Category:Letter type:LR
MONTHYEARLR-N23-0079, Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days2023-12-0707 December 2023 Special Report 23-02-00 Pursuant to the Requirements of Salem Unit 1 Technical Specification 3.3.3.7, Action 10, for the Unit 1 Main Steam Line Rad Monitor Inoperable for Greater than Seven Days LR-N23-0077, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion2023-11-29029 November 2023 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2023 & 30 Day Report for Salem Unit 1 Upflow Conversion LR-N23-0072, Core Operating Limits Report Cycle 302023-11-0101 November 2023 Core Operating Limits Report Cycle 30 LR-N23-0045, and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement2023-09-0808 September 2023 and Peach Bottom Atomic Power Station, Units 2 and 3 - Notice of Proposed Amendment to Decommissioning Trust Agreement LR-N23-0055, Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days2023-08-0303 August 2023 Special Report 272/23-01-00, Pursuant to the Requirements of Technical Specification 3.3.3.1, Action 23, for the Vent Noble Gas Rad Monitor Inoperable for Greater than Seven Days LR-N23-0054, In-Service Inspection Activities2023-07-26026 July 2023 In-Service Inspection Activities LR-N23-0046, Emergency Plan Document Revisions Implemented June 28, 20232023-07-10010 July 2023 Emergency Plan Document Revisions Implemented June 28, 2023 LR-N23-0005, License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2023-06-23023 June 2023 License Amendment Request to Amend Technical Specifications (TS) 6.8.4.f for Permanent Extension of Type a and Type C Leak Rate Test Frequencies LR-N23-0035, 2022 Annual Radioactive Effluent Release Report (ARERR)2023-04-27027 April 2023 2022 Annual Radioactive Effluent Release Report (ARERR) LR-N23-0034, 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station2023-04-27027 April 2023 2022 Annual Radiological Environmental Operating Report (AREOR) - Salem Nuclear Generating Station, Unit Nos. 1 and 2 and Hope Creek Generating Station LR-N23-0033, Core Operating Limits Report Cycle 272023-04-26026 April 2023 Core Operating Limits Report Cycle 27 LR-N23-0010, License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location2023-04-21021 April 2023 License Amendment Request Revision of Technical Specification (TS) to Delete TS Section 5.5 - Meteorological Tower Location LR-N23-0006, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-24024 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations LR-N23-0019, and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums2023-03-21021 March 2023 and Salem Generating Station, Units 1 and 2 - Guarantees of Payment of Deferred Premiums LR-N23-0016, and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments2023-02-28028 February 2023 and Salem Generating Station, Units 1 and 2 - Report of Changes, Tests, and Experiments LR-N23-0012, Annual Property Insurance Status Report2023-02-24024 February 2023 Annual Property Insurance Status Report LR-N23-0014, Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.7172023-02-23023 February 2023 Stations Submittal of 2022 Annual Report of Fitness for Duty Performance Data Per 10 CFR 26.203(e) and 10 CFR 26.717 LR-N23-0003, Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-2112023-02-0101 February 2023 Response to Requests for Additional Information Salem Unit 2 Relief Request S2-I4R-211 LR-N22-0096, and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination2023-01-0505 January 2023 and Salem Generating Station, Units 1 and 2 - Request for Threshold Determination LR-N22-0095, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 20222022-12-20020 December 2022 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2022 LR-N22-0094, Emergency Plan Document Revisions Implemented November 21, 20222022-12-14014 December 2022 Emergency Plan Document Revisions Implemented November 21, 2022 LR-N22-0092, Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG2022-12-0909 December 