MONTHYEARIR 05000272/20240032024-10-30030 October 2024 Integrated Inspection Report 05000272/2024003 and 05000311/2024003 ML24296B1932024-10-23023 October 2024 Project Manager Assignment LR-N24-0068, Core Operating Limits Report - Cycle 282024-10-21021 October 2024 Core Operating Limits Report - Cycle 28 LR-N24-0063, Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF)2024-10-0707 October 2024 Emergency Plan Document Revision Implemented September 18, 2024. Includes NC.EP-EP.ZZ-0903, Rev. 7, Opening of Emergency Operations Facility (EOF) ML24267A1082024-09-23023 September 2024 Submittal of the Reactor Vessel Material Surveillance Program Capsule Technical Report IR 05000272/20244022024-09-23023 September 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024402, 05000272/2024402, and 05000311/2024402 (Cover Letter Only) IR 05000272/20240052024-08-29029 August 2024 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Report 05000272/2024005 and 05000311/2024005) IR 05000272/20240022024-07-30030 July 2024 Integrated Inspection Report 05000272/2024002 and 05000311/2024002 LR-N24-0012, Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding2024-07-24024 July 2024 Application to Revise Technical Specifications and 10 CFR 50.12 Exemption Request to Implement Optimized ZIRLO Fuel Rod Cladding ML24145A1772024-07-15015 July 2024 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 236, 349, and 331 Modify Exclusion Area Boundary IR 05000272/20245012024-06-12012 June 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Emergency Preparedness Biennial Exercise Inspection Report 05000354/2024501, 05000272/2024501 and 05000311/2024501 ML24099A1572024-05-29029 May 2024 Issuance of Amendment Nos. 348 and 330 Permanent Extension of Type a and Type C Containment Leak Rate Test Frequencies ML24150A0032024-05-28028 May 2024 Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 10 CFR 50.75(h)(1)(iv) and Proposed Amendment to the Decommissioning Trust Agreement LR-N24-0041, Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response2024-05-22022 May 2024 Stations, Revisions to Emergency Plan Document Nc EP-EP-ZZ-01102, Rev. 28, Emergency Coordinator Response IR 05000272/20240102024-05-16016 May 2024 Fire Protection Team Inspection Report 05000272/2024010 and 05000311/2024010 05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger IR 05000272/20240012024-05-0707 May 2024 Integrated Inspection Report 05000272/2024001 and 05000311/2024001 LR-N24-0039, Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage2024-05-0606 May 2024 Steam Generator Tube Inspection Report - Twenty-ninth Refueling Outage LR-N24-0034, 2023 Annual Radioactive Effluent Release Report (ARERR)2024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report (ARERR) LR-N24-0035, 2023 Annual Radiological Environmental Operating Report (AREOR)2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report (AREOR) LR-N24-0024, Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-26026 April 2024 Response to Request for Additional Information Associated with License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary LR-N24-0011, Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary2024-04-0505 April 2024 Supplemental Information to License Amendment Request (LAR) to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20240112024-04-0101 April 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Plant Modification and Annual Problem Identification and Resolution Inspection Report 05000354/2024011, 05000272/2024011, and 05000311/2024011 LR-N24-0028, And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal2024-03-28028 March 2024 And Salem Generating Station - Notice of Intent to Pursue Subsequent License Renewal IR 05000272/20244032024-03-20020 March 2024 And Hope Creek Generating Station - Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000272/2024403, 05000311/2024403, and 05000354/2024403 LR-N24-0021, And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2024-03-20020 March 2024 And Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums ML24071A2132024-03-12012 March 2024 Senior Reactor and Reactor Operator Initial License Examinations LR-N24-0020, Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report2024-03-0707 March 2024 Generation Station and Salem Generating Station, Units 1 & 2 - Annual Property Insurance Status Report LR-N24-0022, Spent Fuel Cask Registration2024-02-29029 February 