Letter Sequence Request |
|---|
EPID:L-2018-RNW-0002, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
- Supplement, Supplement, Supplement
Administration
- Withholding Request
- Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance, Withholding Request Acceptance
- Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting, Meeting
Results
Other: L-2018-154, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 2 Responses, L-2018-175, Subsequent License Renewal Application, Safety Review Requests for Additional Information (RAI) Set 5 Responses, L-2018-176, Subsequent License Renewal Application, Responses to the August 2018 NRC On-Site Regulatory Audit Follow-Up Items, L-2018-187, Subsequent License Renewal Application Revision to SLRA Section 3.5.2.2.2.6, Reduction of Strength and Mechanical, Properties of Concrete Due to Irradiation, L-2019-037, Subsequent License Renewal Application Safety Review Requests for Additional Information (RAI) Set 9 Responses, ML17338A134, ML17338A139, ML17360A054, ML18003A047, ML18037A824, ML18037A828, ML18037A829, ML18074A252, ML18080A175, ML18081A239, ML18081A257, ML18081A270, ML18081A278, ML18086A705, ML18087A433, ML18113A142, ML18160A012, ML18173A087, ML18183A445, ML18214A171, ML18230B482, ML18232A576, ML18299A114, ML18341A024, ML19032A536, ML19050A400, ML19162A072, ML19162A097, ML19162A117, ML19162A343, ML19200A070, ML19326C114, ML22073A122
|
MONTHYEARML19326C1141972-07-19019 July 1972 SLR Tech Specs from Authority File Project stage: Other L-2017-097, Request for Withholding Information from Public Disclosure Re Subsequent License Renewal Notification2017-05-17017 May 2017 Request for Withholding Information from Public Disclosure Re Subsequent License Renewal Notification Project stage: Withholding Request ML18080A1642017-05-25025 May 2017 U.S. Nuclear Regulatory Commission Approval of Florida Power & Light Company Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18081A2862017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Scoping and Screening Methodology Project stage: Meeting ML18080A1782017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Neutron Fluence Calculations Project stage: Meeting ML18080A1702017-08-23023 August 2017 Notice of Forthcoming Closed Teleconference to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant -Environmental Topics and SAMA Project stage: Meeting ML18080A1662017-08-23023 August 2017 Notice of Forthcoming Closed Meeting to Discuss Pre-application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - Reactor Vessel Internals Project stage: Meeting ML18080A1722017-09-0505 September 2017 Official Use Only - Proprietary Information - Unnamed Plant Meeting Prep for Environmental Pre-Application Call - Resent to Include an Additional Topic Project stage: Meeting ML18081A2342017-10-23023 October 2017 Notice of Teleconference to Discuss Pre-Application Activities for the Anticipated Submittal of a Subsequent License Renewal Application for an Unnamed Plant - Reactor Vessel Internals, Neutron Fluence, and Environmentally Assisted Fatigue Project stage: Meeting ML18081A2572017-11-0101 November 2017 Notice of Forthcoming Closed Telecon to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - GALL SLR Requirements for Assessment of Concrete Degradation Project stage: Other ML18081A2702017-11-17017 November 2017 Notice of Closed Telecon to Discuss Pre-Application Activities Related to the Anticipated Submittal of a Subsequent License Renewal Application from an Unnamed Plant - GALL SLR Requirements for Cable and Electrical Aging Management Programs Project stage: Other ML18080A1682017-12-21021 December 2017 Summary of Pre-Application Meeting Between the NRC and FPL to Discuss AMP XI.M16A, PWR Vessel Internals Associated with the Turkey Point Units 3 and 4, Subsequent License Renewal Application Project stage: Meeting ML18081A0252017-12-28028 December 2017 September 11, 2017, Summary of Pre-Application Meeting That Was Scheduled to Be Held Between NRC and FPL to Discuss Neutron Fluence Associated with the Turkey Point Subsequent License Renewal Application Project stage: Meeting ML18080A1752018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on