Advises That Util Commits to Implement Current Order Surveillance Test as Recommended by WOG in Recommended Rod Control Sys Surveillance Test, Distributed to WOG Member Utils on 940408,in Response to NRC 941212 RAI Re GL 93-04
ML18011A764
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/12/1995
From: Robinson W
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-93-04, GL-93-4, HNP-95-001, HNP-95-1, HO-950070, TAC-M86949, NUDOCS 9501250135
Download: ML18011A764 (6)


Text

PRIORITY (ACCELERATED RIDS PROCESSING 1

I REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9501250135 DOC.DATE: 95/01/12 NOTARIZED: YES DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina 05000400 AUTH. NAME AUTHOR AFFILIATION ROBINSON,W.R. Carolina Power & Light Co. P RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Advises that util commits to implement current order surveillance test as recommended by WOG in "Recommended Rod Control Sys Surveillance Test," on 940408. I DISTRIBUTION CODE: A030D COPIES RECEIVED LTR ENCL SIZE: 0 TITLE: Generic Ltr-93-04-Rod Control System Fan ure 6 Wzthdrawa NOTES:Application for permit. renewal filed. 05000400 R RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL LE,N INTERNAL. FILE CENTER 01 NRR/DRCH/HICB NRR/'DRPW/'PDIV=1 NRR/DSSA/SRXB EXTERNAL: NRC PDR D

C u

N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE IVASTE! CONTACTTHE DOCUMENTCONTROL DESK, ROOM Pl-37 (EXT. 504-2083 ) TO ELIXIINATEYOUR . JAIIE PRO~I DISTRIBUTION LISTS I'OR DOCL'MENTS YOU DON"I'EED!

TOTAL NUMBER OF COFIES REQUIRED'TTR 6 ENCL

4 Carolina Power & Light Company William R. Robinson PO Box 165 Vice President New Hill NC 27562 Harris Nuclear Plant JAN t 2 l995 File Number: HO-950070 SERIAL: HNP-95-001 TAC No. M86949 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 GENERIC LETTER 93-04, SUPPLEMENTAL RESPONSE Gentlemen:

By letter dated December 12, 1994, the NRC staff requested that Carolina Power & Light Company (CP8cL) commit to implement the current order timing modification and the new outage-based current order surveillance test as recommended by the Westinghouse Owners Group. Your letter referenced COL's responses to the Generic Letter dated August 4, 1993 and September 20, 1993. However, an additional CP8cL letter dated August 19, 1994 was not referenced. In that letter, CP8cL committed to modify the SHNPP Rod Control System current order timing in accordance with Westinghouse Technical Bulletin NSD-94-05-RO during the next refueling outage, RFO No.6, which is currently scheduled to commence in September 1995. That modification has subsequently been endorsed by the NRC and issued by Westinghouse in WCAP-13864, Revision 1-A.

Additionally, COL commits to implement the current order surveillance test as recommended by the Westinghouse Owners Group in "Recommended Rod Control System Surveillance Test" as distributed to the WOG member utilities on April 8, 1994.

Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 362-2030.

Sincerely, SDC/sdc Mr. S. D. Ebneter c. ". "- ~ P Mr. S. A. Elrod Mr. N. B. Le PDR V,

9501250135 950112 ADOCK 05000000

~01 0 P PDR State Road1134 New Hill NC Tel 919362-2502 Fax 919362-6950

~ A II t

h

g>> ~

Document Control Des

" HNP-95-001

/ Page 2 W. R. Robinson, having been first duly sworn, did depose and say that the information contained herein is true and correct to the best of his information, knowledge and belief; and the sources of his information are officers, employees, contractors, and agents of Carolina Power 8c Light Company.