ML19309H923

From kanterella
Jump to navigation Jump to search
Forwards LER 80-004/03L-0
Date released: 11/19/2019 Download: ML19309H923


LER 80-004/03L-0:on 800417,during Seismic Analysis of as-built safety-related Sys Per IE Bulletin 79-14, Discovered Overstressed Condition in Component Cooling Sys Piping.Caused by Lack of Support Upstream of Juncture
ML19309H926
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/05/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19309H926 (1)
Forwards LER 80-004/03L-0
ML19309H922
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 05/05/1980
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19309H922 (1)