ML20040E106

From kanterella
Jump to navigation Jump to search
Forwards FEMA Interim Findings Re Offsite Emergency Preparedness for Facility.Evaluation of Planning Stds A-P Will Be Submitted by 820315,following Regional Assistance Committee Review & 820202 Exercise Evaluation
ML20040E106
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/26/1982
From: Krimm R
Federal Emergency Management Agency
To: Grimes B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8202030116
Download: ML20040E106 (5)


Text

-

^

p:gs, q iirY } Federal Emergency Management Agency D, ,. [ Washington, D.C. 20472 4' t 2 6 J AN 1982 t R caso 9 MEMORANDUM FOR: Brian K. Grimes I 19 2 Director D aE$rT@825p> kf Division of Emergency Preparedness , re p U.S. Nuclear egul t ry Commission -

X-FROM: . , r Assistant Associate Director Office of Natural and Technological Hazards

SUBJECT:

Interim Findings on the Offsite Emergency Preparedness for the Enrico Fermi Atomic Power Plant, Unit 2 The Michigan State and the Monroe County and Wayne County site specific plans are still being screened by the Federal Emergency Management Agency (FEMA), Region V, and the Regional Assistance Comittee (RAC).

An evaluation of planning standards A-P will be submitted to the Nuclear Regulatory Commission by March 15, 1982, following the RAC review of the plans and the evaluation of the February 2,1982, exercise. Attached are the FEMA Region V interim findings and their letter of January 8,1982, to the State of Michigan.

Attachment h

'd ilu.

PnB)7t01. - ,

~i% . Vete red nwngoecmed.

L's

'S M QQ  %

r202030116 s20126 PDR ADOCK 05000341

, <[,

F PDR g

[

t -

CR9925 FEDERAL~

EMERGENCY MANAGEMENT AGENCY Region V Federal Center Battle Creek, Michigan 49016 JAN 2 1 1992 2 1 J u BI /.i W MEMORANDUM FOR: Acting Chief, Natural and Technological Hazards Division Attention: H. Gaut, Technological Hazards Branch FRON: Regional Director. FEMA Region V

SUBJECT:

Interim Report - Enrico Fermi Atomic Power Plant, Unit 2 In response to your request, attached are the Interim Findings of State and local readiness for off-site radiological emergency preparedness for the Enrico Femi Atomic Power Plant, Unit 2.

An evaluation of planning standards will be submitted as part of this Interim Report once the Regional Advisory Committee has completed its review of the recently submitted Monroe and Wayne Counties local off-site plans and an evaluation has been completed of the Enrico Fermi Atomic Power Plant. Unit 2 scheduled for February 2,1982.

The State will be notified of a 30-day period frtxn receipt of the RAC plan review and the post-exercise evaluation in which to connent on any deficiencies.

O

!d% __ - '

, f 56hn T. Anderson Attachment o

L -

Federal Emergency Mana'genient Agency Region V 300 South Wacker,24th Floor, Chicago. IL 60606 (312) 353-1500 January 8, 1982 Captain Peter Basolo, Deputy Director of Emergency Services Dept. of State Police' 111 So. Capitol Ave. 2nd F1.

Lansing, Michigan 48913

Dear Captain Basolo:

The Federal Emergency Management Agency (FEMA) has requested an interim report on the planning status for Enrico Fermi Atomic Power Plant, Unit 2.

Interim findings may be based on any stage of preparedness ranging from an untried paper plan to a state of preparedness which except for the formalities of the process, could satisfy the condition of 10 CFR 350.

The enclosed document is the interim report on Enrico Fermi Atomic Power Plant, Unit 2 prepared by FEMA Region 5 staff.

An evaluation of planning standards A-P will be submitted as part of this interim report once the Regional Advisory Committee has completed its review of the recently submitted Monroe and Wayne Counties local site specific plans and an evaluation has been completed of the Enrico Fermi Atomic Power Plant, Unit 2 scheduled for February 2, 1982.

Any consnents you may have on this interim finding should be sent to Mr. Dan Bement by February 5, 1982.

