Forwards Application to Amend License NPF-3 Revising Provisions in TS to Allow Storage of New & Spent Fuel Assemblies W/Initial Nominal Enrichment of uranium-235 No Greater than 5.0 Weight Percent
ML20045E708
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/23/1993
From: Storz L
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045E709 List:
References
2149, TAC-M86933, NUDOCS 9307020343
Download: ML20045E708 (2)


Text

- . , , ,

~. s CENTERCOR ENERGY C200 Dak Tree Boulevard Mail Address- .,

independence OH P O Box 94661 '

210 447-3100 Cleveiend, OH 44101-d661 i

Docket Number 50-346 ,

License Number NPF-3 Serial Number 2149 June 23, 1993 United States Nuclear Regulatory Commission Document Control Desk Vashington, D. C. 20555

Subject:

License Amendment Application to Revise Technical ,

Specification (TS) 3/4.9.13, Refueling Operations - Spent Fuel Pool Fuel Assembly Storage, and TS 5.6, Design Features

- Fuel Storage Gentlemen:

Enclosed is an application for an amendment'to the Davis-Besse Nuclear Power Station (DBNPS) Unit Number 1 Operating License NPF-3,. Appendix A Technical Specifications (TS) to reflect the changes attached. The proposed changes involve TS 3/4.9.13, Refueling Operations - Spent Fuel Pool Fuel Assembly Storage, and TS 5.6, Design Features - Fuel Storage.

The proposed amendment vould revise the provisions in the TS to allow storage of new and spent fuel assemblies with an initial nominal enrichment of uranium - 235 no greater than 5.0 veight percent. The existing TS Figure 3.9-1, "Burnup versus Enrichment Curve for Davis-Besse Spent Fuel Storage Racks," which is referenced by TS  ;

3/4.9.13, limits the initial enrichment of fuel that can be stored in the spent fuel pool to 3.8 veight percent. The proposed amendment '

would revise TS Figure 3.9-1 to reflect the desired higher enrichment limitation.

The proposed amendment vould.also revise TS 5.6.1.1 to add an appropriate cross-reference to TS 3.9.13 to the description of the spent fuel storage racks, and would revise TS 5.6.1.2 to note the 5.0 l veight percent uranium - 235 limitation in the description of the new L fuel storage racks.

Operanng companies OAI g6 cleveiana Dectnc muminanng 9307020343 930623 Toledo Ed: son PDR ADOCK 05000346 I il i P PDR \} ,

l

_,- Docket Number 50-346 License Number NPF-3 1

, Serial Number 2149 Page 2 In addition,.the proposed amendment.vould revise the TS 3/4.9.13' Surveillance Requirements to make them consistent vith the new Standard i TS for Babcock and Vilcox type plants (NUREG-1430).

It is anticipated that enrichments exceeding.the current limit vill be required for Cycle 10 (Fuel Batch 12). Toledo Edison requests that the j NRC issue this amendment by October 15, 1993, at which time _the enrichment _ vill be specified to the vendor for Fuel Batch 12. f Should you.have any questions or requite additional information, please contact Mr. Robert V. Schrauder, Manager - Nuclear Licensing, at -

(419) 249-2366.

~i Very truly yours, I # * ,

Loui F Stor i

Vice P esident - Nuclear  !

MKL/dle  ;

cc: J. B. Hopkins, NRC Senior Project Manager ~!

J. B. Martin, Regional Administrator, NRC Region III ,

S. Stasek, DB-1 NRC Senior Resident Inspector 4 J. R. Villiams, Chief of; Staff, Ohio Emergency Management Agency,. ,

State of Ohio (NRC Liaison)

Utility Radiological Safety Board .

T f

r l

i i I L

9 J .1