2022 Response to Final Iolb Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG LR-N22-0091, Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments2022-12-0202 December 2022 Independent Spent Fuel Storage Installation, Report of 10 CFR 72.48 Changes, Tests, and Experiments LR-N22-0084, Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095)2022-11-17017 November 2022 Response to Final Request for Additional Information for Salem LAR to Revise TS to Extend Allowed Outage Time for Inoperable EDG (EPID L- 2022-LLA-0095) LR-N22-0090, Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem2022-11-10010 November 2022 Supplement to Submittal of Salem Generating Station Updated FSAR, Revision 33, 10 CFR 71.106 Review Results and 10 CFR 54.37(b) Review Results for Salem LR-N22-0065, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2022-09-27027 September 2022 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations LR-N22-0074, Emergency Plan Evacuation Time Estimate2022-09-15015 September 2022 Emergency Plan Evacuation Time Estimate LR-N22-0066, License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM)2022-08-31031 August 2022 License Amendment Request (LAR) to Relocate Technical Specifications (TS) Requirements for Reactor Head Vents to the Technical Requirements Manual (TRM) LR-N22-0063, Spent Fuel Cask Registration2022-08-10010 August 2022 Spent Fuel Cask Registration LR-N22-0068, In-Service Inspection Activities - 90-Day Report2022-08-10010 August 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0012, License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature2022-08-0707 August 2022 License Amendment Request to Amend the Technical Specifications to Revise and Relocate the Reactor Coolant System Pressure and Temperature Limits and Pressurizer Overpressure Protection System Limits to a Pressure and Temperature LR-N22-0062, Spent Fuel Cask Registration2022-07-21021 July 2022 Spent Fuel Cask Registration LR-N22-0006, License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days2022-06-29029 June 2022 License Amendment Request (LAR) to Amend Salem Unit 1 and Unit 2 Technical Specifications (TS) to Extend the Allowed Outage Time for an Inoperable Emergency Diesel Generator from 72 Hours to 14 Days LR-N22-0051, License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report2022-06-22022 June 2022 License Amendment Request to Relocate Technical Specification Facility/Unit Staff Qualification Requirements to Quality Assurance Topical Report LR-N22-0044, Emergency Plan Document Revisions Implemented November, 20212022-05-19019 May 2022 Emergency Plan Document Revisions Implemented November, 2021 LR-N22-0043, Core Operating Limits Report - Cycle 292022-05-0909 May 2022 Core Operating Limits Report - Cycle 29 LR-N22-0041, 2021 Annual Radioactive Effluent Release Report (Rerr)2022-04-28028 April 2022 2021 Annual Radioactive Effluent Release Report (Rerr) LR-N22-0040, 2021 Annual Radiological Environmental Operating Report2022-04-28028 April 2022 2021 Annual Radiological Environmental Operating Report LR-N22-0039, Emergency Plan Document Revisions Implemented March 24, 20222022-04-21021 April 2022 Emergency Plan Document Revisions Implemented March 24, 2022 LR-N21-0052, Request for Relief from ASME Code Defect Removal for Service Water Buried Piping2022-04-0707 April 2022 Request for Relief from ASME Code Defect Removal for Service Water Buried Piping LR-N22-0023, Guarantees of Payment of Deferred Premiums2022-03-21021 March 2022 Guarantees of Payment of Deferred Premiums LR-N22-0022, Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds2022-03-21021 March 2022 Response to Request for Additional Information Relief Request S1-14R-210, Alternative Examination of Welds LR-N22-0017, Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data2022-02-25025 February 2022 Submittal of 2021 Annual Report of Fitness for Duty (FFD) Performance Data LR-N22-0016, Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility2022-02-24024 