Letter Sequence Approval |
|---|
TAC:07811, (Approved, Closed) TAC:08019, (Approved, Closed) TAC:57450, (Open) TAC:57451, (Open) TAC:7811, (Approved, Closed) TAC:8019, (Approved, Closed) |
Results
Other: ML17318A294, ML19274D226, ML19309G772, ML19345F245, ML19345F247, ML20011B254, ML20023A486, ML20024E088, ML20028D207, ML20041G421, ML20065B814, ML20236J661
|
MONTHYEARML19326A4051977-04-22022 April 1977 Grants Relief from ASME Requirements for Proposed Inservice Testing Program for Pumps & Valves for Defined Period of Time.Addl Info Needed for Request for Relief from ASME Code Requirements Under Section 4.0.5b of Tech Specs Project stage: Other ML19326A4091977-04-22022 April 1977 NRC Guidance for Complying W/Certain Provisions of 10CFR50. 55a(g), Inservice Insp Requirements. List of Info Required for NRC Review of Inservice Insp Review & Testing Program Encl Project stage: Approval ML19326A4151977-04-22022 April 1977 NRC Guidelines for Excluding Exercising (Cycling) Tests of Certain Valves During Plant Operation Project stage: Other ML19329A8581977-06-27027 June 1977 Responds to NRC 770422 Request.Forwards Pump & Valve Test Program, for Compliance w/10CFR50.55a(g).Additions & Changes to Program,Which Meet Code Testing Requirements Will Be Implemented.W/O Encl Project stage: Other ML19329A9201977-11-22022 November 1977 ASME Section 11 Weld Examination Program for Facility: Inservice Insp Program Project stage: Other ML19329A9091977-11-22022 November 1977 Responds to NRC 770422 Request Re Facility Inservice Insp Program Compliance w/10CFR50.55a(g).Forwards Program for ASME Class 2 & 3 Components.W/O Encl Project stage: Other ML19329A8551978-01-0505 January 1978 Responds to NRC 770104 Request.Forwards Second Transmittal of 770627 Rept, Pump & Valve Test Program, for Docketing. W/O Encl Project stage: Request ML19317F5831978-01-0505 January 1978 ASME Section 11 Pump & Valve Test Program for Facility Project stage: Other ML19329B7741978-01-0606 January 1978 Notifies of Receipt of Util Request for Relief from Requirements of ASME Code Section 11,1974 Edition W/Addenda Through Summer 1975.Forwards Info Re Proposed Testing Program.W/O Encl Project stage: Other ML20236J6611978-03-29029 March 1978 Advises That Submittal of Second 40 Month Insp Period Plan Rescheduled to 780801.Submittal Date Changed from 780601 Due to Unanticipated Demand on Available Engineering Manpower Project stage: Other ML20112H3841978-08-0303 August 1978 Forwards Description of Planned Inservice Insp & Testing Program for Next 40-month Period & Three Sets of Modified Piping & Instrumentation Drawings,Including Applicable Components,Per Project stage: Request ML20147B6621978-10-0303 October 1978 Forwards Proposed Amend to Tech Specs Which Will Upgrade the Insvc Inspec Requirements Per 10CFR55a(g)(4)(ii).Proposed Changes Rely on Standard Tech Specs Project stage: Request ML19256A1661978-10-19019 October 1978 Responds to Requesting Relief from Certain Requirements of Section XI of ASME Boiler & Pressure Vessel Code.Preliminary Review by NRC Finds Compliance W/Codes Would Cause Unusual Hardship & Are Waived Project stage: Other ML19256A1711978-10-19019 October 1978 Notice of Granting of Relief from ASME Section XI Inservice Insp (Testing) Requirements Project stage: Other ML20062F4091978-12-12012 December 1978 Responds to 781201 Request for List of Plant Mod Being Made to Implement the Fire Hazard Analysis Rept.Fire Extinguishers Being Added to 13 Rooms & Wet Sprinkler or Spray Sys Being Added or Upgraded Project stage: Request ML19274D2261979-01-0303 January 1979 Grants Relief from Certain Inservice Insp & Testing Requirements of the ASME Boiler & Pressure Vessel Code, Section 11,pending Review Completion.Determines That Environ Statement Re This Action Is Not Necessary Project stage: Other ML19274E5471979-03-0909 March 1979 Requests Confirmation That Meb Will Not Review Inservice Testing Program in the Same Way They Review Inservice Insp Program.Asks for Name of Lead Reviewer of Testing Program Project