ML19281C520

From kanterella
Jump to navigation Jump to search
Requests Evaluation of Encl Util Response to NRC Generic Request for Info Re Auxiliary Feedwater Reliability & Request for Verification of Sys Adequacy Re DBA & Transients.W/O Encl
ML19281C520
Person / Time
Site: 05000000, Indian Point
Issue date: 08/15/1980
From: Parr O
Office of Nuclear Reactor Regulation
To: Speis T
Office of Nuclear Reactor Regulation
Shared Package
ML093450149 List: ... further results
References
FOIA-80-515, FOIA-80-555 NUDOCS 8008270836
Download: ML19281C520 (1)


Text

.

P 0 O RO Ri al N A I.m a~ N

~

DISTRIBUTIO1: '4/0 ATTACHMElT J

DOCKET FILE nUG 1 a E80 ASB READItiG OParr Docket.io. 50-247 I!E:10RA.iDU'1 FOR: Thenis P. Speis, Chief Reactor Systens 3ranca, DSI FRO:1:

Olan D. Parr, Chiaf Auxiliary Systens Branca, DSI SU3 JECT:

AF.4 FLC'.i DESITi SASIS - IriDIA:1 POI:lT U'iIT 2 Attached is tne response fron Consolidated Edison Company for Indian Point Unit 2 in answer to tne staff ARl reliability evaluation generic recuest for infornation to verify tnat onerating plant AF1 systen flows ara adequate for design basis transients and accidents.

It sho'!1d be noted tnat Indian Point 2 presenst34trAFI flow control valves for 15] gnn to each stean generator and nanual action inside the control rocn is needed to increaseett.ii flow rate when tne systaa starts. It does not appear that Consolidated Edison considered this recuired action in tacif response.

Reactor Systens Branca is requested to evaluate shis response including tha 150 gpn linisation and 10 minutes for coerator action since the transients and accidents a e part of FSAR Chaotar 15 review. Please submit Jour avalua-tion or ;uestions direct to tne OP.P'! (Lenny Olsnan)' however, please provida a copy to AS3 to confirm that the AEl systen flow is adecuste. Previous rav' es wor < by S. :lewberry ]f the T'!I-l res::onse to this cuestion should be considered to ?rovide revi:w consistency. This work is part of Task Action Plan II.E.1.

It should'also be noted that we have been recuested by the ORr't to expedite tae Indian Point Unit 2 (also Zion and Indian Point Unit 3) review since the, plant is located close to a high population area and, thereface, has been notified by the 'IRR staff to conolete modifications and crocedural cnanges at an earliar date taan other coerating nlants. 7e Indian Point Unit 2 response should, therefore, have a nigher priority than the responses fran other plants already transmitted to you.

Crittui signed bv Cha D. Parr Olan D. Parr, Chief O3/

Auxiliary Systens Branch

.80082700 C)

Division of Systaas Integration

...u.u.

orrk nQ.u d..

DSQASB.,,,

.pI:(S,3

""* tV.^dattar.hnent" ' tt*:.7/o"attac23t;t" '

ansa acr.r/...

. 2..Caeck..

354/R Cl.6./30 unc ronu s'd YOUi!ncu cuo

" "'"""L...v.~~

~.~~=

"um

~ ~