February 2022 Radiological Survey of Site Property to Be Used for Offshore Wind Port Facility LR-N22-0013, In-Service Inspection Activities - 90-Day Report2022-02-10010 February 2022 In-Service Inspection Activities - 90-Day Report LR-N22-0007, Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs2022-01-0505 January 2022 Request for Exemption from Specific Requirements of 10 CFR Part 26, Fitness for Duty Programs LR-N21-0061, Annual Report of Specific Activity Analysis - TS 6.9.1.5c2021-12-0909 December 2021 Annual Report of Specific Activity Analysis - TS 6.9.1.5c LR-N21-0083, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion2021-11-24024 November 2021 Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report 2021 & 30 Day Report for Salem Unit 2 Upflow Conversion LR-N21-0078, Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS2021-11-18018 November 2021 Hope and Creek Generating Station, Supplement to License Amendment Request to Revise Technical Specifications (TS) to Delete Definitions Found in 10 CFR Part 20 and Delete Figures of the Site and Surrounding Areas from TS LR-N21-0066, Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations2021-11-10010 November 2021 Submittal of Relief Request Associated with the Fourth Inservice Inspection (ISI) Interval Limited Examinations 2023-09-08
[Table view] Category:Licensee Event Report (LER)
MONTHYEAR05000272/LER-2017-0012018-01-0808 January 2018 Containment Integrity Inoperable for Longer than Allowed by Technical Specifications, LER 17-001-00 for Salem Generating Station, Unit 1 Regarding Containment Integrity Inoperable for Longer than Allowed by Technical Specifications 05000311/LER-2016-0022017-09-0707 September 2017 Automatic Reactor Trip due to Main Turbine Trip, LER 16-002-01 for Salem, Unit 2, Regarding Automatic Reactor Trip Due to Main Turbine Trip 05000311/LER-2015-0022017-09-0707 September 2017 P.O. Box 236, Hancocks Bridge, NJ 08038-0236 PSEG Nadea, II,C OCT 0 2 2015 LR-N15-0205 10 CFR 50.73 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 LER 311/2015-002-00 Salem Nuclear Generating Station Unit 2 Renewed Facility Operating License No. DPR-75 NRC Docket No. 50-311 SUBJECT: Licensee Event Report 311/2015-002-00 In accordance with the requirements of 10 CFR 50.73(a)(2)(iv), PSEG Nuclear LLC is submitting the enclosed Licensee Event Report (LER) Number 2015-002-00, "Reactor Trip Due to Loss of 4kV Non-Vital Group Bus." There are no regulatory commitments contained in this letter. If you have any questions or require additional information, please contact Mr. David Lafleur of Salem Regulatory Assurance at 856-339-1754. Sincerely, John F. Perry Site Vice President — alem Attachment OCT 0 2 2015 10 CFR 50.73 Page 2 LR-N15-0205 CC Mr. D. Dorman, Administrator— Region 1, NRC Mr. T. Wengert, Licensing Project Manager (acting) — Salem, NRC Mr. P. Finney, USNRC Senior Resident Inspector, Salem (X24) Mr. P. Mulligan, Manager IV, NJBNE Mr. R. Braun, President and Chief Nuclear Officer — Nuclear Mr. T. Cachaza, Salem Commitment Tracking Coordinator Mr. L. Marabella, Corporate Commitment Tracking Coordinator Mr. D. Lafleur, Salem Regulatory Assurance NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION 01-2014) t, , .1 • '., LICENSEE EVENT REPORT (LER) 'S ree Page 2 or required number of digits/characters for each block) APPROVED BY OMB: NO. 3150-0104 EXPIRES: 0113112017 Estimated burden per response to comply with this mandatory collection request: 80 hours. Reported lessons learned are Incorporated Into the licensing process and fed back to Industry. Send comments regarding burden estimate to the FOIA, Privacy and Information Collections Branch (T-5 F53), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet e-mall to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0104), Office of Management and Budget, Washington, DC 20503. If a means used to Impose an information collection does not display a currentlyvaild OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection. 