September 7, 2017, Between NRC and FPL to Discuss the Environmental Report Associated with the Turkey Point Subsequent License Renewal Application Project stage: Other ML18081A2782018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on November 21, 2017, Between NRC and FPL to Discuss Cable and Electrical Aging Management Programs Associated with the Turkey Point Subsequent License Renewal Application Project stage: Other ML18081A2932018-01-0505 January 2018 Summary of Closed Pre-Application Teleconference Held on September 12, 2017, Between NRC and FPL to Discuss Scoping and Screening Methodology Associated with the Turkey Point Unit Nos. 3 and 4 Subsequent License Renewal Application Project stage: Meeting ML18081A2632018-01-0505 January 2018 Summary of Closed Pre-Application Teleconference Between NRC and FPL to Discuss Concrete Degradation Associated with the Turkey Point Subsequent License Renewal Application Project stage: Meeting ML18081A2392018-01-0505 January 2018 Summary of Closed Pre-Application Telecon Held on November 6, 2017, Between the NRC and FPL to Discuss MRP-227, Reactor Vessel Internals, and Environmentally Assisted Fatigue Associated with the Turkey Point Subsequent License Renewal Appli Project stage: Other L-2018-004, Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version)2018-01-30030 January 2018 Enclosure 4 - Non-Proprietary Reference Documents and Redacted Versions of Proprietary Reference Documents (Public Version) Project stage: Request ML18037A8122018-01-30030 January 2018, 31 January 2018 Submittal of Subsequent License Renewal Application Project stage: Request ML18037A8292018-01-30030 January 2018 Enclosure 2 - Applications for Withholding Proprietary Information from Public Disclosure Pursuant to 10 CFR 2.390 Project stage: Other ML18037A8282018-01-30030 January 2018 Enclosure 1 - Turkey Point Subsequent License Renewal Application Enclosure Summary Project stage: Other ML18037A8242018-01-30030 January 2018 Submittal of Subsequent License Renewal Application Project stage: Other ML18113A1322018-01-31031 January 2018, 10 April 2018, 30 April 2018 Transmittal of Subsequent License Renewal Application Revision 1 Project stage: Request L-2018-039, License Renewal Application - Supplement 12018-02-0909 February 2018 License Renewal Application - Supplement 1 Project stage: Supplement ML18053A1372018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Supplement L-2018-053, Replacement Pages to Enclosure 3, SLRA Section 42018-02-16016 February 2018 Replacement Pages to Enclosure 3, SLRA Section 4 Project stage: Request ML18053A1232018-02-16016 February 2018 Subsequent License Renewal Application - Supplement 2 Project stage: Request ML18038A6912018-04-0303 April 2018 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18113A1422018-04-10010 April 2018 Enclosure 2 to L-2018-082, Applications for Withholding Proprietary Information from Public Disclosure Per 10 CFR 2.390 (Public Version) Project stage: Other ML18074A2522018-04-12012 April 2018 Status of Subsequent License Renewal Application Project stage: Other ML17338A1342018-04-13013 April 2018 Receipt and Availability of the Subsequent License Renewal Application for the Turkey Point Nuclear Generating Units 3 and 4 Project stage: Other ML17338A1392018-04-13013 April 2018 FRN for Receipt and Availability of the Subsequent License Renewal Application for the Turkey Point Nuclear Generating Units 3 and 4 Project stage: Other ML18087A4332018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Other ML18087A4742018-04-20020 April 2018 Change in Determination for Withholding Information from Public Disclosure Project stage: Request ML17360A0542018-04-25025 April 2018 Subsequent License Renewal Application Online Reference Portal Project stage: Other ML18003A0482018-04-26026 April 2018 Federal Register Notice (FRN) for Opportunity to Request a Hearing and to Petition for Leave to Intervene in the Review of FPLs Turkey Point Subsequent License Renewal Application Project stage: Approval ML18003A0472018-04-26026 April 2018 Determination of Acceptability and Sufficiency for Docketing, Proposed Review Schedule, and Opportunity for a Hearing