Monthly Operating Repts for Oct 1989 for Limerick Generating Station Units 1 & 2.W/891114 Ltr
ML19332C711
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/31/1989
From: Leitch G, Jerome Murphy
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8911280449
Download: ML19332C711 (11)


Text

.,.

b. ' V

. -3892386830 T-S.6.9.1.6-  !

~

PHILADELPHIA ELECTRIC. COMPANY

',lMERICK GENER ATING STATION P. O, BOX A .

SAN ATOG A, PENNSYLV ANI A 19164

(215) 3271200, EXT. 3000 l

~

l-GR AH AM M. LE8TCH

.j

~

f vics enesso..? -

u . . ........ . .,. .

ifovember 14,.1989 Lccket Nos. 50-352 '

! 50-353 License Nos. NPF-39 NPF-85 i I

U. . S. Nuclear Regulatory Commission Attn: -Document Control Desk ,

Washington, DC '20555

Subject:

Limerick Generating Station Monthly Operating Report For Units 1 and 2 Enclosed are the monthly operating reports for Limerick Unit

-1 and Unit 2 for the month of October 1989~ forwarded pursuant to Technical Specification 6.9.1.6.

Very truly ours,

[

v' l-l' JJM/kk Enclosure 1:

l[ cc: . William T. Russell, Administrator, Region I, USNRC '

T. J. Kenny, USNRC Senior Resident Inspector p

l i

l.

0911280449 891031 ADOCK 05000352 l- PDR l ', R PNU -

l

i 3892386830  ;

(:.  ;

Docket No. 50-352 i i

Attachment to Monthly Operating Report for October 1989 Limerick Generating Station l Unit 1

, October 1 through October 31, 1989 I. Narrative Summary of Ooeratina Exoeriences  ;

Limerick Unit 1 began the month of October in Operational l i Condition (OPCON) 1 (operations), at a nominal 100% of rated thermal power. On October 12, reactor power was reduced to approximately 90% to support a control rod pattern adjustment.

Reactor power was restored to 100% on October 13. On October i 19, reactor power was reduced to 81% following discovery of l an Electro Hydraulic Control (EHC) leak. The leak was l

contained and a control rod pattern adjustment made. Reactor power was increased to 100% on October 20. Unit i ended the month of October in OPCON 1 at a nominal 100% of rated thermal power. '

Operational events that occurred during the month of October included:

On October 19, reactor power was reduced by 200 MWe -

after an EHC leak was discovered on a pipe weld for the No. 2 main turbine control valve. Maintenance personnel installed a temporary clamp on the pipe i

to prevent the leak from getting larger. Drain tubing was also insta31ed to divert the EHC fluid into a drum in crdar to prevent admission of EHC fluid into the ?,dwaste System. A camera was set up so that the leak could be monitored. Upon

, completion of this work, a control rod pattern I adjustment was made and reactor power was increased back to 100%.

On October 22, the Main Control Room (MCR) was placed in the Chlorine Isolation Mode following receipt of a Toxic Gas alarm due to the 'A' Toxic Gas Analyzer detecting a concentration of vinyl chloride greater than 10 ppm in the MCR air intake plenum. Chemistry personnel sampled the intake plenum and no significant concentrations of toxic chemicals were detected. A local chemical company was contacted and reported that incinerator problems had occurred. After ensuring that the problem was resolved, the MCR chlorine isolation was reset and MCR HVAC restored to normal.

II. Challences to Main Steam Safety Relief Valves There were no challsnges to the Main Steam Relief Valves during the month of October.

,e

. 3892386830

t. .a  ;

i 6~ AVERAGE DA!LV' UNIT power LEVEL I f

, , 1 DOCKET NO. ED . 352 [

.. ~.........................

7 UNIT 1 r  ; -Uh!- .' i +. A

- ~41

. . C

. .K

[- ' DATE h':vcMLdR 14, 1989

. i

~

w  ;

_ COMPANY PHILADELPHIA' ELECTRIC COMPANY f J. J. MURPHY l

. REPORTS $UPERv!$0R 1 r PROJECT 3 DIVISION .

t f, L1WERICK GENERATING STATION i (I 't

[9 , TELEPHONE'(215) 327 1200 EXTENSION 3752 i t...; ............................. .

f7 -

f CONTH .DCTOBER 1989' f

i. I DAY ' AVERAGE DA!LY power LEVEL DAY- AVERAGE DA!LY POWER LEVEL i
(MwE. NET) (MwE. NET) }

l --:

E- 1- :1020' 17 1019 .

g 2 1018' 18 1034 >

b '

l!