2024 Spent Fuel Cask Registration IR 05000272/20230062024-02-28028 February 2024 Annual Assessment Letter for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023006 and 05000311/2023006 IR 05000272/20244012024-02-26026 February 2024 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2024401, 05000272/2024401 and 05000311/2024401 (Cover Letter Only) IR 05000272/20230042024-02-0505 February 2024 Integrated Inspection Report 05000272/2023004 and 05000311/2023004 LR-N24-0009, In-Service Inspection Activities2024-02-0505 February 2024 In-Service Inspection Activities ML24009A1022024-01-26026 January 2024 – Exemption from Select Requirements of 10 CF Part 73 (EPID L-2023-LLE-0045 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000272/20234012024-01-22022 January 2024 Material Control and Accounting Program Inspection Report 05000272/2023401 and 05000311/2023401 ML24004A1542024-01-0808 January 2024 Notification of Conduct of a Fire Protection Team Inspection LR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion ML23270C0072023-11-29029 November 2023 Notice of Proposed Amendment to Decommissioning Trust Agreement ML23324A3072023-11-17017 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24250A0582023-11-14014 November 2023 PSEG to Marine Mammal Stranding Center, Salem Sea Turtle Stranding Response Services IR 05000272/20230032023-11-13013 November 2023 Integrated Inspection Report 05000272/2023003 and 05000311/2023003 LR-N23-0072, Core Operating Limits Report – Cycle 302023-11-0101 November 2023 Core Operating Limits Report – Cycle 30 IR 05000272/20230102023-10-12012 October 2023 Biennial Problem Identification and Resolution Inspection Report O5000272/2023010 and 05000311/2023010 IR 05000272/20234022023-10-12012 October 2023 And Salem Nuclear Generating Station, Units 1 and 2 - Security Baseline Inspection Report 05000354/2023402, 05000272/2023402 and 05000311/2023402 (Cover Letter Only) LR-N23-0045, And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 And Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement ML23249A2612023-09-0606 September 2023 License Amendment Request to Modify the Salem and Hope Creek Exclusion Area Boundary IR 05000272/20230052023-08-31031 August 2023 Updated Inspection Plan for Salem Nuclear Generating Station, Units 1 and 2 (Reports 05000272/2023005 and 05000311/2023005) ML23233A0762023-08-21021 August 2023 Requalification Program Inspection ML23192A8212023-08-14014 August 2023 And Salem Nuclear Generating Station, Unit Nos. 1 and 2 - Issuance of Amendment Nos. 234, 347, and 329 Revise Technical Specifications to Delete Meteorological Tower Location 2024-09-23
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000272/LER-2024-001, Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger2024-05-0909 May 2024 Pressure Boundary Leakage Through a Reactor Coolant Pump Thermal Barrier Heat Exchanger 05000272/LER-2017-0012018-01-0808 January 2018 Containment Integrity Inoperable for Longer than Allowed by Technical Specifications, LER 17-001-00 for Salem Generating Station, Unit 1 Regarding Containment Integrity Inoperable for Longer than Allowed by Technical Specifications 05000311/LER-2015-0022017-09-0707 September 2017 P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSEG Nadea, II,C OCT 0 2 2015 LR-N15-0205 10 CFR 50.73 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LER 311/2015-002-00 Salem Nuclear Generating Station Unit 2 Renewed Facility Operating License No. DPR-75 NRC Docket No. 50-311 SUBJECT: Licensee Event Report 311/2015-002-00 In accordance with the requirements of 10 CFR 50.73(a)(2)(iv), PSEG Nuclear LLC is submitting the enclosed Licensee Event Report (LER) Number 2015-002-00, "Reactor Trip Due to Loss of 4kV Non-Vital Group Bus." There are no regulatory commitments contained in this letter. If you have any questions or require additional information, please contact Mr. David Lafleur of Salem Regulatory Assurance at 856-339-1754. Sincerely, John F. Perry Site Vice President — alem Attachment OCT 0 2 2015 10 CFR 50.73 Page 2 LR-N15-0205 CC Mr. D. Dorman, Administrator— Region 1, NRC Mr. T. Wengert, Licensing Project Manager (acting) — Salem, NRC Mr. P. Finney, USNRC Senior Resident Inspector, Salem (X24) Mr. P. Mulligan, Manager IV, NJBNE Mr. R. Braun, President and Chief Nuclear Officer — Nuclear Mr. T. Cachaza, Salem Commitment Tracking Coordinator Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. D. Lafleur, Salem