Responds to NRC 770422 Request Re Facility Inservice Insp Program Compliance w/10CFR50.55a(g).Forwards Program for ASME Class 2 & 3 Components.W/O Encl
ML19329A909
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/22/1977
From: Roe L
TOLEDO EDISON CO.
To: Boyd R
Office of Nuclear Reactor Regulation
References
402, TAC-10985, NUDOCS 8001150805
Download: ML19329A909 (3)


Text

--...

m u.s. Nuct. san s:stui.AToav f.

wisser m octxs? NuMesa

.f 27e3 Id-34 MACirnu 196 f

NRC OISTRIBUTION son PART 50 DOCKET MATERIAL p3AR/FSAR AMDT DIST.

FROM:

cats op occuMsNT 70, Toledo Edison Company 11/22/77 Mr. Roger S. Boyd Toledo, Ohio cats macsivso 11/25/77 Lowell E. Roe gr.stism CMcToalanD P4oP INPuTPoMM NuMesM cP COP 9Es asCalVED i A!on tGIN AL.

Ngg,Agggpt gg

/ <iAndo cco" auct.csu as

.esscaiPTion Consists of requested info. concerning the Davis-Besse Unit No.1 Inservice Inspection Progra..... [AS 4C Secho XI i

scQ Esa. ia.4 L n g < u* )

i r

AWJ RJL 12/3/77 (2-P)

(l")

PLANT NAME: Davis-Besse Unit No. I taf 3.btfoYr" l.'2.

N

/ 8M N' PPM

  1. Adr73 LT=#55 FCR ACTION /INFORMATICN

~

I uSIcNED AD:

(tTR) 6 VL53 o JJ M I

I aRxtCR CRTEFt L TL 1 % f h I b l

i PROJECT MANAGER:LIl E 69 /8, I

I LIcT'fST'TG ASS??

(L*R)!

4/El'A' # M i

g I

i i

i INTERNAL OlSTRISUTICN f erg m_r(T~M i LAINAS t._f"r2.

I i I i vRc M R U.

I IPPOLITO L PPp.,

I I i i

i F. ROSA 4 8"87.,

1 l

I i f

t TCI

'2, 6T2,5 i

I cer3 (t m I i GAMMILL f Ge 4P4 i i

  • I i

1 P. COLLINS l74.

I l VOLLMER (LTR)

I i l I i

i.10USTON tt"ft.

t i SUNCR

& P ("L 4

t t

i j

i UEL'" EMES arTg, i I J. COLLINS 474P.

l i i i

! CASE (LTR) i i KREGER 1/7f, I

i t I

i

'4IPC ( LTR )

I i 8. Af'## Nan /dCPA L72, I e i 1

I Dr!GHT (TR) 1 M A A b f & d dP & FT21 l I

i i 4 30SNAK C2) i ST'dL'A t o LTS I I I

I 8/f'f#N4/7"J TfLi l I i I

e i SIHWEIL LT"fL,

' i PAWLICKI LT4 i

J//AO 6?f4 i i l I i

t ROSS tLTR) i BAdEM.

LTE,

) i l I i

i NOVAK (m

i i durad# tre i l I i l

(.s/2//Pyt,Y 4y-2, i I i t i

8 i ROSZTOC;:Y L7t"4, i I

1 CHECK
Af1Z, I i Z SA# Ir/2 I I i i I

t C ESCO (LTR) e i l 1 i I

~

i I 3rNAROYA AN i I I i I i

(

l EXTERNAL CISTRIBUTICN CONTRCL NLM EER i

LPDRf I \\ I"'8eNt to'10hd OM 8

8 l

i

+ l T c L,vt i I I I d

77339QO I 'tSI; 1 TE.

i i I i I i t i ACRS 1611S SE'iT CATEGURY ll ll ll 46, Y

... 8001150 } O 5.

m khL.

1. N.au f h

~

TOLEDO EDISON Docket No. 50-346 LOWELL E. ROE v. pr

.a.a.

rxo.

Serial No. 402 p,.

November 22, 1977

\\

gi U/

~

f,O x %sc.g.

Ed.

'2)

/

Director of Nuclear Reactor Regulatiot Attention:

Mr. Roger S. Boyd, Directo

b.,

/

Division of Project Managment x,

s Office of Nuclear Reactor Regulation

's,O; s

U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Boyd:

Enclosed is the information requested in your letter dated April 22, 1977 concerning the Davis-Besse Nuclear Power Station Unit No. 1 In-Service Inspection Program planned for compliance with 10CFR50.55a(g).

The information pertaining to the pump and valve test program was sub-mitted to you in a letter dated June 27, 1977.

The ASME Class I components have been addressed separately from the Class 2 and 3 components. The preoperational inspection performed at Davis-Besse Nuclear Power Station Unit No. I which met the requirements of the 1971 edition of the ASME Boiler and Pressure Vessel Code,Section XI including the 1971 Wintar Addenda was limit 9d essentially to Class I components. The in-service inspection to be p rformed on these Class 1 components are described in Attachment D.

Specific Class 1 items for which we request waiver from the requirements of Section XI of the 1974 edition of the ASME Code are identified in Attachment E.

The ASME Class 2 and 3 components In-service Inspection program is presented in Attachments A, B and C to this letter. This information has been developed to provide the information suggested in Enclosure 1 to your April 2?., 1977 letter entitled, "NRC Staff Guidance for Compliance with certain Provisions of 10CFT.aG,55a(g) 'In-Service Inspection Require-ments'".

Attachment A describes tae weld inspection program and cor-responds to your Enclosure 1.

Attachmeat B identities the tests we have determined to be impractical and corresponds to Appendix B of your.

Attachment C contains the figures and tables which supple-ment Attachments A and B.

v THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISO.4 AVENUE TOLEDO, OHIO 43652

m We request, relief from the testing requirements identified in Table 2 of Attachment C and the testing requirements identified in Artachment E as provided in 10CFR50.55a(g)(5)(iii). Relief from any further code require-ments identified as the test program is implemented will be requested if and when they are identified. However, Edditions and changes to the present program which in no way compromises the code testing requirements will be implemented as needed without prior NRC notification.