MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design ML20069K2781994-06-10010 June 1994 Application for Amends to Licenses NPF-2 & NPF-8,changing RTS & ESFAS Setpoints Associated W/Sg Water Level. Westinghouse Nonproprietary & Proprietary Version of Rept, SG Lower Level Tap... Encl.Proprietary Rept Withheld ML20064C2111994-02-23023 February 1994 Application for Amend to License NPF-2,revising TS, to Allow Implementation of 2 Volt Interim Plugging Criteria 1999-09-15
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARL-99-033, Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions1999-10-0404 October 1999 Application for Amends to Licenses NPF-2 & NPF-8,to Change TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation,Which Reflect Agreements Reached in 990909 & 16 Discussions ML20212C5831999-09-15015 September 1999 Application for Amends to Licenses NPF-2 & NPF-8,committing Util to Transfer Certain CTS Requirements Into Util Controlled Documents & Specifying Schedule for Performing New & Revised ITS Surveillances.Revised License Pages,Encl ML20210R5181999-08-12012 August 1999 Revised Page 6 to 990430 LAR to Operate Farley Nuclear Plant,Unit 1,for Cycle 16,based on risk-informed Approach for Evaluation of SG Tube Structural Integrity.Marked Page of Current License,Included L-99-018, Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity1999-04-30030 April 1999 Application for Amend to License NPF-2 for Approval to Operate Unit 1,cycle 16 Only,Based on risk-informed Approach for Evaluation of SG Tube Structural Integrity L-99-013, Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl1999-04-0202 April 1999 Application for Amends to Licenses NPF-2 & NPF-8.Amends Would Increase Dei Limit from 0.15 to 0.3 Uci/Gram IAW 10CFR50.90.Marked-up & Revised Current TS Encl ML20155J4391998-11-0606 November 1998 Application for Amends to Licenses NPF-2 & NPF-8,requesting Change to TS Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2451998-10-12012 October 1998 Application for Amends to Licenses NPF-2 & NPF-8,revising Section 6 of TS by Recognizing Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20216F7051998-03-12012 March 1998 Application for Amends to Licenses NPF-2 & NPF-8 to Revise Existing TS in Entirety.Amend Consists Primarily of Conversion of Current TS to Improved Ts,Per NUREG-1431,rev 1.Vols 1-10 Contain Listed Attachments ML20198H3561998-01-0707 January 1998 Application for Amends to Licenses NPF-2 & NPF-8,adding Note to TS to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisified ML20198E6531997-12-31031 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value to Be Consistent W/W Std TS,NUREG-1431,Rev 1.Proprietary Safety Analysis,Encl.Proprietary Info Withheld ML20198E2891997-12-30030 December 1997 Application for Amends to Licenses NPF-2 & NPF-8,changing Requirements for Auxiliary Bldg & Svc Water Bldg Batteries, Per NRC Staff Concerns as Described in URI 50-348/97-201 & 50-364/97-201 & NOV 50-348/97-11 & 50-364/97-11 ML20198R5181997-10-29029 October 1997 Amends 132 & 124 to Licenses NPF-02 & NPF-08,respectively, Changing TS 3/4.4.9, Specific Activity & Associated Bases to Reduce Limit Associated W/Dose Equivalent iodine-131 ML20211P5811997-10-16016 October 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211A6811997-09-17017 September 1997 Application for Amends to Licenses NPF-2 & NPF-8,amending Primary Coolant Specific Activity,Per GL 95-05 ML20216C9231997-09-0303 September 1997 Application for Amend to License NPF-2,allowing Reduction in Available Paths to Min of 50% w/3 Per Core Quadrant. Non-proprietary & Proprietary W Repts CAA-97-234 & CAA-97-235,encl.Proprietary Info,Withheld ML20149K0971997-07-23023 July 1997 Application for Amends to Licenses NPF-2 & NPF-8,relocating RCS P/T Limits from TS to Proposed PT Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Protection Sys Limits ML20148R7351997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl ML20148Q0981997-06-30030 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys & Related Storage Pool Ventilation Sys & Revises Radiation Monitoring Instrumentation Channels ML20148K7421997-06-13013 June 1997 Application for Amends to Licenses NPF-2 & NPF-8,proposing Changes Found in Tech Specs 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3861997-05-28028 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5851997-05-27027 May 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Pump Valves ML20138B9161997-04-23023 April 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Proposed TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6011997-03-25025 March 1997 Application for