Emergency Plan, Revision 76
ML17276B861
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 10/03/2017
From: Neve D
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GNR0-2017/00062
Download: ML17276B861 (329)


Text

  • "'PEntergy Entergy Operations, Inc.

P.O. Box 756 Port Gibson, Mississippi 39150 Douglas A. Neve Regulatory Assurance Manager Grand Gulf Nuclear Station Tel: 601-437-2103 GNR0-2017 /00062 October 3, 2Q17 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Emergency Plan Revision 76 Grand Gulf Nuclear Station, Unit 1 Docket No. 50-416 License No. NPF-29

Dear Sir or Madam:

In accordance with 10 CFR 50.54(q)(5), 10CFR50 Appendix E(v), 10CFR50.4(8)(5)(ii),

  • 10CFR72.44(f) and 10CFR72.4, Entergy Operation Inc., (Entergy) hereby submits Revision 76 to the Grand Gulf Nuclear Station (GGNS) Emergency Plan, including a summary and analysis of the changes, which became effectiVE} on September 20, 2017.

The changes to the GGNS Emergency Plan were evaluated by Entergy and determined to not reduce the effectiveness of the plan. Attachment 1 contains the summary and analysis of the Emergency Plan changes. Attachment 2 contains the GGNS Emergency Plan Revision 76.

This letter contains no new Regulatory Commitments. Should you have any questions concerning the content of this letter, please contact Douglas Neve, Regulatory Assurance

- Manager, at (601)-437-2103.

Sincerely,

~~ Doug~(A. ~eve Regulatory Assurance Manager DAN/sas Attachments: 1., Summary and Analysis of the GGNS Emergency Plan Changes

2. Grand Gulf Nuclear Station Emergency Plan, Revision 76

GNR0-2017/00062 Page 2 of 2 cc:

Mr. Scott Morris U.S. Nuclear Regulatory Commission Regional Administrator (Acting), Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Mr. Siva Lingam U.S. Nuclear Regulatory Commission Mail Stop OWFN 8 81 Rockville, MD 20852-2738 NRC Senior Resident Inspector Grand Gulf Nuclear Station Port Gibson, MS 39150 Dr. Mary Currier, M.D., M.P.H State Health Officer Mississippi Department of Health P.O. Box 1700 Jackson, MS 39215-1700 Email: mary.currier@msdh.ms.gov

Attachment 1 to GNR0-2017/00062 Summary and Analysis of the GGNS Emergency Plan Changes

            • ATTACHMENT9.2:** 10 CfR 50~54'(~L~~REENING *
  • '"i'HEET 1 Of* 9* *.

. Procedure/Document Numb~r: Emergency Plan ...

  • Part I. Description of Activity Being Reviewed (This Is generally changes to the emergency plan,: f::Als, EAL:

. basesf etc. ~refer tcfstep 3.0[6D: . * * *

  • Page ~~1 Change~ sectiora 9. 0 .. title from 11 II Reentry and Recovery" to "Recovery~

... Page 9~1 Removecl section: 9.1."Reentry/Recovery" *

  • Pag~ 9~1 Changed section 9. 0, *1st: ~enterice: " In any Em~rge~cy, the immediate acti~n i~ directed*.

toward* limiting the consequences of the incident,:* in a rnanner:thataffords thf:nnaximtim protection to the ***

pl~mtpersonnel; and thl:l general public..<. . . .

        • ro:. * . ********** *:  : ****. * .** * ** :*. * ... **
  • !!In: any declared. Emergency j. immediate actiont; c1re intended to limit consequences and .provide *
  • maximum .. protection to . plant personnel,

.the general. public1

,* ~nd: plant equipment:' . .

Page 9-1 Chahged section 9.*o. 2nd sentence: ."OnceHh& corrective and protective actions hc1ve been established an effective control over the situation, *theemergency*actions*shifts*into the *reentry and*

.. th~ subs~quent recovery* phases du,nng 'Nhich all actions are plarmed: and deliberaba; '.l .

To. . . . . . ...... * . . ... ** .. **. . ....

11 For a* Site Area or General Emergency;* cmce emergency phase corrective and protective actions have been jmplemented and effective controls established, emergency actions* shift to the Recovery phase which includes reentry and recovery operations/' * ** * * **

  • Page 9-1. Relocated:. paragraph 4 urider 9;3 "Recovery. to section 9.0 paragraph 4 and changed it from;> :.

"Recovery may be completed byJhe Emerg~ncy Organization before the termination ofthe *emergency; .**** ***:

, If recovery has not been accomplished by the tenmnation of the emergency,cl recovery9rganization is **

activated as described in Section 5.5..* Its function is to safely and effectively* place the plant back in safe

  • a

.*operating condition~*. Appropriate :GGNS and outside assistance is mobilized to accomplish. the. objectivet *

... .The Emergency Director Is responsible for transmitting the notificatiortthat the incidenUs terminated and :*

.. reentry/recovery: may begin bthose agencies connected to the GGNS *operational Hot Une (see<Section *

. . 7.5.3:a~ 1)" * * * .. .. : .. *.. . .. . . * . > * ** * .  : ** .. . *.

To::. :* .. * .. ,**** * .. * *.*: ....... * . ... . . .. .* ** . . .. ** *.

  • "Recovery may. be completed* by the Emergency *Organization. before emt:!rgency terminatiort. *If recovery**:

.. has not been accomplished. by the termination of the: emergency,. a. recovery organi:zation is* activated as:*

  • ** described in Section 5;5; Us *objectivrtds to safely and effectively place the pfantback ir'la safe operating.
  • condition or. an acceptable long. term condition; : Appropriate GGNS and outside assistance is mobilized to**
  • *accomplish this objective.** The* Emergency Director is responsible for transmitting a notification to those **

agencie$ connected to the ~GNS Operational Hot:Line (see Section 7.5.3;aJ)that the incident is .

terminated and **the.plant is transitioning to the Recovery phase." *

  • EN-EP-305 RE\l 4 .

ATTACHMENT9.2<:

.Procedure/Document Number. Emergency Plan .* .. .

  • Pag~ 9-1 *Rerocated *paragraph 7 under: 9(3 "Recover( to section 9J) paragraph 5 and changed it from: ::.*:

11 Recovecy operations are conducted in compliance with normal operational radiation exposure levels

  • specified in 10CFR20. *: V\lhen: possiblei significant releases of radiation during recovery: .is planned; *: ****
  • controlled, evaluated in* advance for radiological impacti and appropriate offsite* organizations and
  • agencies informed of the scheduled rel~ase and estimated impact.* Emergency Plar'1Procedures provide:*

. *. methods of periodically :estimating total population exposure." ** * * * * ** *

  • To::.* .......... .

. . Recovery is conducted in pompliance with normai. occupational dose limits specified in 10CFR2(t **.

11 Signifieanfreleases ofradioactive materials duririg'.recoveryjs planned; controlled; and evaluated in :*

  • advance for radiological impacti. and appropriate .offsite organizations and agencies infom,ed of the *.. .

.scheduled release and: estimated impact Emergency Plan Procedures provide methods of periodically**: ..

estimating total population expqsure/ * * * *

  • P~ge 9~2 ReJocatedsecti.on !t3 11 Recovery" to the. changed se~tion 9.1 14 Recovery Operations**
8. : .page 9"."2 Ad~ed the senter,ce: II Mare detailed information :,s provid~d in Emergency Plan procedures. to .. :

. the end of the first paragraph in: section 9.1.* Recovery Operations;;: * * * * * * * * **

  • . 9. Page 9-:2 Section 9~1~ second paragraph:*Changed* " *.. recoveryprogrc:.1111s~:.: "to: recovery operations.

11 1O; Page . . .

9.;1:. Changed . .. . ..

section . .

9.2*uReentry

. to section 9.2 "Reentry Operations."

  • 1 t *General~ Procedure 1O~S;.01-22, Rec0\1~ry;
  • wm be deleted and superseded by EN.;.EP~ 13, ~Recovery :*
      • from Declared Emergencies~ atthe same time thh~ revision is issued~ **
  • EditorialChanges: ***.. * . .. * * .  : .. * . * .* . * ..* * *** * .. . * .* *. . * . .*. ...
  • ..12.. Pages 1;3.4 ListofEffecUve PE!gt?s 113,4~ Revised to update revision rtumbers for pages ~hanged .

. 13: *PageTQC vii *9.0 Change *wording: from "Reentry and Recovery: to Recovery\* *9. 1: Chang, .wording:.**.

from "Recovery" to "Recovery Operations": 9~2 Change wording from "Reentry!' to ~Reentry * *

. : .Operations". 9.3.Delete "Recovery:'\ .TOC:ii~ 5A.8, corrected misspelling of "Offsite. ***

  • 14; Page 3~1a; section 3.2.hiChangeR~entry and Recovery to Recovery.
  • 15; Page 9-1, section 9;0 first.p~ragraph: Corr~ct~d subjectlobjectlverb position tom~ke the sentences
  • clearer and more .gramm~ticaUy correct: and less likely to be misinte,rpretecl. * *
16. Page 9-1,9..;2. 9~3, Removed unnecessary use of "the~. Removed unnecessary prepositional phrases.
  • Simplified.. tenses. .. . . .. . . .. ... . .. . .. .

"L. release of radiation.. / to : ~ .. release oHadioactive materialsL ~* ..

.

  • 17~ .Page 9~1, Section 9; ~.bdhanged
  • 18. :Page. 9..;~, section* . .

9;0 Thi.rd* .

paragraph: Repracecl 11 ** ~ before .

the.~

  • . 11 with .

"prior';

19~ Page 9-1, Section 9.0, paragraph 5 Changed\.~release of radiation.~." to" ... release of radioactive *

. materials~ .. "*:****.* * ** * * .*.. .* * ** .. * . * . * *. ** * . . * ** > *..

11 1

20. Page 9-2; Section 9J, second paragraph: Removed . . . as requirecL;":* Replaced *.*.*.~ .. investigation;~. ' *

. with'\ .. assessmenL" . . . *.*: *:*.**** *** *. * . * ... . . * . . . . . . .. . t . .

EN~f:p...305 .REV 4 *

Procedure/Pocument Number: Emergency Plan Equiprnent/facmty/Other:: Grand Gulf Nuclear Station* *
*: Editorial Changes <continued}: .****
  • 21. Page *9-2,:: *S~tion: 9J ;: i second : paragraph: Changed . *** ~A .systematic **investigation .is : conducted to :

.*determine the equipment that has been damaged and the extent of the damage to ptant equipment"

  • To:.. ...... * .: ***** . ** * * . * .. *** ... :.*. ** . ** .

A systematic assessmentfs c~nducted tq detennine the extent~f dama.g~ to plant equi~ment" . .

22~ Page 9~2; Section 9.1 t. third: paragraphi second. sentence~. Replaced* ..Determinations: are* made as :to the :

repair work requir~d *.to perform* necessary mQdifications to plant* equipment ahd/or operating procedures~ *

  • Repair work* and approved modifications. are .carried out as: authorized~ *: Test programs to confirm* fitness
  • for return to services are tel be developed. and. executed/***
  • To:** .. ****. * *.*:* . .. ..... -... *.* .. *  : *. . .. * . * *

"Repair work and: modifications to plant equipment and/or changes to operating. procedures are

  • detemiined,. approved*.r and performed. Test programs to confirm fitness for return to services .are *

. *developed and implemented/ **. . * * . * .. . . *. .. . **

23~.Page 9~3;: Section*9.2~ Reentry Oper~tions: Chang~d.terminology more accurately define* to

  • conditions. Removed vagye and:ambiguous ~dverbs and adjectives~ < *** *: ** * . ** *** . .
24. Page A~41 1 Changed the following reference to section 9.1: Remove reference to "to:.S-Ot.;.22~. and ...
  • "1CJ,.S-Ot-23~,'.and fEN.,.EP~aos":,** and replacedwith 11 EN~EP~13it. Replace 'Reentry/Recovery11 with*.*
  • 1

,;Recovecyli: * * * * ** * * ** * * * * * ** .

Changed the following i'eferencf::s to sectie>n ~.2: Remove reference to "EN;.EP-609"; and replace with

  • uEN-EP~613 Replaced 0 Reentrytl with "Recovery Operations~:
  • 12

~

Remove reference .

to* section. .~l3. and.

all 'associated references~*

25. Page A-14; Replaced reference to* procedure 1' to-s~ot-22 : and. replaced with EN~EP-613 .* Replace*

11 "Recovery~ with ~R:eentry Operations\ . :.. . . .. .. . . .. -

26; .Page A-:14, Modified the* descripti6fr of* 1O~~O 1~23, .Reentry. from:* .... this* procedure provides general

. guidance for the Reentry phase ofon emergency." . .-. .. . . -

. To: . ... ... .. .

"This procedure provides *general* guidance for Reentry *Op~ram:ms. ' *

  • 2L PageG-19, Changedthe cross reference sections for NUREG 0654 M.3., and MA from GGNS E~ ..

Plan section 9~Yto "9.0".

11 EN-EP-305 REV 4 . :

Procedure/Document Nu:mber: Emergency Plan* ***.

. . EqufprnentlFacmtylOther:: Grand Gulf Nuclear Statucm** **

Part II. Activity Previously Reviewed? DYES. 181 NO Is this activity fully bounded by an NRC approved 10 CFR 50.90 submittal or 50.54(q)(3) Continue to Evaluation is next part Alert and Notification System Design Report? NOT required.

Enter lf YES, identify bounding source document number/approval reference and justification ensure the basis for concluding the source document fuHy bounds the below and complete Part proposed change is documented below: Vt Justification:

D Bounding document attached (optional) m.

Part Appfic~tdUty .cf Other Regtd~tory Citangf! Ctmtrol Processes *.*

.Checidf any other regulatory c~artge im:messes control the proposed aciivity:{Refer to EN;.U-100)

APPLICABILITY CONCLUSION**. *. *. * *. . * ... * *
  • t81 If th~re are no. other controUing change pr~cessesi ccmtinue the. 50.54{q)(3) Screening;** . . .

.D One or rnore controlling change processes are selectedf however~ some portion of the activity involves the** .. *

  • emergency plan or. affects the* implementatiQri of the emergency *ptan; .continua .the ij0..54(q)(3) Screening for that portion*.
  • of the activity~ . Identify the applicable controlling change procl3sses below. * ** ** * * .. * . * ** . *. * *.. .