Regulatory Assurance NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION 01-2014) t, , .1 • '., LICENSEE EVENT REPORT (LER) 'S ree Page 2 or required number of digits/characters for each block) APPROVED BY OMB: NO. 3150-0104 EXPIRES: 0113112017 Estimated burden per response to comply with this mandatory collection request: 80 hours. Reported lessons learned are Incorporated Into the licensing process and fed back to Industry. Send comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mall to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a means used to Impose an information collection does not display a currentlyvaild OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. 1. FACILITY NAME Salem Generating Station - Unit 2 2. DOCKET NUMBER 05000311 3. PAGE 1 OF 4 4. TrrLE Reactor Trip Due to Loss of 4 kV Non-Vital Group Bus, LER 15-002-01 for Salem, Unit 2, Regarding Reactor Trip Due to Loss of 4 kV Non-Vital Group Bus 05000311/LER-2016-0022017-09-0707 September 2017 Automatic Reactor Trip due to Main Turbine Trip, LER 16-002-01 for Salem, Unit 2, Regarding Automatic Reactor Trip Due to Main Turbine Trip 05000311/LER-2017-0012017-06-13013 June 2017 Emergency Diesel Generator Start Due to a Loss of Power to the 2C 4160 Volt Vital Bus, LER 17-001-00 for Salem, Unit 2, Regarding Emergency Diesel Generator Start Due to a Loss of Power to the 2C 4160 Volt Vital Bus 05000272/LER-2015-0022016-11-16016 November 2016 Condition Prohibited by Technical Specification for One Channel of Steam Generator Level Indication Inoperable, LER 15-002-002 for Salem, Unit 1, Regarding Condition Prohibited by Technical Specification for One Channel of Steam Generator Level Indication Inoperable 05000311/LER-2016-0062016-10-31031 October 2016 Automatic Reactor Trip Due to Trip of the 21 Reactor Coolant Pump, LER 16-006-00 for Salem, Unit 2, Regarding Automatic Reactor Trip Due to Trip of the 21 Reactor Coolant Pump 05000311/LER-2016-0052016-08-29029 August 2016 Automatic Reactor Trip due to Main Generator Protection Trip, LER 16-005-00 for Salem Generating Station, Unit 2 Regarding Automatic Reactor Trip due to Main Generator Protection Trip 05000272/LER-2016-0012016-07-0505 July 2016 Unanalyzed Condition due to Degraded Reactor Baffle to Former Bolts, LER 16-001-00 for Salem, Unit 1, Regarding Unanalyzed Condition due to Degraded Reactor Baffle to Former Bolts 05000311/LER-2016-0032016-04-14014 April 2016 Automatic Reactor Trip due to Main Generator Protection Trip, LER 16-003-00 for Salem, Unit 2, Regarding Automatic Reactor Trip due to Main Generator Protection Trip 05000311/LER-2016-0012016-03-21021 March 2016 AFW Loop Response Time Exceeded Technical Specifications, LER 16-001-00 for Salem, Unit 2, Regarding AFW Loop Response Time Exceeded Technical Specifications 05000272/LER-2015-0072016-01-29029 January 2016 Inoperable Control Room Emergency Air Conditioning System Due to Failed Charcoal Filter Surveillance Test, LER 15-007-01 for Salem, Unit 1, Regarding Inoperable Control Room Emergency Air Conditioning System Due to Failed Charcoal Filter Surveillance Test 05000311/LER-2015-0032016-01-22022 January 2016 Both Trains of High Head Safety Injection Inoperable Due to a Relief Valve Failure, LER 15-003-00 for Salem, Unit 2, Regarding Both Trains of High Head Safety Injection Inoperable Due to a Relief Valve Failure LR-N14-0128, Special Report 311/14-04-00, Pursuant to the Requirements of Technical Specification (TS) 3.4.10.3, Action D, for Overpressure Protection System Used to Mitigate an RCS Pressure Transient2014-05-13013 May 2014 Special Report 311/14-04-00, Pursuant to the Requirements of Technical Specification (TS) 3.4.10.3, Action D, for Overpressure Protection System Used to Mitigate an RCS Pressure Transient ML1015505772010-04-0808 April 2010 Event Notification for Salem on Storm Drain System Tested Positive for Tritium ML1034404492010-04-0505 April 2010 Document: Apparent Cause Evaluation Template Document: from Robert Montgomery LR-N05-0419, LER 05-04-00 for Salem Generating Station, Unit 2 Regarding Operation in a Condition Prohibited by Technical Specification - Containment Isolation Valves2005-08-15015 August 2005 LER 05-04-00 for Salem Generating Station, Unit 2 Regarding Operation in a Condition Prohibited by Technical Specification - Containment Isolation Valves ML0435704542004-12-13013 December 2004 Special