IJ 3 1043 19 1009  !

l

)s) i 4 1019 20 981 i N 5" 1044 21 1032

-l 6' '1017 22 1030 j L

k. - .7 10271 23 1030 81 1028 24 1029 I
9. .993. 25 1033- 1, 10- 1065 26 1030 -l i

.11 1036 27 1C30  !

12: .

1016 28 1030 '!

13 1024 20 107' ~t c14 1026 30 1027 i r

t

..15, 1023 31 1026

'S' :16 '~

1022  ;

?

4 t

i i

k i

t r

3

.5 p .

wu . _ . , _ . . , . , _ _ - _ _ - _ - .

e s ic o

Ev4 ..

3892386830 m

OPERAT3NG DATA REPORT e

f 2 DOCKET NO. 60 - 352

,:l .............................

.i, DATE NOVEMBER 14, 1989

] COMPLETED BY PHILADELPHIA ELECTRIC COMPANY J. J. MURPHY

, , -/ ' REPORTS SUPERv!SOR F PROJECTS DIVI $10N E.-

LIMERICK GENERATING STATION

[

< TELEPHONE (216) 327 1200 EXTENSION 3762 bl .............................

L ~ OPERATING STATUS l:7 . ................ .

1. UNIT NAME LIMERICK. UNIT 1 NOTES THERE WA% ONE SCHEDULED
2. REPORTING PERIOD: OCTOBER. 1989

[

?:

LOAD REDUCTIONS OF 20%.

3. LICEN$F.D THERMAL POWER (MWT): 3293 IT WAS MADE TO SUPPORT

[ ................

'd.-NAMEPLATE RATING (GROSS MWE): 1138 A CONTROL R0D PATTERN t

c r 5. DESIGN ELECTRICAL RAT]NG (NET MwE): 1055 ADJUSTMENT, p 6. MAXIMUM DEPENDASLE CAPACITY (CRO$$ MwE): 1092

7. WAXIMUM DEDlNDASLE' CAPACITY (NET MWE): 1055 L ...... .........................................
8. D' CHANGES' OCCUR IN CAPACITY RATING $ (ITEM $ NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASON $:
o 9. DOWER LEVEL TO whiCH RESTRICTED. IF ANY (NET Mwt)

10,' REASONS FOR RESTRIC110N$. IF.ANY:

  • THIS MONTH VR-TO-DATE CUMULATIVE

.11l, HOUR $ IN REPORT 3NG PERIOD 745 7.296 32.856-

.12. NUMBER OF HOUR $ REACTOR WAS CR]TICAL s 745.0 4.320.5 25.664.8

13. REACTOR-RESERVE $HUTDOWN HOUR $ 0.0 0.0 0.0 f1C.' HOUR $ GENERATOR'ON-LINE 745.0 '4.174.9 26.207.6
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16, GROSS TMERMAL ENERGY GENERATED (MWH) 2,439.377 12.299.216 73.096.973 y . . . ............ ............ ............

^17.. GROS $ ELECTRICAL ENERGY GENERATED (MWH) 793.940 3.952.960 23.634.630

18. NET ELECTRICAL ENERGY GENERATED (MWH) 763.945 3.718.628 22.561.116 PAGE 1 0F 2 Lc

C4 _m 3892386830 cu. l

. 4: I i

. i

, OPERATING DATA REPORT (CONTINUED) . DOCKET NO. 50 - 352 1

>$.h,. .

~

0 ATE NOVEMBER 14 1989  !

4; .

...........s.................  ;

o THIS MONTH YR-TO-DATE - CUMULAT!vE .

,2 UNIT, SERVICE FACTOR A .1 100.0 57.2 76.7 *

-j ~ e0! UNIT AVAILABILITU FACTOR 100.0 57.2 76.7

,7 21a _ UN11 CAPACIT* FACTOR - (USING MDC NET) 97.2 ,

48.3. 65.1, -f

'22. UNIT' CAPACITY FACTOR (USING DER' NET) 97.2 48.3. 65.1'  !

