LER 80-005/03L-0:on 800303,while Performing LPCI & Containment Cooling Modes of Rhrs Logic test,5-s Delay Timer 10A-M2A for 1002B RHR Pump Failed to Actuate Relay K21A.Relay Failed to Energize.Caused by Microswitch Drift
ML19309A980
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 03/24/1980
From: Hafera T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19309A971 List:
References
LER-80-005-03L-02, LER-80-5-3L-2, NUDOCS 8004020445
Download: ML19309A980 (2)


Text

_

NRC FCM 366 U.S. NUCLEAR REGULATORY COMMISSION wm .

LICENSEE EVENT REPORT

.A

\j CONTROL BLOCK: l 1

l l l l l 6

lh (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION)

~ [OTil8I 9i l L lLICENSEE 7

Q l ACODE lD l 214l@lIS 0 l 0 l 0 l - LICENSE l 0 l 0NUMSER l 0 l - l 0 l 0 l250 [@l 26 4LICENSE l 1 l1TYPE l1l1l@l Jo l

57 CAT $8 lg CON'T

~

lOlil 3[C"]

l60L }@l0 l 5 l 0DOCKET l O lNUMBE 0 l 21 6 l 568l@l690 l 3EVENT10 DATE l 318 l 0 74l@l750 l 3REPORT l 2 l DATg 4 l 8 l O80 l@

I 8 61 R EVENT DEScalPTION AND PROBABLE CONSEQUENCES h 10121l While performing the LPCI and Containment Cooling Modes of RHRS Logic Test, procedure l l0#3[l QMS 700-2, the 5 second delay timer for the 1002B RHR pump, timer 10A-M2A failed to l l 014 l l actuate relay K21A and the relay failed to energize. The three remaining timers in l 10IslI the one-out-of-two-twice logic circuit tested satisfactorily. Subsequently the l IT Tii1 I logic circuit would have operated as designed and started the 10028 RHR pump in the l

@l required 5 seconds. Testing was being done in accordance with Technical Specification l i O is i l 4.5.A.3 l 7 8 9 so E CODE S 8C E COMPONENT CODE SUSCODE SU E 7

O 9 8

l C lFtol@

9 11

@ 12

@ lR lE lL lA lY lX l@ W@ l Z l@

13 18 19 20 SEQUENTIAL OCCURRENCE REPORT REVISION LER EVENT YE AR REPORT NO. CODE TYPE NO.

@ ,a g/RO 18101 1-1 1010151 1/1 10 13 I ILI L---J Lo_]

21 22 23 24 26 27 28 29 30 31 32 K N AC ON PLANT MET HOURS 22 S8 IT POR B. S PPLIE MANUFACTURER l33Elgl34 Zl@ Jg 35 lZl@

36 l0l0l0l0l 31 40-lY lg l Ylg {g 44 42 4J lH l1 l2 l O gg 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h li l0 l l The micro-switch on the timer had drifted from its initial adjustment preventing the i gl timer from actuating the relay properly. The micro-switch was adjusted and the i i

gl timer was retested satisfactorily, actuating the relay after the 5 second time r

, 3 l delay as designed. l t 4 1 1 7 8 9 80 STA  % POWER CTHER STATUS IS O RY DISCOVERY OESCRIPTION y l H l@ l 0l 0l 0l@l NA l lBl@l Routine Test l ACTIVITY CO TENT RELEASED CP RELEASE AMOUNT OP ACTIVtTY LOCATION OP RELEASE g l Z l @ ygl NA l l NA l PERSONNEL EXPOS ES NuM8ER TvPE OESCRiPriON h NA lTT71 1 o l o l 01@l z l@l l PER$CNN INJURIES NUV8ER DESCRIPTION g l0l0l0lgl 7 8 9 NA l

11 12 do LOSS OP OR DAMAGE TO PACluTV "c " '"' ~

[gg i'T igi NA 8oo4oao s i 7 8 9 to 80 is$

  • NA lllllllllllllj

[,,2,,j,,0,_l @lOESCRIPTION l 1 7 8 9 10 68 69 60 4 T. Hafera 309-654-2241 Ext. 176 e l NAME OF PREPARER PHONE: $ j

l. .LER NUMBER: R0.80-05/03L-0

.11. LICENSEE NAME: . Commonwealth Edison Company Quad-Cities Nuclear Power Station Ill. FACILITY NAME: Unit Two IV. DOCKET NUMBER: 050-265 V. EVENT DESCRIPTION:

On March 3,1980, while performing the' LPCI and Containment Cooling Modes of RHRS Logic Test, procedure QMS 700-2, timer 10A-M2A failed. to actuate relay K21 A and the relay failed to energize. The-10A-M2A timer is used to delay the starting of the 10028 RHR pump. The three remaining timers in the one-out-of-two-twice logic circuit were tested satisfactorily.

The-testing of the LPCI and Containment Cooling modes of the RHR system were being performed in accordance with Technical Specification 4.5.A.3 VI. PROBABLE CONSQUENCES OF THE OCCURRENCE:

The starting of the. pump is delayed to prevent' Diesel Generator overload. Because the timers are connected i.' a one-out-of-two-twice logic circuit, and the 10A-M4A timer operated properly, the logic circuit would have operated as designed and started the 1002B RHR Pump in the required 5 seconds.

Plant safety was not affected.

Vll. CAUSE:

The cause of this occurrence is designated as equipment failure.

The micro-switch on the timer had drifted from its initial adjustment, preventing the timer f rom actuating the relay properly. The timer unit is manufactured by Hayden Manufacturing Company.

Vill. CORRECTIVE ACTION:

The micro switch on the timer was readjusted to allow the timer to work properly. The timer was retested and was found to actuate the relay af ter the 5 second time delay as designed.