stage: Other ML20244A5731979-03-28028 March 1979 Forwards Summary of 790222 Meeting Re Inservice Insp & Test Program.Summary Identifies Addl Info Required to Complete Review of Requested Relief from Certain ASME Code Requirements Project stage: Meeting ML20244A5791979-03-28028 March 1979 Summary of 790221 Meeting W/Util at Site Re Inservice Insp & Testing Program Project stage: Meeting ML19308A4531979-08-0808 August 1979 Discusses Review Re ASME Code,Section XI Exemption of ECCS Components from Inservice Insp Based on Water Chemistry Control.Water Chemistry Control to Minimize Stress Corrosion Is Unacceptable Basis for Exemption from Insp Project stage: Approval ML17318A2941979-09-14014 September 1979 Proposes Mods to Inservice Insp & Inservice Testing Program Review Responsibilities to Minimize Duplication of Effort at NRC & Maximize Contractor Review Activities.Sister Nuclear Facilities Should Be Managed by Same NRC Ofc Project stage: Other ML19309G7721980-05-0101 May 1980 Submits Addl Info Re Inservice Insp & Testing,In Response to NUREG-0411 Requirements.All Inservice Examinations Will Be Performed Per 1974 ASME Code XI W/Addenda Through 1975. Requests Relief from Hydrostatic Test Temp & Test Duration Project stage: Other ML19323D0851980-05-15015 May 1980 Updated Inservice Insp Program for Pumps,Valves,Welds (Including Supports,Components & Bolting) & Sys Pressure tests.Twenty-three Oversize Drawings Encl Project stage: Other ML19323D0821980-05-15015 May 1980 Forwards Updated Inservice Insp Program for Pumps,Valves, Welds(Including Supports,Components & Bolting) & Sys Pressure Tests Project stage: Other ML19345B2191980-11-14014 November 1980 Forwards Branch Questions & Comments & Request for Addl Info Re Util 800515 Revised Inservice Insp Program.Comments Will Form Basis for 801119-21 Working Session at Site Project stage: RAI ML19340E1221980-11-30030 November 1980 To Inservice Insp Program Project stage: Other ML19340E1191980-12-15015 December 1980 Forwards Revision to 800515 Inservice Insp Program.Changes Reflect Results of 801119 & 20 Meetings W/Nrc Onsite Re Lower Head Weld Insp & Requirements in 1977 Edition Through Summer 1978 Addenda of Boiler & Pressure Vessel Code Project stage: Meeting ML19345F2451981-01-27027 January 1981 Forwards Amend 2 to Facility Inservice Insp Program, Replacing 790606 Amend 1 Submittal.Requested Relief Does Not Affect Public Health & Safety.Requests Approval Project stage: Other ML19345F2471981-01-27027 January 1981 Amend 2 to Inservice Insp Program Project stage: Other ML19345G5121981-03-31031 March 1981 Forwards Editorial Revisions to Inservice Insp Program Project stage: Other ML19240C0021981-03-31031 March 1981 Inservice Testing Program for Pumps & Valves at Davis-Besse Nuclear Power Station - Unit 1 (Docket 50-346) for Period Nov 1977 Through Nov 1987, Safety Evaluation Project stage: Other ML20011B2541981-11-24024 November 1981 Forwards Info Re Class I Inservice Exam Areas Not Receiving Full Code Exam During 1981 Maint Refueling Outage.Areas Include Lugs,Reactor Recirculation Sys Vessel Nozzles,Piping Butt Welds & Recirculation Pump Studs Project stage: Other 05000270/LER-1982-002-01, /01T-0:on 820122,three Core Support Assembly Thermal Shield Bolts Found W/Heads Broken Off & Shock Pad Y-2 Attachment Bolts Discovered Broken.Caused by Intergranular Stress Corrosion Cracking.Pad Removed1982-02-0505 February 1982 /01T-0:on 820122,three Core Support Assembly Thermal Shield Bolts Found W/Heads Broken Off & Shock Pad Y-2 Attachment Bolts Discovered Broken.Caused by Intergranular Stress Corrosion Cracking.Pad Removed Project stage: Other 05000270/LER-1982-002, Forwards LER 82-002/01T-0.Detailed Event Analysis Encl1982-02-0505 February 1982 Forwards LER 82-002/01T-0.Detailed Event Analysis Encl Project stage: Other ML20041C2071982-02-0808 February 1982 Forwards SER & Fr Notice Re Inservice Test Program & Granting of Relief from ASME Code Section XI Inservice Testing Requirements.Approval of Relief Expires on 850508 for Unit 