-23. UNIT FORCED OUTAGE RATE 0.0 0.0 3.1 24 SHUTDOWNS SCHEDULED DVfA NEXT 6 MONTHS (TYPE. DATE. AND DURATION OF EACH): .

)

'b

'26.;1F1$HUTDOWN AT END OF REPORT PERIOD. EST! MATED DATE OF STARTUP~

[

.26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): FORECAST ACHIEVED

!NITIAL CRITICALITY 12/19/04 12/22/84-t 2NITIAL ELECTMICITY- MID APRIL 85 4/13/85  ;

.......... ......... i COMMERCIAL OPERATION. 157 QTR 2/01/86

. . . . . . . .' ..8 6 . . . . . . . . . . .,

i i

r

'k PAGE 2 0F 2 ,

'y S

t T

d i'Y ? I 6

"^

w e - r,-,w occv e -

UNIT SHUTDONNS CND POME 2 REDUCTIONS DOCKET NO. 50 - 352 UNIT NAME LIMERICK UNIT 1 ,. .

DATE NOVEMBER 14. 1989 REPORT MONTH OCTOBER. 1989 COMPLETED BY PHILADELPHIA ELECTRIC COMPANY

=_

__________=-- _=___________

J. J. MURPHY REPORTS SUPERVISOR -

PROJECTS DIVISION LIMERICK GENERATING STATIC.

TELEPHONE (215) 327-1200 EXTENSION 3752

________________=- -________

___=z- -__- -_____-- -- _ _ _ = - - ---

_____________________________ - _-- - = _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - - --

l l l l METHOD OF l- LICENSEE lSYSTEMICOMPONENTl CAUSE AND CORRECTIVE I ITYPE DURATION l REASON' SHUTTING DONNl EVENT- l CODE l CODE l ACTION TO

'NO.! DATE l (1)l (HOURS)l (2) REACTOR (3) i REPORT

  • l (4) I (5) l PREVENT RECURRENCE o l C91019 l 5 l 000.0 l F l 4 l N/A l ZZ l ZZZZZZ l REACTOR POWER REDUCED TO ACCOMODATE A l l 1 l~ l l l l l

l CONTROL ROD PATTERN ADJUSTMENT AND AN i l l l l l EHC FLUID LEAK REPAIR I I i i i l I I i i l i I- 1 I I i  : 1 I I I I I I l ----- H I l l l 1 I I i -

! I l i I I i

(1) (2) (3) (4)

  • - FORCED REASON METHOD S - SCHEDULED EXHIBIT G - INSTRUCTIONS A - EQUIPMEN' FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAW. ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATI SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN) FILE (NUREG-0161)

E - OPERATOR TRAINING + LICENSE EXAMINATION F - ADMINISTRATIVE (5)

G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER(EXPLAIN) EXHIBIT I - SAME SOURCE e

e s er e- .

ew $ +--ya- .- = __r-m -

-- - - - - = --

{

3892386830 Docket No. 50-353 Attachment to Monthly Operating Report for October 1989 Limerick Generating Station Unit 2 October 1 through October 31, 1989 I. Narrative Summary of Operatina Exoeriences Limerick Unit 2 began the month of October in Operational Condition (OPCON) 4 (cold shutdown) with a Maintenance outage in progress. The outage was completed and start-up activities commenced on October 8. Unit 2 entered OPCON 1 on October 9 and reactor power was increased to 50% by October 12. On October 20, reactor power was raised to 65%, and again to 70%

on October 22 to support start-up testing. On October 23, reactor power was decreased to 55% when the '2A' recirculation pump was tripped and restarted as part of further start-up testing. Reactor power was then increased to 69% on October 24 and both recirculation pumps (2A and 2B) were tripped for recirculation pump coast down time testing. The '2A' recirculation pump was restarted and reactor power was increased 40%. The '2B' recirculation pump was restarted on-October 25 following maintenance and power was raised to 67%

by October 26. On October 27, a 75% control rod line was established and power was increased to 73%. Unit 2 ended the month of October in OPCON 1 (operations) at a nominal 73% of rated thermal power.

