-1 ** *)* **

Frederick W. Schneider

  • Public Service Electric and Gas Company 80 Park Place Newark. N.J. 07101 201/622-7000 Vice President Production May 11; 1977 Mr. James P. O'Reilly Director of USNRC Off ice of Inspections and Enforcements Region 1 631 Park A.venue King of Prussia, Pennsylvania 19406

Dear Mr. O'Reilly:

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 77-27/03L Pursuant to the requirements of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable.Occurrence 77-27/03L. This*

report is required within thirty (30) days of the occurrence.

Sincerely yours, CC: Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies) 771 :~:70005

  • * - Report Number: - e-27/03L_ -- :

/Report Date: - -

0 5/-3/77- ...

. -.e *'

. '*.  :. Occurrence Date: - 4/12/77- ...... - -'~

Facility ~alem Gene~ating Station . '. .

Public Service Electric -& Gas Company- * '

  • Hancocks Bridge, New' Jersey 08038 -

IDENTIFICATION OF OCCURRENCE:

Loss of lB AkV Vital Bus and_ Inoperable Group of Containment- Fan Coil Units *.

'*,_ ._. .-* - -. *.*.~;

. .~'* .

CONDITIONS PRIOR TO OCCURRENCE:

Unit in Mode 3, recovering from Safety Injection.

I I .. - :' .. ~ .

.~- - .

DESCRIPTION OF OCCURRENCE:

At 1037 hours0.012 days <br />0.288 hours <br />0.00171 weeks <br />3.945785e-4 months <br />., the 12BSD 4kV feed breaker to the lB _Vital Bus tripped. -- - - '. ~ .

No indication of*- the cause of _the trip* was shown on* the breaker. The 12BSD breaker was reclosed_ and the 1B4D feeder breaker to the 460/230 ' .*.,.,

volt load center tripped on _overload. Thi's resulted in Nos._ 12 and 14 fan coil unit being inoperable.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The cause of _the_ l2BSD, 4kV~ _- feeder breaker trip is not known. No

_ indication of cause was showing -on the _breaker. G:tiecks of relays __

-*. associated with the operation of this breaker inade by the Relay Dept. -

were all satisfactory. The cause of the 1B4D lead center breaker trip_

was overload. This over.load was caused by the starting curr.ent drawn

  • by all loads that were _running on the load center prior.* to the loss of the 12BSD feeder~ _

ANALYSIS OF OCCURRENCE:_

Technical Specification 3.8.2~1 allows Shours to restore an inoperable on-site distribution system. The lB _vital bus was restored within 10 ..

. minutes. Technical -Specification 3. 6 * .2. 3 allows 72

  • hours to restore_ an _
  • inoperable group of Containment-Fan Coil Units. The 'fan coil units were operable in 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> 48 minutes. In neither case was the limiting con-dition for operation violated.**: At no time was there any danger to the heal th and safe'ty of the general_ public or site personnel.

CORRECTIVE ACTION:

The 460/230 volts load center was stripped of all loads. Checks were made on the bus and on al.l loads for shorts and *grounds. - All checks

,. ..* ~ *-'*~" ,, .. -*. *1 - -

..

  • Report No. 11-27/03AI

'.\..

  • .*.e 5/3/77
  • . :* ~

... were satisfactory. The 460/230 volts load center was z;-e-en~1;gi~~d and all ioads returned to service. *

. *On 5/2/77, the 12BSD~ 4kVbreaker was removed and replaced* with a spare.

A G.E. representative worked with the ,Maintenance Department and in,...

  • 1*

'spected the breaker~ Nothing was found that would explain the tripping

  • of. the breaker.

,,,.*', - .**~

.. - _*,  : ~ -- '~ .. -'

FAILURE DATA: .

- -( ' -

.Not. Applicable

- *.. - ~- - .

. ~--

.Manager~~g

. *{

Prepared by___._T_*.;.__L__;_._S...,_p....;;e_n;;_;;c;_;e;;_;;r;___

Station SORC Meeting No. ___4_8_-_7_7_*_ __

. ~ ... - .

