ML20049A251

From kanterella
Jump to navigation Jump to search

Forwards Util Response Re Auxiliary Feedwater Flow Design Basis.Requests Branch Evaluation
ML20049A251
Person / Time
Site: 05000000, Farley
Issue date: 04/30/1980
From: Parr O
Office of Nuclear Reactor Regulation
To: Speis T
Office of Nuclear Reactor Regulation
Shared Package
ML093450149 List: ... further results
References
FOIA-80-515, FOIA-80-555, RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.1, TASK-TM TAC-12391, TAC-12963, NUDOCS 8005200093
Download: ML20049A251 (1)


Text

I3 l

APR 3 01980 i

DISTRIBUTION:

CENTPAL FILE NRR READIllG i

l ASB READI!!G (ASB fier.bers fE"0RANDUM FOR:

T. Spets, Chief Reactor Systems Branch Division of Systems Integration FR0'i:

Olan D. Parr, Chief Auxiliary Systems Branen Division of Systems Integration SuoJECT:

AP4 FLOW DESIGN BASIS - FARLEY UNIT 1 Attached is the response from the Farley Nuclear Plant. Unit 1 in answer to i

the staff AF4 reliability evaluation generic request for information to verify that operating plant AFW system flows are adequate for design basis transients and accidents.

RS3 is requested to evaluate this response dince the transients and accidents are part of FSAR Ahapter ?5 review. Please submit your evaluations or questions direct to the ORPli (Ed Reeves); however, please provide a copy to ASS to confim that the AFW syttem flow is adequate.

Previous review wort by S. Newberry of the TMI-l response to this mstion should be considered i

to provide review consistency. This work is part of Task Action Plan II.E.E.

i

/s/

Olan D. Parr, Chief Auxiliary Systems Branch Division of Syste:u Integration Attaciment:

As stated cc: w/ attachment S. liewberry W. LeFave cc: w/o attachment P. Check E. Reeves DSI:ASB DSI:ASB

[)of4 C [ hh$&hk b