ML19295E739
| ML19295E739 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 11/25/1980 |
| From: | Phillips L Office of Nuclear Reactor Regulation |
| To: | Check P Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML093450149 | List:
|
| References | |
| FOIA-80-515, FOIA-80-555 NUDOCS 8012080011 | |
| Download: ML19295E739 (1) | |
Text
c e
'S
- .g
$?
?.
5 6-? Y
.NOV 2 51989,
$ki 7
~9
- n co x
3 FEPCRANDUf< FOR:
P. Check, Assistant Director for Plant Systems DSI FPCF:
'. Phillips, Section Leader, Core Performance Branch, DSI THPU:
L. Rutenstein, Assistant Director for Core and Containment Systems, DSI W. V. Johnston, Chief, Core Perfnrrance Branch, DSI SUP. JECT:
RESPCNSE TO TPI-l RESTART CCNTENTIONS UCS-7, SPOLLY 6(b),
AND MTRY 5(b)
My testirrony regarding the TMI-l instrumentation to conitor inade<;uate core cooling is attached. This testimony addresses all of the subject contentions with respect to reactor vessel water level.
giginal signed by:
L. E. Phillips, Section Leader Thermal-Hydraulics Section Core Performance Branch Division of Systems Integration Attachrmnt:
As stated cc:
D. Ross D. Eisenhut L. Rubenstein W. Johnston T. Novak J. Cutchin J. Rosenthal
!!. Silver T. Huang IDISTRIBUTION:
1 Central Files LEPhillips NRR read'ing CPB reading kOff,0b o oll
- C"P[
DS 0 :,CCS DSI,:DIR S CPB D
O rriC SURNAM 11/2f/80 11/ /80' f
11/1780 11/2 /80 OATEk F RM 318 9 76 NRCM O240 DU.S. GOVERNMENT PRINTING OrFICE: 1979 289 369