.D .One. or more controlling. change. processes are. selected. and fully bounds all aspects of the. activity.. 50.54(q)(3} .

  • evaluation is None uired:
  • lderiti controllin chan e recesses below and* com lete Part Vt
  • CONTROlUNGCHANGE:PROCESSES: ... * )

10CFR50~54 *(q)

DYES* ~No*

S0.54(tj)(.3) * .. Continue (O next *.

ts .this activity an editorial or typographical change such as formatting. paragraph *. Evaluation is

  • pnrt.
  • numbering, ~palling; or punctuation that do~s not chantie intent? * * * :. NOT required,
  • Enter*

. Justification:. . . . . . . . . . . . . . juslificntion and

  • The following chang~s are ecUtorial changes per EN*A0~101. Ne;, Is checked at right . t:ontinuc to next
  • because the. remaining changes are non.*editoriaL *** *
  • pnrfor complete Pni'f ***

. Vias npplicable,

  • 12; . Pages 1,3A list of Effective Pages ti3.4. Revised to update revision *

. numbers for pag$s changed. ..  ; .* .

13; Page TOC vii 9.0 Change wording from Reentry and Recovery" to **

11 11 Recovert.** 9J*Changewordingfrom"Recovery"to"Recovery *

    • **Operations\ 9~2Change wording Jron, "Reentrt Je> 14 Reentry Operations" ..

9.3.0efete "Recovery" *. JOC II, 5.4.a~.corrected misspelling of "Offsitet. *

.14. Page 3-1ai sectlon*3~t*h,Changf=Re~entryand Recovery to Recovery~

15;.: Page 9~1

  • First paragraph: Corrected subject/object/verb. position to*

. . .make the. sentences clearer and more *grammatically correct and. less ...

  • likely to .be misinterpreted. * * * * *
  • EN~EP,;.305 REV 4.
  • Procedure/Document Number:: - .

Emergency Plan Part IV. Editorial Change (continued)

17. Page 9-1. Section 9.0.b Changed " ... release of radiation ... " to 11

... release of radioactive materials ... "

1

18. Page 9-1, Third paragraph: Replaced "... before the .. : with "prior'.
19. Page 9..1, Section 9.1, paragraph 5 Changed " ... release of radiation ... to It

"... release of radioactive materials ... "

20. Page 9-2, Section 9.1t second paragraph: Removed "... as required ... ".

Replaced u *** investigation ... 11 with "... assessment. .. 11

21. Page 9-2, Section 9.1 1 second paragraph: Changed "A systematic investigation is conducted to determine the equipment that has been damaged and the extent of the damage to plant equipment."

To:

11 A systematic assessment is conducted to determine the extent of damage to

  • plant equipment 11
  • I1.

I

22. Page 9-2, Section 9.1. third paragraph, second sentence - Replaced I "Determinations are made as to the repair work required to perform '.*

necessary modifications to plant equipment and/or operating procedures.

Repair work and approved modifications arf3 carried out as authorized. Test programs to confirm fitness for return to services are to be developed and executed."

To:

"Repair work and modifications to plant equipment and/or changes to operating procedures are determined, approved

  • and performed. Test programs to confirm fitness for return to services are developed and implemented."
23. Page 9-3t Section 9.2, Reentry Operations: Changed terminology to more accurately define conditions. Removed vague and ambiguous adverbs and adjectives.
24. Page A-11, Changed the following reference to section 9.1: Remove reference to "10*8-01-22", and "10-S-01-23.. , and "EN-EP-609'\ and replace with "EN..EP--61311
  • Replace "Reentry/Recovert with 11 Recovery".

Changed the following references to section 9.2: Remove reference to "EN-EP-609", and replace with "EN-EP-613 11

  • Replace 11 Reentry1' with 11 Recovery Operations".

Remove reference to section 9.3 and all associated references.

25. Page A-14, Page A-14, Replaced reference to procedure '110-S-01-2211 and replace with "EN-EP-613". Replace "Recovery" with "Reentry Operations".
26. Page A"14 Modified the description of 10-S-01-23, Reentry from: This 1

procedure provides general guidance for the Reentry phase of on emergency."

To:

"This rocedure rovides eneraJ uidance for Reent o erations. 11 EN-EP~305 REV 4

10 CFR 50.54(Q)(3) SCREE~ltJ~.

  • SHeeT60F9 Procedure/Docum~nt.Number:.Ernergency.Plan*

27; Page. G~19 Changed the cross tefetence ,sections fot NU REG 0654 M.3.,

and MA from:. G,GNS E".'Plan section "9~.3'f to "9~01'~ '

Part V. Emergency Planning Element/Function Screen {Associated to CFR50A7(b) planning standard function identified in: brackets) Does this activity affect *any ofthe foHowing; including program elements from NUREG~

  • 0654/FEMAREP~1 Section ti? ... .. . 1 L Responsibility for ernergei"!cy response is assigned~ [11: **.
  • o:

2.> The response organization has the staff to respond and .to augment staff on a continuing basis (24/7 D

  • staffing) in accordance with the. emergency plan: [1] * **
  • <t: The process ensures. that on shift emergency .response responsibilities are staffed* and* assignect [21* ** . o>*..

it The process for timely augmentation ofonshiftstaff is*established and.maihtained.[2]:* D

.5. *:*Arrangements for requesting: and using off site assistance have been made;. [3] *. D

6. State and foccll staff can be accommodated atthe EOF in accordance: with the emergency plan. [3] . . o:
7. A standard1scheme*of~mergency**1ssification,and*action levels:is in use *. [4] D a~ of
  • Proc:eduresfor notification State and loca( governmental agencies are capable ohlerting them of*:*  ::*D the*deciared emergency Within 15 *minutes after declaration of an. emergency .and: providing follow~*

up notifications.: [5J ,

9.
  • Administrative and physicalmeans have been established for alerting *and providing prompt D instructions to the public within the plume exposure pathway: (51: *  :

10; The pubHc:AN~ meets the design requirements QfFEMA*REP-10, Guide for Evaluation ofAlertand , D

.Notification Systems for Nuclear Power Plants, or complies with the licensee's FEMA~approved ANS.:*

design report and sup~orting FEMA approval letter. :[5] **

11, 'Systems are established for'prompt communk:ation among principal emergency response

  • u Qrganizations. {61. ** "
12. Systems are established for prompt communication to emergencyfesponse perscmnaL[6] D 13; *: Emergency preparedness infonnation is made .available to the public on a periodic basis within the:** u plume: exposure pathway emerg13ncy planning zone (EPZ); t7l . :
  • 14. *Coordinated dissemination of public information during emergencies is established. [7] LJ
.15;. Adequate facilities are maintained to support emergency response. [BJ . D 16;:.Adequate equipment ismaintained.to.supportemergency response. [8] u

.17. *Methods, systems; and equipment for assessment of 'radioactive releases are in use. [9]

  • u 1~t. A range of public PARs is available for implementation during emergencies; [1 OJ u  :
19. Evacuation time estimates. for the population located in the plume* exposure pathway EPZ are o*:.

available to support the formi.dation of PA Rs ahd hcave :been provided to State' and local governmental authorities. [1 OJ* *. * * * * **

20.: *A fange .of protective .actions: is avaUable for plant* emergency workers. during emergencies,. including 0 those for hostile action events.[1 O] * * ** * *

  • EN-EP~305 REV 4

ATTACHMENT 9~2

.SHEET7 C>F 9 Procedure/Document Number: emergency Plan,

' EquipmentiFaciUty/Other: Gral1d Gulf Nuclear Station:***

Title:

Emergency Plan:* *

    • 22~ Arrang,ments are made for medical services for contaminated, injured individuals; [12]
23. Plansfor recovery and reentry are develope& :[13} .

. 24 ... A drill.and exercise prograrn.(including radiological.medical,. heaUh physics and other program an:?a:s> is established.[14F ** * * * * ** * * ** * * ** .

25.::0rills. ex~rcises; and trainia,g evolutions toatprovide pertormance opportunities .to developj*** *

  • .. '**maintain,* and demonstrate key skms elre asselSsed via a .formal critique process in order to identify weaknesses; [1.4] .. *: *
    • 2aJ. ldentmect:weaknesses are eorrected.:(14J** ..

27J

  • Training is provided to emergency responders; [15]

28;: Responsibility for emergency plan develbpment and review is established; [16]

29.: Planners responsible for emergency plan developmentand:maintenanceare properly trained. [16]:***** :

APPLICABILITY CONCLUSION: .. *. . ... .. * *

Cl If no Part V criteri~ are checked, a* 50.54(q)(3) Evaluation: is NOT. required;: document the basis for conclusion below*.
andComplete Pan VI. : * *.: * .:. *. :: : * * ** .* **. ***:** .. **.:* . **
  • ~.* If any Part Vcriteria are checked, complete .Part VI and perform a 50 *.54(q)(3) Evaluation;:
  • BASIS FOR CONCLUSION*

The folk'lVJing Uems, do not require a<50;54(q) evaluation Ond the basis is provided: . .

3. Page :9.1 Changed settion 9.0, 1st s~ratence: In any Emergency. the inmiediate action is directed
  • M toward limiting the consequences of the incident. in a manner that affords the maximum protection to

. the plant person net and the general public." *

  • To; . ..:* * * * ** .. : .: * .. * . * . *.

. ~any declared Emergency. imm~diate actions are intended to limit consequences and provide

  • maximum protection to plantpersonnel.the generalpublic; and planteguipmentt>
  • Ttie sentence was simplified grammatically and plant equipment was added to the* end, ofthe :sentence~. :
  • *Protecting plant:equipmentisimportant:since certainsystemcan be used to mitigate consequences of::

the event, either by .minimizing a release or minimizing further damage to fission product barriers. * *.: *. * *

  • inclusion of plant equipment does:not affect any:of the planning standards ir,,10CFR50.47 (b)i.the requirements in 1o CFR 50 Appendix :E, **or the* program .elements in NU REG 0654.: No further evaluation is required for this change~ . . .
  • 5; Page 9-f Relocated paragraph 4 under 9.3 "Recovery" to section iW paragraph 4 and changed it from:
  • "Recovery may be comgleted by the Emergency Organization.before the termination of the* emergency~.*

If recovery has not been accomplished by the termination of the

  • emergency. a recovery organization is

.* activated as described in .Section 5~5.' . Its function is 'to safely and effectively place the plant back in a safe operating condition *. Approcriate GGNS and outside assistance is rnobitized to accomplish the.:* **

***obiective. *. The Emergency* Director is responsible for transmitting th*e notification. thatthe incident is .. *:
  • terminated and reentry/recovery may begin to those agencies connected to the GGNS Operational Hot line (see Section 7.5:3.a,.1 )'2 . .. .

To:< . . . . . .. .

11

. RecoveQ! may be completed by:the Emergency Organization. before emergency termination; It : . :

recovery has not been accomplished by the: termination of the emergency. a recovery organization is activated as described hi Section 5.5. Its objective is to safely and effectively. place the plant back in a . **

  • *safe operating condition .or an acceptable long term condition. Appropriate GGNS and* outside **
  • to assistance is mobilized accom lish this ob'ective~ The Erner enc Director is res onsible: for:

EN~EP-305 REV 4

AITACHMENT9~2 ... 10 CF.R50~54(d)(3) SCREENING .*

SHealroFs*

PrQcedure/Document Number.: Emergency Plan* Revision: 76:

.* EquipmentlfatUity/Other: Grand Gulf Nuclear Station *..

Title:

Emergency Plan:*.**.

transmitting* a notification* to those agencies connected to. the GGNS Operational* Hot line (see* Section ...

7.5~3~a.1lthat the incident is terminated* and the plant is transitioning to the Recovery phase." 7.5~3.a.1)

    • that the incident is *terminated and .the plant is. transitioning to the Recovery phasie1
  • The sentence was simplified grammatically. and 14 ,.~oracceptable long term condition/' was addedto theend*of the 311:t sentence.The prior sentence assumed that the: plantcould_:be place:back into:a.safe ..

operating condition~ This may not be achievable and an alternative would be to :place the plantinto an *

  • acceptable long term condition~ Inclusion of the alternative statement does not affect anYof the planning*

standards in 10CFR50A7 (b)~ the requirements in 1o.CFR 50 Appendix E, or the program elements irf * **

NU REG 0654J No f_urther evaluatio_n. is required for this changej * ** *

6. Page 9;.1
  • Relocated: paragraph T undefll3 "Recovery" to se1etion 9.ff garagraph 5 and changed: iUrorn: *.. *
  • "Recovery operations are conducted in compliance with normai operational radiation exposure levels. :

specified* in .1 OCFR20. When possible. significant releases of radiation during. recovery is planned *. :. .: .

controlled; evaluated in advance forradiological impact and appropriate offsite organizations and agencies>

. informed ofthe scheduled release and estimated .impacL Emergency Plar'iProcedures provide methods of

    • periodicaH~ estimating total ocipulation exposure;" *** * * * * * * **

To:. * *** * .:. ** ***** * .* . . ** . . *.* ** ..

"Recovery*is conductedirioompliance\vith normal occupational dose limits specified in 10CFR20~:: .

Signfficantrereases of radioactive materials during recovery is planned; controlled. am:f:evaluated iri advance

  • for radiological* impact. *and appropriate *Offsite organizations arid agencies informed: of the scheduled: release*

and estimated impact.** Emergency* Plan Procedures provide. methods: of periodically estimating total* . *

population exposure;" :* ' * ** * * * * * * *
  • Changed.wordfhg:in*thefirst sentence:to correct its meaning .. "~****norma1::operational radiation exposure .

levels~.~~* *are radlatiori levels encountered* In: the plant during: normal operations. These are not specified*:.

in 1o'CFR 20. *Replaced with \;: normal occupational dose limits *.. , which are included in 10 CFR 2m *-

11

. Changed wor~fng In the* secon(J sentence from '\ .* release of radiation .. ; to\;. release of radioactive material'\ Radiation is always being released from the atom or m.icleus.

Neither oUhese change*u,ffect any of the pfanning standards in .1 OCFR50.47 (b); the requirements in 1o *

    • CFR50 Appendix:Ei ortheprogram,elements in NUREG 0654; No further evaluatkm required forth1s
  • is change.** *** * * *
  • 11.General- Procedure 10-S;..o 1~22; Recovery, *wm be deleted and super§eded by EN-EP-613i* "Recovery<
  • from Declared Emergencies11 at the same time this revision is Issued. * * * * ** *
  • This change is listed aspartofeditorialchanges*in sectionA-14and.A-1(?; Supf3rsedenceoUhe older *

. procedure by the newer one requires a 50~54(q)review be performed on the new procedU:r~. The review *

  • is performed separately and not in *this document. *
  • EN:;.Ep;.305 REV4<

Pfoeedure/Doeum<<mt Ntumber:* Emergency. Plan*

  • BASIS FOR CONCLUSION * . .