Report 311/04-010 for Salem Unit 2 Regarding the 2R45 Detector Being Inoperable on 12/01/2004 ML19030A6261980-03-0303 March 1980 Licensee Event Report Inoperability of Air Particulate Detector Pump ML19031B0801978-09-18018 September 1978 Submit Licensee Event Report for Reportable Occurrence 78-56/03L ML19031B0381978-08-24024 August 1978 LER 1978-042-03 for Salem Unit 1 Excessive Trip Setpoint During Functional Test on No. 13 S/G Steam Flow Channel 1 ML19031B5091978-08-24024 August 1978 LER 1978 for Reportable Occurrence 78-45/03L on 100 Ft. Elevation Personnel Airlock Inoperable ML19031B0361978-08-24024 August 1978 LER 1978-044-03 for Salem Unit 1 Inoperability of No. 11 S/G Feedwater Flow Channel 2 ML19031B5101978-08-24024 August 1978 LER 1978 for Reportable Occurrence 78-43/03L on Quadrant Power Tilt Ratio Greater than 1.02 ML19031A8951978-08-14014 August 1978 LER 1978-041-03 for Salem Unit 1 Excessive Quadrant Power Tilt Ratio During Power Escalation ML19031B0391978-08-0303 August 1978 LER 1978-040-03 for Salem Unit 1 Inoperability of Makeup Valve from Demineralized Water Plant ML19031B5121978-08-0202 August 1978 Licensee Event Report 1978 for Reportable Occurrence 78-39/03L Re No. 13 Containment Fan Foil Unit Inoperable ML19031B5111978-08-0202 August 1978 Licensee Event Report 1978 for Reportable Occurrence 78-38/03L Re No. 11 Steam Generator Flow Channel II Inoperable ML19031B5131978-07-20020 July 1978 Licensee Event Report 1978 for Reportable Occurrence 78-36/03L Re Vital Bus Under Voltage Relay Setting Outside Technical Specification Limit ML19031C0301978-07-20020 July 1978 07/20/1978 Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids ML19031B1651978-07-20020 July 1978 LER 1978-035-03 for Salem Unit 1 Loss of Power to No. 2 Station Power Transformer ML19031B0401978-07-12012 July 1978 LER 1978-033-03 for Salem Unit 1 No. 11 Steam Generator Steam Flow Channel II ML19031B1671978-07-12012 July 1978 LER 1978-026-03 for Salem Unit 1 Failure of Motor Operated Valve ML19031C0311978-07-12012 July 1978 07/12/1978 Letter Reportable Occurrence on Missed Surveillance of Monthly Functional Test of Steam Generator Blowdown Radiation Monitoring Channels ML19031B5151978-07-10010 July 1978 Licensee Event Report 1978 for Reportable Occurrence 78-30/03L Re Control Bank and Shutdown Rod Misalignment ML19031B0411978-06-30030 June 1978 LER 1978-027-03 for Salem Unit 1 Malfunctioning Exterior Door of Containment Entry Air Lock ML19031B5171978-06-30030 June 1978 No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door ML19031C0321978-06-28028 June 1978 06/28/1978 Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis ML19031A8191978-06-21021 June 1978 LER 1978-029-01 for Salem Unit 1 Inoperability of Two Power Range Channels During Training Startups ML19031B5191978-05-15015 May 1978 LER 1978-025-03 for Salem Generating Station Unit 1 Re Missed Tech. Specification Surveillance: 4.8.2.4.1 DC and 4.8.2.2 AC Breaker Alignment and Power Availability ML19031B5201978-05-10010 May 1978 LER Supplemental Report for Reportable Occurrence 77-43/03L Re Inoperable No 12 S/G Channel 3 Due to Failed Pressure Transmitter ML19031B5211978-04-27027 April 1978 04/27/1978 Letter Reportable Occurrence on Excessive Concentration of Iodine in Milk Sample Collected at Environmental Sampling Location ML19031B0421978-04-17017 April 1978 LER 1978-021-03 for Salem Unit 1 Missed Surveillance of Fluoride Sample ML19031A8961978-04-17017 April 1978 LER 1978-022-01 for Salem Unit 1 Seismic Test Results for NEMA 12 Enclosures ML19031B5221978-04-11011 April 1978 LER 1978-080-03 for Salem Unit 1 Inoperability of 1B Diesel ML19031C0331978-04-0606 April 1978 04/06/1978 Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis ML19031B5231978-04-0606 April 1978 LER 1977-042-03 for Salem Unit 1 Inoperability of Channel III Pressurizer Level ML19031A8971978-04-0606 April 1978 LER 1978-018-03 for Salem Unit 1 Excessive Trip Setpoint During Functional Test on PWR Range Channel N43 ML19031A8981978-04-0505 April 1978 LER 1978-017-03 for Salem Unit 1 Tilt Ratio During Power Escalation ML19031B5261978-04-0404 April 1978 04/04/1978 Letter Reportable Occurrence on Monthly Water Quality Samples 2024-05-09
[Table view] |
Text
0 PS~G* e REGULATORY DOCl\ET FILE COPY Public Service Electric and Gas Company 80 Park Place Newark, N.J. 07101 Phone 2011622-7000 August 14, 1 97 8 CJ -;;:-0 r,.:' co r'
--! CJ
- -~
c: (// ~~'..!