Sincerely yours, r ., -

4 John T. Anderson Regional Director Attachments O

~ * ^

INTER 7M FINDINGS FOR ENRICO FERMI NbCLEAR POWER PLANT, UNIT 2 OFF-SITE RADIOLOGICAL EMERGENCY PREPAREDNESS I. Introduction

1. This document constitutes an interim finding prepared by the Federal Emergency Management Agency (FEMA) Region V on the adequacy of radiological emergency preparedness of the state and local governments within Region V that would have to respond in the event of an accident at the Enrico Fernii Atomic Power Plant, Unit 2.

Enrico Fenni Atomic Power Plant, Unit 2 is located in Frenchtown Township approximately 6 miles NE of Monroe, Michigan and is on the western shore of Lake Erie. The plume exposure pathway Emergency Planning zone (EPZ) out to ten (10) miles includes parts of Monroe and Wayne Counties in Michigan and the Southern tip of Essex County, Canada. The affected population within the 10 mile EPZ is 64,546. The ingestion pathway EPZ (50 miles) includes portions of Canada, all of Monroe and Wayne Counties, part of Macomb, Oakland, Livingston, Washtenaw, Jackson, Lenawee, and Oakland Counties in Michigan. As well as Erie, Fulton, Lucas, Ottawa, Sandusky and Wood Counties in Ohio.

The principal technical and planning organizations involved are:

The Division of Emergency Services, Michigan Department of State Police.

Monroe City / County Office of Civil Preparedness Wayne County Office of Emergency Preparedness

2. The state plan'and site specific plans for Big Rock Point, D.C. Cook, and Palisades were initially prepared by state and local officials using NUREG 0654/ FEMA REP-1 Interim as a guide. These plans were informally submitted on April 21, 1980, for screening by FEMA and the Regional Advisory Committee. The results of this screening was provided to state and local officials in Lansing, Michigan on May 13, 1980.

A full scale exercise was conducted on June 24, 1980, to test the state plan and Charlevoix and Emmett Counties site specific plans for Big Rock Point Nuclear Power Plant. Subsequent exercises to test the state plan and site specific local plan for D.C. Cook and Palisades was cbnducted on October 9, 1980, and December 9, 1980.

On February 26, 1981, the Director of the Emergency Services Division, Michigan Department of State Police formally submitted to FEMA Region V for the Regional Director review of the state plan and local site specific plan for Big Rock Point, D.C. Cook, and Palisades Nuclear Power Plants. The Regional Director review is currently in. process.

? .<  ; -

The state plan, Monroe and Wayne Counties site specific plan for Enrico Femi Atomic Power Plant Unit 2 was submitted to FEMA Region V for screening by FEMA Region V and the Regional Advisory Committee on November 19, 1981. The state and local site specific plans were prepared by state and local officials using NUREG 0654/ FEMA REP-1 revised as a guide. Screening of the state plan and local site specific plans.for Enrico Femi Atomic Power Plant, Unit 2 is still in process by FEMA Region V and the Regional Assistance Committee.

A full scale exercise to test the state plan and local site specific plans for Enrico Fermi Atomic Power Plant, Unit 2 is scheduled for February 2, 1982. Public official conference and training drills are scheduled during January to prepare state and local officials for the February 2nd exercise.

A significant political event concerns the Emergency Classification system. Temporary rules were initially adopted so that the emergency classification system used by the state and local. governments would be consistent with that of the utility. These temporary rules when formally considered during the sumer of 1981 were not fomally adopted. Inquiries with the state has not clarified what Emergency Classification system Michigan follows.

3. Materials available for examination that form the basis for the findings l

presented in this document and available for examination include the

,following plans:

! Michigan Emergency Prepardness Plan including Radiological Emergency Response procedures.

Monroe County Emergency Operation Plan, Appendix 1, Nuclear

) Facility procedures.

Wayne County Emergency Operation Plan, Appendix 1, Nuclear Facility procedures.

II. Evaluation Screening of the state and local site specific plans for Enrico Femi Atomic Power Plant, Unit 2 is still in process of screening by FEMA l Region V and the Regional Advisory Committee. An evaluation of planning l standards A - P will be submitted after the Regional Advisory Comittee has completed its screening of the state and local site specific plans and an evaluation has been completed of the February 2, 1982, exercise.'

III. Schedule of Corrections

' Expected date for development of a schedule of Correction for specific deficiencies is expected to be developed in March, 1982.