ML19295E739

From kanterella
Jump to navigation Jump to search
Forwards Testimony in Response to Ucs Contention F,Sholly Contention 6(b) & Angry Contention 5(b) Re Instrumentation to Measure Inadequate Core Cooling.W/O Encl
ML19295E739
Person / Time
Site: Crane Constellation icon.png
Issue date: 11/25/1980
From: Phillips L
Office of Nuclear Reactor Regulation
To: Check P
Office of Nuclear Reactor Regulation
Shared Package
ML093450149 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8012080011
Download: ML19295E739 (1)


Text

c e

'S

.g

$?

?.

5 6-? Y

.NOV 2 51989,

$ki 7

~9

n co x

3 FEPCRANDUf< FOR:

P. Check, Assistant Director for Plant Systems DSI FPCF:

'. Phillips, Section Leader, Core Performance Branch, DSI THPU:

L. Rutenstein, Assistant Director for Core and Containment Systems, DSI W. V. Johnston, Chief, Core Perfnrrance Branch, DSI SUP. JECT:

RESPCNSE TO TPI-l RESTART CCNTENTIONS UCS-7, SPOLLY 6(b),

AND MTRY 5(b)

My testirrony regarding the TMI-l instrumentation to conitor inade<;uate core cooling is attached. This testimony addresses all of the subject contentions with respect to reactor vessel water level.

giginal signed by:

L. E. Phillips, Section Leader Thermal-Hydraulics Section Core Performance Branch Division of Systems Integration Attachrmnt:

As stated cc:

D. Ross D. Eisenhut L. Rubenstein W. Johnston T. Novak J. Cutchin J. Rosenthal

!!. Silver T. Huang IDISTRIBUTION:

1 Central Files LEPhillips NRR read'ing CPB reading kOff,0b o oll

C"P[

DS 0 :,CCS DSI,:DIR S CPB D

O rriC SURNAM 11/2f/80 11/ /80' f

11/1780 11/2 /80 OATEk F RM 318 9 76 NRCM O240 DU.S. GOVERNMENT PRINTING OrFICE: 1979 289 369