ML18022B023

From kanterella
Jump to navigation Jump to search
Forwards ISI Rept Which Covers Insps Performed During Cycle 7 Operation,Including Refueling Outage 7,in First 10-year Insp Interval
ML18022B023
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/29/1997
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML18022B024 List:
References
HNP-97-169, NUDOCS 9709090042
Download: ML18022B023 (6)


Text

C ATEGORY 1 REGULATCI INFORMATION DISTRIBUTION STEM (RIDE)

AC(:ESSIGN NBR:9709090042 DOC.DATE: 97/08/29 NOTARIZED: NO DOCKET FACIL:50-,400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400-AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power a Light RECIPIENT AFFILIATION Co.'ECIP.NAME Document Control Branch (Document ontrol Desk)

SUBJECT:

Forwards ISI rept which covers insps performed during Cycle 7 operation, including Refueling Outage 7,in first 10-year insp interval.

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR ( ENCL ( SIZE~ I +200 TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code. GL-89-04 T

NOTES:Appli.cation for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA 1 1 PD2-1 PD 1 1 ROONEY,V 1 1 INTERNAL: AC 1 1 AEOD/SPD/RAB 1 1 LE CENTER 0 1 1 NRR/DE/EMEB 1 1 N 1 1 OGC/HDS2 1 0 RES/DET/EIB 1 1 RES/DET/EMMEB 1 1 EXTERNAL: LITCO ANDERSON 1 1 NOAC 1 1 NRC PDR 1 1 D

0 E

N NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL 13

I II 1

H

Carolina Power 8 Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant SERIAL: HNP-97-169 10 CFR 50.55a AUG P, g 1997 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 INSERVICE INSPECTION REPORT

Dear Sir or Madam:

In accordance with the reporting requirements of the ASME Boiler and Pressure Vessel Code, 1983 Edition through the Summer 1983 Addenda,Section XI, Article IWA-6220(b), Carolina Power & Light Company (CP&L) hereby submits Harris Nuclear Plant (HNP) Inservice Inspection results. The enclosed report covers the inspections performed during Cycle 7 operations, including Refueling Outage No. 7, in the first 10-year inspection interval.

Questions regarding this matter may be referred to Mr. J. H. Eads at (919) 362-2646.

Sincerely, AEC/aec Enclosure c: Mr. J. B. Brady (NRC Senior Resident Inspector, HNP)

Mr. L. A. Reyes (NRC Regional Administrator, Region II)

Mr. V. L. Rooney (NRR Project Manager, HNP)

Mr. J. M Given, Jr. (North Carolina Department of Labor) 9709090042 970829 PDR ADQCK 05000400 8 PDR 9

lllllllllillllllflllllllllllllllllllllll (8 ~

'tate Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095

K 4 I ~

4 ii,.

INSERVICE INSPECTION

SUMMARY

7'" Refueling Outage Completed 6/9/97 Carolina Power 8 Light Company P. O. Box 155 i Raleigh, North Carolina 27602 Shearon Harris Nuclear Power Plant - Unit 1 5413 Shearon Harris Road New Hill, North Carolina 27562 Commercial Operation May 2, 1987

~3-Pi%

pro gog8@.

Z/81/g7