MONTHYEARML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design ML20069K2781994-06-10010 June 1994 Application for Amends to Licenses NPF-2 & NPF-8,changing RTS & ESFAS Setpoints Associated W/Sg Water Level. Westinghouse Nonproprietary & Proprietary Version of Rept, SG Lower Level Tap... Encl.Proprietary Rept Withheld ML20064C2111994-02-23023 February 1994 Application for Amend to License NPF-2,revising TS, to Allow Implementation of 2 Volt Interim Plugging Criteria ML20063M0051994-02-16016 February 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes to TS to Allow Fuel Reconstitution,To Allow Use of ZIRLO Clad Fuel & to Remove Unnecessary Detailed Descriptions of Fuel & Control Rod Assemblies ML20067B9681994-02-15015 February 1994 Suppls 931124 Application for Amends to Licenses NPF-2 & NPF-8 Re Relocation of Reactor Trip & ESFAS Response Time Limits,Per Guidance in Final Form of GL 93-08, Relocation of TS Tables of Instrument Response Time Limits ML20058J5531993-12-0909 December 1993 Application for Amend to License NPF-2,revising TS 3/4.4.6, SGs & Associated Bases & TS 3/4.4.9, Specific Activity & Associated Bases for Use of 2 Volt Interim Repair Criteria for Next Refueling Outage Scheduled for Spring of 1994 1999-09-15
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20212K9531999-10-0101 October 1999 Amends 144 & 135 to Licenses NPF-2 & NPF-8,respectively, Revising TS Nis SRs to Adjust Nis Pr Channels Only When calorimetric-calculated Power Greater than Pr Indicated Power by More than +2% RTP ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20211B8761999-08-17017 August 1999 Amend 143 to License NPF-2,changing Unit 1 License in Response to Application Dtd 990423,by Adding Addl Condition Which Allows Operation of Unit 1 for Cycle 16 Based on risk- Informed Approach to Evaluate SG Tube Structural Integrity ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included ML20206L4451999-05-10010 May 1999 Amends 142 & 134 to Licenses NPF-2 & NPF-8,respectively, Changing TS 3/4.4.9, Specific Activity & Associated Bases to Increase Limit Associated with Dose Equivalent I-131 ML20203J0561999-02-19019 February 1999 Amends 107 & 85 to Licenses NPF-2 & NPF-8,respectively, Revising Section 6, Administrative Controls ML20196J4441998-12-0808 December 1998 Amends 140 & 132 to Licenses NPF-2 & NPF-8,respectively, Changing TSs to Revise Intermediate Range Neutron Flux Reactor Trip Setpoint & Allowable Valus & Delete Ref to Reactor Trip Setpoints in TS 3.10.3 ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20155H4771998-11-0303 November 1998 Amends 139 & 131 to FOLs NPF-2 & NPF-8,respectively,changing TSs to Revise SRs for Auxiliary Building & SW Building Batteries to Remove Existing 1.75 Volt Min Individual Cell Voltage Associated with Svc Test Acceptance Criterion ML20154L2731998-10-15015 October 1998 Amends 138 & 130 to Licenses NPF-2 & NPF-8,respectively, Changing TSs to Change Applicable Modes for Source Range Nuclear Instrumentation (TS 3/4.3.1, Reactor Trip Sys Instrumentation) ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20217P0471998-04-29029 April 1998 Amends 137 & 129 to Licenses NPF-02 & NPF-08,respectively, Change Max Reactor Core Power Level for Facility Operation from 2652 Mwt to 2775 Mwt for Plants.Amends Also Approve Changes to TS to Implement Uprated Power Operation ML20216C1651998-04-0909 April 1998 Amends 136 & 128 to Licenses NPF-2 & NPF-8,respectively, Revising pressure-temp Limit Heatup & Cooldown & Hydrostatic Testing Curves ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20203B4521998-02-0505 February 1998 Amends 135 & 127 to Licenses NPF-2 & NPF-8,respectively, Changing Number of Allowable Charging Pumps Capable of Injecting Into RCS When Temp of One or More Cold Legs Equal to or Less than 180F ML20203B7501998-02-0505 February 1998 Amends 134 & 126 to Licenses NPF-2 & NPF-8,respectively, Change TS 3.9.13 by Adding Footnote to Clarify Required Electrical Power Sources for Penetration Room Filtration Sys When Aligned to SFP Room During Refueling Operations ML20199F8751998-01-23023 January 1998 Amends 133 & 125 to Licenses NPF-02 & NPF-08,respectively, Changing Plant TS to Incorporate Requirements Necessary to Change Basis for Prevention of Criticality in FSP ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20198R5181997-10-29029 October 1997 Amends 132 & 124 to Licenses NPF-02 & NPF-08,respectively, Changing TS 3/4.4.9, Specific Activity & Associated Bases to Reduce Limit Associated W/Dose Equivalent iodine-131 ML20212F4621997-10-23023 October 1997 Amend 131 to License NPF-2,reducing Number of Required Incore Detectors Necessary for Continued Operation for Reminder of Cycle 15 Only ML20212A2221997-10-17017 October 1997 Amends 130 & 123 to Licenses NPF-2 & NPF-8,respectively, Changing TS for Both Farley Units to Allow Operability Testing for Certain Containment Isolation Valves During Defueled Status ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20217E8231997-10-0101 October 1997 Amends 129 & 122 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Clarify That Testing of Each Shared EDG 1-2A & 1C,to Comply W/Surveillance Requirement 4.8.1.1.2.e,only Required Once Per 5 Yrs on Per EDG Basis ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20141F2391997-05-19019 May 1997 Amend 128 to License NPF-2,changing TS 3/4.4.9 & Associated Bases to Reduce Limit Associated W/Dose Equivalent I-131 ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137E2621997-03-25025 March 1997 Amends 126 & 120 to Licenses NPF-2 & NPF-8,respectively, Revising Listed TSs & Associated Bases to Remove Certain cycle-specific Parameter Limits from TSs & Relocating to COLR ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20137E2891997-03-24024 March 1997 Amends 125 & 119 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Incorporate Latest Revised Topical Repts Governing Installation of Laser Welded SG Tube Sleeves ML20137D6751997-03-24024 March 1997 Amend 124 to License NPF-2,revising TS 3/4.4.6, Steam Generators & Associated Bases to Implement voltage-based Alternate Repair Criteria for Steam Generator Tubes ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20134F3611997-02-0303 February 1997 Amends 123 & 118 to Licenses NPF-02 & NPF-08,respectively, Replacing Containment Sys TS 3.6.2.2 for Spray Additive Sys W/New ECCS TS 3.5.6 for ECCS Recirculation Fluid Ph Control Sys ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20129K3761996-11-20020 November 1996 Amend 117 to License NPF-8,changing TS to Allow Installation of Laser Welded Elevated Tubesheet Sleeves ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20115J9241996-07-19019 July 1996 Amends 120 & 112 to Licenses NPF-2 & NPF-8,respectively, Approving Unit Cycle Specific TS Change to Note 4 of Table 4.3-1 That Permits Continued Operation of Both Units W/O Performing Required Serveillance of Manual Safety Infection 1999-09-15
[Table view] |
Text
0-b Malling Addrms Alabama Powar Company 600 North 18th Street Post Office Box 2641
~
Birmmgham, Alabama 35291 Telephone 205 783-6081 b
F. L. Clayton, Jr.
S0,'
- %dl"'
AlabamaPower g
the souttern electrc system October 8, 1982 Docket No. 50-364 Director, Nuclear Regulatory Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 j
Attention:
Mr. S. A. Varga l
l Joseph M. Farley Nuclear Plant - Unit 2 l
Turbine Valve Technical Specification Change Request Gentlemen:
1 In accordance with Unit 2 Technical Specification 3/4.3.4, Alabama Power Company is required to perform periodic surveillance testing of turbine valves to demonstrate valve operability.
These surveillance requirements necessitate all turbine stop, governor, reheat stop and reheat intercept valves to be stroked through their complete cycle from their operational position.
Alabama Power Company requests a one-time change to Technical Specification 4.3.4.2.a and 4.3.4.2.b to waive turbine valve testing during the remainder of the first fuel cycle for Unit 2.
l Steam enters the high pressure turbine through four turbine l
stop valves in series with four governor valves.
Steam exits the high pressure turbine, flows through the moisture separator reheaters, and enters the low pressure turbines through four reheat stop valves in series with four reheat intercept valves.
The turbine is equipped with
)
an emergency trip system that is designed to close the turbine gjoOl stop, governor. reheat stop and reheat intercept val ves in the event of turbine overspeed, low bearing oil pressure, low vacuum, or thrust i
bearing failure.
