Grants Relief from ASME Requirements for Proposed Inservice Testing Program for Pumps & Valves for Defined Period of Time.Addl Info Needed for Request for Relief from ASME Code Requirements Under Section 4.0.5b of Tech Specs
ML19326A405
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/22/1977
From: Boyd R
Office of Nuclear Reactor Regulation
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19326A406 List:
References
TAC-10985, NUDOCS 8002030209
Download: ML19326A405 (3)


Text

-

-.-..-r-,.

Dist

ution, d

Docht Fil7

  • K. Coller

!!RC PDR J. P. Knight Local P0q G. Foss APR 2 21977 LUR 1 File G. Lear

n. B. Vassallo P. '.fagner F. J. Milliams J. Stolz

.f Locket 130. 50-346 L. Engle E. Hylton ACRS (16)

ELD Toleco Edison Cuppany IE (3)

ATm: nr. ' Lowll C. Foe H. Smith Vloe President, Facilities Dwelogrnent R. S. Boyd D. Eisenhut Edison Plaza 30 M ison A m ue J. R. Buchanan T.B.Abernatd,MSIr c'.

Toledo, Ohio 43652 0**D

  • D' bY 7Ic Gentlecen:

OO W

a SUtMD.7. : RCLIE2' MGt IES RECUIECC.?J CF T!IE ASIE i.)ILER IJiD PRC3SUrc VE35EI. CCDS, SECfIO*1 XI (OAVIS DESSE 2CID.R MiER S"ATIOi-1, WIT 1)

We nr.va expleted our review cf ycur propoced inservice inamction aM testing progran for Cavic 8 esse, Unit I described in tne enclosure to your letter cated 2ve:ter 9, Iv75, and your request for relief frca ene requiremnts of tne ASME coller ano Pressure Vescal Code,Section XI.

Based on our review, we nava concluded tnat your proposed inservice testing program for pumps caa valves is acceptacle fcr tne 1ialted

erlil of tim frca tne-date of issuance of tm f
cility operating license to the start of f acility caarrelal omraticn. In lieu of the surveillance requiremnes of section XI of tne laE 0:xie, you snall perfora cne curveillance descriced in the enclosure to your letter dated aov e r 9, 1976, except that pucps shall be tested every 31 days to conform to our requiremnts instead of the 92 days wnien ycu procosed in your runnittal.

n the bacis that ycur procosed program is acceptr.cle and snall ce implemnted for rne period of time from issuance of the operating license to start of facility corrercial operation, w nereoy grant relief frca tne A3:tB Code requirements pursuant to Section 4.0.5a or tre plant recanical Specitications.

iiita regard to your raquest for rellef from the A3ME Code requiremnts Lv;osed oy Section 4.0.5o of rne plant Tecnnical Specifications for the pericd of time following the start of facility comnercial operation, w nave ceternirec that your request does not include sufficient inter-lt.arica for us to. ake a determination pursuant to 10 CFR 50.55a(g)(6)(i) 80020 @ 9 M 4

'errec a >

eumwaaes >

oavs >

NRC PORM 518 (9 70' NRCM 0240

' W u. a. aovsenwant >= =rewo orrisse vere-eae.ea4

. ~..;

.e 1

APR 2 2 1977 Ioledo Edison Company that,E<c Code requiresaents are impractical for tne areas of tne facility for whicn pu are requesting relief within the limitations of design, geometry, and materials of construction. We progrom which you suinitted (iiscusses caly those portions of the ASM Code wnica you have cetermined to De practical.

In order for us to make an evaluation of your requent for relief pursuant to 10 CPR 50.55a(g)(6)(1) for tne period of tire af ter the start of comoercial operation, you will need to provide inrormation to stsport ycur oeterminations of these items of insyction and testing wnich are deeml to be bpractical for the facility. we specific information tnat we will need is provided as Enclosures 1 and 2 of th%1etter.