Amend to License NPF-2,requesting Implementation of voltage-based Alternate Repair Criteria, Per GL 95-05 ML20137E2891997-03-24024 March 1997 Amends 125 & 119 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Incorporate Latest Revised Topical Repts Governing Installation of Laser Welded SG Tube Sleeves ML20136F8141997-03-0707 March 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising TS 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6511997-02-24024 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,requesting Revision & Clarification to Surveillance Requirements for Control Room Emergency Filtration Sys,Penetration Room Filtration Sys & Containment Purge Exhaust Filter ML20135C8311997-02-14014 February 1997 Application for Amends to Licenses NPF-2 & NPF-8,revising Specified Max Power Level & Definition of Rated Thermal Power ML20138G9451996-12-26026 December 1996 Application for Amends to Licenses NPF-2 & NPF-8,reflecting Guidance in GL 95-05, SG Tube Support Plate Voltage-Based Repair..., to Use Revised Accident Leakage Limit of 20 Gpm & Include 50% of Rpc Ndds in Calculation.W/O Unit 2 TSs ML20134K5501996-11-15015 November 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting Deletion of TS 3.6.2.2 Re Containment Spray Additive Sys ML20128F8681996-09-30030 September 1996 Application for Amends to Licenses NPF-2 & NPF-8,relocating cycle-specific Core Operating Parameter Limits to Colr. Proposed Changes Based on Guidance Found in NRC GL 88-16, WOG-90-016,NUREG-1431 & VEGP COLR Approved by NRC ML20117G2911996-08-30030 August 1996 Application for Amend to License NPF-8,requesting Deletion of References to Cycle Specific L* Criteria ML20117D2201996-08-23023 August 1996 Application for Amends to Licenses NPF-2 & NPF-8,requesting to Allow Use of Elevated Sleeve ML20113B6931996-06-24024 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,deleting Requirement for Surveillance of Manual SI Input to Reactor Trip Circuitry Until Next Unit Shutdown ML20113A7991996-06-20020 June 1996 Application to Revise Ts,Reflecting Implementation of 10CFR50,App J,Option B & Represent Crossed Beneficial Licensee Actions ML20112G9711996-06-12012 June 1996 Application for Amends to Licenses NPF-2 & NPF-8,providing Improved Operating Margins as Well as Increased Flexibility W/Respect to Core Designs & Plant Operating Strategy. Rev 2 to NSD-NT-OPL-96-152 Withheld ML20107J9551996-04-23023 April 1996 Application for Amend to License NPF-8,requesting Unit 2 Cycle 11 TS Change for SG Tubes Remaining in Svc ML20107J1521996-04-22022 April 1996 Application for Amend to License NPF-8,reflecting Implementation of New F* Criteria Based on Maintaining Existing Safety Margins for SG Tube Structural Integrity Concurrent W/Allowance for NDE Eddy Current Uncertainty ML20101L9041996-03-29029 March 1996 Application for Amend to License NPF-8,revising TS 3/4.4.6, Steam Generators & Associated Bases,Reflecting Guidance in GL 95-05.Responses to GL & Revised TS Encl ML20095L0161995-12-19019 December 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising Tech Specs Section 3/.7.7 Re Control Room Emergency Ventilation Sys ML20098B0911995-09-26026 September 1995 Application for Amends to Licenses NPF-2 & NPF-8,changing TS 4.6.1.3 to Incorporate Improvements to Containment Air Lock Testing Ref in Chapter 3.6,containment Sys of NUREG-1431, Sts,Westinghouse Plants ML20092F3821995-09-15015 September 1995 Application for Amend to License NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements ML20084P4901995-05-31031 May 1995 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Associated W/Steam Generator Tube Support Plate voltage- Based Repair Criteria ML20080R8201995-03-0606 March 1995 Application for Amends to Licenses NPF-2 & NPF-8,relocating Seismic & Meteorological Monitoring Instrumentation TSs to FSAR ML20078P8331995-02-14014 February 1995 Application for Amend to Licenses NPF-2 & NPF-8 Re Permanent voltage-based Repair Criteria for Outside Diameter Stress Corrosion Cracking at SG Tube Support Plates for Both Units at Plant ML20077R4071995-01-0909 January 1995 Application for Amends to Licenses NPF-2 & NPF-8, Incorporating line-item TS Improvements to Reduce Surveillance Requirements for Testing During Power Operation in Response to GL 93-05 ML20078S7531994-12-19019 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS Pages for Mssv,Per NRC Information Notice 94-060, Potential Overpressurization of Main Steam Sys ML20077E3461994-12-0707 December 1994 Application for Amends to Licenses NPF-2 & NPF-8,revising TS to Reflect Guidance in Draft GL 94-XX, Voltage-Based Repair Criteria for Repair