en r*r: *<.::'
Mr. Boyce H. Grier '--"~ ~ ..-- :::urr~
- -.;c:.i
~.r -~ =-~ ;::J i\-:f Director of USNRC ~:*:-.* r:.~
r)o rn-~
Off ice of Inspections and Enforcements ~;~~;j U)~
- c* i71(/> ~ -;
2::: c::v Region 1 :::v =.in:
~cu
...r.,::
631 Park Avenue <J
-iC:
King of Prussia, Pennsylvania 19406 rr1 0
0 V>
-..:*1 --*
Dear Mr. Grier:
LICENSE NO. DPR-70 DOCKET NO. 50-272 REPORTABLE OCCURRENCE 78-41/03L
'\
Pursuant to the requirements of Salem Generating Station Unit No. 1 Technical Specifications, Section 6.9.1.9.b, we are supmitting Licensee Event Report for Reportable Occurrence 78-41/03L. This report is required within thirty (30) days of the occurrence.
Sincerely yours, J~
F. P. Librizzi General Manager -
Electric Production CC: Director, Office of Inspection and Enforcement (30 copies)
Director, Office of Management Information and Program Control (3 copies)
The Energy People
- Report Number: *-41/03L Report Date: 8-14-78 Occurrence Date: 8/1/78 Facility: Salem Generating Station Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:
Quadrant P6wer Tilt Ratio Greater Thari 1.02.
CONDITIONS PRIOR TO OCCURRENCE:
Operational Mode 1, Reactor Power 50%,. Increasing Power at 5%/hour.
DESCRIPTION OF OCCURRENCE:.
At 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> during a power escalation to 100% following a 50% load reduction, Quadrant Power Tilt Ratio was determined to be 1.027.
This being greater than the 1.02 allowed by Technical Specification 3.2.4 required the implementation of Action Statement "a". Power escalation continued and the QPT ratio* was recalculated at 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />.
Quadrant Power Tilt Ratio had decreased to 1.018. Action.Statement "a" for LCO 3.2.4 was terminated.
DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:
The cause of this occurrence was the power escalation at 5%/hour following a large load reduction. This type of occurrence is con-sidered normal during power escalations a~d no further action is planned.
ANALYSIS OF OCCURRENCE:
Technical Specification 3.2.4 states that with the Quadrant Power Tilt Ratio determined to exceed 1.02 but less than or equal to 1.09, within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, either reduce the QPT ratio to within its limits, or reduce thermal power at least 3% from rated thermal power for each .
1% of indicated Quadr~nt P6wer Tilt Ratio in excess of 1.0 and similarly reduce the power range neutron flux high setpoints within the next 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />.
Identify and correct the cause of the out of limit condition prior to increasing thermal power. Subsequent power operation above 50%
of rated thermal power may proceed provided that the Quadrant Power Tilt Ratio is verified to be within its limits at least once per hour f6r 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or until verified acceptable at 95% or gr~ater rated thermal power.
The QPT ratio was recalculated and shown -to be within its limit within one hour.
LER 78-41/03L 'CORRECTIVE ACTION:
This type of occurrence is considered normal during power escalations.
It has been demonstrated that a rate of 5% per hour can produce a QPT ratio of greater than 1.02.
FAILURE DATA:
N/A Prepared by ____T__ L_.__S~p~e~n_c_;;_e_r_________
Manager - Salem Generating Stati SORC Meeting No. 50-78
~
CONTROL BLOCK: I 1.
