ML19031C031

From kanterella
Jump to navigation Jump to search
07/12/1978 Letter Reportable Occurrence on Missed Surveillance of Monthly Functional Test of Steam Generator Blowdown Radiation Monitoring Channels
ML19031C031
Person / Time
Site: Salem  PSEG icon.png
Issue date: 07/12/1978
From: Librizzi F
Public Service Electric & Gas Co
To: Grier B
NRC/IE, NRC Region 1
References
LER 1978-034-04
Download: ML19031C031 (2)


Text

e PS~G Public service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 201 /622-7000 July 12, 1978 Mr. Boyce H. Grier '15 CJ Director of USNRC l/~

co

--: c_ . ..

Office of Inspections and Enforcements p '..

Region 1 .. .. -.

~-~.

I L:;

631 Park Avenue **-

!_'!\--:*
  • ./i c; .-~.

(-. ~

s~c ..,  ;:u

\._:')

-1'1

(")

.::;;;;<.. ~.,..

,J
:'.:: :::;:-;

Dear Mr. Grier:

< -tC 0

(/} i',)

Cl

  • !~--

LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 78-34/04L Pursuant to the requirements of Salem Generating Station Unit No. 1 Environmental Technical Specifications, we are submitting Licensee Event Report for Reportable Occurrence 78-34/04L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours,

i. P. ~~ 'ilL-8 F. P. Librizzi 'J General Manager -

Electric Production CC: Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and

( 3 copies) Program Contr;lGU 13\l~ \\ijti{i\ i\\I ~~(l*,I

~:<.

Th*? Energy People r1, 95-2001 300M 10*74

~ Report Number: '-34/04L Report Date:

7/12/78 Occurrence Date: 6/27/78 Facility: Salem Generating Station Public Service Electric &.Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Missed Surveillance: Monthly Functional Test of Steam Generator Blowdown Radiation Monitoring Channels 1Rl9, A, B, C, D.

CONDITIONS PRIOR TO OCCURRENCE:

N/A DESCRIPTION OF OCCURRENCE:

At 0945 hours0.0109 days <br />0.263 hours <br />0.00156 weeks <br />3.595725e-4 months <br /> on 6/27/78, Performance Department personnel discovered that the monthly functional test of the Steam Generator Blowdown Radiation Monitors was overdue. This test was required to be performed by 6/25/78 using the 25% tolerance allowed by Technical Specifications.

The test was immediately performed and the results were satisfactory.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The cause of this occurrence was personnel error in that the responsible supervisor failed to identify the required test before it became overdue.

ANALYSIS OF OCCURRENCE:

Environmental Technical Specification 2.3.2.f states that all liquid effluent radia~ion monitors shall be calibrated at least quarterly by means of a radioactive source which has been calibrated to a NBS source. Each monitor shall also have a functional test monthly ....

Failure to perform the required surveillance is a violation of Environmental Specification 2.3.2.f.

CORRECTIVE ACTION:

Immediately upon identification of the missed surveillance, the functional test was performed. Test results were satisfactory.

FAILURE DATA:

N/A Prepared by T. L. Spencer

~~~~~-=-~~~~~~~

7 Manager - Salem Generating Station SORC Meeting No *. 44-78

~~~~~~~~~~-