'* ~ .

. j

LER 77-32/03L tJl3/77 ,

LICENSEE EVENT REPORT *-

t *-.

--f'f-CONTROL BLOCK I I 6

UCENSEE EVENT NAME UCl!NSE NUMBER' 1'.YPC REPORT REPORT

. CATEGORY TYi'£ SOURCE DoCKET NUMBER EVENT DATE REPORT CATE

<fil1l CON'T! P I OJ I~ l 1L I I 0 I 51 0 I -I 0 I 2 I 71 2j I 0I 4I l !2 I7 I 7I *~~ 1.s 1 o ! 3 17 17J

~ 57 Sil - 60 61 , ,. ~ 69 . 74 EVENT DESCRIPTION . . ...

@:I!! I During Mode 3. operation,* the 12BSD breaker tripped cansin~ a loss of t-he I 7 89 , . *, . *80

_. @:§] lB Vital Bus and loss of a group of CFCU's.

  • Th~ 1A and lC Vital Busses .*

7 8

'l* 7!!I!]8.,,_were ____operable

_:___________ duririg ;;_this* event. Breaker was

__________________ removed and inspected.

~------...,....-------=---------~

(9l!J I is the first occurrence of this. typ.e. * (77-27 /03L) . I 7 8 9 80

.* 7(![!]8 ':-------------.........,,,.,,._,.~------------~-----=

9 PRIME 80 SYSTEM CAUSE COMPONENT MACNOUMFPAOCNTEUNRTER . VIOL.AT* ION

. COOE CQOE COMPONENT CODE: , . SUPPLIER .

@I!) I E I B I lKJ I Z I Z I Z I z I Z..JZ.j * . LU .*I Z I 9 19 I 9 I * . lliJ

  • 7 8 9 10 11 1:Z 17 43 . 44 47 . 48 CAUSE DESCRIPTION *

...J!I!J 1 A G.E. representative dismantled the breaker. inspected and then reassemhlbd

.7@!I89I the 9

unit I No indication as to the cause of the trtp could he found I i 80

[!ID ...

7 8 9 ', 80 F'ACILITY . METHOD OF r:T:'1 STATUS 'lit POWER OTHER STATUS DISCOVERV DISCOVERY DESCRIPTION 7

L!J.~i IJ lD.J

  • 9 Io l-0 1- a I 10 12

'~--N~/-A..___~L 13 44 LEJ 45 46 N/A so I.

l'OAMOI' ACTIVITY CONTENT RELEASED OF REL.EASE AMOUNT OF ACTIVITY 1.0CATION OF REI.EASE (ill]8 W W I N/A 44I ., 4°"5""'*-.____________~/A

  • 1 ......_______________ __,,SQ~I 7 .9 10 11 PERSONNEL EXPOSURES . ,. . ~ '. .

NUMBER TYPE DESCRIPTION 7

1010101 9 11 , 12 1ZJ I1~3~.---------....--------------------------------------------------~§S~

N/A j PERSONNEL INJURIES NUMBER CESCRIPTION 1

GEJta§0 10 IOh I I N/A

~12..-------------""""'""""'"----------------------------------------------~ao~

I

. .

  • OFFSITE CONSEQUENCES.

riTsl I ---- - N/A r"'i § .

LOSS OR DAMAGE TO FACILITY r.r:'J TYl>t! CESCRIPTION l.!..l!J I Z I- I

  • N/A 1 a-r- 10 .

PUBLICITY (II!J"=-__________________

1 89

....,.~--------------------------------------_,..,. ao L!J!J.,._ ADDITIONAL FACTORS

_______________________________________________________________ ~

l'j"1il N/A 1 a g

[I!].__,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._,..._~

1 aa so NAME=-----""'T"""""'."""""L-~;._S;;;..o;;p_;;e;,,;n"""c~e..;;r'------ PHONE; (609) 365-7000 Ext.Salem:-528