LER 90-001-00:on 900103,containment Ventilation Isolation Occurred Due to Loss of Power to Radiation Monitor Actuation Relay.Caused by Technician Lifting Power Lead. Technicians Trained & counseled.W/900216 Ltr
ML20006E378
Person / Time
Site: South Texas STP Nuclear Operating Company icon.png
Issue date: 02/16/1990
From: Ayala C, Vaughn G
HOUSTON LIGHTING & POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
LER-90-001, LER-90-1, ST-HL-AE-3364, NUDOCS 9002230025
Download: ML20006E378 (6)


Text

.

.c . ...

Houston Lighting & Power.. .._ ._. .___,- .. =PO.'

Houston, Box Texas 1700 77001 (713) 228 9211

. . . , - . . ~ _ . _ , . , _ . . _ _ _ _ _ . _ . _ - - ~

February 16, 1990 ST-HL-AE-3364 File No.: G26 10CFR50.73 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 South Texas Project Electric Generating Station Unit 1 Docket No. STN 50-498 Licensee Event Report 90-001 Regarding Engineered Safety Features Actuation Due to Loss of Power to a Radiation Monitor Relay Pursuant to 10CFR50.73, Houston Lighting & Power (HL&P) submits the attached Licensee Event Report 90-001 regarding Engineered Safety Features Actuation due to loss of power to a radiation monitor relay. This event did not have any adverse impact on the health and safety of the public.

On February 2, 1990, an extension of the due date of this letter to February 16, 1990 was requested of, and granted by, Mr. Gene Holler of NRC Region IV.

If you should have any questions on this matter, please contact Mr. C. A. Ayala at (512) 972-8628 or myself at (512) 972-7921.

d.U G. E. Vaughn '

Vice President Nuclear Operations i 1

GEV/ RAD /n1

Attachment:

South Texas, Unit 1  ;

LER 90-001 l l

l 22fftfi k

/

NL.LER90001.U1 A Subsidiary of 11ouston Industries incorporated o

/ l

-f,c "f H

y ST.HL. AE. 3364

[' Houston tighting k Power Company File No.: C26 South Texas Project Electric Generating Station Page 2 CC' Regional Administrator, Region IV Rufus S. Scott Nuclear Regulatory _ Commission Associate General Counsel 611 Ryan Plaza Drive, Suite 1000 Houston Lighting & Power Company Arlington, TX 76011 P. O. Box 61867 Houston, TX 77208 George Dick, Project Manager U.S. Nuclear Regulatory Commission INPO Washington, DC 20555 Records Center 1100 circle 75 Parkway J. I. Tapia Atlanta, CA 30339 3064 Senior Resident Inspector c/o U._S. Nuclear Regulatory Dr. Joseph M. Hendrie i commission 50 Be11 port Lane P. O. Box 910 Be11 port, NY 11713 Bay City, TX 77414 D. K. Lacker J. R. Newman, Esquire Bureau of Radiation Control Newman & Holtzinger, P.C.- Texas Department of Health 1615 L Street, N.W. 1100 West 49th Street Washington, DC 20036 Austin, TX 78704 D. E. Ward /R. P. Verret i Central Power & Light Company ,

P. O. Box 2121 Corpus Christi, TX 78403

" J. C. Lanier -

Director of Generation City of Austin Electric Utility >

721 Barton Springs Road Austin, TX 78704 R. J. Costello/M T. Hardt City Public Service Board P. O. Box 1771  :

San Antonio, TX 78296 Revised 12/15/89 L4/NRC/

4

-. - - r-

G I

[."

h. , s p

F.

O f. esar to..a set - U.S NUCLtMt aliUL2 TORT COMMISSION h [ APPROVED 0hlt 9#0 3501e4

$, ' ' I?. ;..

7 UCENSEE EVENT REPORT (LER) 8 Ra'u 8" F. , ACiuf v N=t m 00C a t "UMM R m - ""*

W-South Texas, Unit 1-0 is l o 10 l o l 41918 1 loFl 0 l 4

-j l

f 'iMe "' Engineered Safety Features Actuation Due to Loss of Power to a Radiation \

Monitor Re1nv "

- SVENT DAf t (St Lth NLMeth 161 REPORT oaf t til DTHER f ACILITitt INv0Lvt0 tel MONTH DAv vtAR vlAR N$n U/w*e@ MONTH DAY vtAR

  • Acettiv NAuss 00 cat 1 NUMetRtli 015101010 1 1 1

, - 1

' Oh Ol3 9 0 9 I0 0l0l1 0l0 O!2 1l 6 9l0 0 l5 to 10 3 0; l l }

ATING THIS fit ORT tl SUOMITTIO PURSUANT TO TMt REOUIRtMENTS OF 10 CPR 6 (Cnera one or more et rae foiwaal f111 M006 W 1 N 403tbl 30 40stal 93.734eH3Hrvl 73.716th R 30 40SisH1H4 90 384eH1) to.73leH3Hul 73,714e1 :

0 01 11010 80 *****it' H8'