1 & on 870401 for Unit 2 Project stage: Approval ML20041C2151982-02-0808 February 1982 Safety Evaluation Re Inservice Test Program & Granting of Relief from ASME Code Section XI Inservice Testing Requirements Project stage: Approval ML20041C2181982-02-0808 February 1982 Notice of Granting Relief from ASME Section XI Inservice Testing Requirements Project stage: Other ML20040H1821982-02-16016 February 1982 Submits Editorial Revisions,Revision 3,to Inservice Insp Program Project stage: Other ML20040H1851982-02-28028 February 1982 Inservice Insp Weld & Support Insp Program,Revision 3, Editorial Changes Project stage: Other ML20041G4211982-03-12012 March 1982 Requests Addl Info Re Inservice Insp Program Relief.Info Should Be Forwarded to Science Applications,Inc,Within 30 Days of Ltr Project stage: Other ML20054D3051982-04-0606 April 1982 Requests Addl Info Required for Review of Inservice Insp Program.Response by 820611 Requested Project stage: Approval ML20054C6451982-04-0707 April 1982 Approves Util 800501 & 820311 Requests for Relief from 1974 Edition of ASME Section XI Code Re Required Inservice Insp Hydrostatic Min Test Temp of 100 F & Hold Times Project stage: Other ML20054C9571982-04-0808 April 1982 Notice of Violation from Insp on 820101-0228 Project stage: Other ML20052F3891982-05-0505 May 1982 Notice of Granting Relief from ASME Code Requirements Project stage: Other ML20052F3771982-05-0505 May 1982 Advises That Sections 3 & 4 of 800515 Revised Inservice Insp & Testing Program Per ASME Boiler & Pressure Vessel Code Section XI of 1977 Edition Through Summer 1978 Addenda Acceptable for Remainder of 120-month Insp Interval Project stage: Other ML20052F3861982-05-0505 May 1982 Safety Evaluation Re ASME Code Section Xi,Inservice Insp Requirements.Granting of Relief Does Not Authorize Change in Effluent Types or Total Amounts Nor Increase in Power Level & Will Not Result in Significant Environ Impact Project stage: Approval ML20023A4861982-09-0202 September 1982 Ei Hatch Nuclear Plant Units 1 & 2 Inservice Insp Program, Technical Evaluation Rept Project stage: Other ML20065B8141982-09-15015 September 1982 Advises of Exam Areas Not Receiving Full Code Exam During Inservice Insp Activities Conducted During Maint/Refueling Outage & Forwards Lists of Exam Limitations.Welds Receiving Limited Coverage Listed Project stage: Other ML20028D2071983-01-0707 January 1983 Comments on Upgrading Inservice Insp/Inservice Testing Program.Upgrade Requires Extensive Rewrite Due to Significant Changes in 1980 Edition of ASME Section XI Code from That Currently Used.Submittal Delayed Until 830801 Project stage: Other ML20028G1681983-02-0202 February 1983 Forwards Addl Info on Modified 821214 Code Relief Request 1 Revising Inservice Testing Program.Basis for Request Listed. Request Per ASME Section XI Iwv Re MSIVs MS-100 & MS-101 Project stage: Request 1980-12-15
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
_
l dj7hDb DISTRIRUTION Docket File GRivenbark NRC PDR RIngram L PDR Gray File +4 ORB #4 Rdg PTam
[9g DEisenhut DELD Docket Nos. 50-321 A ena C J n /tJ,p and 50-366 LHamon ACRS-10 TBarnhart-8 LSchneider f!r. J. T. Beckham, Jr.
0GC Vice President - Nuclear Generation OPA Georgia Power Company DBrinkman P.O. Box 4545 RDiggs Atlanta, Georgia 30302 ASLAB
Dear !!r. Beckham:
By letters dated August 3 and September 21, 1 978, respectively, you submitted proposed inservice inspection programs for the Edwin I.
Hatch Nuclear Plant Units 1 and 2.
In subsequent correspondence, you submitted revisions to these programs add /or requested relief, pursuant to 10 CFR 50.55af 9) from the inspection requirements of Section IX of the American Society of flechanical Engineers Boller and Pressure Vessel Code (the. Code). This correspondence consisted of letters dated January 24,1979, June 6,1979 January 27, 1981,
and November 10, 1981 for Hatch Unit 1; letters dated liay 1,1980 and No o ber 18, 1981 for Hatch Unit 2; and letters dated March 2, 1982 and June 11, 1982 for both Units 1 and z.