I e LICENSEE EVENT REPORT IQ 6
L§JI).a IN IJ Is I G Is I 1 101 o I oI - Io Io I oI o I o I - I oI o 10)14 I 1 I 1 l.1 I 1101 I 10 7 9 1.ICENSE!: CODE . 14 - 15 l.ICENSE NUMBER (PLEASE PRINT OR 25
.e 26 ALL REQUIRED INFORMATION) 1.ICENSE TYPE JO 57 CAT 58 CON'T ITTTl 7 B
~~~~! LlJ© I o I s I oI o I o I 2 I 7 I 2 101 o I a ! o I l I 1-1 a I© I -o I a I 1 I 4 I 7 1a IG) 60
- 61 COCKET NUMBER 68 69 EVENT CATE 74 75 REPORT CATE 80 EVENT OESC.RIPTION ANO PROBABLE CONSEQUENCES@) .
I At 1115 hours0.0129 days <br />0.31 hours <br />0.00184 weeks <br />4.242575e-4 months <br /> during a power escalation to 100% Quadrant Power Tilt
[)))) Ratio was determined to be 1 .. 027. Action Statement "a" for LCO 3~2.4 .J
[))3J was implemented. At 1205 hours0.0139 days <br />0.335 hours <br />0.00199 weeks <br />4.585025e-4 months <br />, QPT was reduced to less than 1.02
[)))) and Action Statement "a" for LCO 3.2.4 was terminated. This is the
[]J[] fourth occurrence of this type.
III2J
[£IlJ 7 8 9 80 SYSTEM CAUSE CAUSE COMP. VAi.VE cooE cooE suBcooE COMPONENT cooE suBcOcE suBcooE
[ill] IZ I z I@ w@ w@ I z I z I z I z I z I z 1e L!...J@) w@
7 8 9 10 11 12 13 18 19 20 SEQUENTIAi. OCCURRENCE REPORT REVISION t::;\ l.ER'RO CVENT VE.AA REPORT NO. COOE TYPE NC.
\:...:,) REPORT NUMBER I7 I 8I 21 22 I
23 I I o 14 11 I 24 26 I/I 27 I oI 3I 28 29 LIJ JO L=J 31 w32 ACTION FUTURE EFFECT SHUTCOWN ~ ATTACHMENT NPRD-4 PRIME COMP. COMPONENT TAKEN ACTION ON Pl.ANT METHOO HOURS 1.;;J SUSMITTEO FOAM liU8. SUPPi.i EA MANUFACTURER l..!J@W@ W@
33 34 35 W
36 I 01010 I Ol 37 40 LYJ@
41 l.!Ll(§ 42 W I z 1*9 I 9 I 9 I@
43 44 47 CAUSE DESCRIPTION ANO CORRECTIVE ACTIONS @
o:::I]J I This occurr~nce was the result of power escalation rate and is considere~
(((I] normal. Escalation rate was reduced and QPT ratio returned to less o::m I than 1~02.
OJIJ o:El 7 8 9 80 FACll.ITY l3Q'I METHOO OF STATUS % POWER OTHER STATUS \::.:::; OISCOVERV OISCOVERY OESCRIP'TION @-
[ill] l!'.J@ I oI s I o l@_I_ __.-N-.../...,.A,__ _I ~@I QPT Ratio Calculation -
7 8 9 10 12 1l 44 45 46 80 ACTIVITY . CONTENT C\ 0 REl.EASEO OF RELEASE AMOUNT OF ACTIVITY ~ LOCATION OF REl.EASc@)
IIfil l.Ll@ W@)I
' N/A NLA 7 8 9 10 11 44 45 80 PERSONNEL EXPOSURES t:;;;\
~TYPE(.;';;\ OESCRIPTION ITITJ NUMBER I oI o I olW~..____N....../_A_ _ _,...__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____
7 8 9 ,1 12 13 80 PERSONNEL INJURIES ~
NUMBER CESCRIPTION~
IIII]
7 8 9 I olol ol(§.__ 11 12
____~N~A=-------------------------------~
80 l.OSS OF OR OAMAGE TO FACll.ITY ~
7VPE OESCAIPTION C/
ETIJ l.z..J@ . NA 7 8 9 10 so PUBLICITY t:;;\ NRC SE 0 ISSUEDC,;\ DESCRIPTION~ U NL y *Q
[ill] lz.J6--------=N~A;.;;..__ _ _ _ _ _ _ _ _ _ _ _ ___. I I I I I I I I I I I lj !-
1 8 9 10 6B ss ao ;
NAMEOFPREPARER~~--T=--*._.;;;:L_.__ s_p___e_n_c_e_r__~~~~~- PHONE: (609)365-7000 Salen Ext.~
528 ,,,