    • .88 ta H25 so 78t*H8H*di

_ EM8%Tga,A

, a

> 20 4084aH1Hd4 90.73eH3HQ .50.73tsH3HvillHAl J86Al 30 406teH1Hht 90.73tsH3HN) 90.73teH3HvielH01 30 setteH1Het 60.73 eH3 Hun to.73tel(3Hal LICINatt CCAT ACT FOR THit Lin titt NJ.Mt TELEPHONE NUM9tR Amt A CODE Charles Ayala - Supervising Licensing Engineer Si112 917l2l- l816121 8 COMPLETE ONE LINI FOR E ACM COMPONENT f ALLURE OtSCRitt0 IN THl4 REPORT (13) caval 8v57tv - COMP 0NtNT

][ "f0 NPR's CAU68 SvsitM COMPONENT "$8jC- ntPORTAgt d

! I I I I I I I I I i 1 1 I

, I I I I I I I I I I I I I I SUPPLEMENT AL REPORT E XPECTIO tidi MONTH DAY vtAR SV9 MIS $10N

~~ hts m ,.. w. .

AS:Y R ACT n . e. um - . .

surcrso sUewss,0N 0 arts

, y . .y. -, e-,n.a u.o iwi g i i On January 3,1990 Unit -1 Mode.1 at 100% power.. At 1051 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.999055e-4 months <br /> a Containment Ventilation Isolat <I) actuation occurred due to loss of

. power to a radiation monitor ac t . ion relay. The' power supply to the Fuel .

I Handling Building (FHB) HVAC monitor actuation logic relays are wired in a sequence = arrangement to the CVI monitor relays. An interfering power lead to a FHB HVAC monitor actuation relay was lifted during scheduled work which '

' resulted in-the interruption of power to the CVI monitor relay. -All systems functioned' properly after power was restored to the monitor relays. The '

causes of this event were inadequate planning and f ailure to adhere to station work practices. Corrective actions include the revision of work package instructions, revision of the work planning procedure and the issuance of a training bulletin.

NL.LER90001.U1 a

gc,. . m s

. , _ _ , , .____ .m______-_---------- - - - - - - - - - - -

Wnt Pero setA .. U.S NVCL81218IULitORY COMMISBloes LICENSEE EVENT REPORT (LER) TEXT CONTINUATION maovfo cw =o mo-me ExPIRIS 4/3U96 FAJetitV hA044 m DOChil NVASER GI Lth feUMBER (Si P&Of m "a " M.W.',' "'#.?

South Texas, Unit: 1 0F 0l5 0 l 0 l 0 l 419 l8 9l0 --

0l 0l 1 --

010 0l2 0 l 4, text w == ans = .mewes ass-w mac r = amismm DESCRIPTION OF OCCURRENCE:

On January 3,1990, Unit I was in Mode 1 at 100% power. At 1051 hours0.0122 days <br />0.292 hours <br />0.00174 weeks <br />3.999055e-4 months <br /> a Containment Ventilation Isolation (CVI) actuation occurred. The source of the actuation-was a loss of power to the high radiation relay for radiation-monitor RT-8012 which when deenergized causes a CVI actuation. This occurred while Radiation Monitoring Technicians-were installing a modification in a radiation monitor control panel.

-The work which was performed was part of a design package to modify the i Engineered Safety Feature (ESF) actuation logic so that operate failure signals from a radiation monitor channel would not cause an ESF actuation.

The original work package instructions were written to perform the rewiring of the monitor relays for the Fuel Handling Building (FHB), Control' Room Envelope (CRE) and CVI HVAC systems. Work instructions required that each system be placed in the actuated condition as a prerequisite. The system engineer and maintenance planner noted that the testing for each system following the modification would be time consuming and they wanted to reduce the amount of time each. system was left in the actuated condition to minimize carbon filter consumption. Therefore, the system engineer and maintenance planner decided to revise the work instructions by writing separate work documents for each 'q HVAC system to allow work on one system without affecting the other syctems.

I h In the preparation of the work instructions at the request of the planner the. system engineer conducted a walkdown of the radiation monitoring system contro!' panel'to identify the wiring changes which were necessary to I perform-the modification. The system engineer noted that the configuration of the relay is such that there is an upper and lower tier of termination points.

The modification required the addition and removal of leads from the lower tier. It is physically impossible to access the lower tier without removing the leads from the upper tier. The system engineer did not relate the fact that an interference existed when discussing the job with the maintenance 3 planner nor was it apparent from the schematics that the interference existed. l ene maintenance planner did not walkdown the job because he considered the  !

.walkdown conducted'by the system engineer sufficient. Since the maintenance  !

planner had no knowledge of the interference, he did not add steps in the work {

instructions for lifting the interfering leads and to evaluate the effects of ,

lifting the leads.  !