We have completed our review of these submittals and have dilineated in the enclosed Safety Evaluation (Enclosure 1) our detemination with respect to each of the items for which you requested relief.
We have granted relief as requested from all except two items:
1.
Relief from Item B.4.5 of IWB-2600 which was requested for Unit 1 only was granted provided that the first weld outside the penetration is volumetrically examined.
2.
Relief from IWC.2520(a) for Class 2 components that are exempted under IWC-1220(a) was not granted.
As stated in the Safety Evaluation, for those items for which relief has been granted, we have detemined, pursuant to 10 CFR 50.55a(g)(6)
(1), that Code requirements are impractical, the granting of relief is authorized by law and will not endanger life or property or the common defense and security, and is otherwise in the public. interest considering the burden that could result if they were imposed at your facility.
Section 50.55a(g) of 10 CFR Part 50 requires that your program be revised at 120-month intervals with the start of commercial operation 8308090155 830729
$DRADOCK 05000321 PD omce>..................................R
.........--a.-
- - - - ~ ~ ~..
j SURNAME)
........ ~........ -
..a
.a.*.-~~...
~~~a..a-aaa DATE )
.. * ~..............
. *~.~ ~ ~*~ ~
NRC FORM 318 0480) NRCM ONO OFFIClAL RECORD COPY usom im-m8E
Y A '
+
.o Mr. J. T. Beckham, Jr. being the reference date. The start dates of the next intervals for your facility are May 5,1986 for Unit I and September 5,1989 for Unit 2, and your inservice inspection and testing program for each Unit must be based on the edition and addenda of the Code incorporated by 10 CFR 50.55a(g) 12 months prior to the start date for that Unit. Any changes to your Technical Specifications are required to be submitted at least six months prior to the beginning of a 120-month interval, and it is requested that any request for relief from Code requirements be provided on the same schedule. Our review of your relief requests for your next intervals will be conducted on a schedule based on the program-Until that time, you should revision requirements for your facility.
follow the inservice inspection programs proposed by your letters dated 21, 1978, modified as described herein and by August 3 and September any further relief granted or additional testing imposed during the remainder of the period. Any relief from Code requirements granted herein expires on May 5,1986 for Unit 1 and on September 5,1989 for Unit 2.
A copy of the related Notice of Granting of Relief is also enclosed (Enclosure 2).
S_incerel y, W s>te# b John F. Stolz, Chief Operating Reactors Branch #4 Division of Licensing Enclosures :
As Stated cc w/ enclosures:
See next page a
I \\>
. 0RB#NDL......
..C,7,C,h,B,M,,:,0L,
...QRM.].;.0.L.
f.b.D..'.'.i.h 4.f).d...
............. ~ _..
omce>
.ao.
~..am me.
"*m a a * ~a* m.*
i
}.D.D.\\....
SURNAME) onep. 7.l.lkf.83.....
. ?.!l$.!.0
....?.!.h.]!. 3
. 3$$El~.
~L.O.-
.~...a..~.......
- ~ - -. ~. - -
usa m m w s9a -
OFFICIAL RECORD C,OPY NRC FORM 318 00% NRCM 0ao
f Hatch 1/2 Georgia Power Company 50-321/366 cc w/ enclosure (s):
Mr. James P. O'Reilly, Regional Administrator ots$ndTrowbridge ha,
t a Re ion I 1800 M Street, N.W.
101 Marietta Street, Suite 3100 Washington, D. C.
20036 ^
Atlanta, Georgia 30303 Ruble A. Thomas Vice President P. O. Box 2625 Southern Company Services Inc.
Birmingham, Alabama 35202 Ozen Batum Charles H. Badger Southern Company' Services, Inc.
Office of Planning and Budget Post Office Box 2625 Room 610 Birmingham, Alabama 35202 270 Washington Street, S.W.
Atlanta, Georgia 30334 Chairman Appling County Commissioners County Courthouse Baxley, Georgia 31513 Mr. L. T. Gucwa Georgia Power Company Engineering Department P. O. Box 4545 Atlanta, Georgia 30302 Mr. Max Manry Georgia Power Company Edwin I. Hatch Plant P. O. Box 442 Baxley, Georgia 31513 Regional Radiation Representative EPA Region IV 345 Courtland Street, N.E.
Atlanta, Georgia 30308 i
Resident Inspector U. S. Huclear Regulatory Commission Route 1, P. O. Box 279 Baxley, Georgia 31513
.. ~,