An electric trip system is also provided for remote vJC[
manual trips and various other trips.
Turbine trip for an overspeed D
condition is ef fected by three overspeed sensors.
The primary overspeed YD2O.O control is provided by the Digital Electro-Hydraulic Control System which is set to produce a turbine trip at 103% of rated shaft speed.
The first backup overspeed protection is provided by a mechanical overspeed mechanism and trips the turbine at 111% of rated shaft speed.
The secondary backup overspeed protection is provided by the electro-hydraulic control system if the rated shaft speed exceeds 111.5%.
This redundancy in both turbine valves and overspeed protection controls provides high assurance that turbine speed control will be maintained.
8211040354 B21008 PDS ADOCK 05000364 L
~
PDR p
F'~
October 8,1982 Mr. S.~A. Varga U. S. Nuclear Regulatory Commission Page 2 1
Alabama Power Company has reviewed the results of the weekly performances of the Unit 2 turbine valve technical specification surveillance requirement and past performance of valve _ operation during Unit 2 turbine trips and has determined that no turbine valve has failed to close on demand.
Additionally, turbine valves on Unit 1, identical models to Unit 2, have never failed to fully close on demand _ during associated turbine valve tests and turbine trips.
These results are based on 40 turbine trips and 69 valve tests for Unit 2 and 118' turbine trips and over 90 valve tests for Unit 1.
This history of trouble-f ree valve operation provides added assurance of the dependability of these valves and the redundant overspeed protection systems.
In addition to the turbine stop and governor valves, the main steam isolation valves, which are periodically tested, provide another mechanism to terminate steam flow to the turbine.
In order to perform the turbine valve tests required by the technical specifications, the unit must be reduced to approximately 85%
power.
As the reactor core nears end-of-life, cycling of the nuclear steam supply system imposes operational dif ficulties in maintaining the axial flux difference within the technical specification target band limitation and results in a potential restriction of 50% power for 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
The return to full power following turbine valve tests performed near the end of reactor core life necessitates the processing of significant amounts (i.e., 20,000 gallons) of reactor coolant.
In returning to full power, operational dif ficulties also occur from overcoming negative reactivity due to xenon transients.
These power transients and the potential for delays in the return to power from turbine valve tests performed during the end of reactor core life are unnecessary because the turbine valves and overspeed protection system have been demonstrated as highly reliable.
Since Alabama Power Company has demonstrated the high reliability of the turbine overspeed protection system and turbine valves, this proposed one-time change does not represent a risk to the health and safety of the public nor jeopardizes the safe operation of the Farley Nuclear Plant - Unit 2.
In order to avoid the unnecessary cycling of the nuclear steam supply system and the potential delays in the return to power from the turbine valve tests, Alabama Power Company requests a one-time change to Technical Specification 4.3.4.2.a and 4.3.4.2.b to waive turbine valve testing during the remainder of the first fuel cycle for Unit 2.
The Unit 2 first fuel cycle is expected to end in late October, and this proposed one-time change would waive approximately two turbine valve tests required by the current technical specifications.
The Plant Operations Review Committee and the Nuuear Operations Review Board of Alabama Power Company have reviewed this proposed one-time Technical Specification change (Attachment 1) and have determined that this change does not involve an unreviewed safety question as shown in the attached safety evaluation ( Attachment 2).
f Mr. S. A. Varga October 8,1982 U. S. Nuclear Regulatory Commission Page 3 Your response to this proposed one-time technical specification change is requested by October 8, 1982, 5:00 p.m. CDT, in order to waive the requirements prior to the upcoming turbine valve tests scheduled for the weekend of October 9, 1982.
This proposed amendment is designated as Class III for Unit 2 in accordance with 10 CFR 170.22 requirements.
Enclosed is a check for
$4,000 to cover the total amount of fees required.
In accordance with 10 CFR 50.30(c)(1)(1) three signed originals and forty (40) additional copies of the proposed changes are enclosed.
Yours very truly, F. L. Clayton 'Jr.
q FLCJ r/ MAL :l s h-09 Attachments cc:
Mr. R. A. Thomas SWORN TO AND SUBSCRIBED BEFORE ME Mr. G. F. Trowbridge THIS S C DAY OF/VftJdA., 1982 Mr. J. P. O'Reilly