1. FACILITY NAME Salem Generating Station - Unit 2 2. DOCKET NUMBER 05000311 3. PAGE 1 OF 4 4. TrrLE Reactor Trip Due to Loss of 4 kV Non-Vital Group Bus, LER 15-002-01 for Salem, Unit 2, Regarding Reactor Trip Due to Loss of 4 kV Non-Vital Group Bus 05000311/LER-2017-0012017-06-13013 June 2017 Emergency Diesel Generator Start Due to a Loss of Power to the 2C 4160 Volt Vital Bus, LER 17-001-00 for Salem, Unit 2, Regarding Emergency Diesel Generator Start Due to a Loss of Power to the 2C 4160 Volt Vital Bus 05000272/LER-2015-0022016-11-16016 November 2016 Condition Prohibited by Technical Specification for One Channel of Steam Generator Level Indication Inoperable, LER 15-002-002 for Salem, Unit 1, Regarding Condition Prohibited by Technical Specification for One Channel of Steam Generator Level Indication Inoperable 05000311/LER-2016-0062016-10-31031 October 2016 Automatic Reactor Trip Due to Trip of the 21 Reactor Coolant Pump, LER 16-006-00 for Salem, Unit 2, Regarding Automatic Reactor Trip Due to Trip of the 21 Reactor Coolant Pump 05000311/LER-2016-0052016-08-29029 August 2016 Automatic Reactor Trip due to Main Generator Protection Trip, LER 16-005-00 for Salem Generating Station, Unit 2 Regarding Automatic Reactor Trip due to Main Generator Protection Trip 05000272/LER-2016-0012016-07-0505 July 2016 Unanalyzed Condition due to Degraded Reactor Baffle to Former Bolts, LER 16-001-00 for Salem, Unit 1, Regarding Unanalyzed Condition due to Degraded Reactor Baffle to Former Bolts 05000311/LER-2016-0032016-04-14014 April 2016 Automatic Reactor Trip due to Main Generator Protection Trip, LER 16-003-00 for Salem, Unit 2, Regarding Automatic Reactor Trip due to Main Generator Protection Trip 05000311/LER-2016-0012016-03-21021 March 2016 AFW Loop Response Time Exceeded Technical Specifications, LER 16-001-00 for Salem, Unit 2, Regarding AFW Loop Response Time Exceeded Technical Specifications 05000272/LER-2015-0072016-01-29029 January 2016 Inoperable Control Room Emergency Air Conditioning System Due to Failed Charcoal Filter Surveillance Test, LER 15-007-01 for Salem, Unit 1, Regarding Inoperable Control Room Emergency Air Conditioning System Due to Failed Charcoal Filter Surveillance Test 05000311/LER-2015-0032016-01-22022 January 2016 Both Trains of High Head Safety Injection Inoperable Due to a Relief Valve Failure, LER 15-003-00 for Salem, Unit 2, Regarding Both Trains of High Head Safety Injection Inoperable Due to a Relief Valve Failure LR-N14-0128, Special Report 311/14-04-00, Pursuant to the Requirements of Technical Specification (TS) 3.4.10.3, Action D, for Overpressure Protection System Used to Mitigate an RCS Pressure Transient2014-05-13013 May 2014 Special Report 311/14-04-00, Pursuant to the Requirements of Technical Specification (TS) 3.4.10.3, Action D, for Overpressure Protection System Used to Mitigate an RCS Pressure Transient ML1015505772010-04-0808 April 2010 Event Notification for Salem on Storm Drain System Tested Positive for Tritium ML1034404492010-04-0505 April 2010 Document: Apparent Cause Evaluation Template Document: from Robert Montgomery LR-N05-0419, LER 05-04-00 for Salem Generating Station, Unit 2 Regarding Operation in a Condition Prohibited by Technical Specification - Containment Isolation Valves2005-08-15015 August 2005 LER 05-04-00 for Salem Generating Station, Unit 2 Regarding Operation in a Condition Prohibited by Technical Specification - Containment Isolation Valves ML0435704542004-12-13013 December 2004 Special Report 311/04-010 for Salem Unit 2 Regarding the 2R45 Detector Being Inoperable on 12/01/2004 ML19030A6261980-03-0303 March 1980 Licensee Event Report Inoperability of Air Particulate Detector Pump ML19031B0801978-09-18018 September 1978 Submit Licensee Event Report for Reportable Occurrence 78-56/03L ML19031B0381978-08-24024 August 1978 LER 1978-042-03 for Salem Unit 1 Excessive Trip Setpoint During Functional Test on No. 13 S/G Steam Flow Channel 