.Non~edltoriaf changes requiring: a 50 e4( q) eval~a~on, The foUo~ng changes thisform: *

  • in part or collectively affecl the emergency planfling standard .13 Hsted in Part V of
  • t Page 9*1 Changed section 9.0: title from nReeritrv and Recovery* trf'Recovery."
2. *.Page 9.;.1 *Removed secUori i,1* "'Reentry/Recovent
4. Page 9*1 Qhanged se~tion 9.0. 2nd sentem:e: Qnce the correeth,e 14

~nd prq~iva actions hav~ been

  • estabijshed an effective ccmtroJ over the situatkm. the emergency actions shifts into the reentry ancHne: :

subsequent reeove(Y phises during which all acticms are planned and deliberatel To: ...

11 For ~* Site Area or General Emergency. one~ emergency phase corrective and prolm;tive actions hawe:

t;u~en Implemented and effective ci:mtrols established. emergency aµUgns shift. to the Recovecy phase which Inch.rdes reentry* and recgverv. operaticmst ** * * * * *

1. .F'51ge 9..2 <Relocated section 9.~ ~Recovert to the changed section 9.1 ~Recovery Ocie@tionsn El. eage 9~2Added the sentem;:a "More detailed infr.mnatloo is provided in Emergency Plan procedures."to Jhe
  • end of the first>~aragraph in section 9.1. Recovery Operations~
  • 9~ *Page 9*2 Section:9;1, second paragraph: Changed ".i1£ecover,programs ** .8' tg .. recovecy operaUons,
  • 10. Page g..3. ReloCated sectkm 9;3 -Reent1;l *tg section 9.2 and renamed lhe tiUe *,gReenb'y OP1ratioris.".

Tt,e .changes remove ~Reentry" as a separate phase thaUs performed prior to recovery and makes it subordlnatetothe*lllRecovery phase\Under the -Recovery phaset.:"Recovery*operations":and*"Reentry***

Operations~ are p,normed.>

  • A 10CFR50. 54 (q) evaluation will be 'performed to determine whetheror not the effectiveness oUhe emergency plan is reduced and prie1r NRC approval is required. * **

Pri;JJarer Name (print)***

  • pautSudnak Reviewer Name (Print).* *
  • David Townstmd Nuctear EP Project Manager
  • Approver Name (Prinl) Approver Signature*

Jaff Seiter Manager, emergency Planning or deslgnee **

  • .***SHEET*1 OF4>
  • I I

i

.. . F>roc~dure/Document Number: Emerg~ncy e1an.. I. R~viskm:7.6 * *. *

  • . EqaJipm~ntlFacmtylOther:* Grartd Gulf Nuclear. Station *.
  • Piirt I** Descdptlon of Proposed. Change:: . . . . . ' .. ' .. .

The ~limbering used below corresponds to the de$criptions listed in attachment 9.2, WCFR 50.54(q)(2) Sc:reenfng.

Page 9-1 ChangecJ settton 9,9 title from '.'Reentry and.Recovery1 to 11 Recovery."

Page s~t, Removed

$eCtton. *9A

Reentry/Recovery.

4; Page 9-1 *Changed section 9.0, 2nd sentence:. '"Once the corrective and protective actions have been

        • . established an effective control over the situationi the emergency actions shifts into the! reentry and the*

subsequent recovery* phases during which all actions are planned and* deliberate/

. To:*<'. . . . . .

    • "For. a Site Area or Gmeral Emergencyf once emergency phase. corrective and protective actions have **, **

been implemented and effective controls.established~ emergency actions: shift to the Recovery phase

  • which includeis reentry:an.d recovery operations." * (
  • 7; Page 9"'.2: Relocated section 9.31!Recovert to the changed section 9.1 "Recovery Operationsr,
8. .Page 9~2 Added the sentence UMore detailed infonnation is providedln Emergency Plan procedures.no the.*.

end of the... first paragraph in section.

9.1;

  • Recovery Operations.

.9. *. Page*

9-2 Section $.1, *secpnd . . . .

pa~graph:

Changed.*'\ .. recove*ry . .

programs~~

. 11 to " recovery operations"~

1.0.Page 9-3 Relocated s~ction. gj ."Reentry *to section.* 9.i ~nd renamed the title "Reentry Operations:".* *..

11 11

. The changes remove Reentry as aseparate phase that is performed prior to recovery an~ make!!Ut .

1

  • *subordinate to the 'Hecovery phase Under the HRecovery phase\ ."Reepvery Operations~ and '.'Reentry
  • 1 1
  • Operations'.' are performed/ .. . .. . . .. .. . . . .
  • part U. Descrtl'.)tJ011 i!lmd:Review of licensing Ba;si~ Affected by the PropoJed Ctnmge:

oftha

. Performed electronic search GGNS Emerg:encyPlan section 9.o;;Reentry and R~eoyery,, 9.1 Reentry/Recovery,R2tReentry, AppendixG, page G-4, NUREG;.Q654CrossReference B.7; Appendix G;

  • page G"'19. NUREG 0654 C:i"(?S$ Reference M, M~1, M.2~ M.3~ * . .

Revision 1*bfthe Emergency Plan was reviewetj fbt' the original approved text used to describe Reentry and*

  • Reqovery. **With. the ;exception. of the following revision changes,. all other changes. were editorial or error*.
  • corrections; Rev 75, section 9.0: This revision removed Site or General Emergency. from the first sentence and:resulted
  • au i.n immediate actions ~pplying to emergencies. The first sentence is a generic. ~tatement, and does not ..

contain*

any commitments or implement .

any .

regulations. . .

Rev 61, section 9~3: This revision* changed the name from the Emergency Director/Off-site Emergency< >.

Coordinatorto the Emergency Director. This was a simpleiname change, did not change responsibilities and obligations,* and. c~nsoUdated. Fleet wide!* naming .cor1Vention~.. . . *

Rev 61; Seciiol19.3: This revision added the Sm paragraph: uThe Emerg(:JncyDirectordiscusses*existing offsite conditior,s with appropriate* State officials prior to tenninating a Site Area Emergency or General Emergency classification . ., This change. was evaluated and determined that there were no effects on the GGNS Emergency Plan~*

Revision 1 of the Plan approved by the NRC~ estabiished the licensing basis for the GGNS EmergencyPlan, It, along with the changes in revision 61 *arid 75, and the changes in revision, 76 were considered in their '

ri~ . . . . .

EN-EP-305 REV 4

ATTACHMENT 9~3 ..

SHEET20F4

. .erocedure/Document Number:. Emergency Plan***

  • j Revision:76 ****. ***

Title:

  • Grand* Gulf Nuclear Statfon* Emergency* Plan*
  • . Part m/De$cribe How the Proposetd Change C~mplies with Relevaot Emergency Preparedness* .
  • Regulation(s)and Previous ~ommitment(s) Made to the NRt:: .. . . . . . .

10 CFR 50.47 (b)(13l <3eneral plans for recovery al1dreentry are developed.*

Site Compliance:Joroughimplementation ofthis revision;the commitment to comply with.the planning standards provided in to CFR 50A7 (b)(13) re.mains, and the requirementfor Reentry and Recovery plans* remains in the GGNS Emergency Plan;*
  • 1o CFRso Appendix E. IV. H. Recovery* Criteria to be used to determine when~ following an accidenti r~er:itry ofthefa.ciJity:would.

be".*:*.*:*

appropriateorwhen operat1on:could beiesumed shall be:.. described~

to Site Compliance: Thre>ugh implementation of this revision. llie commitment comply with the **.

. regulations provided in. 10 CFR 59 Appendix E, IV H.. Recovery remains; and Reentry and Re~overy ..

  • criteria are esti3blished and rematn in the GGNS Emerg~ncy Plan: * *
  • Previous NRC commitments~ licensing Research System(LRS)v3;0a was.used to search fotpotential.

NRC commitment change~ a~ a resultofth.e GGNS Emergency Plan changet There wer~ no ide11tifi¢d

  • *conflicts wit11 *the :Plan changes and* the cu.rrent NRQ *ce>mmitrnents. *All current NRC. comntitments that relate**
  • to Reentry and Recovery ~ontinue to be n'laintairied and fulfilled withthis plan change~ * * *
  • EN-EP~305 REV 4 .

ATTACHMENT 9.3 SHEEf 3 .OF 4. *. *: .

. Prot:edure/Document Nurnb~r: Emergency Plan****

!Equipmentlfacility/Other: Grand *Gulf Nucle.ar Station ****

Title:

Grand Gulf Nuclear Station E111erg~ncy Plan Part:v.*oescription oflmpactof.theProposed:Change on the Effectiveness of Emergency.Plan*:**

functions: . . . .. . . ... .. .. .. . . . . . . . ...

The* change incorporates both Reentry Operations, an.d. Recovery Operations .under the Recovery phase.::*::

. bUrlng Recovery. Operations; plans are established to :i~~ntify equipment to be repairerJ; replaced! or :*. .

returned fo service. priorities are: assigned to equipment. and systems yielding. the highest value to: meet: *....

Recovery objectives; Personnel are assigned to the Recovery organization based ori planned Recovery' *

  • efforts; priorities,* and* objectives~ * *

. F6f1nitial Reentry Operation~,. area hazards are assessed and evaluated; These assessments~ including

  • radiation surveys,: are perforined in areas associated with critical systems and equipment which have been id~ntlfled irfthe Recovery plan as nece5.sary to support Recov~ry Operations. . . .. .. . . .. . . . .. .

The curr~nt revision of 'the GGNS: l:mergency Plan: separates the Reentry phase from the Recovery :Phase:*

. and describes the Recovery phase as: being entered subsequent fo the Reentry phase.* hi reality,: initial*:.*.: ..

Recovery plans would include Reentry into *arecJS with equipment and systems needed for further stabilizing **..

  • the plant and establishing additionallevels OfcontroL Based: reentry surveys and ~sse~sments; Recov~ry
  • on
  • plans may be modified based on significant hazards or impediments in areas identified as critical for **.. * *
  • . Recovery~ *A reiterative process is likely base~ on r~sults ofongoir1g planf hazar~s atisessments and.*****.*.:* ., *.
  • R~~ovecy pl~nning; . * *** * ***. ** * * ***: ** ***** ** **** *** * * *** * .. *****. *. *. .. ..:*. . .. . *. * * * **. *.. * : . .** ... * *
  • Aflexible and reiterative pr9cess cannc:,t be implemented if elements of the process are predefined; distinct,***

and sequer1tial. **** * * ** * * * * *

. For-this reasont it i~ logical ~nd prude~t to perform both reentry and reco~ery planriing arid cert~i~ aspects ***

  • of Reentry at"ldRecovery operations aUhe same time. This allows* modifying plans based ortongr:>ing .

c1ssessme~ts of plant c.onditions. * .. .. . .. * . * * .. * * *. * *. * .. * * * . * .*.. * . * .... *

.

  • Aside from the benefit ofincorporating*both Recovery and Reentry Operations into.the Recovery phase, the eler11Elnts of both Reentry and Recovery ofthe prior revision remain irtthis revisiort * . .

Since R~entry Op~ration~ and Recovery Operations etements ~ssentially remain the same with

.*impact on either Reentry or Recovery, the change. and* clarification to section 9.0 .is not considered a **

~o adverse .

reduction in effectiveness; . .. . .

' The proposed changes to the GGNS :emergency plan contim.ie to meeHhe planning standards outlined in 10

  • CFR 50A7(b)(14).The effectiveness rifthe emergency planis notreduced~ *The emergency plan changes
  • can be: incorporated without prior NRC approval. *
  • EN-EP.;.305 REV 4

Nuclear EP Pro}ecl M~n~gsr:.: **.,

.Approver Name (Print) *.:. ***

.Jeffery Seiter**

Mamige( EmergencY Preparedness Ot\cieid9'1Ct?

EN. EP~305. REV 4 *.

Attachment 2 to GNR0-2017/00062 Grand Gulf Nuclear Station Emergency Plan, Revision 76

Grand Gulf Nucle ar Statio n Emerg ency Plan

GRAND GULF NUCLEAR STATION EMERGENCY PLAN RECORD OF REVISION Revision/Change Number Date Entered Entered by I

Keep this sheet in the front of your copy of the GGNS Emergency Plan as a record of incorporation of periodic revisions and changes.