Operational events that occurred during the month of October included:

On October 13, the HPCI exhaust line drain pot was found to be draining improperly. This was due to a clog in the t- flow orifico drain line to the barometric condenser. The drain pot was filling up due to steam leaking past the steam inlet valve seat. HPCI was declared inoperable and the flow orifice was unclogged. HPCI was then placed in service to verify operability.

II . - Challences to Main Steam Safety Re13ef Valves There were no challenges to the Main Steam Relief Valves during the month of October.

l

F W cM ,' # 3892386830

, e.

..n -

k at l Fv

.m

. it-AVERAGE' DAILY UNIT POWER LEVEL '

i

. .t DOCKET NO. 50 - 353 [

............................. I p

  • UNIT LIMERICK UNIT 2 i

............................. i ii ,

DATE NOVEMBER 14, 1989- '

F COMPANY PHILADELPHIA ELECTRIC COMPANY I p

.c J. J. MURPHY REPORTS SUPERVISOR:

PROJECTS DIVI $10N-LIMERICK GENERATING STATION' h TELEPHONE (215) 327-1200 EXTEN$!ON 3752 L

re fr -

MONTH. OCTOBER _1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY. POWER LEVEL

-(MWE-NET) -(MWE-NET)

F, 1 0 17' 486 p 2 0 18 .524 p :3 0 19 624 i;

4' O 20 667 U

R ,

$l 0 21 671 l -6 0 22 . 747 7 0 23 693 f'

'82 0 24 693

+

9 0 25 486

10. 1 26 719' 11 232 27 690 12' -405 25 755

.13 . 459 29 781 m

14- 486 30 752 15 474 31 751 16 476 1 .

w

.a .m

._ i. <

^

s.

9J 1 3892386830 jr ,

u b

OPERATING DATA REPORT DOCKET NO. 60 363 DATE NOVEMDER 14 1969 COMPLETED By PHILADELPHIA ELECTRIC COMPANY i.

J. J. MURPHY P REPORT 5 $UPERv!&OR FROJECTS D!vl$10N LlWERICK GENERATING $YATION (l . TELEPHONE (215) 327 1200 EXTEN530N 3762

[

OPERATING STATUS l

1 UNIT NAME: LIMERICK UNIT 2 NOTES: A FULL POWER LICENSE j- 2.. REPORTING PERIOD ' OCT082R, 1989 WAS 35$UED ON 8/25/09

3. LICENSED THERMAL P0wtR(MWT)'

...........3293 THE STARTUP TESTING

. G. NAMEPLATE RATING (GROSS MWE) - 1138 PROGRAM !$ IN PROGRESS.
5. DE$1GN ELECTRI*AL RATING (NET MWE): 1055 COMMERCIAL OPERATION !$

6.. MAXIMUM DEPENDABLE CAPACITY-(GRO$$ WWE): .

EXPECTED IN THE FIR $T T. MAXIMUM DEPENDABLE CAPACITY (NET MwE):

  • OUARTER OF 1990.
8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT. GIVE REASO
9. POWER LEVEL.TO wHICH RESTRICTED. 3F ANY (NET MwE):

'10.-REASONS FOR RESTRICTIONS. IF ANY:

THIS MONTH VR.TO-DATE CUMULAT2VE 11 HOURS !N REPORTING PERIOD 745 1932.5

............ ..... 1932 5 "12. NUMBER OF HOURS REACTOR WAS CRITICAL 565.7

............ ......1374 4 . ....1.$.74. ... 4

13. REACTOR RESERVE SHUTDOWN HOUR $ 0.0 0.0 0.0 14.-HOURS GENERATOR ON.LINE 507.4 978.6 978.6
16. UNIT RESERVE $HUTDOWN HOURS 0.0 0.0 0.0 16.. GROSS THERMAL ENERGY GENERATED (MwH) 1.010.215 1.450.944 1.450.944

-17. GROSS ELECTRICAL ENERGY GENERATED (MwH) 317.450 421,890 421.890 18', NET ELECTRICAL ENERGY GENERATED (MwH) 300.548 398.282 398.282 PAGE 1 0F 2

o. s' ,

- . 313923Gl66125C) .-.

