ML19309H926

From kanterella
Jump to navigation Jump to search
LER 80-004/03L-0:on 800417,during Seismic Analysis of as-built safety-related Sys Per IE Bulletin 79-14, Discovered Overstressed Condition in Component Cooling Sys Piping.Caused by Lack of Support Upstream of Juncture
ML19309H926
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/05/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19309H923 List:
References
IEB-79-14, LER-80-004-03L-01, LER-80-4-3L-1, NUDOCS 8005200667
Download: ML19309H926 (1)


Text

NRC F OIM 3si6 U. S. NUCLE A3 CE!UL ATCGY COMMISSION (7 77)

, LICENSEE EVENT REPORT 8005200G(p]

CONTROL BLOCK: l i

l l l l l ,,l h (PLE ASE PRINT OR TYPE ALL REQUIREO INFORMATIONI ITTil8 9I wl Il p l B l al 21@l 010 l- 10 10101010 l- 10 l o l@l 41111 I ll ll@l l l@

7 LICENSEE COOE 14 15 LICENSE NUM8ER 25 26 LICENSE TYPE Jo 57 CA T $8 CON'T a

l lO1:l 3g l L l@l 01510 l 010 l 310 l 1 l@l 0 l 4 l 1 l 718 l 0 l@l 0 l 5 l 015 l 8 l 0 l@

7 8 60 61 Dot.K E7 NUM8ER wt 69 EVENT OATE 74 75 af PORT DATE 80 EVENT DESCRIPTION AND PROBABLE CONSEQUENCES h lo 12'l lDuring seismic analysis of as-built safetv-related nininc systems in I F5TT] laccordance with IEB 79-14, an overstressed condition in the component i F5Tl lcooling system piping was discovered. The high stress area was at a l IOisIIstub end weld which joined the discharge of the two pumps. This iunc- 1 10161 Iture has a very large stress intensification factor which resulted in a I

['0T71 6 [ safe shutdown earthquake condition stress of 46,400 psi. This is l l O ia i l greater than the allowable of 27,000 osi but less than the tensile of I 7

s 960,000 ps kSTEu S CAuSE CAuSE CovP. VALVE CODE CODE SU8 CODE COMPONENT CODE SUSCODE SUSCOOE ITTTl 7 8 Iw IB l@ LB_J@ l A lh l P l Il p l E l XIX lh [_Djh (J,j h 9 to 11 12 13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISeON LEn nt EVENTVEAR REPOR T NO. COOE TYPE NO.

@ sgg)a 18 l 0 l l-l 1010141 l/l 1013 I LL_J 1--J LaJ

_ 28 22 2J 24 16 27 28 29 30 31 J2 TAK A T ON ON PL AN T VETH HOURS SB IT D FOR 8. $UPP R MANUFACTURER lFl@lZl@ l Z l@

JJ 34 JS lZl@

36 l 0 l 0 l0 l0 l 40

[Nj@

el lNl@ [A,j@ l44B l 113 l 047l@

42 43 CAUSE DESCRIPTION ANO CORRECTIVE ACTIONS h l i l o l B piping support will be added crior to startuo followine the evistina l m Irefueling shutdown. This support will be added between t'eo vn 1 m j ne I g lupstream of the juncture, similar to Unit 1, and will be sufficient to I g l reduce seismic and all other stresses to allowable levels. This dis- I gig Icovery is reportable per IEB 79-14 and in accordance with T.S . 15.6 4.2 $.2.

7 8 9 90 STA S  % POWE R OTHER STATUS DIS O RY DISCOVERY DESCRIPTION y l H l@ l 0l 0 ] 0 l@l N/A l l C l@l IE Bulletin 79-14 Insoection l

' ' " ** '8

  • A2TiviTY COZTENT RELEASED OF RELE ASE LOCATION OF RELEASE @

liisI LZ_1 @ LZl@lN/A AMOUNTOF 7 8 9 10  : 44 l N/A 45 ACTivtTY @ l 80 l

PERSONNEL ExPOSunES NOV8ER TYPE DESCRIPTION I ITl'l '010 l 0 l@l' Z l@l" N/A '

l PERSO~NEL.N;U4ES

  • Nuo8ER OESCR PTiON@

li la 8l lo 7 9 l o l o l@l N/A 11 12 I

80 LOSS OF OR DAMAGE TO FACILITY Q TYPE OESCRIPTION  %/

Ii 191 7 8 9 LZJ@lto N/A l 80 PU8LICITY DESCRIPTION NRC USE ONLY

  • ISSUEO y l N lhl N/A l llllllllllllII 7 8 9 to 68 69 80 3 NAME OF PREPARER C. W. Fay PHONE: 414/277-2811 {

l