MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design ML20069K2781994-06-10010 June 1994 Application for Amends to Licenses NPF-2 & NPF-8,changing RTS & ESFAS Setpoints Associated W/Sg Water Level. Westinghouse Nonproprietary & Proprietary Version of Rept, SG Lower Level Tap... Encl.Proprietary Rept Withheld ML20064C2111994-02-23023 February 1994 Application for Amend to License NPF-2,revising TS, to Allow Implementation of 2 Volt Interim Plugging Criteria 1999-09-15
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20198R5181997-10-29029 October 1997 Amends 132 & 124 to Licenses NPF-02 & NPF-08,respectively, Changing TS 3/4.4.9, Specific Activity & Associated Bases to Reduce Limit Associated W/Dose Equivalent iodine-131 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20137E2891997-03-24024 March 1997 Amends 125 & 119 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Incorporate Latest Revised Topical Repts Governing Installation of Laser Welded SG Tube Sleeves ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design 1999-09-15
[Table view] |
Text
..
,*. Deva M r:y S:utheraNucle r Vice Presdent Op;t: ting Ccmpany I
' ~ Farley Pmmt P.O. Box 1295 Bamingham. Alabama 35201 Tel 205 992.5131 June 13,1997 SOUTHERN COMPANY Energy to Serve Your%%" 7 Docket Nos.: 50-348 10 CFR 50.90 ,
50-364 U.S. Nuclear Regulatory Commissior.
ATTN: Document Control Desk Washington, DC 20555 :
Joseph M. Farley Nuclear Plant Request to Revise Technical Specifications and Associated Bases Storage Pool Ventilation (Fuel Movement) l Ladies and Gentlemen:
l In accordance with the provisions of 10 CFR 50.90, Southern Nuclear Operating Company (Southern Nuclear) proposes to amend the Joseph M. Farley Nuclear Plant Units 1 and 2 Technical Specifications (TSs). The proposed changes are found in TS 3/4.9.13, Storage Pool a
- Ventilation (Fuel Movement), of the Unit I and Unit 2 TSs and the essociated Bases. The first ,
of these proposed changes will add a note in the TSs to specifically indicate that the normal or emergency power source may be inoperable in MODE 5 or 6 provided that the requirements of ,
TS 3.8.1.2 are satisfied. The second of these proposed changes will extend the TS 3.9.13 I completion time allowed for returning one out-of-service penetration room filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days. The Bases will also be modified to provide additional detail concerning these changes. These TS changes are technically consistent with the requirements 1 l ofNUREG-1431, Revision 1," Westinghouse Standard Technical Specifications," issued on !
April 7,1995.
i l
The basis for the proposed TS changes is provided in Enclosure 1. The supporting significant hazards evaluation pursuant to 10 CFR 50.91 is provided in Enclosure 2. Based upon the
!/
l analysis provided, Southern Nuclear has determined that the proposed changes to the TS do
! not involve a significant hazards consideration as defined by 10 CFR 50.92. Sou has determined that the proposed license amendment will not significantly affect the quality of ,
the human environment. ;
l The revised typed pages of the proposed TSs, including page change instructions, are included in Enclosure 3. The marked pages are provided in Enclosure 4.
The Plant Operations Review Committee has reviewed and recommended approval of these proposed changes. A copy of these proposed changes is being sent to Dr. Donald E.
Williamson, the Alabama State Designee, in accordance with 10 CFR 50.91(b)(1). l
(
l 4
9706180347 970613 PDR ADOCK 05000348 g g,gglllglQl P PDR;.
.; s ,
- U.S.' Nuclear Regulatory Commission Page 2 Approval status of this amendment request will atTect the upcoming outage duration.
Therefore, NRC review and approval of these proposed changes is requested by October 1997, ,
to support planning efTorts for the Spring 1998 outage. j 1
If there are any questions, please advise j Respectfully submitted, !
l SOUTilERN NUCLEAR OPERATING COMPANY -
$1 }7lpw l l Dave Morey
. Sworn to andsubscribed bgore me this /3 Y day o 199, as b
Notary Public !
