piping Sys to Containment,Per Generic Ltr 84-04 & USI A-21990-08-13013 August 1990 Provides Info Re RCS Leak Detection Sys to Detect Leaks from Primary Piping Sys to Containment,Per Generic Ltr 84-04 & USI A-2 LIC-90-0631, Responds to Generic Ltr 89-15 Re NRC Solicitation of Utils to Voluntarily Participate Emergency Response Data Sys Program.Util Prepared to Work W/Nrc to Investigate Actions Necessary to Implement Program at Plant1990-08-0808 August 1990 Responds to Generic Ltr 89-15 Re NRC Solicitation of Utils to Voluntarily Participate Emergency Response Data Sys Program.Util Prepared to Work W/Nrc to Investigate Actions Necessary to Implement Program at Plant LIC-90-0485, Confirms Interim Resolution of Identified Problem Associated W/Use of Input Variable for PORV Opening Time in Calculation of Low Temp Overpressure Protection Sys Setpoints1990-08-0707 August 1990 Confirms Interim Resolution of Identified Problem Associated W/Use of Input Variable for PORV Opening Time in Calculation of Low Temp Overpressure Protection Sys Setpoints LIC-90-0645, Forwards Application for Amend to License DPR-40,making Typo & Administrative Corrections to Tech Specs1990-08-0202 August 1990 Forwards Application for Amend to License DPR-40,making Typo & Administrative Corrections to Tech Specs ML20056A7801990-08-0202 August 1990 Forwards Owners Data Rept for ISI & Owners Rept for Repairs & Replacements NLS9000308, Forwards Info to Demonstrate Util Ability to Obtain Funds for Payment of Deferred Insurance Premiums.Supporting Documentation Encl1990-08-0101 August 1990 Forwards Info to Demonstrate Util Ability to Obtain Funds for Payment of Deferred Insurance Premiums.Supporting Documentation Encl LIC-90-0647, Informs That Tl Patterson Assumed Position of Plant Manager, Effective 9008011990-08-0101 August 1990 Informs That Tl Patterson Assumed Position of Plant Manager, Effective 900801 LIC-90-0659, Advises of Plans to Achieve Operability of Third Auxiliary Feedwater Pump by 9008101990-07-31031 July 1990 Advises of Plans to Achieve Operability of Third Auxiliary Feedwater Pump by 900810 NLS9000196, Responds to Violations Noted in Insp Rept 50-298/90-09. Corrective Actions:To Ensure Future Clarity,District Will Revise Procedures to Clearly Indicate Acceptability of Okonite in Instrumentation Applications1990-07-31031 July 1990 Responds to Violations Noted in Insp Rept 50-298/90-09. Corrective Actions:To Ensure Future Clarity,District Will Revise Procedures to Clearly Indicate Acceptability of Okonite in Instrumentation Applications LIC-90-0449, Forwards Rev 1 to EA-FC-90-037, Control Room Habitability Evaluation for NUREG-0737,Item III.D.3.41990-07-20020 July 1990 Forwards Rev 1 to EA-FC-90-037, Control Room Habitability Evaluation for NUREG-0737,Item III.D.3.4 LIC-90-0588, Provides Notification of SPDS Implementation at Plant,Per1990-07-19019 July 1990 Provides Notification of SPDS Implementation at Plant,Per LIC-90-0581, Informs That Requirements of NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount Satisfied.None of 48 Transmitters in Use at Plant Exhibited Symptoms Indicative of Fill Oil Problems Since Installation in 19871990-07-18018 July 1990 Informs That Requirements of NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount Satisfied.None of 48 Transmitters in Use at Plant Exhibited Symptoms Indicative of Fill Oil Problems Since Installation in 1987 LIC-90-0585, Forwards Simulator Malfunction Cause & Effects1990-07-18018 July 1990 Forwards Simulator Malfunction Cause & Effects NLS9000268, Forwards Endorsement 79 to Maelu Policy MF-70 & Endorsement 95 to Nelia Policy NF-2001990-07-10010 July 1990 Forwards Endorsement 79 to Maelu Policy MF-70 & Endorsement 95 to Nelia Policy NF-200 ML20055F3701990-07-10010 July 1990 Informs That Acceptance Criteria for Startup Physics Tests Have Been Met for Recent Cycle 14 Startup,Per NLS9000260, Requests Rev to List of Carbon Copies on NRC Correspondence to util.Marked-up Ltr Showing Revs Encl1990-07-0909 July 1990 Requests Rev to List of Carbon Copies on NRC Correspondence to util.Marked-up Ltr Showing Revs Encl ML20044A8331990-07-0606 July 1990 Informs of New Official Title for Ga Trevors,Effective 900701 NLS9000254, Notifies That Util Fitness for Duty Program Includes Drug Screening for Addl Drugs Over Min Panel of Drugs Required by 10CFR26.Drugs & Testing Cutoff Levels Listed1990-07-0505 July 1990 Notifies That Util Fitness for Duty Program Includes Drug Screening for Addl Drugs Over Min Panel of Drugs Required by 10CFR26.Drugs & Testing Cutoff Levels Listed ML20055D9351990-07-0202 July 1990 Forwards Fort Calhoun Station Performance Indicators,May 1990 NLS9000192, Forwards Rev 8 to Updated SAR for Cooper Nuclear Station. Rev 6 to QA Program Transmitted on 900406 Ref in App D.Next Rev to Updated SAR Will Be Submitted on or Before 9107221990-07-0202 July 1990 Forwards Rev 8 to Updated SAR for Cooper Nuclear Station. Rev 6 to QA Program Transmitted on 900406 Ref in App D.Next Rev to Updated SAR Will Be Submitted on or Before 910722 LIC-90-0522, Forwards Revised Response to Notice of Deviation from Insp Rept 50-285/90-02.Corrective Actions:Cable Trays 5-4A & 5-4B Reworked to Neatly Tie Down Cables & Remove Crossovers & Engineering Instruction GEI-9 on Electrical Sys Updated1990-06-29029 June 1990 Forwards Revised Response to Notice of Deviation from Insp Rept 50-285/90-02.Corrective Actions:Cable Trays 5-4A & 5-4B Reworked to Neatly Tie Down Cables & Remove Crossovers & Engineering Instruction GEI-9 on Electrical Sys Updated LIC-90-0566, Forwards 1990/1991 Statement of Cash Flow from Operations. Cash Flow Statement Deviates from Reg Guide 9.4 Due to Util Being Political Subdivision of State of Ne1990-06-29029 June 1990 Forwards 1990/1991 Statement of Cash Flow from Operations. Cash Flow Statement Deviates from Reg Guide 9.4 Due to Util Being Political Subdivision of State of Ne LIC-90-0564, Forwards Updated, Position Paper Re Seismic Capability of Welded Steel Piping. Documentation Demonstrates No Generic Thermal or Seismic Safety Issue Exists for Welded Steel Small Diameter Piping at Facility1990-06-29029 June 1990 Forwards Updated, Position Paper Re Seismic Capability of Welded Steel Piping. Documentation Demonstrates No Generic Thermal or Seismic Safety Issue Exists for Welded Steel Small Diameter Piping at Facility LIC-90-0488, Responds to Request for Info Re Status of Implementation of Generic Safety Issue Requirements1990-06-29029 June 1990 Responds to Request for Info Re Status of Implementation of Generic Safety Issue Requirements LIC-90-0429, Forwards Application to Amend License DPR-40,adding Hydrogen Purge Sys to Tech Spec.Discussion,Justification & NSHC Analysis for Amend,Provided1990-06-28028 June 1990 Forwards Application to Amend License DPR-40,adding Hydrogen Purge Sys to Tech Spec.Discussion,Justification & NSHC Analysis for Amend,Provided LIC-90-0446, Forwards Application for Amend to License DPR-40,to Restrict Containment Spray Use as Backup for Shutdown Cooling in Tech Specs1990-06-28028 June 1990 Forwards Application for Amend to License DPR-40,to Restrict Containment Spray Use as Backup for Shutdown Cooling in Tech Specs ML20043J0651990-06-22022 June 1990 Responds to Generic Ltr 90-04, Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions. Item 4.1 of Generic Safety Issues 75 Not Applicable to Plant ML20044A1631990-06-22022 June 1990 Requests That NRC Continue Processing Exemption Request for Configuration of wide-range Nuclear Instrumentation Cables in Fire Area 34B (Upper Electrical Penetration Room). Emergency Boration Added to Achieve Safe Shutdown ML20043J0611990-06-22022 June 1990 Responds to NRC 900523 Ltr Re Violations Noted in Insp Rept 50-285/90-29.Corrective Actions:Five Chemistry Technicians Provided Refresher Training on 900427 on Existing EPIP-EOF-6 NLS9000217, Submits Followup Response to Insp Rept 50-298/89-34 Re Physical Security Program.Util Completed Safeguards Info Audit of Each Contractor Holding Safeguards Info.Contractor Surrendered All Safeguards Info Documents on Plant to Util1990-06-19019 June 1990 Submits Followup Response to Insp Rept 50-298/89-34 Re Physical Security Program.Util Completed Safeguards Info Audit of Each Contractor Holding Safeguards Info.Contractor Surrendered All Safeguards Info Documents on Plant to Util ML20044A4961990-06-18018 June 1990 Forwards Supplemental Application for Amend to License DPR-40,making Administrative Corrections to Tech Specs. Procedure SO-G-70, Chemical Control Also Encl ML20043G6381990-06-15015 June 1990 Forwards Monthly Operating Rept for May 1990 & Corrected Operating Rept for Apr 1990 for Cooper Nuclear Station 1990-09-07
[Table view] |