Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing
ML20138B916
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/23/1997
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20138B921 List:
References
NUDOCS 9704290307
Download: ML20138B916 (2)


Text

_ _ _ .. _ _ ___

a

, . s

  • D:vo Mor:y South 1rn Nuclear

, g Vice President Operating Crmpany 8 ** . Fady Project P.O. Box 1295

, Birmingham, Alabama 35201 Tel 205 992.5131 s

April 23, 1997

SOUTHERN L COMPANY Energy to Sern YourWorld" Docket Nos.
50-348 10 CFR 50.90 50-364 i

U.S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, DC 20555 Joseph M. Farley Nuclear Plant

, Control Room Emergency Filtration, Penetration Room Filtration,

and Containment Purge Exhaust Filtration Systems 1

Enforcement Discretion Supplement 3 Ladies and Gentlemen:

By letter dated February 27,1997, Southern Nuclear requested enforcement discretion for Technical Specification (TS) requirements associated with the Control Room Emergency Filtration, Penetration Room Filtration, and Containment Purge Exhaust Filtration Systems.

Recent discussions with the NRC Staff have identified a requirement to revise the proposed technical specification pages associated with the request for enforcement discretion and to provide additional information on filter testing and mechanical heater testing.

The proposed technical specification pages were originally submitted by Southern Nuclear letter dated February 24,1997. The pages will be revised to include a footnote concerning the filter pressure drop testing and the mechanical heater testing. The marked up revisions to the technical specification pages submitted on February 24,1997 are provided in Enclosure 1. Enclosure 2 contains the revised technical specification pages. To ensure completeness, all revised pages submitted with the February 24,1997 submittal are included in this submittal. The conclusions of the significant hazards evaluation provided by the February 24,1997 letter are not affected by the changes and remain valid.

d In summary the proposed changes reflect a commitment to revise the Technical Specifications to specify a pressure drop that will correspond to the filter pressure drop that ensures compliance

, with the minimum flow rates identified in the applicable TS. His will be accomplished in our June 1997 submittal. In addition the proposed changes allow SNC to defer performing heater mechanical testing until the completion of each Unit's next scheduled refueling outage. He extended implementation is needed since the FNP HVAC systems are not designed to perform this i testing, test procedures and analytical methods need to be developed, and the testing may require modifications to the FNP HVAC systems. SNC intends to implement this testing as soon as /

practical and if no modifications are required, the testing should be implemented by December 1997. b(f (

i II la' u 8-9704290307 970423 s a u ADOCK 05000348 l ll' ll lllt PDR p PDR - i = = l l.llli

.l'l a n

.. . .. ._ . . _. _ - - . - .--. . - - . - .__ - - . . - _. -._ ..=_ _..__. - . - .-

e#

~

1 .

) *

  • o i .

4 U. S. Nuclear Regulatory Commission Page 2 l

l  !

1 l l If you have any questions, please advise. l

Respectfully submitted,

]

1 SOUTHERN NUCLEAR OPERATING COMPANY l

Ch %sf 1

Dave Morey Sworn to andsubscribed b fore me thi. y af 1997 7hictAo ehlt 2& Notary PublicV 1

My Commission Expires: /, / 7 l JGS/maf: PRFSUPP3. DOC a

l

Enclosures:

1. Marked Up Technical Specification Pages
2. Unit i Technical Specification Pages
3. Unit 2 Technical Specification Pages cc: Mr. L. A. Reyes, Region II Administrator Mr. J.1. Zinunerman, NRR Project Manager Mr. T. M. Ross, Plant Sr. Resident inspector Dr. D. E. Williamson, State Department of Public Health