! My Commission Expires: /, Nb JMG/ cit:zzzprf. doc
Enclosures:
- 1. Basis for Change Request
- 2. 10 CFR 50.92 Evaluation
- 3. Page Change Instructions and Revised Pages
- 4. liand-Marked Pages cc: Mr. L. A. Reyes, Region 11 Administrator Mr. J.1. Zimmerman, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident inspector Dr. D. E. Williamson, State Department of Public Health l
l i
f a
e.
i
Joseph M. Farley Nuclear Plant l Request to Revise Technical Specifications and Associated Bases Storage Pool Ventilation (Fuel Movement) 113 sis for Change Reques.1_
The first of the proposed changes will add a note in technical specification (TS) 3/4.9.13 to specifically indicate that the normal or emeigency power source may be inoperable in MODE 5 l or 6 provided that the requirements of TS 3.8.1.2 are satisfied. Currently, the TSs do not I specifically note that either the normal or emergency power sources may be inoperable during 1 MODE 5 or 6. The Farley Nuclear Plant (FNP) design basis for electrical sources during refueling (TS 3.8.1.2) requires at least one offsite circuit through the IE distribution system be ;
operable and at least one of the emergency diesels be operable. If the present TS 3/4.9.13 was read to require that both independent penetration room filtration systems be operable when it is aligned to the spent fuel room during refueling operations - using the definition of OPERABLE in the TSs - each system would have to have at least one offsite circuit through the 1E distribution system and at least one of the emergency diesels to be operable. This l interpretation would require that, for the Penetration Room Filtration sy', tem to be in an I operable status when it is aligned to the spent fuel room during refueling operations, at least two offsite circuits through separate 1E distribution systems and at least two emergency diesels must be operable. This requirement for diversity and redundancy during periods of refueling is beyond the required design basis of the plant. The associated Bases will also include a statement that, in Modes 5 and 6, the electrical power requirements do not require considering a single failure coincident with a loss of all offsite or all onsite power.
The note that is being proposed provides clarification relative to the electrical system requirements for the penetration room filtration system when it is aligned to the spent fuel pool room during refueling operations. This issue was suitably addressed when the Improved Westinghouse Standard Technical Specifications NUREG-1431, Revision 1 (ITS) were issued on April 7,1995. This change is technically consistent with the requirements of the ITS.
The second of these proposed changes will extend the TS 3.9.13 completion time allowed for returning one out-of-service penetration room filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days. This specification is applicable during crane operation with loads over the fuel in the spent fuel pit and during fuel movement within the spent fuel pit. The 7 day completion time for this action is consistent with the existing TS 3.7.8, Penetration Room Filtration System (Modes 1-4). The 7 day completion time is based on the low likelihood of an event occurring during this time l
l r
i El-1
t .
.j- * ,
Enclosure 1 Basis for Change Request l
l that would require this system to function, the fact that the remaining operable train is capable of automatically providing 100% of the required system function, and the capability exists to manually operate system components on the inoperable train, if required. This change will make the two TS requirements for this system (3.9.13 and 3.7.8) consistent and still provide a ,
sufficient restriction upon plant operation to avoid an undue rish to public health and safety. 1 This change is also technically consistent with the requirements of the ITS. The associated Bases will also include additional information regarding this change.
l l
i l
l l
i o
i l El-2 1
l
ENCLOSURE 2 Joseph M. Farley Nuclear Plant Request to Revise Technical Specifications and Associated Bases Storage Pool Ventilation (Fuel Movement) i 1.0 CFR 50.92 Evaluation Pursuant to 10 CFR 50.92 each application for amendment to an operating license must be reviewed to determine if the proposed change involves a significant hazards consideration. l The amendment, as defined below, describing the Technical Specifications changes to the Storage Pool Ventilation during fuel movement requirements and the associated Bases, has been reviewed and deemed not to involve a significant hazards consideration. The basis for this determination follows.
BACKGROUND One of the purposes of the penetration room filtration system is to ensure that radioactive material released as a result of a fuel handling accident in the spent fuel pool room will be filtered through the HEPA filters and charcoal absorbers prior to discharge to the atmosphere.
Physically, for each unit, there are two systems which perform functions during normal operations and other functions during refueling operations. The governing specifications for these systems during normal operations in Modes 1-4 are TS 3/4.7.8, Penetration Room Filtration Systems. The governing specification during refueling operations is 3/4.9.12 and 3/4.9.13. The current specification, read literally -- using the definition of OPERABLE in the technical specification -- would require at least two offsite circuits through separate 1E distrib systems and at least two emergency diesels for the penetration room filtration system :., oe in an operable status when it is aligned to the spent fuel room during refueling operations.
Likewise, the completion time allowed for returning one out-of-service penetration room filtration system is 7 days during Modes 1-4 (TS 3.7.8). The current TS 3.9.13 requirement provides a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> allowed outage time for one out-of-service penetration room filtration system during crane operation with loads over the fuel in the spent fuel pit and during fuel movement within the spent fuel pit. There is a low likelihood of an event occurring during this time that would require this system to function. The remaining operable train is capable of automatically providing 100% of the required system function and capability exists to manually operate system components on the inoperable train, if required.
l i
i E2-1 l
( .
s
' l l Enclosure 2 i 10 CFR 50.92 Evaluation l
DESCRIPTION OF CHANGE REOUEST The first proposed change will specifically note that the normal or emergency power source may be inoperable in MODE 5 or 6 provided that the requirements of TS 3.8.1.2 are satisfied.