GG FSAR LIST OF EFFECTIVE PAGES Revision Revision List of Effective Pages 2-13 70 2-14 70 1 76 I

2-15 64 2 75 3 76 3-1 74 4 76 3-la 68 3-2 64 i I 44 ii I 70 4-1 59 iii I 71 4-2 61 ma 71 4-3 65 iv 61 4-4 61 v 61 4-5 69 vi 44 4-6 69 vii 76 4-7 69 viii 44 4-8 69 lX 70 4-9 69 x 61 4-10 69 4-11 69 1-1 56 4-12 69 1-2 44 4-12a 69 1-3 61 4-13 69 1-4 61 4-13a 69 1-5 72 4-14 69 1-6 72 4-15 71 1-7 72 4-16 69 1-8 72 4-17 69 2-1 23 4-17a 70 2-2 64 4-18 69 2-2a 58 4-19 69 2-3 25 4-20 69 2-4 I 56 4-21 69 2-4a 52 4-22 69 2-5 25 4-23 57 2-6 25 5-1 70 2-7 39 5-2 70 2-S 58 5-3 70 2-9 61 5-4 70 2-lO 70 5-5 61 2-lOa 70 5-6 61 2-ll 26 2-!2 68 Revision 76 9/17

GG FSAR LIST OF EFFECTIVE PAGES Revision Revision 5-5 61 6-8 72 5-6 61 6-9 61 5-7 61 6-10 61 5-8 62 6-11 65 5-9 61 6-12 75 5-9a 71 6-13 75 5-10 71 6-14 75 5-11 71 6-15 26 5-12 71 6-16 71 5-13 71 5-14 71 7-1 61 5-15 71 7-2 61 5-16 71 7-3 70 5-17 74 7-4 75 5-18. 71 7-5 72 5-19 61 7-6 74 5-20 71 7-7 58 5-21 64 7-8 61 5-22 . 71 7-9 71 5-23 61 7-10 _,

64 5-24 61 7-11 66 5-25 61 7-12 75 5-26 61 7-13 46 5-27 68 7-14 61 5-28 70 7-15 59 5-29 71 7-16 73 5-30 69 7-17 45 5-31 61 7-18 45 5-32 70 7-19 28 5-33 65 7-20 65 5-34 71 7-21 61 5-35 61 7-22 51 5-36 61 7-23 43 7-24 61 6-1 61 7-25 71 6-2 43 7-26 75 6-3 75 7-27 41 6-4 61 7-28 46 6-5 43 7-29 61 6-6 70 7-30 29 6-7 61 7-31 24 2 Revision 75 3 /17

GG FSAR LIST OF EFFECTIVE PAGES Revision Revision A-14 76 7-32 72 A-15 75 7-33 68 A-16 75 7-34 71 7-35 53 B-1 75 7-36 53 C-1 23 7-37 71 D-1 74 7-38 61 D-2 72 8-1 75 D-3 70 8-2 23 D-4 51 8-3 70 D-5 70 8-4 26 D-5a 60 8-5 70 D-5b 60 8-6 75 D-5c 60 8-6a 75 D-5d 75 8-7 75 D-5e 75 8-7a 75 D-5f 75 8-8 70 D-6 75 8-9 70 D-7 49 8-10 75 D-7a 49 8-lOa 70 D-7b 71 8-11 70 D-8 52 8-12 31 D-8a 52 9-1 76 D-8b 71 9-2 76 D-9 60 9-3 76 D-9a 60 D-9b 39 A-1 28 D-9c 39 A-2 72 D-9d 71 A-3 75 D-10 74 A-4 75 D-11 75 A-5 75 D-lla 75 A-5a , 72 D-12. 71 A-6 72 D-12a 71 A-7 72 D-13 70 A-8 72 D-14 70 A-9 75 D-15 47 A-10 72 D-16 47 A-11 76 A-12 72 A-13 31 3 Revision 76 9/17

GG FSAR LIST OF EFFECTIVE PAGES Revision Revision F-1 33 D-17 75 D-18 47 G-1 75 D-19 74 G-2 75 D-20 74 G-3 75

  • D-21 74 G-4 75 D-22 74 G-5 75 D-23 74 G-6 75 74 G-7 75 D-24 74 G-8 75 D-25 G-9 75 D-26 74 G-10 75 D-27 74 G-11 75 D-18 74 G-12 75 D-29 68 G-13 75 D-30 68 71 G-14 75 D-31 G-15 75 D-32 21 27 G-16 75 D-33 G-17 75 D-34 70 G-18 - 75 D-35 70 G-19 76 D-J6 53 G-~O 75 D-J7 60 G-21 75 D-J8 60 G-22 75 D-J9 60 D-4.0 G-23 75 71 G-24 75 Appendix E Cover

\

Page 70 H-1 61 E-L 70 H-2 64 E-2 70 H-3 61 E-3 70 H-4 61 E-4 70 H-5 61 E-5 70 H-6 61 E-6 70 E-'7 70 E-8 70 E-9 70 E-10 70 E-11 70 E-l2 70 E-l3 70 4 Revision 76 9/ 17

GRAND GULF NUCLEAR STATION FINAL SAFETY ANALYSIS REPORT SECTION 13.3 - EMERGENCY PLANNING TABLE OF CONTENTS SECTION PAGE 1.0 DEFINITIONS ....... *....................................................................... .............. 1 - 1 2.0 SCOPE AND APPLICABILITY ....... *............................................................... 2 - 1 2.1 Criterion for Grand Gulf Nuclear Station Emergency, Plan Development .. ; ........... 2 - 1 2.2 Applicability of the Emergency Plan ........................................................... 2 - 1 2.2.1 General Information and Site Description ..................................... 2 - 1 2.2.2 Population and Population Distribution ........................................ 2 - 3 2.2. 3 Emergency Planning Zones ....................................................... 2 - 3 2 .3 Scope of the Emergency Plan ................................................................... 2 - 4

2. 3 .1 Regulatory Requirements ......................................................... 2 - 4 2.3.2 Objectives of the Emergency Plan ............................................... 2 - 5 2 .4 Emergency Plan Interrelationships ............................................................. 2 - 5 2.4.1 Emergency Plan Procedures., .................................................... 2 - 6 2.4.2 Related Plans, Programs and Procedures ......................,. ............... 2 - 6

,2.4.3 . Participating Governmental Agencies ........................................... *2 - 7 3.0

SUMMARY

OF EMERGENCY PLAN ............................................................. 3 - 1 3 .1 Emergency Planning ...........................................  ! ********************************** 3 -* 1

3. 2 Emergency Plan Steps ....................................................................... ..... 3 - 1
3. 3 Emergency Direction and Assignments ........................................................ 3 - 2 4.0 EMERGENCY CONDITIONS ....................................................................... . 4 - 1 4.1 Emergency Classification Systems ............................................................. 4 - 1 4.1.1 Unusual Event ....................................................................... 4 - 2 4.1.2 Alert ........................ : ........................................................... 4 - 2 4 .1. 3 Site Area Emergency .............................................................. 4 - 3 4 .1.4 General Emergency ................................................................ 4 _, 3 4.2 Classification of Postulated Accidents ......................................................... 4 - 4 Revision 44 01/01

GG FSAR SECTION PAGE 5.0 ORGANIZATIONAL CONTROL OF EMERGENCIES ........... 5 - 1 5.1 GGNS Organization ........................................................................................................... 5 - 1 5.2 Normal Station Organization ........................................*..................................................... 5 - 1 5 .2.1 General Manager, Plant Operations .............................................................. 5 - 1 5 .2.2 Manager, Operations ..................................................................................... 5 - 2 .

5.2.3 Manager, Maintenance .................................................................................. 5 - 2 5 .2.4 Manager, Radiation Protection ...................................................................... 5 - 2 I

5.2.5 Manager, Production ..................................................................................... 5 - 2 5.2.6 Manager, Training ......................................................................................... 5 - 3 5.2.7 Shift Technical Advisor ................................................................................. 5 - 3 5.2.8 Manager, Materials, Purchasing and Contracts ............................................ 5 - 3 5.2.9 Director, Regulatory & Performance Improvement ..................................... 5 - 3 5.3 Normal Station Shift Staffing ............................................................................................ 5 - 4 5.4 Emergency Organization..................................................................................................... 5 - 4 5.4.1 Normal Station Shift ...................................................................................... 5 - 4 5.4.2 Emergency Director (ED) .............................................................................. 5 - 5 5.4.3 EOF Manager................................................................................................. 5 - 5 5.4.4 Radiological Assessment Coordinator (RAC) .............................................. 5 - 6 5.4.5 Technical Advisor (TA) ................................................................................ 5 - 6 5.4.6 Admin. & Logistics Coordinator ................................................................... 5 - 7 5.4.7 Public Information Liaison ............................................................................ 5 - 7 5.4.8 Offsite Communicator ................................................................................... 5 - 7 5.4.9 EOF Communicator ............................ ;......................................................... 5 - 8 5.4.10 Lead Offsite Liaison ...................................................................................... 5 - 8 5.4.11 Offsite Liaison ............................................................. *.............................*..... 5 - 8 5.4.12 Dose Assessor ................................................................................................ 5 - 8 5.4.13 Offsite Team Coordinator (OTC) .................................................................. 5 - 9 5.4.14 Offsite Monitoring Team (OMT) .........-.......................................~ ................. 5 - 9

/

ii Revision 76 9/17

GG FSAR SECTION PAGE 5.4.15 Information Technology (IT) Specialist- EOF ............................................ 5-9 5.4.16 EOF Log Keeper ........................................................................................... 5 -9a 5.4.17 Emergency Plant Manager (EPM) ............................................................... 5 -10 5.4.18 TSC Manager ................................................................................................ 5 - 10 5.4.19 TSC Communicator ..................................................................................... 5 - 11 5.4.20 Security Coordinator .................................................................................... 5 - 11 5.4.21 ENS Communicator................................................ ~ .................................... 5 - 11 5.4.22 Maintenance Coordinator ............................................................................ 5 - 12 5.4.23 Engineering Coordinator ............................................................................. 5 - 12 5.4.24 Radiological Coordinator............................................................................. 5 - 12 5.4.25 Operations Coordinator ............................................................................... 5 - 13 5.4.26 Engineers (Mechanical/I&C/Electrical) ...................................................... 5 - 13 5.4.27 Reactor Engineer .......................................................................................... 5 - 13 5.4.28 OSC Manager............................................................................ ~ .................. 5 - 14 5.4.29 Log Keeper- OSC ....................................................................................... 5 - 14 5.4.30 Operations Support .................................................................................. 5 - 14 5.4.31 Work Control Coordinator .......................................................................... 5 - 15 5.4.32 Mechanical/l&C/Electrical Coordinator ..................................................... 5 - 15 5.4.33 Rad Chem Coordinator ................................................................................ 5 - 15 5.4.34 Company Spokesperson................................................................................ 5 - 16 5.4.35 Technical Advisor-llC ............................................................................... 5 - 16 5.4.36 JIC Man.ager ................................................................................................. 5 - 16 5.4.37 Log Keeper- nc ..........................................................................................5 - 16 5.4.38 Inquiry Response Coordinator .................................................................... .5 - 17 5.4.39 Press Release Writer ............................ ~ .................................................. ~ .... 5 - 17 111 Revision 71 06/14

GG FSAR SECTION PAGE 5.5 Recovery Orgarlization~ .................................................................................................... 5 - 19 5.6 Local Services Support................................................................................................ ~ .... 5 - 20 5.6.1 Medical Support ........................................................................................... 5 - 20 5.6.2 Fire Support.................................................................................................. 5 - 21 5.6.3 Law Enforcement Agencies ......................................................................... 5 - 22 5.7 Coordination with Governmental Agencies .................................................................... 5 - 22

5. 7.1 Mississippi Emergency Management Agency (MEMA) and Mississippi State Department of Health/ Division of Radjological Health (DR!I) ......................................................................... 5 - 23 iiia Revision 71 06/ 14

GG FSAR SECTION 5.7.2 Louisiana Department of Environmental Quality (LDEQ) and Louisiana Office of Homeland Security and Emergency Preparedness (LHLS/EP) ........................................ 5 - 24 5.7.3 Port Gibson/Claiborne County Civil Defense ................................ 5 - 25 5.7.4 Tensas Parish Office of Homeland Security and Emergency Preparedness ......................................................... 5 - 25 5.7.5 Nuclear Regulatory Commission (NRC) ...................................... 5 - 26 5.7.6 Department of Energy (DOE) ................................................... 5 - 27 5.7.7 Institute of Nuclear Power Operations (INPO) .............................. 5 - 27 5.7.8 U.S. Coast Guard ................................................................. 5 - 27

5. 8 Contractor Assistance ........................................................................ .... 5 - 28
5. 9 Support for Federal Response .................................................................. 5 - 28 6.0 EMERGENCY MEASURES ........................................................................ ... 6 - 1 6 .1 Initiating Emergency Measures ................................................................. 6 - 1 6 .1.1 Emergency Suspension of Normal Quality Assurance Procedures and Administrative Controls, License Conditions, and Technical Specifications ........................................................... 6 - 1 6.1.2 Suspension of Normal Emergency Actions for Security Emergencies ........................................................................ . 6 - 1 6 .2 Activation of Emergency Organization ............................. ; .......................... 6 - 2 6.2.1 Control Room Operators .......................................................... 6 - 2 6.2.2 Shift Manager ....................................................................... 6 - 2 6.2.3 Shift Technical Advisor ........................................................... 6 - 3
6. 2.4 Emergency Director ............................................................... 6 - 3
6. 3 Assessment Actions ........................................................................ ....... 6 - 4 6.3.1 Assessment Actions During Unusual Events .................................. 6 - 4 6.3.2 Assessment Actions During Alerts .............................................. 6 - 5 6.3.3 Assessment Actions During Site Area Emergencies ......................... 6 - 5 6.3.4 Assessment Actions During General Emergencies ........................... 6 - 5 6.4 Corrective Actions ........................................................................ ......... 6 - 6 iv Revision 61 03/09

GG FSAR SECTION PAGE 6.5 Protective Actions ....................................................................... .......... 6 - 6 6.5.1 Protective Cover, Evacuation, Personnel Accountability ................... 6 - 6

6. 5 .1. a Grand. Gulf Nuclear Station................................................... 6 - 6 6.5.1.b Offsite Areas .................................................................... 6 - 8
6. 6 Contamination Control Measures ............................................................... 6 - 9
6. 7 Aid to Affected Personnel ....................................................................... . 6 - 9
6. 7 .1 Emergency Personnel Exposure ................................................. 6 - 9 6.7.2 Decontamination and First Aid ................................................. 6 - 11
6. 7 .3 Medical Transportation ........................................................... 6 - 12 6.7.4 Medical Treatment ................................................................ 6 - 12 7.0 EMERGENCY FACILITIES AND EQUIPMENT ................................................ 7 - 1 7 .1 Facilities and Equipment ....................................................................... .. 7 - 1 7.2 Control Room ....................................................................... ............... 7 - 1 7 .3 Emergency Response Facilities ............................. ~ ................................... 7 - 1 7.3.1 Technical Support Center (TSC) ................................................ 7 - 1 7.3.2 Operations Support Center (OSC) ............................................... 7 - 3 7 .3.3 Emergency Operations Facility (EOF) ......................................... 7 - 4 7 .3 .4 Backup Emergency Operations Facility (BEOF) ............................. 7 - 4 7.3.5 Media Centers ....................................................................... 7 - 5 7.4 County and State Emergency Centers .......................................................... 7 - 6 7.4.1 Claiborne County Emergency Operations Center ............................ 7 - 6 7 .4.2 Mississippi State Emergency Operations Center ............................. 7 - 6 7.4.3 Tensas Parish Emergency Operations Center ................................. 7 - 7 7.4.4 Louisiana State Emergency Operations Center ............................... 7 - 7
7. 5 Communications Systems ....................................................................... . 7 - 7
7. 5 .1 Telephone System .................................................................. 7 - 8 v Revision 61 03/09 I

