ML18022B016

From kanterella
Jump to navigation Jump to search
Submits Completion of Spent Fuel Survey Commitments.Changes Will Be Incorporated in FSAR Amend 48 Scheduled for Issuance No Later than Six Months Following RFO7 Completion
ML18022B016
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 04/18/1997
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
HNP-97-091, HNP-97-91, NUDOCS 9704240034
Download: ML18022B016 (7)


Text

CATEGORY 1 REGULAT i. INFORMATION*1H'STRIBUTION ~ STEM (RIDS)

ACCESSION /BR:9704240034 DOC.DATE: 97/04/18 NOTARIZED: YES DOCKET I FACIL~~~O-$ 00 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH.'AME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Submits completion of spent fuel survey commitments. Changes will be incorporated in FSAR amend 48 scheduled for issuance no later than six months following RF07 completion.

DISTRIBUTION CODE: A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution T NOTES:Application for permit renewal filed. 05000400 RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-1 LA PD2-1 PD LE,N INTERNAL: ACRS 1 'Cg@"~cE~R 01 NRR/DE/ECGB/A 1 NRR/DE/EMCB NRR/DRCH/HICB 1 NRR/DSSA/SPLB NRR/DSSA/SRXB 1 NUDOCS-ABSTRACT OGC/HDS2 1 EXTERNAL: NOAC NRC PDR 0

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 14 ENCL

I

'L L

Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant "APR 1 8 1997 SERIAL: HNP-97-091 10 CFR 50.54(f)

United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 COMPLETION OF SPENT FUEL SURVEY COMMITMENTS

Dear Sir or Madam:

By letter dated July 1, 1996 and received July 8, 1996, the NRC requested that Carolina Power &

Light Company (CP&L) acknowledge and provide projected completion dates for commitments made related to spent fuel activities at the Harris Nuclear Plant (HNP). Specifically, CP&L was requested to confirm that: (1) the current spent fuel pool heatload analysis will be updated for current and future practices/assumptions; (2) the HNP FSAR will be revised to address the full-core off-loads, including the clarification or deletion of terminology such as "normal" and "abnormal;" and (3) the HNP FSAR will be revised to reflect the current as-installed spent fuel pool configuration.

By letter dated August 8, 1996, (HNP-96-131), CP&L committed to complete the above spent fuel related activities concurrently and prior to beginning fuel off-load for RFO7, which is currently in progress.

The fuel pool heatload analysis has been updated and approved. This analysis is valid for RFO7 and cycle 8 operation. The FSAR revisions to document this heatload analysis, clarify terminology and refueling strategies, and reflect the current as-installed spent fuel pool configuration, were approved on March 12, 1997. These changes will be incorporated in FSAR Amendment 48 scheduled for issuance no later than six months following RFO7 completion.

Please refer any questions regarding this submittal to Ms. D. B. Alexander at (919) 362-3190.

Sincerely, 3OIO

'st704240034 9704i8 llll]ll]ll'jllllfllEllllllll PDR ADQCK 05000400 P -PDR State Road 1134 New Hill NC Tel 919362-2502 Fax 919362-2095

Enc osure to Serial: HNP-97-091 Page 2 of 3 KWS/kws W. R. Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are employees, contractors, and agents of Carolina Power Ec Light Company.

My commission expires: ~~~ 8 5, Z O o/

Notary ( eal) c: Mr. J. B. Brady, NRC Sr. Resident Inspector Mr. N. B. Le, NRC Project Manager Mr. L. A. Reyes, NRC Regional Administrator

C Enc osure to Serial: HNP-97-091 Page 3 of 3 bc: Mr. H. K. Chernoff (RNP) Ms. W. C. Langston (PE&RAS File)

Mr. B. H. Clark Mr. L. A. Martin Mr. D. D. Davis Mr. R. D. Martin Mr. G. W. Davis Mr. W. S. Orser Mr. J. W. Donahue Mr. G. A. Rolfson Ms. S. F. Flynn Mr. M. A. Turkal (BNP)

Mr. H. W. Habermeyer, Jr. Mr. T. D. Walt Mr. M. D. Hill Ms. J. H. Westmoreland Mr. W. J. Hindman Nuclear Records Mr. R. M. Krich Nuclear Licensing File File: HUA-2D

I I k~

0