Responds to NRC 781128 Ltr Re Violation Noted in IE Insp Rept 50-293/78-25.Corrective Actions:Issued Memo to Watch Engineers Reemphasizing Responsibility to Check All Instructions Against Normal Operating Procedures
ML19269B980
Person / Time
Site: Pilgrim
Issue date: 12/20/1978
From: Andognini G
BOSTON EDISON CO.
To: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19269B979 List:
References
BECO-LTR-78-207, NUDOCS 7901190176
Download: ML19269B980 (2)


Text

e BOSTON EDISON COMPANY GENER A6 oFFICf #, % 'o S QY(STQN STR EET S Q STON. M AS S ACNU SETTS o2199 G. CAAL ANDQQNINI MANAGER NUCLEAN QPERAff 0NS DEPAATMENT December 20, 1978 BECo. Ltr. #78-207 Mr. Eldon J. Brunner, Chief Reactor Operations and Nuclear Support Branch Office of Inspection and Enforcement Region I U.S. Nuclear Regulatory Cccaission 631 Park Avenue King of Prussia, PA. 19406 License No. DPR-35 Decket No. 50-293 Response to IE Inspection 78-25

Dear Sir:

Inspection Report No. 78-25 dated November 28, 1978 contained one item of noncompliance. Contained herein is Boston Edison Company's response to the infraction.

INFRACTION Technical Specification 6.8.A states in part: " Written procedures...shall be established, implemented..."

Procedure 8.A.9, Revision 0 dated October 24, 1978, " Weekly Turbine Tests,"

states in part A.9.A, "... turbine control valves will not be tested when unit load is greater than 70%..."

Contrary to the above, Procedure 8.A.9 was not followed en October 30, 1978 in that turbine control valves were tested at 70%, at 75%, and an attempt was made to test the valves at 80% unit load without utilization of the prescribed methods for effecting changes to procedures.

RESPONSE

The Chief Operating Engineer issued a memorandum to all Watch Engineers, re-emphasizing the responsibility of the Watch Engineer to check all instructions against normal operating procedures, and, if a change in the procedure is required to accomplish the instructions, then an SRO change to the procedure must be generated.

7901190 %

Ba sTnN ,EDISCN COMPANY Mr. Eldon J. Brunner, Chief December 20, 1978*

Page 2 In addition to this memo, these requirements will be re-emphasized during the upcoming requalifics' ion trair.irg program.

Full compliance will be reached on or before December 21, 1978.

We believe that this letter is responsive to your concerns. However, should you have any questions regarding this submittal, please contact us.

Very truly yours,

,!N). -

/