GG FSAR SECTION PAGE 7.5.2 Plant Paging System & Sound Powered Phones .............................. 7 - 8 7.5.3 Emergency Communications Equipment ....................................... 7 - 9 7.5.4 Alert Notification System ........................................................ 7 - 12 7 .6 Assessment Facilities ............................................................................. 7 - 12

7. 6 .1 Onsite Systems and Equipment ................................................. 7 - 12 7.6.2 Offsite Monitoring Equipment and Facilities ................................. 7 - 19 7 .6.3 Radiological Assessment Laboratories ........................................ 7 - 20 7 .6.4 Post-Accident Sampling Capability ............................................ 7 - 21
7. 7 Protective Facilities .............................................................................. 7 - 22
7. 8 First Aid and Medical Facilities ............................................................... 7 - 22
7. 9 Rescue and Damage Control Equipment ..................................................... 7 - 23 7 .10 Personal Protective Equipment ................................................................. 7 - 23 8.0 MAINTAINING EMERGENCY PREPAREDNESS .............................................. 8 - 1 8 .1 Organizational Preparedness ..................................................................... 8 - 1 8.2 Training ............................................................................................. 8 - 1 8.2.1 General Emergency Plan Training .............................................. 8 - 2 8.2.2 Emergency Preparedness Training Specialized and Emergency
  • Plan Procedure Training .......................................................... 8 - 2 8.2.3 Orientation and Training Program for Offsite Support Agencies ............................................................................. 8 - 3
8. 3 Drills and Exercises ............................................................................... 8 - 4
8. 3 .1 Drill and Exercise Scenarios ..................................................... 8 - 5
8. 3. 2 Drill and Exercise Schedule ...................................................... 8 - 6 8.4 Responsibilities ..................................................................................... 8 - 8 8.5 Review and Updating of the Emergency Plan and Emergency Plan Procedures .................................................................... 8 - 10
8. 6 Maintenance and Inventory of Emergency Equipment and Supplies .................... 8 - 11 vi Revision 44 01/01

GG FSAR SECTION PAGE 8.7 Educational Information to the Public ............................................................................. 8 - 12 8.8 News Media Information ................................................................................................. 8 - 12 9.0 RECOVERY ................................................................................................................................ 9 - 1 9.1 Recovery Operations .......................................................................................................... 9 - 2 9.2 Reentry Operations ............................................................................................................. 9 - 3 vu Revision 76 9 /1 T

GG FSAR LIST OF APPENDICES APPENDIX TITLE A Emergency Plan Cross Reference & List of Procedures that Implement the Emergency Plan ............................................................ A - 1 B List of Emergency Equipment and Supplies for Emergency Facilities and Hospitals ....................................................................... B - 1 C Reserved ....................................................................... .................. C - 1 D Letters of Agreement ....................................................................... ... D - 1 E Evacuation Time Estimate Study ............................................................ E - 1 F List of Supporting Plans ...................................................................... F - 1 G Reserved.*........................................................................ ................. G - 1 H News Media Emergency Information Program for GGNS &

Public Education and Information Program for GGNS ................................. H - 1 viii Revision 44 01/01

GG FSAR LIST OF TABLES TABLE TITLE 2-1 Public Facilities and Institutions ...................................................................................... 2 - 9 2-2 Resident Population Distribution in Evacuation Area by Sector ................................. 2 - 10 2-3 Permanent Resident Population by Protective Action Areas ..................................... 2- lOa 4-1 Summary ofEmergency Actions Levels ......................................................................... 4 - 5 4-2 FSAR Accident Classification ....................................................................................... 4 - 23 5-1 Shift Staffing and Augmentation Capabilities ............................................................... 5 - 29 6-1 Protective Actions Guides for the Early Phase of a Nuclear Incident.. ........................ 6 - 14 7-1 GGNS Operational Hot Line ......................................................................................... 7 - 25 ix Revision 70 11/13

GG FSAR LIST OF FIGURES FIGURE TITLE 2-J

  • General Area Surrounding The Grand Gulf Nuclear Station ......................... 2 - 11 2-2 Site Layout .................................... .................................... ............. 2 - 12 2-3 Permanent Resident Population Distribution.................................... ......... 2:... 13 2-4 Ten-Mile Emergency Planning Zone .................................... .................. 2 - 14 2-5 Fifty-Mile Efuergency Planning Zone .................................... ................ 2 - 15 5-1 Deleted .................................... .................................... .................. 5 - 31 5-2 Normal Station Organization .................................... ........................... 5 - 32 5-3 Emergency Organization .................................... ................................ 5 - 33 5-4 Emergency Organization .................................... ................................ 5 - 34.

5-5 Interrelationships of Emergency Response Organizations ............................. 5 - 35 5-6 Federal Response Management Diagram .................................... ............. 5 - 36 6-1 Deleted .................................... .................................... .................. 6 - 15 6-2 Emergency Notification Form ........................ *.................................... .. 6 - 16 7-1 Emergency Facilities .................................... .................................... . 7 - 26 7-2 Technical Support Center .................................... ............................... 7 - 27 7-3 Operations Support Center .................................... .............................. 7 - 28 7-4 Emergency Operations Facility - Level I .................................... ............. 7 - 29 7-5 Emergency Operations Facility - Level II .................................... ............ 7 - 30 7-6 Emergency Operations Facility Location .................................... ............. 7 - 31 7-7 Backup Emergency Operations Facility .................................... .............. 7 - 32 7-8 Deleted .................................... .................................... . , ................ 7 - 33 7-9 Joint Information Center .................................... ................................. 7 - 34 7-10 Deleted .................................... .................................... ................... 7 - 35 7-11 Deleted .................................... .................................... .................. 7 - 36 7-12 Communications Interfaces .................................... ............................. 7 - 37 7-13 Siren Locations .................................... .................................... ......... 7 - 38 x Revision 61 03/09

GG FSAR 1.0 DEFINITIONS This section provides definitions which include various terms that are unique or given connotations that differ from normally accepted usage. The list below includes terms used throughout this Emergency Plan along with the definitions that are applied to these terms.

1.1 Accident - An unintentional or unexpected event resulting in radiological exposure or physical injury to individuals and/or physical damage to property.

1.2 Activation - Actions taken to staff and setup an emergency facility for operation. Includes notification of emergency personnel, equipment setup and equipment operability testing.

1.3 Affected Persons - lndividual(s) who have been radiologically exposed or physically injured as a result of an accident to a degree requiring special attention, e.g., protective actions, decontamination, first aid, or medical services.

1.4 Ala11n - An indication of abnormal plant conditions and/or equipment status.

1.5 Alert - An emergency classification in which events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of Hostile Action. Any releases are expected to be limited to small fractions of the Environmental Protection Agency (EPA) Protective Action Guideline exposure levels.

1.6 Annual - As used for scheduling purposes, means that the event will be scheduled no later than 12 months after the previous event's original schedule date. If the event is not completed within 15 months of the previous events original schedule date, it will be considered late. This definition does not apply to ERO Training. ERO Training frequency is described and defined in Training & Qualifications procedure TQ-110.

1.7 Assessment Action -Those actions taken during or after an accident to obtain and process 1-1 Revision 56 01 / 06

GG FSAR infonnation that is necessary to make decisions to implement specific emergency measures.

1. 8 Augmentation - Actions taken to support onshift personnel prior to emergency facilities becoming fully operational.

1.9 CDB -Commi~ Dose Equivalent 1.10 Control Room - The location at the GGNS from which the reactor and most of its auxiliary systems are normally controlled.

1.11 Control Room Personnel - Shift Manager, Senior Reactor Operator (SRO), Reactor Operators (RO), Auxiliary Operators, and Shift Technical Advisor (STA).

1.12 Corrective Actions - Those emergency measures taken to lessen the severity of or terminate an emergency situation at or near the source of the problem in order to prevent or control a release of radioactive material or to minimize the damage to plant equipment, e.g., shutting down equipment, firefighting, repair and damage control.

1.13 County- Claiborne County or Tensas Parish; same as "local."

1.14 Design Basis Accident (DBA) - One of the most important parts of the site criteria is the requirement to 1dentify the worst case accident based on detailed analysis of hypothesized accidents. As part of the Final Safety Analysis Report (FSAR), the licensee is required to assume a fission product release from the core based upon a major accident, hypothesized for purposes of site analysis, or postulated from considerations of possible accident hazards not exceeded by those from any accident considered credible.

1.15" Decontamination - The removal of surface radioactive material from individuals, equipment, surfaces, food stuffs, etc.

1.16 Emergency .;. A sudden, urgent, usually unforeseen occurrence or occasion requiring immediate action. It may result from accidental causes, natural causes, or malicious I -2 Revision 44 01/01

GG FSAR man-made actions. There are four classes of emergencies considered: Unusual Event, Alert, Site Area Emergency, and General Emergency.

1.17 Emergency Action Levels (EAL) - Radiological dose rates, specific contamination levels of airborne, waterborne, or surface-deposited concentrations of radioactive materials; or specific instrument indications (including* their rates of change) that are used as thresholds for initiating such specific emergency measures as designated for a particular class of emergency, initiating a notification procedure, or initiating a particular protective action.

1.18 Emergency Director - An individual designated onsite having the authority and responsibility to initiate the Emergency Plan and coordinate efforts to reduce the consequences of the event and bring it under control (Equivalent to the position of Emergency Coordinator referenced in NUREG 0654 Rev. 1). The Shift Manager. will assume this responsibility at the declaration of an Emergency.

1.19 Emergency Operations Facility (EOF) - A near-site emergency center from which the offsite emergency support activities _are controlled.

1.20 Emergency Plan Procedures - Procedures providing the means to implement the Emergency Plan.

1.21 Emergency Planning Zone <EPZ) - Areas designated for which planning is provided to assure that prompt and effective action is initiated to protect the public in the event of an emergency.

1.22 Emergency Preparedness Owner Controlled Area (EPOCA) - the area at the site, which is owned and controlled by the station, for which the station has the responsibility to evacuate, except for any defined areas covered by agreements with State or other governmental agencies.

1-3 Revision 61 03/09

GG FSAR 1.23 Emergency Plant Manager - an individual designated the responsibility for accident mitigation at the plant.

1.24 EOF Emergency Director - an i~dividual designated the responsibility for the total emergency response effort and is the central figure for the emergency organization. The EOF Emergency Director relieves the Shift Manager of the Emergency Director responsibilities at which time the Shift Manager resumes Control Room duties.

1.25 Exclusion Area - The area surrounding the plant owned by the reactor licensee in which he*!

has the authority to determine all activities including exclusion or removal of persons and property from the area during accident conditions.

1.26 Fitness For Duty (FFD) - A company policy implementing requirements under I OCFR26 that provides reasonable assurance that employees and other individuals directly associated with GGNS facilities will perform their tasks in a reliable and trustworthy manner. This is accomplished in part by assuring they are not under influence of any substance, legal or illegal, or mentally or physically impaired from any cause, which in any way adversely affects their ability to safely and competently perform their duties. This policy provides measures for early detection of persons who are not fit to perform their assigned duties.

1.27 General Emergency - An emergency classification in which events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential for loss of containment integrity or Hostile Action that results in an actual loss of physical control of the facility. Releases can be reasonably expected to exceed EPA Protective Action Guideline exposure levels offsite for more than the immediate site area.

1.28 Hostile Action - An act toward the plant or its personnel that includes the use of violent force to destroy equipment, take hostages, and/or intimidate the plant staff to achieve an end.

This includes attack by air, land or water using guns, explosives projectiles, vehicles, or other devices used to deliver destructive force. Other acts that satisfy the overall intent may be included. HOSTILE ACTION should not be construed to include acts of civil disobedience or felonious acts that are not part of a concerted attack on the plant. Non-1-4 Revision 61 03/09

GG FSAR terrorism based EALs should be used to address such activities, (e.g~ violent acts between individuals in the owner controlled area).

1.29 Hostile Force - One or more individuals who are engaged in a determined assault, overtly or by stealth and deception, equipped with suitable weapons capable of killing, maiming, or causing destructions.

1.30 Ingestion Exposure Pathway - An area with a radius of about 50 miles from the reactor site.

Predetermined protective action plans are in place for this EPZ and are designed to avoid or reduce dose from potential ingestion of radioactive materials. These actions include a ban of contaminated food and water.

1.31 Joint Information Center (TIC) - An area designated outside the protected area that provides a location for the media so that communication and information can be disseminated concerning plant conditions and emergency operations.

1.32 Low Population Zone (LPZ) - As defined in 10CFRl 00.3, the area immediately surrounding the exclusion area which contains residents, the total number and density are such that appropriate protective measures could be taken in their behalf in the event of a serious accident. The low population zone for the Grand Gulf Site is the area within a 2-mile radius from the plant.

1.33 Monitor and Prepare - A type of precautionary action intended to advise the public within the EPZ that a serious emergency at the nuclear power plant exists and that it should monitor the situation and prepare for the possibility of evacuation, Shelter In Place (SIP),

or other protective actions.

1.34 Non-Essential Personnel - employees not having emergency assignments (ERO), visitors, contractors/construction personnei and members of the public who may be in p~blic access areas within the Exclusion Area or Emergency Preparedness Owner Controlled Area. Non-essential personnel and non-emergency personnel are equivalent and used interchangeably.

1-5 Revision 72 11/14

GG FSAR 1.35 Offsite - As used for accountability purposes, any area outside the GGNS protected area. As used for plume tracking survey purposes, all areas beyond the site boundary.

1.36 Onsite - As used for accountability purposes, the area within the GGNS protected area. As used for plume tracking survey purposes, all areas external to the power block, out to and including the site boundary.

1.3 7 Operational - Status of an emergency facility declared by the appropriate facility manager upon determining that the facility is adequately staffed and equipment is setup and available to assume perform the emergency functions assigned to that facility.

1.38 Operations Support Center (OSC) - Location from which onsite non-control room activities are staged and implemented.

1.39 Pathway - Method by which radiological exposure is received.

1.40 Plan - The Grand GulfNuclear Station Emergency Plan.

1.41 Plume Exposure Pathway - The process by which a person receives exposure from direct interaction with the products of a radiological release. This includes receiving direct gamma radiation from sources external to the body, both instantaneous and short term due to being in the presence of the products of the release. It also includes direct gamma, beta, and alpha radiation from sources inside the body due to inhalation.

1.42 Plume Tracking Survey - Onsite or offsite surveys performed to support offsite dose assessments which are ultimately used to provide state and local agencies with Protective Action Recommendations.