of Westinghouse SG Tubes Affected by Outside Diameter Stress Corrosion Cracking ML20078B5451994-10-20020 October 1994 Application for Amends to Licenses NPF-2 & NPF-8,proposing TS 3/4.3.3.6 & Associated Bases,Which Will Delete Requirements for Chlorine Detection Sys from Units 1 & 2 TS ML20072F3401994-08-17017 August 1994 Application for Amends to Licenses NPF-2 & NPF-8,eliminating Periodic Pressure Sensor Response Time Testing Requirements. Rev 1 to WCAP-13787 & Proprietary Rev 1 to WCAP-13632, Elimination of Pressure... encl.WCAP-13632,Rev 1 Withheld ML20070A1001994-06-17017 June 1994 Application for Amend to License NPF-2,revising TS 3/4.2.3 to Increase Nuclear Enthalpy Rise Hot Channel Factor Limit from 1.65 to 1.70 for Vantage 5 Fuel,In Order to Provide Greater Flexibility in Farley Unit 1 Core Design 1999-09-15
[Table view] |
Text
'
~
_ .p -]
, __ N*1- J Southern Nuclear Oper; tin 0 Company -
- ~1e
) t }, y Post Omco Box 1295 -
Sirmingham, Alabama 35201 p . Telephone (205) 868 5131 -
' +'
' oeve morey Southern Nudear Operating Company Vee President Farley Project : the southem electnc System March 6,1995
- 10 CFR 50.90 Docket Nos. 50-348 1 I
L 50 364 l l U. S. Nuclear Regulatory Commission j ATTN: Document ControlDesk Washington, D. C. 20555 Joseph M. Farley Nuclear Plant Request to Relocate Seismic and Meteorological Monitoring Instrumentation Technical Specifications to FSAR '
Ladies and Gentlemen:
In accordance with the provisions of 10 CFR 50.90, Southern Nuclear Operating Company (SNC) proposes to amend the Farley Unit I and Unit 2 Technical Specifications
- (TS) to relocate the Seismic and Meteorological Monitoring Instrumentation from the TS to the Final Safety Analysis Report (FSAR). The proposed changes are consistent with the NRC " Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors" dated July 22,1993. Accordingly, the seismic and meteorological monitoring instrumentation will be relocated to the FSAR. Compliance with 10 CFR 50.59 and applicable regulatory guidance will ensure acceptable seismic and meteorological monitoring instmmentation performance is maintained.
This change will facilitate more efficient use of NRC and SNC resources by allowing future installation of replacement instmmentation without the need for a License -
Amendment. For example, the presently installed seismic recording instrumentation is --
scheduled for replacement. Available replacements offer superior performance, including accuracy. However, the performance parameters for the proposed replacement equipment vary from those detailed in the existing TS. Relocation of the instruments to the FSAR will allow evaluation of such changes via 10 CFR 50.59. In order to facilitate the presently planned seismic instrumentation replacements, NRC approval is requested by May 15,1995.
1C00n
- iR3288EiZI8She i P
!)
M .
q q '
- Myj ,
Vy r
. l U.' S. Nuclear Regulatory Commission
. Page 2 .
Note that SNC _is transferring all of the TS requirements for the seismic and meteorological instmmentation to the FSAR for future control per 10 CFR 50.59 with the . 9
", following exception. The Special Reports regarding inoperable instrumentation in TS 3.3.3.3(a) and 3.3.3.4(a) will no longer be required. This instrumentation will be treated consistent with'other important but non-TS instmmentation inservice at FNP.-
g ..
. The safety analysis for the proposed TS changes is provided in Enclosure 1 7The supporting significant hazards evaluation pursusnt to 10 CFR 50.92 is provided in f
~
Enclosure 2_. ' Based upon the analysis provided, SNC has determined the proposed . :
changes to the TS do' not involve a significant hazards consideration as defined by 10 CFR 50.92. - SNC has also determined that the proposed changes will not significantly affect the . ;
quality of the environment.' Enclosure 3 provides the proposed Technical Specification changed pages. The hand-marked pages are provided in Enclosure 4. ,
The Plant Operation Review Committee has reviewed and recommended approval of these : 1 proposed changes. A copy of these proposed changes is being sent to Dr. D.E.-
Williamson, the Alabama State Designee, in accordance with 10 CFR 50.91 (b)(1).' l If there are any questions, please advise. i Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY :
7/hth Dave Morey DPH: mar SEISMIC 1. DOC SWORN TO AND SUBSCRIBED BEFORE ME
Enclosures:
- 1. Safety Analysis THIS d DAY OF d 1995 Ndl.f d r S Ch nged Pages O
- 4. TS Hand-Marked Pages ' Notary Public' (/
MY COMMISSION EXPIRES 87/1 /f /997 L
cc: Mr.' S. D. Ebneter
. Mr. B. L. Siegel i
Mr. T. M. Ross Dr. D. E. Williamson
- i d
q
, - 2
g =
1 g <
y ,. , , f% .c. m .
