Application for Amend to License NPF-2,revising TS, to Allow Implementation of 2 Volt Interim Plugging Criteria
ML20064C211
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 02/23/1994
From: Dennis Morey
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20064C213 List:
References
NUDOCS 9403090209
Download: ML20064C211 (2)


Text

__

Southern Nuclear Operating Company Post O%ce Box 1295 Birmmgham. Alabam135201

, , Telephone p05) 868 5131 nk

^

o... u m., Southern Nudear Operating Company ll$$$ February 23, 1994 the sounwn eiwinc svstem Docket No. 50-348 10 CFR 50.90 U. S. Nuclear Regulatory Commission ATTN.: Document Control Desk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant - Unit 1 Technical Specification Changes Associated With

' Steam Generator Tube Support Plate Interim Repair Criteria Gentlemen:

By letter dated February 26,1991, Alabama Power Company submitted a steam generator tube support plate altemate plugging criteria. As a result of delays in approving the full voltage alternate repair criteria, a reduced voltage interim plugging criteria (IPC) was approved for Unit

1. The Unit 1 criteria were approved for one cycle of use on October 8,1992. The one cycle interim plugging criteria is on!y valid until the next refueling outage currently scheduled for March 1994.

By letter dated December 9,1993, Southern Nuclear submitted a proposed amendment to the Unit 1 Technical Specifications to allow implementation of a 2 voit IPC. During public meetings held on February 8-9,1994, the NRC Staff provided comments on the proposed 2 volt IPC.

In response to the NRC Staff comments and subsequent discussions with the Staff, Southern Nuclear will take the following actions in support of our 2 volt IPC request:

1. Southern Nuclear will continue to report predicted steam line break leakage prior to restart from the outage. Following completion of the outage, Southern Nuclear will provide a more detailed assessment of the effectiveness of the IPC methodology similar to that provided following the Unit 2 ninth refueling outage. Included in this detailed assessment will be a calculated probability of tube rupture in the event of a steam line break.
2. Prior to using smaller bobbin probes in the implementation of the IPC, additional evaluation of the smaller probes will be performed. This evaluation will be discussed with the NRC Staff prior to its implementation.
3. Southern Nuclear will reduce the upper bobbin voltage limit at which tubes inspected using the rotating pancake coil probe can be left in service if degradation is not detected to the level previously approved in earlier IPCs. Attachment 1 conta;as a revised Technical Specification page reducing the voltage. This page should be used as a replacement page for page 3/4 4-12a included in the December 9,1993, submittal.

9403090209 940223 ()

PDR ADOCK 05000348 P PDR \

s o

U. S. N'uclear Regulatory Commission Page 2

4. Southern Nuclear will continue to inform the NRC, prior to restart from the refueling outage, of any unexpected inspection findings relative to the assumed characteristics of the flaws at tube support plates. This includes any detectable circumferential indications or detectable indications extending outside the tube support plate thickness.

Any applicable safety evaluations for unexpected findings will be provided to the NRC.

Attachment 2 provides the updated voltage repair criteria.

Following a review of the 10CFR50.92 Significant Hazards Consideration evaluation contained in the December 9,1993, submittal, it was determined that the evaluation remains valid for these changes. Consequently, a revised Significant Hazards Consideration evaluation is not required.

A copy of these proposed changes is being sent to Dr. D. E. Williamson, the Alabama State Designee, in accordance with 10 CFR 50.91(b)(1).

If there are any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY l [ /Yri-Dave Morey REM / cit 2vlPCR2. OOC SWORN TO AND SUBSCRIBED BEFORE ME Attachments .

THIS cd3 4 DAY OF 'ht da aa a o1994 l cc: Mr. S. D. Ebneter s f C/ / '

Mr. B. L. Siegel ~ -))1CCb ' 4 g /r L M2C Mr. T. M. Ross

' Notary Pubild Dr. D. E. Williamson My Commission Expires: / #8 j / / 997 ge , , - ~.g-,.~ - ,- -w- e ,