1 ML19031B5091978-08-24024 August 1978 LER 1978 for Reportable Occurrence 78-45/03L on 100 Ft. Elevation Personnel Airlock Inoperable ML19031B5101978-08-24024 August 1978 LER 1978 for Reportable Occurrence 78-43/03L on Quadrant Power Tilt Ratio Greater than 1.02 ML19031B0361978-08-24024 August 1978 LER 1978-044-03 for Salem Unit 1 Inoperability of No. 11 S/G Feedwater Flow Channel 2 ML19031A8951978-08-14014 August 1978 LER 1978-041-03 for Salem Unit 1 Excessive Quadrant Power Tilt Ratio During Power Escalation ML19031B0391978-08-0303 August 1978 LER 1978-040-03 for Salem Unit 1 Inoperability of Makeup Valve from Demineralized Water Plant ML19031B5121978-08-0202 August 1978 Licensee Event Report 1978 for Reportable Occurrence 78-39/03L Re No. 13 Containment Fan Foil Unit Inoperable ML19031B5111978-08-0202 August 1978 Licensee Event Report 1978 for Reportable Occurrence 78-38/03L Re No. 11 Steam Generator Flow Channel II Inoperable ML19031B5131978-07-20020 July 1978 Licensee Event Report 1978 for Reportable Occurrence 78-36/03L Re Vital Bus Under Voltage Relay Setting Outside Technical Specification Limit ML19031C0301978-07-20020 July 1978 07/20/1978 Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids ML19031B1651978-07-20020 July 1978 LER 1978-035-03 for Salem Unit 1 Loss of Power to No. 2 Station Power Transformer ML19031B0401978-07-12012 July 1978 LER 1978-033-03 for Salem Unit 1 No. 11 Steam Generator Steam Flow Channel II ML19031B1671978-07-12012 July 1978 LER 1978-026-03 for Salem Unit 1 Failure of Motor Operated Valve ML19031C0311978-07-12012 July 1978 07/12/1978 Letter Reportable Occurrence on Missed Surveillance of Monthly Functional Test of Steam Generator Blowdown Radiation Monitoring Channels ML19031B5151978-07-10010 July 1978 Licensee Event Report 1978 for Reportable Occurrence 78-30/03L Re Control Bank and Shutdown Rod Misalignment ML19031B0411978-06-30030 June 1978 LER 1978-027-03 for Salem Unit 1 Malfunctioning Exterior Door of Containment Entry Air Lock ML19031B5171978-06-30030 June 1978 No. 1 - Licensee Event Report 1978 for Reportable Occurrence 78-28/03L Re Inoperable 100 Ft. Elevation Air Lock Interior Door ML19031C0321978-06-28028 June 1978 06/28/1978 Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis ML19031A8191978-06-21021 June 1978 LER 1978-029-01 for Salem Unit 1 Inoperability of Two Power Range Channels During Training Startups ML19031B5191978-05-15015 May 1978 LER 1978-025-03 for Salem Generating Station Unit 1 Re Missed Tech. Specification Surveillance: 4.8.2.4.1 DC and 4.8.2.2 AC Breaker Alignment and Power Availability ML19031B5201978-05-10010 May 1978 LER Supplemental Report for Reportable Occurrence 77-43/03L Re Inoperable No 12 S/G Channel 3 Due to Failed Pressure Transmitter ML19031B5211978-04-27027 April 1978 04/27/1978 Letter Reportable Occurrence on Excessive Concentration of Iodine in Milk Sample Collected at Environmental Sampling Location ML19031B0421978-04-17017 April 1978 LER 1978-021-03 for Salem Unit 1 Missed Surveillance of Fluoride Sample ML19031A8961978-04-17017 April 1978 LER 1978-022-01 for Salem Unit 1 Seismic Test Results for NEMA 12 Enclosures ML19031B5221978-04-11011 April 1978 LER 1978-080-03 for Salem Unit 1 Inoperability of 1B Diesel ML19031C0331978-04-0606 April 1978 04/06/1978 Letter Reportable Occurrence on Non-Radwaste Sampling for Suspended Solids Analysis ML19031B5231978-04-0606 April 1978 LER 1977-042-03 for Salem Unit 1 Inoperability of Channel III Pressurizer Level ML19031A8971978-04-0606 April 1978 LER 1978-018-03 for Salem Unit 1 Excessive Trip Setpoint During Functional Test on PWR Range Channel N43 ML19031A8981978-04-0505 April 1978 LER 1978-017-03 for Salem Unit 1 Tilt Ratio During Power Escalation ML19031B5261978-04-0404 April 1978 04/04/1978 Letter Reportable Occurrence on Monthly Water Quality Samples ML19031B5251978-04-0404 April 1978 04/04/1978 Letter Reportable Occurrence of Missed Sampling of River Water for Biocide 2018-01-08
[Table view] |