-Y q< a . , a,
-]
I
' ~
ENCLOSURE 1- :!
Joseph M. FarleyNuclear Plant ; i (p _ _
. Request to Relocate Seismic and Meteorological- j
, herumentation Technical Specifications to FSAR . 'j j
l Safety Analysis l
- . i
' Prooosed Change l
- j
. Remove Technical Specification (TS) requirements and associated Bases for the Seismic j and Meteorological Monitoring Instn. mentation and relocate the information to the j
. FSAR. !
q Basis for Proposed Change l
The proposed changes are administrative in nature since the changes are consistent with 1 aporoved NRC guidance for TS as discussed in detail below. Relocation of the Seismic - l and Meteorological Monitoring Instrumentation TS will not decrease the effectiveness of j the instrumentation. However, this change will allow SNC to administratively control l changes to the seismic and meteorological monitoring instrumentation in accordance with j the provisions of 10 CFR 50.59. l 1
On July 22,1993, the Final Policy Statement on Technical Specifications Improvements j for Nuclear Power Reactors became effective. According to the Policy Statement, the .j purpose of the TS is to impose those conditions or limitations upon reactor operation !
necessary to obviate the possibility of an abnormal situation or event giving rise to an i immediate threat to the public health 'and safety by identifying those features that 'are of . j controlling importance to safety and establishing on them certain conditions of operation i which cannot be changed without prior Commission approval. The Policy Statement ' ;
establishes an objective set of criteria which delineate the constraints on operation'of nuclear power plants that belong in the TS, in accordance with 10 CFR 50.36 and the ~i purpose of the TS. Specifically, these criteria are as follows: l i
I
.i l
1 i
I
, ,, _ - - _ ,_ . , _ . ._ _ .._.1_ __ __________-
- - - ~ ~ ~
wy# .,
m -
~
f 3
- ,p 1, , ;
3f ';
.// '!
Installed instrumentation that is used to" detect, and indicate in the control room, a j j.
significant abnormal degradation of the reactor coolant pressure boundary.; g y, y _ _ _
i A process variable, design feature, or operating restriction that is an initial condition of a design basis accident or transient analysis that either assumes the 'i failure ofor presents challenge to the integrity of a fission product barrier. q A structure, system, or component that is part of the primary success path and - ,:
which functions or actuates to mitigate a design basis accident or transient that i either assumes the failure of or presents a challenge to the integrity of a fission i product barrier. .j A structure, system, or. component which operating experience or probabilistic safety assessment has shown to be significant to public health and safety.
In accordance with this Policy Statement, improved Standard Technical Specification !
(STS) have been developed for each Nuclear Steam Supply System (NSSS) owners l group. The Westinghouse NSSS STS is embodied in NUREG-1431." Standard Technical-Specifications, Westinghouse Plants."; Seismic and Meteorological Instrumentation ,!
- requirements have been determined to be outside the NRC criteria for inclusion in STS as E
[
evidenced by their omission from NUREG-1431. On this basis, relocation of TS ;
requirements for Seismic and Meteorological Instrumentation to the FSAR is consistent ; .l with the NRC Final Policy Statement for Technical Specification Improvements. i Continued compliance with 10 CFR 50.59 and applicable regulatory guidance will ensure ,
that the Seismic and Meteorological Instrumentation remain viable. !
4
)
l l
1 n
l l
1 -a -
m- *m- ..-m --__._u m a
V .
, r ENCLOSURE 2 Joseph M. Farley Nuclear Plant Request to Relocate Seismic and Meteorological Instrumentation Technical Specifications to FSAR 10 CFR 50.92 Evaluation
Background
Presently the FNP Unit I and Unit 2 Technical Specifications (TS) contain detailed requirements regarding surveillance and performance characteristics of seismic and meteorological monitoring instrumentation. These requirements are presently located in TS 3/4.3.3.3 and 3/4.3.3.4. SNC proposes to remove the TS requirements and associated Bases for the Seismic and Meteorological Monito ing Instrumentation and relocate the information to the FSAR. This TS change will facilitate future changes to the seismic and meteorological instmmentation under the control of 10 CFR 50.59. For example, SNC presently plans to replace seismic accelerographs in 1995. The new instruments offer superior performance to the presently installed accelerographs and meet all regulatory requirements; however, the range of the accelerographs is outside the range allowed in Table 3.3-7. Rather than revise the existing table, SNC chooses to relocate this information consistent with recent industry and NRC guidance as described below.