Regarding the Application from FPL for Subsequent Renewal of the Turkey Point Units 3 and 4 Project stage: Other ML18086A7052018-04-26026 April 2018 Plan for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18149A5702018-05-29029 May 2018 Draft RAI B.2.3.16 1, Fire Protection System Enhancements, for Turkey Point SLRA, for Public Teleconference on June 13, 2018 Project stage: Draft RAI ML18150A2552018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - Spanish Project stage: Meeting ML18150A2402018-05-30030 May 2018 Slides for Turkey Point Public Scoping Meeting on May 31 2018 - English Project stage: Meeting ML18160A0122018-06-12012 June 2018 Plan for the In-Office Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18173A0872018-07-0505 July 2018 Plan for the Irradiated Concrete Technical Issue Regulatory Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18183A4452018-07-23023 July 2018 Report for the Operating Experience Review Audit Regarding the Subsequent License Renewal Application Review Project stage: Other ML18214A1712018-08-0101 August 2018 Subsequent License Renewal Application Project stage: Other ML18218A2002018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - Enclosure Project stage: RAI ML18218A1992018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 (EPID No. L-2018-RNW-0002) - E-mail Project stage: RAI ML18218A1982018-08-0606 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 1 Project stage: Request ML18232A5142018-08-20020 August 2018 Requests for Additional Information for the Safety Review of the Turkey Point Subsequent License Renewal Application - Set 2 Project stage: RAI 2018-02-09
[Table View] |
Text
l=PL..
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington DC 20555-0001 RE:
Turkey Point Nuclear Plant, Unit 3 and 4 Docket Nos. 50-250 and 50-251 Renewed Facility Operating Licenses DPR-31 and DPR-41 October 24, 2018 L-2018-198 10 CFR 50.90 Requested Approval for License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals
Reference:
- 1.
FPL letter L-2018-170, License Amendment Request 265, Revise NFPA 805 License Condition for Reactor Coolant Pump Seals, October 17, 2018 (ADAMS Accession No. ML18290A862)
- 2.
NRC letter to Westinghouse Owners Group, "Final Safety Evaluation for Pressurized Water Reactor Owners Group (PWROG) Topical Report WCAP-16175-P, Revision 0, (CE NPSD-1199, Revision 1) "Model for Failure of RCP Seals Given Loss of Seal Cooling in CE NSSS Plants" (TAC No. MB5803)" dated February 12, 2007 (ADAMS Accession No. ML070240429)
In Reference 1, Florida Power & Light Company (FPL) submitted license amendment request (LAR) 265, "Revise NFPA 805 License Condition for Reactor Coolant Pump Seals", for Turkey Point Nuclear Plant Units 3 and 4 (Turkey Point). The proposed amendments remove reliance on the Flowserve Reactor Coolant Pump (RCP) Seal Topical Report as a condition of Turkey Point's transition to NFPA 805, and document the application of WCAP-16175-P-A (Reference 2) for modeling RCP seal leakage in the Turkey Point Probabilistic Risk Assessment (PRA).
In a discussion with the NRC, the staff requested that FPL specify a requested approval date and implementation period for LAR 265. This letter serves as FPL's request for LAR 265 approval by April 1, 2019 with implementation to be completed within 30 days thereafter. The requested approval supports the planned Unit 4 refuel outage schedule.
This letter contains no new or revised regulatory commitments. This supplemental information does not alter the conclusion in Reference 1 that the proposed changes do not involve a significant hazards consideration pursuant to 10 CFR 50.92, and there are no significant environmental impacts associated with the proposed changes.
Should you have any questions regarding this matter, please feel free to contact me at (305) 246-4112.
Manager, Turkey Point Licensing Florida Power & Light Company
Turkey Point Nuclear Plant L-2018-198 Docket Nos. 50-250 and 50-251 Page 2 of 2 cc:
USNRC Regional Administrator, Region II USNRC Project Manager, Turkey Point Nuclear Plant USNRC Senior Resident Inspector, Turkey Point Nuclear Plant Ms. Cindy Becker, Florida Department of Health