Monthly Operating Repts for June 1993 for Sequoyah Nuclear Plant Units 1 & 2.W/930714 Ltr
ML20045H236
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 06/30/1993
From: Fenech R, Hollomon T
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9307190263
Download: ML20045H236 (10)


Text

{{#Wiki_filter::, . BA Tennessee valiey Authonty. Post Office Box 2000. Soddy-Daisy. Tennessee 37379 2000 L Robert A. Fenech V!ce President, Sequoyah Nutlear Plant July 14, 1993 U.S. Nuclear Regulatory Connission ATTN: Document Control Desk Washington, D.C.-20555 Gentlemen: In the Matter of ) Docket Nos. 50-327 Tennessee Valley Authority ) 50-328 i SEQUOYAH NUCLEAR PLANT (SQN) - JUNE 1993 MONTHLY OPERATING kEPORT Enclosed is the June 1993 Monthly Operating Report as required-by SQN Technical Specification 6.9.1.10. If you have any questions concerning this matter, please call-J. W. Proffitt at (615) 843-6651. Sincerely, Robert A. Fenech r. Enclosure _; cc: See page 2 j i 1 1 l

                                                                                                              /'

9307190263 930630 5 PDR ADOCK;05000327 fj i i R PDR \ f_ t -)

a

 'Q       .
    ;,f        '.*-
s -

U.S. Nuclear Regulatory Commission Page 2 July 14, 1993 cc (Enclosure): INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. D. E. LaBarge, Project Manager-U.S. Nuclear Regulatory Commission One White Flint, North-11555 Rockville Pike. Rockville, Maryland 20852-2739 Mr. Ted Marston, Director Electric Power Research Institute P.O. Box 1041; Palo Alto, California 94304 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administration U.S. Nuclear Regulatory. Commission Office of Inspection and Enforcement Region II-101 Marietta. Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323-2711 Mr. F. Yost, Director Research Services Utility Data Institute 1700 K Street, NW, Suite 400 Washington, D.C. 20006-3800 g

y;.
                                                                 -{

3: l

          .                                                     .i
                                                                 .l
                                                                -i L

L.

                                                                ,i TENNESSEE VALLEY AUTHORITY i

NUCLEAR POWER GROUP. > SEQUOYAH NUCLEAR FIANT .; i l I MONTHLY OPERATING REPORT TO THE :1 t

                      . NUCLEAR REGUIATORY C0FMISSION              ,

J1ME_1223

                                                                  )

UNIT 1 e i DOCKET NUMBER 50-327 LICENSE NUMBER DPR-77 -i UNIT 2 IX)CKET NIMBER 50-328  ! LICENSE NUMBER DPR-79 r l l

I j
                                                                 'l
                                                                -l
]

OPERATIONAL

SUMMARY

JUNE 1993 IMII__1 I Unit 1 began the month in "no mode" as Unit 1 Cycle 6 refueling outage continued. On June 18 at 1836 Eastern daylight time (EDT), Unit 1 entered Mode 6 as the fuel loading process began. On June 19 at approximately 1055 EDT, Fuel Assembly H64 at' location G7 tilted when it , was unlatched from the manipulator crane, and it came to rest against the , core baffle wall. There were no indications of fuel damage. On June 22 at 1006 EDT, the tilted fuel assembly was placed in an upright position. At the end of June, recovery activities associated with Fuel Assembly H64 remained on hold. The scheduled date for generator synchronization is September 16, 1993. UNIT.2 Unit 2 remained in Mode 5 during the entire month of June as a result of inspection / repairs on secondary side piping as a result of erosion / corrosion problems. The scheduled date for generator synchronization is August 19, 1993. EQWER-DEERATID_.REldEE__VAINXS__LEDRVs.l AND_ SAFETY VALVES

SUMMARY

There were no challenges to PORVs or safety valves in June. '