Currently, the TSs do not specifically note that either the normal or emergency power sources may be inoperable during MODE 5 or 6. The Farley Nuclear Plant (FNP) design basis for electrical sources during refueling (TS 3.8.1.2) requires at least one offsite circuit through the l 1E distribution system be operable and at least one of the emergency diesels be: 4.:rable. The I placement of this proposed note will clarify any misconceptions relative to the required electrical power sources. The associated Bases will also be modified to state that, in Modes 5 and 6, the electrical power requirements do not require considering a single failure coincident with a loss of all offsite or all onsite power. This issue was also suitably addressed when the Improved Westinghouse Standard Technical Specifications NUREG-1431, Revision 1 (ITS) were issued on April 7,1995. This change is technically consistent with the requirements of the ITS.
The second proposed change will extend the TS 3.9.13 completion time allowed for returning l one out-of-service penetration room filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days. This change will make the two TS requirements for this system (3.9.13 and 3.7.8) consistent and still provide a suflicient restriction upon plan: operation to avoid an undue risk to public health and safety. This change is also technically consistent with the requirements of the ITS. The associated Bases will also be revised to state that during this period, the remaining OPERABLE train is adequate to perform the penetration room filtration (PRF) function and that the 7 day completion time is based on the low risk of an event occurring requiring the inoperable PRF train, and the capability of the remaining PRF train to provide the required protection.
ANALYSIS Regarding the first proposed change, the allowance to have both penetration room filtration systems powered in accordance with TS 3.8.1.2, when they are aligned to the spent fuel pool room, is technically consistent with the FNP licensing basis. When a unit is shut down, TS requirements ensure that the unit has the capability to mitigate the consequences of postulated accidents. However, assuming a single failure and concurrent loss of all offsite or all onsite l
l E2-2
l En' closure 2 l
10 CFR 50.92 Evaluation power is not required. This proposed change is technically consistent with the requirements of NUREG-1431, Revision 1 which has already received the requisite review and approval of the NRC stafT.
Regarding the second proposed change, extending the TS 3.9.13 completion time allowed for returning one out-of-service penetration room filtration system from 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to 7 days is
! consistent with the existing TS 3.7.8, Penetration Room Filtration System (Modes 1-4). The 7 day completion time is based on the low likelihood of an event occurring during this time that would require this system to function and the fact that the remaining operable train is capable of automatically providing 100% of the required system function. This change will make the two TS requirements for this system (3.9.13 and 3.7.8) consistent and still provide a sufficient restriction upon plant operation to avoid an undue risk to public health and safety. This change is technically consistent with the requirements of the ITS.
10 CFR 50.92 EVAL.UATION CONCLUSIONS Based on the preceding evaluation, the following conclusions are provided with respect to the criteria contained in 10 CFR 50.92.
(1) The proposed changes do not significantly increase the probability or consequences of an accident previously evaluated in the FSAR. The proposed changes have no impact on the probability of an accident. The storage pool ventilation system will continue to ensure that radioactive material released as a result of a fuel handling accident in the l spent fuel pool room will be filtered through the HEPA filters and charcoal absorbers l prior to discharge to the atmosphere. There is no change in the FNP design basis as a result of this change and, as a result, does not involve a significant increase in the consequences of an accident previously evaluated.
(2) The proposed changes to the TSs do not increase the possibility of a new or different ;
kind of accident than any accident already evaluated in the FSAR. No new limiting single failure or accident scenario has been created or identified due to the proposed changes. 1 Safety-related systems will continue to perform as designed. The proposed changes do !
not create the possibility of a new or different kind of accident from any previously evaluated.
l E2-3
e Enclosure 2 10 CFR 50.92 Evaluation (3) The proposed changes do not involve a significant reduction in the margin of safety. As a result of these proposed changes, the penetration room filtration system, when it is ;
aligned to the spent fuel pool room, will continue to require verification of operability.
There is no impact in the accident analyses. These proposed changes are technically consistent with the requirements of NUREG-1431, Revision I which has already received the requisite review and approval of the NRC staff. Thus the proposed changes j do not involve a significant reduction in the margin of safety. l Accordingly, Southern Nuclear has determined that the proposed changes with respect to the Storage Pool Ventilation during, fuel movement TSs do not involve a significant hazards consideration.