Amends 129 & 122 to Licenses NPF-2 & NPF-8,respectively, Revising TS to Clarify That Testing of Each Shared EDG 1-2A & 1C,to Comply W/Surveillance Requirement 4.8.1.1.2.e,only Required Once Per 5 Yrs on Per EDG Basis
ML20217E823
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 10/01/1997
From: Berkow H
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20217E828 List:
References
NUDOCS 9710070239
Download: ML20217E823 (8)


Text

,

p3 At; p

L UNITED STATJS g

}

NUCLEAR REGULATORY COMMISSION

%,*****/g WASHINGTON. D.C. 30666 4 001 g

SQUTHERN NUCLEAR OPERATING COMPANY. INC.

ALABAMA PQWEB COMPANY DOCKET NO. 50-348 JOSEPH M. FARLEY NUCLEAR PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE 1

Amendment No.129 l

License No. NPF 2 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southern Nuclear Operating Company, Inc.

(Southern Nuclear), dated May 28,1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 4

B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications, as indicated in the attachment to this license amendment; and paragraph 2.C.(2) of Facility Operating License No. NPF-2 is hereby amended to read as follows:

9710070239 971001 PDR ADOCK 05000348 P

PDR

q 2

(2)

Technical Soecifications The Technical Specifications contained in Appendices A and C, as revised through Amendment No.129. are hereby incorporated in the license. Southem Nuclear shall operate the facility In accordance with the Technical Specifications, 3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

)'

erbert N. Berkow, Director Project Directorate ll-2 Division of Reactvr Projects - 1/ll Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications i

Date ofIssuance:

October 1, 1997 1

a

ATTACHMENT TO LICENSE AMENDMENT NO.129 TO FACILITY OPERATING LICENSE NO. NPF-2 DOCKET NO. 50 348 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginallines.

Remove 1DadE1 i

3/4 8-6 3/4 8-6 L

_. _-.-.~

s ELECTRIC'AL DOWER SYSTEMS SURWILLANCE REQUIREMENTS (Continued) b)

Coolant Temperature High (CTH) c)

Coolant Pressure Low (CPL) d)

Crankcase Pressure High (CCPH) 11.

Verifying the capability to reject a load of greater than or

+

equal to the largest single load associated with that emergency diesel generator (approximately 1000 kw) while maintaining voltage between 3740 and 4580 volts and speed less than or equal to 75% of the difference between nominal speed and the overspeed trip setpoint, i

d.

At least once per 10 years or after any modifications which could i

affect emergency diesel generator interdependence by starting the emergency diesel generators simultaneously, and verifying that the emergency diesel generators accelerate to at least 900 rpm, for the 2850 kw generator and 514 rpm for the 4075 kw generators, in less than or equal to 12 seconds, At least once per 5 years, ot. a staggered basis, by verifying that e.

the emergenc',' diesel generator can reject a load of 1200-2400 kw without tripping. The emergency diesel generator output breaker (s) must remain closed such that the emergency diesel generator is connected to at least one emergency bus. Verify that all fuses and breakers on the energired emergency bus (es) are not tripped. The generator voltage shall remain within 3330 and 4990 volts during and following the load rejection. **

l

FARLEY-UNIT 1 3/4 8-6 AMENDMENT NO. g7, TOT, 129

(..

o.

j.

jf$$ ce; J

UNITED STATES i

g

.{

NUCLEAR REGULATORY COMMISSION i

o WASHINGTON, D.C. 300eHo01

%,, g,

  • i

- SOUTHERN NUCI FAR OPERATING COMPANY. INC.

1 ALABAMA POWER COMPANY i

i DOCKET NO. 50-384 l

JOSEPH M FART FY NUCI FAR PLANT. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE 3-4 r

Amendment No $22 License No. NPF :

i 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Southem Nuclear Operating Company, Inc.

(Southem Nuclear), dated May 28,1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the

!~

Commission's rules and regulations set forth in 10 CFR Chapter I; l

i B.

The facility will operate in conformity with the application, the provisions of the l

Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the.

L public, and (ii) that such activities will be conducted in compliance with the l

Commission's regulations; 4

D.

The issuance of this license amendment will not be inimical to the common l

- defense and security or to the health and safety of the public; and l-E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the j.

Commission's regulations and all applicable requirements have been satisfied.

i 2.

Accordingly, the license is amended by changes to the Technical Specificationa, as -

Indicated in the attachment to this license amendment; and para 0raph 2.C.(2) of Facility l

Operating License No. NPF-8 is hereby amended to read as follows:

s ii I

j h

1 lf

. (2)

Technical Soecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.122, are hereby incorporated in the licen=e. Southem Nuclear shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented within 30 days of issuance.

FOR THE NUCLEAR P,EGULATORY COMMISSION ow er rt N. Berkow, Director Project Directorate ll 2 Division of Reactor Projects - 1/ll Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical SpecificaSns Date of issuance: October 1, 1997

{

1

.. ~... -

. ~,...

-._... ~..

-......_..,-.a_~_w.

.,_...,_u.

. _. = _

6TTACHMENT TO LICENSE AMENDMENT NO.122 TO FACILITY OPERATING LICENSE NO. NPF-8 DOCKET NO. 50-364 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginallines.

Remove IDaed 3/4 8-6 3/4 8-6 e

9

ft.FETRTCAL DOWER SYSTEME SURVEILIANCE REQUIREMENTS (Continued) b)

Coolant Temperature High (CTN) c)

Coolant Pressure Low (CPL) d)

Crankcase Pressure High (CCPH) 11.

Verifying the capability to reject a load of greater than or equal to the largest single load associated with that emergency diesel generator (approximately 1000 kw) while maintaining voltage between 3740 and 4580 volts and speed less than or equal to 75% of the difference between nominal speed and the overspeed trip setpoint, d.

At least once per 10 years or after any modifications which could affect emergency diesel genurator interdependence by starting the emergency diesel generators simultaneously, and verifying that the emergency dissel generators accelerate to at least 900 rpm, for the 2850 kw generator and 514 rpm for the 4075 kw generators, in less than or equal to 12 seconds, At least once per 5 years, on a staggered basis, by verifying that e.

the emergency diesel generator cat. reject a load of 1200-2400 kw without tripping.

The emergency diesel generator output breaker (s) must remain closed such that the emergency diesel generator is conr.ected to at least one emergency bus. Verify that all fuses and breaktra on the energized emergency bua(es) are not tripped. The generator voltage shall remain within 3330 and 4990 volts during and following the load rejection. **

l Testing of the shared Emergency Diesel Generator (EDG) set (EDO 1-2A or EDG IC) on Unit 1 may be used to satisfy this surveillance requirement for those EDGs.

FARLEY-UNIT 2 3/4 8-6 AMENDMENT NO. 49, 93, 122