                                                                                              /

1 i i

       ,                             AVERAGE DAILY IINIT POWER LEVEL DOCKET NO. 50-3121          UNIT No. One              DATE:    07-08-93 COMPLETED BY: I.d,_Jallomon                          TELEPHONE:   (615) 843-7528 MONTH: J UNE 1993 AVERAGE DAILY POWER LEVEL                 AVERAGE DAILY POWER LEVEL DAY            (MWe-Net)                DAY               (MWe-Net) 1              -12                      17                  -7 2               -5                      18                  -9 3               -7                       19                 -5 4               -5                      20                  -7 5               -7                      21                  -7 6               -5                      22                  -5 7               -7                      23                  -7 8               -7                      24                  -7 9               -5                      25                  -7 10              -9                      26                  -7 11              -5                      27                  -5 12              -7                      28                  -7 13              -5                      29                  -7 14              -9                      30                  -7 15             -12                      31                 JA 16              -7

i

      . e AVERACE DAILY UNIT POWER LEVEL                              j 1

DOCKET NO. SQ .328 UNIT No. Two DATE: 07-08-93 COMPLETED BY: I J J iallomon TELEPHONE: 1615.)_B43-1528 MONTH: __.JENE 1993 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DM (MWe-Net) DM (MWe-Net) 1 -6 17 -4 2 -5 18 -4 3 -5 19 -4 4 -10 20 -6 5 -5 21 -6 6 -5 22 - 6_.

                                                                               /

7 -5 23 -6' 8 -6 24 -6 9 -6 25 -7 10 -6 26 -7 11 -2 27 -7 12 -6 28 -7 13 -10 29 -8 14 -6 30 -8 15 -4 31 NA __ 16 -4 e. r t m 4 1

=e .

  ,       .a
  • OPERATING DATA REPORT '

DOCKET NO. _50-327 DATE : _Q2/08/93

                                                                                        -COMPLETED BY li_A_Hallamon__

TELEPHONE' (615) 843-7528 OPERATING STATUS l Notes .l

1. Unit Name: __lf.guovah Unit One l l
2. Reporting Period:'__alune 1993 l. l
3. Licensed Thermal Power (MWt): 3411.0 l l
4. Nameplate Rating (Gross MWe): _1220.6 l l
5. Design Electrical Rating (Net MWe): 1148.0 l .l
6. Maximum Dependable Capacity (Gross MWe): _11h220 l- l
7. Maximum Dependable Capacity (Net NWe): _1122.0 l l
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Het MWe): N/A
10. Reasons for Restrictions, If Any: N/A This Month Yr-to-Da t e - Cumulative
11. Hours in Reporting Period 720 4.343 1QE.112
12. Number of Hours Reactor Was Critical 0 '1.281.3 56,979
13. Reactor Reserve Shutdown Hours 0 0 0
14. Hours Generator On-Line 0 1.220.6 54.828.5
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 0 3.915.909.5 178.893.754
17. Gross Electrical Energy Generated (MWH) 0 1.358.540 _60.702.654
18. Net Electrical Energy Generated (MWH) -4.928 _ l.202,287 58.2021509-
19. Unit Service Factor '

0 28.1 52.1

20. Unit Availability factor ' 0 28.l_ 52,1__
21. Unit Capacity Factor (Using MDC Net) -0.6' 26.3 49.3
22. Unit Capacity Factor (Using DER Net) ' 0. 6 25.7 48,12__
23. Unit Forced Outage Rate 0 47.5 38.7
24. Shutdowns Scheduled Over Next 6 Honths (Type,.Date, and Duration of Each):
25. If Shut Down At End Of Report Period, Estimated Date of Startup: __Statembe r 16. 1993 M
      . e
   't OPERATING DATA REPORT DOCKET NO.       50-328 DATE    07/08/93 COMPLETED BY        T. J. HollDmDn__           r TELEPHONE f615) 843-7528 OPERATING STATUS l Notes                                l
1. Unit Name: __legggyah Unit Two. l l
2. Reporting Period: June 1993 l l
3. Licensed Thermal Power (MWt): 3411.0 l l
4. Nameplate Rating (Gross MWe): 1220.6 l l S. Design Electrical Rating (Net HWe): _1148.0 l l
6. Maximum Dependable Capacity (Gross MWe): 1162.0 l l
7. Maximum Dependable Capacity (Net HWe): 1122.0 l 'l *
8. If Changes Occur in Capacity Ratings (Item Numbers 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, If Any (Net HWe): N/A
10. Reasons for Restrictions, If Any: N/A l This Month Yr-to-Date Cumulative
11. Hours in Reporting Period 720 4.343 97.152
12. Number of Hours Reactor Was Critical O 1.291.L '57.505
13. Reactor Reserve Shutdown Hours Oe 0 0
14. Hours Generator On-Line 0 -