During installation of the modification on the FHB HVAC, the power lead to the operate failure relay on the FHB HVAC monitor, RT-8035, was lifted in .

order to access the termination points beneath the power lead. The high  !

radiation and operate failure relays for the FHB, CRE and CVI radiation

,l monitors are powered from a 24 vde power supply which is wired in sequence arrangement to the CRE, FHB then CVI relays. The interruption of power to one l of the first relays in the sequence interrupts power to all the downstream  ;

relays. Therefore, when the power lead to the operate failure relay on the L FHB HVAC monitor was lifted it resulted in a loss of power to the CVI monitor l l- ' relays. j NL.LER90001.U1 <

9

. wI conu mA L i

i OfRC Pero attA - .

U S NUCLE Al "41UL ATORY COMheses1086 LICENSEE EVENT REPORT (LER) TEXT CONTINUATION ~ APPRovto ove no mo-oio. ,

E kPIR48 8131186 FACILif y Netet til DOChlt NUMDtR (Il LtR NUhASSR ISI PA05 (36 '-

- v4'a "20!.W. "M*.JO  :

South Texas, Unit 1 o p j o j o j o l 4-l 9 l8 9l 0 -

0l0l1 -

0l 0 0l3 OF 0l4 ran . w N= =. mu .nm .  ;

DESCRIPTION OF OCCURRENCE Cont'd. ,

Shortly af ter the incident on January 3, 1990,-the power was restored and all systems functioned properly. The work instructions for the FHB and CRE HVAC monitors were promptly revised to place all three systems in their actuated condition prior to performing the wiring changes. Rewiring for the  !

FHB_ HVAC monitors was completed on January 5, 1990. -

~

~The rewiring of the CVI monitor relays was performed on November 13, 1989 without incident. The work instructions for the CVI portion of the modification were similar to the work instructions for the other two HVAC systems. However, the CVI. relays are last in the power sequences therefore, the subsequent loss of power to the relays had no effect on the ,

other systems..

CAUSE OF OCCURRENCE:

The event was initiated when utility technicians performing a modification lifted a power lead which was not called for by the work instructions. This '

was caused by:

1. Failure of the maintenance planner to identify the interferences which existed and incorporate the additional steps which were required to perform the modification into the work instructions. ,

i

.2.. Failure of the technicians to follow station work practices which require that work be discontinued to obtain revised work instructions if the work required exceeds the scope of the work instructions.

3. The change to the work. plan to perform the modification on each HVAC I I

system separately, instead of with all three together, was not appropriately considered when replanning the modification work l Instructions. )

l l

T ANALYSIS OF EVENT:

Unplanned actuation of an Engineered Safety Feature (ESF) is reportable under 10CFR50.73(a)(2)(iv). There was no adverse affect on safety due to this event because the system actuated to the safe mode and any radioactive release would have been contained.

While any unnecessary challenge to an ESF is undesirable, actuation of the Containment Ventilation Isolation represents a minimal hazard since it could not cause, worsen, nor prevent mitigation of an accident.

NL.LER90001.U1

,yxg oau mu.

u ,

10

=

s ont Feem 2004 .

U $ NUCLEI.3 E EIULATORY C0aIMlW10N LICENSEE EVENT REPORT (LER) TEXT CONTINUATION - **aovto owe no mo-oiot EXPIRES $/314%

9 ACILITV hatst (n Date'. T wt29th (2) Ltm hunattR (64 P&OE 131

  • vtAR N, n

Nu*eIn

. ,.t

. South Texas', Unit 1 o ls l0 l0 l0 l 4l 918 91 0 010l1 -

0l0 01 4 OF 0l4 gent n . , e am w anc s = ama w im CORRECTIVE ACTION:

The following' corrective actions are being takens i

1. Work package instructions for this modification to the Control Room Envelope HVAC and Fuel Handling Building HVAC were revised to place all three affected oystems in their actuated condition prior to performing work. Additional work steps were added to the CRE work instructions to lift the power leads.

2.- The Radiation Monitoring Technicians involved were counseled and training will be provided to Radiation Monitoring Technicians on verbatim procedural compliance. The training will be completed by- 'l '

March 5, 1990.

3. The Work Planning procedure will be revised to further clarify the i necessity to identify interferences and incorporate specific steps into the work instructions to remove the interferences. This will be completed by March 27, 1990. 'i
4. A trainint bulletin will be issued to maintenance planners on the preparation of work instructions. The bulletin will reemphasize the

~

need to walkdown a job when preparing work instructions. It will also stress the need to re-evaluate work instructions when the scope of a job is changed to ensure that every. aspect of the job is properly considered. This will be completed by March 15, 1990.

ADDITIONAL INFORMATION Failing to follow approved procedures was identified previously.-in Unit 1 Licensee Event Report 89-017. Contained within that LER was corrective action to review the implementation of the station's procedure compliance -l policy with regard to employee understanding and management enforcement. The review has been completed and an action plan for enhancing procedure l compliance has been developed. '

There has been one previous event regarding an ESF actuation due to i failure to follow work instructions, i

-l 89-013 Inadvertent Actuation of FHB HVAC monitors due to Improperly Installec' Switch NL.LER90001.U1 gcoausa.

+a,

, --,-