n .

s

?

t ,

r g

OPERATING DATA REPORT (CONTINUED) DDCKET NO. 60 - 353~; +

p DATE NOVEMBER 14. 1999 5

+.

r,. .l TH!$ MONTH vR.T0*DATE_ . CUMULATIVE j

19. UNIT SERVICE FACTOR '

68.1'

............ . . . .. . . . 5 0 6. - ....... 50 6 t.

t-

-20. UNIT AVAILABILITY FACTOR * *

  • i 21; UNIT CAPAC!TY FACTOR (U$1NG MDC NET) * * *

.g pp . . . . . . . . . . . . . - ............ ............

,. 22. UNIT CAPACITY FACTOR (U$1NG DER NET) * * #*.

[j ............ ............. ............

[y- 23. UNIT FORCED OUTAGE RATE

. ..........v* .. ............

v.*

++

24 5HUTDowNS $CHEDULED OVER NEXT' 6 MONTHS (TYPE. DATE; AND DUR ATION OF CACH):

INITI AL P0wEP. A$CENSION TE$71NG !$ IN PROGRES$

MAINTENANCE /$URVE!LLANCE TEST OUTAGE. 12/01/09, 3 WEEKS L. . 26. IF $HUTDowN AT END OF REPORT PERIOD. ESTIMATED DATE OF $TARTUP:

260 UNITS' !N TEST STATUS (PRIOR TO COMMERCI AL CPERATION): FORECAST ACHIEVED INITIAL CRITICALITY

. 8./.12./.8 .9 8./.12./.89 INITIAL ELECTRICITY 9./.01./.89. .

. . 9./.01./.8 9 COMMERC1AL OPERATION

2. /.Q.}].9 0.. .........

0 NOT APPLICABLE PRIOR TO COMMERCIAL OPERATION PAGE 2 0F 2 4

P> .

UNIT SHUTDOWNS AND POWE3 REDUCTIONS DOCCET NO. 50 - 353 38923868305 '

UNIT NAME LINERICK 'o UNIT 2 **,---

DATE NOVEMBER 14, 1989 .

REPORT MONTH OCTOBER. 1989 '

--- - COMPLETED BV ---__-----PHILADELPHIA ELECTRIC COMP 4MY J. J. MURPHY REPORTS SUPERVISOR ,

PROJECTS DIVISION LIMERICK GENERATING STATION TELEPHONE (215) 327-1200 EXTENSION 3752


= _ - --------------------------

l l l l l METHOD OF l LICENSEE l ISYSTEMl COMPONENT l CAUSE AND CORRECTIVE TYPE l DURATION lREASONlSHUTTING DOWNl EVENT l CODE l CODE l ACTION TO NO.l OATE (1)l (HOURS)l (2) l REACTOR (2) l REPORT # l (4) l (5) l PREVENT RECURRENCE l l l l l 1 1 7 l 891023 l 5l 00.0 l B 1 4 l N/A l ZZ ZZZZZZ 1

i l l 1. I i l SINGLE RECIRC PUMP TRIP TEST MAS PER80RMED l 1 I CAUSING APPROX 25% LOAD REDUCTION AS PART l l l l l l

' l l l 08 THE STARTUP TEST PROGRAM.

l I I I I 8 I 891024 l 5 00.0 B I 4 l N/A l H I I I ZZ l ZZZZZZ l DOUBLE RECIRC PUMP TRIP TEST MAS PERFORWED i 1- l CAUSING APPROX 40% LOAD REDUCTION AS PART l l l l l l l l I OF THE STARTUP TEST PROGRAM.

1 I 1 1 I I I i -

1 I I I (1) (2) (3) (4)

F - FORCED PEASON METHOD S - SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) EXHIBIT G - INSTRUCTIONS 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM.

C - AEFUELING ENTRY SHEETS FOR LICENSEE 3 - AUTOMATIC SCRAM. EVENT REPORT (LER)

D - REGULATORY RESTRICTION 4 - OTHER (EXPLAIN)

E - OPERATOR TRAINING + LICENSE EXAMINATION FILE (NUREG-0161)

F- ADMINISTRATIVE (5)

G - OPERATIONAL ERROR ( ET.PLA I N)