1.43 Population-at~Risk - Those persons for whom protective actions are being or would be taken upon implementation of the plan.

1.44 Population Center -A densely populated area with 25,000 or more inhabitants.

1-6 Revision 72 11/14

GG FSAR 1.45 Protective Actions - Those emergency measures taken, either in anticipation of or after a release of radioactive material has occurred, for the purpose of preventing or minimizing radiological exposure to individuals.

1.46 Protective Action Guides (PAGs) - Guidelines for protective action recommendations to state and local agencies based on predetermined projected radiological dose or dose commitment values to individuals in the general population that warrant protective action in anticipation of or following a release of radioactive material.

1.47 Protected Area - As defined in 10CFR73 .2, an area encompassed by physical barriers to which access is controlled for security purposes.

1.48 Rapidly Progressing Severe Accident - A significant reactor event with immediate or near-immediate offsite consequences that is intended by the regulator to be easily recognizable.

If the decision maker is not sure whether or not such an event is occurring then they should assu~e that a rapidly progressing severe accident is not in progress.

1.49 Recovery Action - Those actions taken after the emergency to restore the plant as nearly as possible to pre-emergency conditions.

1.50 Restricted Area - As defined in 10CFR20.1003, any area to which access is controlled by the licensee for purposes of protection of individuals from exposure to radiation and radioactive material.

1.51 Security Owner Controlled Area - SOCA. The Security area between the OCA detection fence and the protected area boundary.

1.52 SDE - Shallow Dose Equivalent 1.53 Shift Manager - The senior management representative in charge of overall plant operations during each shift.

1-7 Revision 72 11/ 14

GG FSAR 1.54 Site Area Emergency - An emergency classification in which events are in process or have occurred which involve actual or likely major failures of plant functions needed for protection of :

the public or Hostile Action that result in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to likely failure of or; (2) prevents effective access to equipment needed for the protection of the public. Any releases are not expected to result in exposure levels which exceed EPA Protective Action. Guideline exposure levels beyond the site boundary.

1.55 State - The State of Mississippi or Louisiana.

1.56 Station - The Grand GulfNuclear Station.

1.57 Technical Support Center (TSC) - An area which accommodates personnel acting in support of the command and control functions but separate from the control room. These personnei under the guidance of the Emergency Plant Manager, supply in-depth diagnostic and corrective engineering and radiological assistance to the plant operations staff.

1.58 TEDE - Total Effective Dose Equivalent 1.59 Unrestricted Area - As defined in 10CFR20.1003, any area to which access is not controlled by the licensee for the purpose of prbtection of individuals from exposure to radioactive materials.

1.60 Unusual Event - An emergency classification in which events are in process or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No releases of radioactive material requiring offsite response or monitoring are expected unless further degradation of safety systems occurs. (This is the same as the Notification of Unusual Event defined in NUREG-0654; the two expressions are used interchangeably in the Plan and related procedures as appropriate.)

i 1-8 Revision 72 11 / 14

GG FSAR

\

2.0 SCOPE AND APPLICABILITY 2.1 Criterion for Grand Gulf Nuclear Station Emergency Plan Development The Grand Gulf Nuclear Station Emergency Plan (the Plan) has been developed in accordance with NUREG-0654/FEMA~REP-1, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants." The format parallels the guidance given in NRC Regulatory Guide 1.101, "Emergency Planning for Nuclear Plants," Revision 1, dated March, 1977.

2.2 Awlicability of the Emergency Plan 2.2.1 General Information and Site Description The Grand Gulf Nuclear Station is a nuclear power plant operated by Entergy Operations, Inc. An area map *showing the geographical location of the facility is provided in Figure 2-1.

The design of the Grand Gulf Nuclear Station is that of a boiling water nuclear steam supply system supplied by the General Electric Company. A diagram identifying the station facilities is provided in Figure 2-2.

The plant is located in Claiborne County, Mississippi. The site is on the east bank of the Mississippi River, approximately 25 miles south, southwest of Vicksburg and 37 miles north-northeast of Natchez. The Grand Gulf Military Park borders a portion of* the* north side of the property, , and the small community of Grand Gulf is approximately 1-1/2 miles to the north. The town of Port Gibson is about 6 miles southeast of the site. Two lakes, Gin Lake and Hamilton Lake, are located in the western portion of the site. These lakes were once the channel of the Mississippi River and average about eight to ten feet in depth.

The site and its environs consist primarily of woodlands divided between two 2-1 Revision 23 6/92

GG FSAR physiographic regions. The western half of the site is in the alluvial plain of the Mississippi River; the eastern half is in the Loess or Bluff Hills. The elevation of the site varies between 60 and 80 feet above mean sea level in the alluvial plain region, while the Loess Hills portion varies from 80 to more than 200 feet above mean sea level (MSL).

The plant site property boundary encompasses approximately 2100 acres of property that makes up the Grand Gulf Nuclear Station (GGNS) plant site. System Energy Resources, Inc. (SERI), South Mississippi Electric Power Association (SMEPA), and Entergy -

Mississippi own the plant site property as noted in Section 2.1.1.2 of the GGNS FSAR.

There are no unrelated industrial, commercial, institutional or residential structures, with the exception of a Branch Office for Riverland Credit Union, located within the site boundary.

Riverland Credit Union Branch Office is located in the Site Processing Facility which is inside the exclusion area.

The boundary lines of the plant exclusion area consist of semicircles drawn from the center of each containment joined by tangent straight I ines. The minimum distance from each reactor to the exclusion area is 696 meters. This is the closest distance from the center of Unit 1 containment to the plant property line.

There are no rai Iroads or waterways that traverse the site. One county road runs through the site; Bald Hill Road traverses the exclusion area and cuts through the south-southeast, south, south-southwest, and southwest sectors.

The site area is accessible by two major highways. U.S. Highway 61 and State Highway 18 connect Port Gibson (6 miles southeast of the site) with Natchez, Jackson and Vicksburg.

2-2 Revision 64 11 / 10

GG FSAR There are no military installations located near the site area and no known missile sites in either Mississippi or Louisiana. The nearest military facility is England Air Force Base in Alexandria, Louisiana, about 100 miles to the southwest.

The Independent Spent Fuel Storage Installation (ISFSI) is located within the protected area boundary for interim dry storage of spent fuel. The HOLTEC spent fuel storage casks are designed to ensure protection of public health and safety through the use of physical barriers to guard against the uncontrolled release of radioactivity and through the use of shielding to minimize radiation dose to the publ~c from both normal and off-normal conditions of operation. The analysis summarized in the HOLTEC Cask FSAR demonstrate that under assumed accident conditions, the consequences of accidents challenging the integrity of the barriers will not exceed limits established in 10 CFR 72.106.

2-2a Revision 58 12/ 06

GG FSAR 2.2.2 Po.pulation and Population Distribution The individuals residing in the LPZ are distributed such that appropriate measures could be taken in their behalf in the event of a serious accident.

Figure 2-3 illustrates the LPZ and indicates population distribution within a 10-mile radius of the site. Table 2-1 lists the facilities and institutions within approximately ten miles of the GGNS which may require special consideration in preparing emergency plans.

Seasonal and peak daily transient population within the LPZ is mainly due to recreational use of the Grand Gulf Military Park, hunting and sport fishing.

The closest population center is Vicksburg, Mississippi, located approximately 25 miles north-northeast of the site, with a 1990 population of 27,~96. The nearest major city is Jackson, Mississippi. Jackson is located about 55 miles east-northeast of the site and has a population of 196,637 according to a 1990 population survey. Table 2-2 shows the*

resident population distribution in evacuation area by sector.

2.2.3 Emergency Planning Zones In defining the Emergency Planning Zones (EPZs), Grand Gulf Nuclear Station has taken into consideration such things as organizational capabilities, method of implementation for various emergency plans and the availability of onsite and offsite emergency facilities and equipment. EPZs are designated areas for which planning is recommended to assure that prompt and effective actions are taken to protect the public in the event of an emergency.

Two primary zones have been identified for the purpose of development and implementation of emergency planning. The first Emergency Planning Zone has a 10-mile radius. This EPZ is established in response to the possible direct exposure to the 2-3 Revision 25 12/93

GG FSAR plume. Within this zone, shelter, evacuation and consideration of prophylactic use of potassium iodide are the protective actions recommended for the general public, as necessary. The principal concern in the 10 mile EPZ is the plume exposure pathway. The counties within the 10 mile EPZ are Claiborne County and Warren County, in Mississippi, and Tensas Parish in Louisiana (refer to figure 2-4). Beyond a ten mile radius the effect of direct exposure to the plume is no longer of significant concern because the plume is sufficiently dispersed so as not to present an immediate hazard.

The second EPZ has a fifty mile radius. This EPZ is established in response to possible exposure to deposited radionuclides, whether in water or on the ground or vegetation. The principal concern in the 50 mile EPZ is the ingestion exposure pathway. This may necessitate monitoring of such pathways as crops, dairy cows, farm animals, and pastures.

Those counties in Mississippi within the 50-mile EPZ include Issaquena, Sharkey, Yazoo, Warren, Madison, Hinds, Rankin, Copiah, Simpson, Lincoln, Amite, Franklin, Adams, Jefferson, Wilkinson, and Claiborne. Those parishes in Louisiana within the 50-mile EPZ include East and West Carol, Richland, Madison, Tensas, Catahoula, Concordia, Franklin, and Caldwell (refer to Figure 2-5). Figure 2-4 is a detailed 10-mile sector map.

2.3 Scope of the Emergency Plan The principles of effective emergency preparedness incorporate not only the emergency response for systems but also include response for people. Engineered safety systems at the Station are designed to ensure that the consequences of a major malfunction are to be mitigated prior to any adverse effect on the general public or the Station. The basis for emergency planning is to provide human emergency response in much the same way as safety systems do for the physical plant.

2-4 Revision 56 01 / 06

GG FSAR 2.3 .1 Regulatory Requirements 10CFR50, "Licensing of Production and Utilization Facilities," requires that each application for a license to operate a facility include in a Final Safety Analysis Report 2-4a Revision 52 07/ 04 I

GG FSAR (FSAR), along with other information, the applicant's plans for coping with emergencies, including the items specified in 10CFR50.34, 10CFRS0.47, and 10CFR Part 50, Appendix E. 10CFRl00.3 "Reactor Site Criteria," in the definitions of Exclusion Area and Low Population Zone, establishes additional criteria for plans to cope with emergencies and serious accidents. Specific requirements of the Nuclear Regulatory Commission are detailed in NUREG 0654/FEMA-REP.;l, Rev. 1, "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants."

2.3.2 Objectives of the Emergency Plan The objectives of the Emergency Plan are:

a. Enable classification of the emergency
b. Assign responsibilities
c. Provide for assessment of onsite and offsite. radiological conditions during and/or following an emergency.
d. Outline the most effective

(

course of action required to safeguard the public and plant personnel in the event of an emergency.

e. Recommend implementation of any protective actions deemed appropriate.
f. Enable mitigation of the radiological consequences of an emergency, both onsite and offsite.
g. Provide for the training of all emergency organization personnel.

2.4 Emergency Plan Interrelationships The Plan is designed* to be compatible with radiological incident* plans developed by local, state and Federal agencies through establishment of communication channels with these agencies~ and by setting criteria for the notification of such authorities.

The Plan should not, in itself, be considered the sole working document to be used during an emergency. The purpose of the Plan is to classify emergencies according to their 2-S Revision 25 12/93

GG FSAR severity, to assign responsibilities for actions, and to establish the lines of authority and communication so that the most effective course of action can be developed to safeguard the public and plant personnel in the event of an emergency. Detailed instructions and guidelines for emergency actions are included in various emergency procedures. The principal emergency facilities that the major groups function from, are shown in Figure 7-1, including general locations from GGNS.

2.4.1 Emergency Plan Procedures Detailed procedures required to implement the Plan have been developed. Emergency Plan Procedures (EPPs), which* direct the actions of emergency organiz.ation, are safety related and located in Volume 10 of the GGNS Plant Operating Procedures Manual. An index of these procedures is included in Appendix A. Detailed implementing procedures for emergencies considered to be special events, such as civil disturbances, bomb threats, and breaches in security are included as part of the GGNS Physical Security Plan.

Separate emergency procedures are not provided for activities already covered by plant or section operating procedures (i.e., calibration of survey instruments). The Plan incorporates certain aspects of the plant's operating procedures, radiation protection procedures, fire procedures and security procedures, where they are required for clarification.

2.4.2 Related Plans. Proirams and Procedures Several plans, programs and procedures have been developed to assure the safe operation .

of the Station. The Plan and Emergency Plan Procedures have been written to coordinate with these other plans, programs and procedures. During emergency situations, the coordination and utilization of all plans and procedures is essential.

The Security Plan and procedures have been coordinated with the Plan and Emergency Plan Procedures to minimize the consequences of an emergency situation. Security 2-6 Revision 25 12/93

GG FSAR Procedures contain an explanation of the duties and responsibilities for security personnel in the event of an emergency.

Provisions for radiological control at the Station have been covered in Administrative and Radiation Protection Procedures. These Procedures establish controls and protective measures to be placed on work being conducted within the Restricted Area.

A number of emergency operating procedures have been developed to control plant operation during emergency situations. These emergency operating procedures work in conjunction with the Emergency Plan Procedures and are safety related procedures.

I A site fire plan for the control of fires has also been developed and procedurally implemented to assure the safe operation of the station. Fire Plan procedures are referenced in the Emergency Plan Procedures.

2.4.3

  • Participating Governmental Agencies Participating governmental agencies whose plans are interrelated with this plan for action include the following:
a. Mississippi Emergency Management Agency (MEMA)

Charged with direct responsibility for the planning and coordination of the activities of State and local government agencies in the event of a radiological emergency.

b. Mississippi State Department of Health (MSDH)

Has overall responsibility to protect the *public health and safety of the general populace from the hazards of radiation. The Division of Radiological Health (DRH) is that division within the MSDH which is assigned the specific responsibility with regard to the hazards of radiation.

c. Louisiana Department of Environmental Quality (LDEQ)

Has overall responsibility for planning as well as the lead technical response role in the event of a radiological emergency.

2-7 Revision 39 7/ 99

GG FSAR

d. Governor's Office of Homeland *security and Emergency Preparedness (GOHSEP)

Has responsibility for coordination of state agencies as well as logistical and resource support to local governments in the event of a radiological emergency.

e. Department of Energy (DOE)

The DOE, a Federal agency, provides radiological monitoring assistance. There are trained personnel on staff to provide additional expertise onsite/9ffsite during a radiological accident.