! A_nalysis The proposed changes are administrative in nature since the changes are consistent with approved NRC guidance for TS as discussed in detail below. Relocation of the Seismic and Meteorological Monitoring Instmmentation TS will not decrease the effectiveness of l the instmmentation. However, this change will allow SNC to administratively control l changes to the seismic and meteorological monitoring instmmentation in accordance with l the provisions of 10 CFR 50.59.
On July 22,1993, the Final Policy Statement on Technical Specifications Improvements for Nuclear Power Reactors became effective. According to the Policy Statement, the l
purpose of the TS is to impose those conditions or limitations upon reactor operation ;
j necessary to obviate the possibility of an abnormal situation or event giving rise to an immediate threat to the public health and safety by identifying those features that are of l
controlling importance to safety and establishing on them certain conditions of operation which cannot be changed without prior Commission approval. The Policy Statement establishes an objective set of criteria which delineate the constraints on operation of I
e - s
, q
,, M i a, ,e ;;
%g ~~ , ,
,, L nuclear power plants that belong in the TS, in accordance with 10 CFR 50.36 and the' .!
l purpose of the TS. Specifically, these criteria are as follows: j
'i
- Installed instrumentation that is used to detect, and indicate in the control room, a . j significant abnormal degradation of the reactor coolant pressure boundary. l1 A process variable, design feature, or operating restriction that is an initial j condition of a design basis accident or transient analysis that either assumes the d failure of or presents challenge to the htegrity of a fission product barrier. j i
A structure, system, or component that n part of the primary success path and j
( which functions or actuates to mitigate a design basis accident or transient that i either assumes the failure of or presents a challenge to the integrity of a fission . j product barrier.
A structure, system, or component which operating experience or probabilistic .;
safety assessment has shown to be significant to public health and safety. .l In accordance with this Policy Statement, improved Standard Technical Specification j
- (STS) have been developed for each Nuclear Steam Supply System (NSSS) owners. '
group. The Westinghouse NSSS STS is embodied in NUREG-1431 " Standard Technical 1 Specifications, Westinghouse Plants." Seismic and Meteorological 1nstrumentation l requirements have been determined to be outside the NRC criteria for inclusion in STS as ;j evidenced by their omission from NUREG-1431. On this basis, relocation of TS 1
,. requirements for Seismic and Meteorological Instrumentation to the FSAR is consistent j with the NRC Final Policy Statement for Technical Specification Improvements. !
Continued compliance with 10 CFR 50.59 and applicable regulatory guidance will ensure that the Seismic and Meteorological Instrumentation remain viable. i q
Results 1 j
Southern Nuclear Company (SNC) has reviewed the requirements of 10 CFR 50.92 as they relate to the proposed changes and has made the following determination:
]
- 1. Does the proposed change involve a significant increase in the probability or .j consequences of an accident previously evaluated? !
j No. The proposed change relocates information from the TS to the FSAR and has ;!
no impact on physical plant operation of configuration. The continued capability '!
cf the seismic and meteorological instrumentation to perform its intended function ' l will be ensured through controlled change processes governed by 10 CFR 50.59. j l
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
i
_ _ . . _ f
g 3l I. 8 1,z s
, h;
- 2. Dows the proposed change create the possibility of a new or different kind of-
, . accident from~ any previously evaluated?
No. The sole function of the seismic and meteorological monitoring .
instrumentation is to record data. - The proposed change will not involve any design change or modification to the plant. . The proposed change will not alter the operation of the plant or the manner in which it is operated. Any subsequent change to the Seismic and Meteorological Monitoring Instrumentation -
requirements .will undergo a review in accordance with the criteria of 10 CFR .
50.59 to endure that the change does not involve an unreviewed safety _ question.-
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
p 3. Does the proposed change involve a significant reduction in a margin of safety?
No. The proposed change will relocate Seismic and Meteorological Monitoring Instmmentation requirements from the TS to licensee controlled documents subject to the criteria of 10 CFR 50.59. The proposed change will have no adverse impact on any protective boundary or safety limit.
Therefore, the proposed change will not involve a significant reduction in a margin ofsafety.
Conclusion :
i Therefore, SNC has determined the proposed changes meet the requirements of. 1 10 CFR 50.92(c) and do not involve a significant hazards consideration.' l I
s