1.158.2 56.235.6

15. Unit Reserve Shutdown Hours 0 0 ? 0
16. Gross Thermal Energy Generated (MWH) 0 3.773.30id_ 176.955.084
17. Gross Electrical Energy Generated (MWH) 0 1.Z83.783 _{i(LDSL912
18. Het Electrical Energy Generated (HWH) -4.201 1.212.145
  • _J L 427.420
19. Unit Service factor 0 26 d., / . 57.9
20. Unit Availability factor 0 JE .

57J_

21. Unit Capacity factor (Using MDC Net) -0.5 24.9 8 ""52.7 ,
                                                                                                                           ~

22.' Unit Capacity Factor (Using DER Net) T -0.5 24.L $1s. 7 51.5

23. Unit forced Outage Rate 73.3 3LZ_

100.0

24. Shutdowns Scheduled Over Hext 6 Nonths (Type, Date, and Duration ofc..E.gh):." ' -
                                                                                            +
25. If Shut Down At End Of Report Period, Estimated Date of Startup: 2Mugutt_19J933 4 J-i i

l 1

DOCKET NO: 50-327 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME: One DATE: 07/08/93 REFORT MONTH: JUNE 1993 COMPLETED SY:7 J. Ho11cmon . TELEPHONE:f6151 843-7525 e Metnod of Licensee Cause and Corrective

  • Ouration Shutting Down Event System Component Action to l d No. Date Type (Fours) Reason 2 Reactor 3 Report No. Code Code 6

Prevent Recurrence 4 930601 F 720 C 4 N/A N/A N/A Unit 1 Cycle 6 refueling outage continues. 2 3 # I:F Forced Reason: Method: Exhibit G-Instructions 5: Scheduled A-Equipment failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Outage (NUREG-1022) E-Operator Training and License Examination 5-Reduction F-Administrative 9-Other 5 G-Operational Error (Explain) Exhibit I-Same Source H-Other (Explain) e-- 4- p-e ,- .___m a___A __m_-__m.oa2m a

                                                                                                                                   ' DOCKET NO:    50-328        '

UNIT SHUTDOWNS AND POWED RTOUCTIONS UNIT NAME: Two DATE: 07/08/93 -'

                                                                                                                                                                     ~*

REPORT MONTH: JUNE 1993 COMPLETED BY:T. 3. Hal]oacn TELEPHONE:(515) 043-75ZS , l Method of Licensee Cause and Corrective-1 Duration Shutting Do'an Event System Cor.ponent Action to

  • I Ho. Date Type (Hou rs) Reason 2 Reactor 3 Report No. Code Code 5

Prevent' Recurrence 3 930601 F 720 A 4 328/93001 TL EXC Unit 2 remained in the forced outage through the end of June. The outage began on March 1, 1993, as a result of the identified erosion / corrosion problems. 2 3 Method: # I:F Forced Reason: Exhibit G-Instructions 5: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restruction 4-Continuation of Existing Dutage (NUREG-1022.)

                        - E-Operator Training and License Examination       5-Reduction F-Administrative'                                  9-Other 5

G-Operational Error (Explain) Exhibit I-Same Source H-Other (Explain) b im _

                                                                            - .            .   - .                                     .                   _          . - .}}