£ Nuclear Regulatory Commission (NRC)

The role .of the NRC during a radiological emergency is that of verifying that emergency plans and procedures have been implemented, assuring that the public health and safety are protected, and conducting investigative activities associated with the incident. The NRC assists in the coordination of Federal response resources and provide to the licensee, state, and local agencies advisory assistance associated with assessing and mitigating hazards to the public. The NRC's actions are governed by NUREG-728, "NRC Incident Response Plan\

and NUREG-0845, "Agency Procedures for the NRC Incident Response Plan."

g. County and Parish Emergency Services Claiborne County in Mississippi and Tensas Parish in Louisiana are the local governmental jurisdictions within the 10 mile radius of the Grand Gulf Nuclear Station. They have developed plans to be implemented in the event of a radiological emergency. Claiborne County Civil Defense and Tensas Parish Office of Homeland Security and Emergency Preparedness have connnunication centers which serve as the means for notifying various support services (fire and rescue, transportation, law enforcement).

2-8 Revision 58 12/06

GG FSAR TABLE2-l PUBLIC FACILITIES AND INSTITUTIONS Distance From Facility Reactor Centerline (mi.) Direction P011 Gibson Middle School 5.1 SE Port Gibson High School 6.5 ESE Watson Elementary School 4.1 SE Richardson (MAP) Headstart 4.5 SE Chamberlain-Hunt Academy 5.5 SE Claiborne Education Foundation 5.3 SE Alcorn State University 10.5 SSW Patient's Choice Medical Center 5.5 SE Claiborne County Health Center 4.9 SE Claiborne County Courthouse 4.7 SE Grand Gulf Military Park 1.5 N Lake Bruin State Park 9.5 WSW Port Gibson City Hall 5.2 SE 2-9 Revision 61 03/09

GG FSAR TABLE2-2 Resident Population Distribution in Evacuation Area by Sector

  • Sector 0-1 1-2 2-3 3-4 4-5 5-10 10-15 Total A 0 11 0 0 0 0 0 11 B 0 0 0 0 0 0 325 325 c 0 7 0 0 24 101 422 554
) 0 1 0 35 94 125 74 329 3 0 0 0 9 17 111 247 384

-~ 0 5 0 0 417 821 547 1790 G 0 0 0 8 573 1992 655 3228 3 0 0 4 40 0 577 755 1376 I 0 0 0 4 0 38 426 468 K 0 0 2 0 0 2765 95 2862 L 0 0 4 0 0 74 92 170

~\1 0 0 0 0 0 1520 4 1524

~ 0 0 0 0 0 310 7 317 p 0 0 0 0 0 1210 106 1316 Q 0 0 0 0 0 68 0 68 R 0 0 0 0 0 0 0 0

  • Centerline of Sector In Degrees True North 22~0 From Facility Sector

) &360 A

~2~ B 15 c 57~ D SIO E 112~ F 135 G 157~ H 180 J 202~ K 225 L 247~ M 270 N 292~ p 315 Q 337 ~ R NOTES: 1. The letters I and Ohave been omitted from sector designators so as to eliminate

  • mssible confusion between letters and numbers.
2. Source of data: 2012 Grand Gulf Evacuation Time Estimate Study pages 3-6 & 3-8.

2-10 Revision 70 11/13

GG FSAR TABLE 2-3 Permanent Resident Population and Vehicles by PAS/PAA PAS/PAA 2010 Population 2010 Resident Vehicles 1 43 24 2A 305 166 2B 151 83 3A 961 519 3B 388 209 4A 2,407 1,298 4B 453 248 (

SA 138 75 SB 356 193 6 2,629 1,686 7 28 15 8 126 71 9 1,185 642 10 394 214 11 1,403 755 12 - -

TOTAL 10,967 6,198 2-lOa Revision 70 11 / 13

GG FSAR PORT GIBSON i N

~'

5 1Ql 15 20

,+ AIRPORT 0

~ INTERSTATE HIGHWAY I 1 I

- - - @ - US HIGHWAY

                            • RAILROADS ' Miles General Area Surrounding the Grand Gulf Nuclear Station FIGURE 2-1 2 - 11 Revision 26 6/94

GG FSAR Exclusion hea Bounda,y 696m

/

/ 1 £ilergg SelVioos Cooter 2 Uri 2Wrehoose 3 Qi&'lructioo &.ilding 4~:

S Site Pmssir(J Center s hlnd~mu Buldng 7 Mocificaoofl &Eng. il1g; 8 Di~I Generata &Jikilg 9 Cmtol Bwkiig 10 AAJllia~ Blil~

11 Tuibtie 9Jildhg 12 lmlt IWlehoose 13 ~ Building 14 Coding Tower 15 Old Traini1lJ BLidi~

16 Aux. Coolir,J Tm 11 Comt:inm Slop 16 ~FSIPad

====~BAlJ)=.~Hlll~FIOAO======:::=" 19 Lige ---'!VIII 0


~-*

Site Layout FIGURE2-2 Page 2-12 Rev 68 08/12

GG FSAR N

NNW NNE Iu I *[I]*

[I]

NW -~*

NE

[ID WNW ...

ENE .

Lil~ioJ ., 1. G1ss. 1 w *1 E

1: 310

  • 1 :*42 0 1 I n1 1 I

ESE 1:t,24li SE L?1.~:z.::tl

_ _., 10. Mil~s to EPZ Soundary SSW .._ *ssE 12,767 I s Ii 621 I N I:. 42 I Resident Po:pu!atioh

  • MU@l Stihh:ital hv *Rine: Cwm ul.ath1e Total IJ,1 0 0 24 2.4 lO 34 96 130 w .E:.

4.5 1. 125 1;2!IS L2JJ7 1;462 6-7 SJt, 4,038

~

4,292.

8-9' 4,639 1/JOB S,647 10-EPZ 5;:320 l.J},967 Tot.JI: 10.!:167 s Permanent Resident Population Distribution FIGURE2-3 2-13 Revision 70 11 / lp

GG FSAR LEGEND Efv1ERGEfJC'f PLANN!NG.

N zrir,JEBDLlNDABf : -

PROTE01Tlf_EACTlON

, .2~~ l

, AREA BOU NOA.RY PR01JC1WEACT1DN-AREA NUiv1BERAND fi.Jc,_6 ;1 "EV.A.1:oEE PQPU\.ATrn.J Scale i inch eqµais2.im#es:

TEN MILE.

EMERGENCY PLAf\JN~J\~(3.

ZQNE*

ORIGINAL MAP PRODUCED BY

. MAR.l~s)JuNE19'9-3: *..

i:wn~s fOSS Were digm~. by trre fo4.0.R.I~ i,,dulii:a! ts-nt~ri Mi:ssis~p,¢ roads :a1uf. streams data .were di.iii,~

frcm USGS :t:1~0,{m.l).~g~µ~-Graf)!}

F~~t Lc.1$:iana T~.~1lid__strea~~ wsre pr~s~ by '11He fytfR{S Te<lm:icaJ Center frorni Umtsd *S;Ums Oaj>artmant of .

CpmJnercr,,: E!UfSll of: the cenrus-TIGER fl.ls, for.T~.ns:is Paris:ll,: Popi.~ -fi,,~res 51.<pptiiod wKID fngi~riiig: from tlM,, 20~2 OONS EV~nia'fion Tim!" ~a,t:e J~\:MW:ember 2012 The mfoi1;tatio~

  • p:m~ oitllii i,iap was darilJ:-£4 frnm a variety ¢ pw~c and pit..ra,t:e

~uries. ~ ~f4 ?Qf Trustees. of _the J~ll-$ .of Higti£r Lerrung/Mli,RJ~-

T~ Cen~dnaka.no war1arities asb

~coffi.!!iat~, a~uracy, rm~. 'll!f .

Ten-Mile Emergency Planning Zone FIGURE2-4 2-14 Revision 70 11 / 13

\

GG LEGEND FSAR STATE EVACUATION Interstate EOC @ ROUTES ,._ Highway *'M Q; """'"

Fifty Mile Emergency Planning Zone ~ggNTY 1tJ EMERGENCY US Highways GRAND GULF ~rit~R ,, -=-@==

NUCLEAR I STATIONS ~ Natchez Trace -

STATION HOSPITALS + AIRPORT -t MBULANCEe Other Roads Water 0 5 10 20 MILES Fig 2-5 Rev 64 ( 11 /10 )

Page 2-15

.GG**

. FSAR lt1 *:accordance** with*. the :requii-ements *.of *. IOCFR:50.47 *. arid*: Appendix. E* to*

. supplemented by: :the* guidance; is~ued. by: the* Nuclear Regulatory Commission in NlJRl:(}~0654:*

and other docUillents, the: P~ and .i~ ~sociated Emergency Pl$ Procedt1res have been established :t~ cope wi~.  :

the. various: types ~f eme~encies *in an orderl;. cll d effe~ti~e* Jll8llller* :.: .

. *. Grand** Gulf* Nuclear* Station* maintains .the

  • capability : to*:* assesst . classify, *. and **declare:. an:.* *

. emergency conditio~ within. Js minutes after the availability of indicatio; lo* pl&nt operators. *

  • . Uiat *an* etrlergency: actio11 *1~ve1 *has. been. e~ceeded: rutd shall* promptly declare *the ~tl'lergency ***

. condition rui *soon:*~ possible following :identificiltie>n of the

  • appropriate< emergency;**

classificationlev~L .. . . .

.

  • The Plan; shallb~ implement~d:by the appropriate procedure~ in Appendix Awhenevera reior<
  • potential.: *plant.:. emergency *. :i~ . identified .*. that.: meets:.: the :.Emergency .* Action *.. µ!Vel ** criteria

. des~ribeci in.Section . .

4~0. The. d~tails . .

ofthe EmergencynanP~ocedures are not incluclecl hereill, *..

buf the* infonm1tio11 contained within the* Plan.* includes a description o( procedures to an extent**

..* suffici~nt. to* demonstntte. th~t tile Plan provides* ~surance. that appropriat~* *actions can* :betaken **..

. by the StlltiOll and support agencies to protect Station pe~nne{pltd the genCral pllblic during

  • eriiergenci~s. *
  • The Pian establishes .the concepts~ evaluation .and assessment criteri~.and*Protective**actions *

... thaf tire necessary: to, mitigate: the. :co~~eqtiences of ajly ;of: the. four cla.sses of eiri~rgencies; ..:The :*..

. : . . . . . . .. *. . . .: .. . . . . *: .( . . . . . . . ... .  :: ... ' : . .

Plan .also* prpvides .. the. necessary* pre~ariangements, . directions~:. and . organizations so .that all**

Suition *ernergen~i~:

can :

  • . . be *effectively**

resolved*. in** order*. to *. safeguat"d :.Station.* personnel,.

. property' and the general p~blic.

Revision 74* .* **12/15

GG FSAR 3.2 Emergency Plan Steps In general, the Plan encompasses the following:

a. Detection of the emergency
b. Classification of the emergency
c. Activation of the responding organization(s)
d. Assessment of the event
e. Initiation of corrective actions
f. Recommend initiation of protective actions
g. Aid to affected persons
h. Recovery 3-la Revision 76 9/17

GG FSAR

g. Aid to affected persons
h. Re-entry and Recovery 3.3 Emergency Direction and Assignments At the onset of all station emergencies, the Shift Manager shall assume the position of Emergency Director and is responsible for initiating the immediate actions required to safeguard the public, onsite personnel and equipment. Utilizing the Emergency Plan Procedures, he orders the activation of the necessary portions of the Emergency Organization. Upon notification of an Unusual Event from the Shift Manager, the EOF Emergency Director may report to the plant and assume the position of Emergency Director as deemed necessary. Upon notification of an Alert or higher emergency classification, the EOF Emergency Director reports to the site and assumes the position of Emergency Director from the Shift Manager. The Shift Manager will resume control room duties upon relief by the augmenting. EOF Emergency Director when the EOF is declared operational. Section 5.0 describes, in detail, the assignments and duties of key Emergency Organization Personnel.

The criteria which are to be considered for the safe operation of the plant and/or for actions during an emergency are summarized below:

a. Protection of plant personnel and the. general public has the highest priority. Plant

,~ystem and equipment protection is secondary.

b. Whenever there is doubt as to the classification of the emergency condition, the more conservative case shall be considered.
c. Operators are to believe and respond conservatively to all alarms. Alarms and instrumentation are only to be considered erroneous if proven so by 2 ind~pendent indications.
d. Alarms shal I be promptly acknowledged and the required response action taken.
e. Indications of situations and actions taken are to be made a matter of record.

Notifications to personnel and/or offsite. agencies are also to be made a matter of record.

3-2 Revision 64 11 / 10

GG FSAR 4.0 EMERGENCY CONDITIONS 4.1 Emergency Classification System There are four classes of emergency conditions used in emergency planning. These four classes cover the entire spectrum of possible emergency situations, from minor local incidents to hypothetical major radiological emergencies, and allow for classification of an accident, notification of the appropriate offsite agencies and support groups, and the activation of emergency organizations. The system also provides for the notification and implementation of actions innnediately applicable to a specific condition, and for upgrading the response to the appropriate level of classification in the event of a change in the severity of the condition. These actions are further described in Section 6.0.

Emergency Action Levels (EALs) are used to proyide indication that an initiating condition exists. These levels are composed of a combination of plant parameters (such as instrument readings and system status) that can be used to give relatively quick indication to the Station operating staff of the severity of the accident situation. The purpose of the EALs is to provide the earliest possible indication of actual or potential accident situations. In most cases further assessment action is conducted both onsite and offsite .before actual protective actions are initiated. EALs associated with radiological releases are related to the Environmental Protection Agency's Protective Action Guides (PAGs) summarized in EPA 400-R-92-001 "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents." A detennination by the station emergency organization, along with state and local support agencies, of the potential of reaching or exceeding the PAGs is performed in accordance with dose assessment procedures in the event of a radiological release to the environment. The EALs discussed in this section are found in Table 4-1. The EALs were developed from guidance in NEI 99-01, Revision 4 "Methodology for Development of Emergency Action Levels" and from accidents analyzed in the GGNS Final Safety Analysis Report. When EALs are observed in conjunction with plant or equipment status due to planned maintenance or testing activities, an emergency condition may or may not exist and the situation must be evaluated on a case by case basis.