With regard to the request for rel fel, tne :rtC nas received a nudoer of inquiries from J icensees regarding acceptacle ::vthods for complying witn 10 CF3 50.55a(g). In general, tnese incuirles have been directM toward tnree major areas relative to ccep] lance witn the regulation:

1.

te determination of whien A3:2 Boiler and Pressure Vescel Coce cdition and,vxierda are applicacle for any updatec inservice inspection or testing program.

2.

me requirement to conform the wcnnical 2pecifications to a revisec program, and 3.

me process or Octaining reliet fr::e,u.4 ede requirecents four.d to be impractical., "icc Staff anidance for Cc= plying witn Certain Previsions of 10 CFR 50.55a(g), Inservice Increction Foquirerents," descrices ene cajor provisicna of tre revbeu regulation, adcreases the areas of 1icensee concern listed above, and provices guidance en information wnica w will need to evaluate req.:esta for rellet frec,mc Coae requirewnts enat are determined to t# icpractical.

As discucced in Inciccure 1, you should nutr.i*. a deceription of your planned inservice inspection sna testing progrecs, as ell as any relicf fracz AE Code requirements determined to be impractical for the facility, as far in advance as posalble cf tne start of any 40-acatn inservice inspection period, or 20-month puz p and valve testing program.

In additicn, we mid 1ike to empnasire an intortant ?oint rogardbg the < TOE Code Section XI require::ents to test selectec pumos and valves that are rw incorporated in 10 CFR 50.55a(g): 2e.%E Code Section XI D**}D *}D[3'l$

o J uU S Inl a o o Ju OPPtCE >

9 URN A.eE W OATE W

  • " M ???L2" "
  • " "=a'aa ""J"""*.*"'e = ' - - -a

E

\\,

b APR 2 21977 Toledo IMison Company requirer.ents apply only to selected valves and pumps that can be tested witnout placing tne plant in an unsafe condition. You sbould exercise care in planning your testing progra:s to ensure that no test will ce conaucted wnlle tne plant is in an operating : node tnat woulo make it vulneraale to a test error or a test failure. Particular attention should be directed toward tne valve exercising (cycling) rests.

In this regard, some baalc guidelines for excluding exerciaireg (cycling) tests of certain valves during plant operatica are contained in.

Valve leakage tests and otner valve and pung tests required by the ASdC Code should ce reviewed for eacn eccpenent, rela-tive to each plant operating =ade, to assure tnat no test will nave an a:: verse 1::qnce on plant safery.

If you have any furtner questions regarding inplementation of 10 CFR 50.55a(g) at your facility, please contact us.

Sincerely, Original agned by IL C. DeYoung

};,. Pager 5. Ecyd, Directcr T Division of Project fianagment Office of ;ns: lear mactor regulation inclosures:

1.

IGC :.itaff Guidance for Cceplying witn Certain Provicien of 10 CFR 50.55a(g) 2.

Gaidelinea for ::xcluding Exercising (Cycling) Tests of Certain Valves During Plant Operation cc w/ enclosures:

tr. Donald H. dauser, Esq.

2ne Cleveland Electric Illtrainating Ctx::pany P. O. Ecx 5000 Cleveland, Olio 44101 Gerald Charnoff, Esq.-

  1. q w

't Snaw, Pittman, Potts and Trowbridge~

O 1800 M Street, N. W J

Washington, D. C.

20036 oc w

teslie tienry, Esq.

Fuller, Seney, Benry and Dodge 300 Hadison Avenue toledo, Onto 43604

,j:

LWRel M L'Al AD/ LWR DSS fk DP

., m.

ley @e'/Yed

JStM3, DBVas M io'MD MMiaht dovh

,,,,,,,,,e, 4/hD/77

,_440/77 4/sA77 4/22L77 5 4/M/77-

'ajpf 77

~'

NRC FORM 31s (9 76) NRCM 024L_,.

Tr u. s. soveme,ese remnme orms. ene.ees.ees

,