4-1 Revision 59 06/ 07

GG FSAR The four emergency classes that comprise the emergency classification system are:

a. Unusual Event
b. Alert
c. Site Area Emergency
d. General Emergency 4.1.1 Unusual Event The Unusual Event classification is an emergency in which events are in process or have occurred which indicate a potential degradation of the level of safety of the plant or indicate a security threat to facility protection has been initiated. No release of radioactive material requiring o:ffsite response or monitoring are expected unless further degradation of safety systems occurs.

The EALs Table 4-1, while comprehensive, are not meant to be all inclusive. The I

Emergency Director may declare an Unusual Event based on other plant conditions and the potential for the degradation of these conditions.

Training of the Emergency Organization members should emphasize the need to evaluate the potential for more serious plant conditions to occur at a future time.

4.1.2 Alert The Alert classification is an emergency classification in which events are in process or have occurred which involve an actual or potential substantial degradation of the level of safety of the plant or a security event that involves probable life threatening risk to site personnel or damage to site equipment because of Hostile Action. Because of the increased potential for more serious offsite consequences, the emergency organization is activated, as well as notification of key offsite authorities and the news media. The Alert class also addresses limited releases of radioactive material and therefore might require some radiological monitoring and assessment actions by the emergency organizations.

4-2 Revision 61 03/09

GG FSAR The Alert class assures that emergency personnel are readily available to respond to a change in plant conditions and to provide assessment support as required.

4.1.3 Site Area Emergency Site Arca Emergency is an emergency classification in which events arc in process or have occurred which involve actual or likely major failures of plant functions need~d for protection of the public or Hostile Action that result in intentional damage or malicious acts; (1) toward site personnel or equipment that could lead to likely failure of or; (2) prevent effective access to equipment needed for the protection of the public.

Immediate protective actions are not required upon notification of a Site Area Emergency condition; however, preliminary steps are initiated in anticipation of possible protective actions. These preliminary steps include complete activation of the emergency organization, alerting and/or mobilizing of monitoring teams, and notification of all offsite authorities and the news media. The Site Area Emergency class includes accidents which have a significant potential for the release of radioactive material.

Unlike the two previously described classes of emergencies, the Site Area Emergency is very likely to involve some radiation exposure to the near-site public. Also, many of the accidents included in this class have the potential for escalation to the General Emergency class.

14.1.4 General Emergency*

The most severe emergency class used in emergency planning is the General Emergency.

General Emergency is an emergency classification in which events are in process or have occurred which involve actual or imminent substantial core degradation or melting with potential'"'for loss of containment integrity or Hostile Action that results in an actual loss of physical control of the facility.

4-3 Revision 65 04/ 11

GG FSAR Protective actions shall be recommended upon declaration of the General Emergency, as the accidents considered could result in the exceeding of the lower limits of the PAGs. The General Emergency EAL~ that require dose projections offsite use actual meteorology rather than the adverse meteorology assumptions used in the Site Area Emergency action levels.

None of the accidents analyzed in the FSAR would normally be classified as a General Emergency. However, the Loss of Coolant Accident (LOCA) within the reactor coolant pressure boundary analyzed in the FSAR could lead to a General Emergency classification in a situation where there was a subsequent loss of plant safety systems leading to a possible core melt and failure of containment. Criteria to be used for declaration of a General Emergency includes core and containment status as well as actual radiation release data.

4.2 Classification of Postulated Accidents A thorough analysis of each of the postulated accidents is included in the Grand Oulf Nuclear Station Final Safety Analysis Report (FSAR). All of the postulated ac~idents could be classified into one of the four emergency classes (See Table 4-2). In classifying each of the postulated accidents, the conservative assumptions used it:1 the FSAR analysis were considered. It is possible that occurrence of some of the postul~ted accidents results in a classification lower in severity.

4-4 Revision 61 03/09 I

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS Offsite dose resulting from an actual or IMMINENT Offsite dose resulting from an actual or IMMINENT Any release of gaseous or liquid radioactivity to the Any release of gaseous or liquid radioactivity to release of gaseous radioactivity >1000 mR TEDE or . release of gaseous radioactivity > 100 mR TEDE or environment> 200 times the ODCM limit for the environment> 2 times the ODCM limit for;?: 60 5000 mR Thyroid COE for the actual or projected 500 mR Thyroid COE for the actual or projected  ;?: 15 minutes minutes.

.duration of the release using actual meteorology duration of the release (1 or 2 or 3)

Emergency Action Level(s}: Emergency Action Level(s}: (1 or 2 or 3)

Emergency Action Levells}: (1 or 2 or 3) Emergency Action Level(s}: (1 or 2 or 3) NOTE: The Emergency Director should not wait until the applicable NOTE: The Emergency Director should not wait until the time has elapsed, but should declare the event as soon as it is applicable time has elapsed, but should declare the event as NOTE: The Emergency Director should not wait until the NOTE: The Emergency Director should not wait until the determined that the release duration has exceeded, or will likely applicable time has elapsed, but should declare the event as applicable time has elapsed, but should declare the event as soon as it is determined that the release duration has exceed, the applicable time. In the absence of data to the contrary, soon as it is determined that the condition will likely exceed the exceeded, or will likely exceed, the applicable time. In the soon as it is determined that the condition will likely exceed the assume that the release duration has exceeded the applicable time if applicable time. If dose assessment results are available, the absence of data to the contrary, assume that the release applicable time. If dose assessment results are available, the an ongoing release is detected and the release start time is unknown. duration has exceeded the applicable time if an ongoing_

classification should be based on EAL #2 instead of EAL #1. Do classification should be based on EAL #2 instead of EAL #1. Do release is detected and the release start time is unknown.

J!1 c not delay declaration awaiting dose assessment results. not delay declaration awaiting dose assessment results. 1. VALID readings on the radiation monitors in Table Cl) R1 "ALERT"> the reading shown for;?: 15 minutes.

1. VALID readings on the radiation monitors in

=

I 1. VALID readings on the radiation monitors in
1. VALID readings on the radiation monitors in OR Table R1 "UNUSUAL EVENT"> the reading w Table R1 "GENERAL EMERGENCY"> the Table R1 "SITE AREA EMERGENCY"> the
2. a. For liquid release SD17K606 Radwaste Effluent shown for;?: 60 minutes.

ii reading shown for ;?: 15 minutes. reading shown for;?: 15 minutes.

u Radiation Monitor:

'a, OR OR EITHER OR 0 VALID reading> 400 times the Hi-Hi alarm 0 2. Dose assessment using actual meteorology 2. Dose assessment using actual meteorology 2. VALID reading on any effluent monitor> 4 setpoint established by a current radioactivity

=s indicates doses > 1000 mR TEDE or > 5000 indicates doses > 100 mR TEDE or > 500 mR discharge permit for.:':. 15 minutes.

times the Hi:::Hi alarm setpoint established by a

/}. mR thyroid COE at or beyond the site thyroid COE at or beyond the site boundary. current radioactivity discharge permit for ;?: 60 OR boundary. minutes.

OR VALID reading.:':. 1E6cpm for?:_ 15 minutes.

OR 3. Field survey results indicate closed window OR OR dose rates > 100 mR/hr expected to continue ~VALID reading on any effluent monitor> 400

3. Field survey results indicate closed window 3. Confirmed sample analyses for gaseous or for.:':. 60 minutes; or analyses of field survey times the Hi-Hi alarm setpoint established by a dose rates > 1000 mR/hr expected to continue liquid releases indicate concentrations or samples indicate thyroid COE > 500 mR for current radioactivity discharge permit for ;?: 15 for.:':. 60 minutes; or analyses of field survey release rates > 2 times the ODCM limit for one hour of inhalation, at or beyond the site minutes.

samples indicate thyroid CDE > 5000 mR for .:':. 60 minutes.

one hour of inhalation, at or beyond the site boundary. OR boundary.

3. Confirmed sample analyses for gaseous or liquid releases indicate concentrations or release rates

> 200 times the ODCM limit for.:':. 15 minutes.

Table R1: EAL THRESHOLD Method GENERAL EMERGENCY SITE AREA EMERGENCY ALERT UNUSUAL EVENT Computer Point Threshold Computer Point Threshold Computer Point Threshold Computer Point Threshold Release Point Total:

OG/Radwaste Vent FHA Vent 0173004 0173003 0173002 0173001 3.37E+02 Ci/sec 3.37E+01 Ci/sec 3. 73E+OO Ci/sec 3. 73E-02 Ci/sec In Alarm In Alarm In Alarm In Alarm CTMTVent Turb Bldg Vent SBGT A/B 4-5 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS Damage to irradiated fuel or loss of water level that has UNPLANNED rise in plant radiation levels resulted or will result in the uncovering of irradiated fuel Emergency Action Level(s): (1 or 2) outside the reactor vessel

1. a. UNPLANNED water level drop in a Emergency Action Level{s): (1 or 2) reaGtor refueling pathway as indicated by water level drop in Upper Ctmt Pools,
1. A water level drop in the Upper Ctmt Pools, Aux Aux\Bldg Fuel Pools or the Fuel Transfer Bldg Fuel Pools or Fuel Transfer Canal that will Canal, personnel observation or result in irradiated fuel becoming uncovered.

indi~tion on area camera.

AND

b. VAUD Area Radiation Monitor reading
2. A VALID alarm on any of the following radiation rise on any of the following:

monitors due to damage to irradiated fuel or loss of water level: Ctmt 209 Airlock ------------ (1021 K630)

Cl) Ctmt Fuel Hdlg Area------- (1D21K626)

"iD Ctmt Vent---------------------------------(P601-19A-G9)

Aux Bldg Fuel Hdlg Area - (1D21K622) ii

..J FH Area Vent----------------------------(P601-19A-C11)

OR Ctmt 209 Airlock------------------------(P844-1A-A 1) c Ctmt Fuel Hdlg-Area -------------------(P844-1A-A3) 0 NOTE: For Control Room Envelope review

~ Aux Bldg Fuel Hdlg Area -------------(P844-1A-A4) Initiating Condition AA3.

~

/}_ 2. UNPLANNNED VALID Area Radiation iu Monitor readings or survey results indicate a e

0 rise by a factor of 1000 over normal* levels c NOTE: For area radiation monitors with ranges

.a Rise in radiation levels within the facility that impedes cc operation of systems required to maintain plant safety incapable oi measuring 1ooo times normal*

levels, classification shall be based on VALID full functions scale indications unless surveys confirm that area Emergency Action Level(s): radiation levels are below 1000 times normal*

within 15 minutes of the Area Radiation Monitor

1. Dose rate > 15 mR/hr in any of the following indications going full scale.

areas ,requiring continous occupancy to maintain plant safety functions:

  • Normal can be considered the highest reading in Control Room Envelope the past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> excluding the current peak value.

4-6 Revision 69 11/12

GG FSAR TABLE 4-.1 EMERGENCY ACTION LEVELS

'~

Loss of RCS inventory affecting fuel clad integrity with Loss of RCS/RPV inventory affecting core decay heat Loss ofRCS/RPV inventory RCS leakage containment challenged removal capability Emergency Action Level{s):

  • Emergency Action Level{s): (1 or 2)

Emergency Action Level{sl: (1 or 2)

Emergency Action Level{s): (,-1 or 2 or 3) Note: The Emergency Director should not wait until the Note: The Emergency Director should not wait until the Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as applicable time has elapsed, but should declare the Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event soon as it is determined that the condition will likely exceed event as soon as it is determined that the condition will applicable time has elapsed, but should declare the event as soon as it is determined that the condition will likely the applicable time. likely exceed the applicable time.

as soon as itis determined that the condition will likely exceed the applicable time.

exceed the applicable time.

1. a. RPV level< - 167 in. (TAF) for~ 30 minutes
1. Loss of RCS inventory as indicated by RPV level 1. RCS leakage results in the inability to Mm 1. With CONTAINMENT CLOSURE not established, < -41 .6 in. (Level 2). maintain or restore RPV level > + 11 .4 in.

~ b. Any containment challenge indication in Table RPV level< -47.6 in. OR (Level 3) for ~ 15 minutes .

.sc C1 2. RCS level cannot be monitored for > 15 minutes Cl) OR

> OR with a loss of RCS inventory as indicated by an

.5 2. a. RCS level cannot be monitored with core 2. With CONTAINMENT CLOSURE established, unexplained rise in floor or equipment sump level,

>a. uncovery indicated by any of the following for RPV level< -167 in. (TAF) Suppression Pool level, vessel make-up rate or 0:: ~ 30 minutes.

observation of leakage or inventory loss.

en OR

~ Containment High Range Radiation Monitor reading > 100 R/hr

  • 3. RCS level cannot be monitored for

'o Erratic Source Range Monitor indication ~ 30 minutes .with a loss of RCS inventory as en indicated by any of the following:

g Unexplained rise in floor or equipment

..J sump level, Suppression Pool level, vessel en make-up rate or observation of leakage or Containment High Range Radiation Monitor

.5 inventory loss

  • reading > 100 R/hr a; Erratic Source Range Monitor indication
s Unexplained rise in floor or equipment sump ic b. Any containment challenge indication in Table C1 level, Suppression Pool level, vessel make-up rate or observation of leakage or inventory

~ Table C1: Containment Challenge Indications loss

s:s
  • CONTAINMENT CLOSURE not established

.c * > 2.9% hydrogen concentration inside U)

"C containment 0

  • UNPLANNED rise in containment pressure 0

Area Max Safe Operating Value 4

RH,R Room A 8 x 10 mR/hr 4

RHRRoomB 8 x 10 mR/hr 4

"- RHR HX A Hatch Bx 10 mR/hr 4

RHR HX B Hatch 8 x 10 mR/hr 4

RCICRoom 8 x 10 mR/hr MSL Rad Monitor 8 x 104 mR/hr 2

SGTS Fltr. Tm. 8 x 10 mR/hr 4-7 Revision-69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS

~ Cold Shutdown CU2 UNPLANNED loss of RCS/RPV inventory Emergency Action Level(s): (1 or 2)

Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the

§c event as soon as it is determined that the condition will likely exceed the applicable time.

Cl>>

.E 1. UNPLANNED RCS level drop as indicated by D.

either of the following:

0:::

U) a. RCS water level drop below the RPV flange 0 for ~ 15 minutes when the RCS level band 0:::

is established above the RPV flange.

0 II)

II) OR 0

...J c, b. RCS water level drop below the RPV level

.5 band for ~ 15 minutes when the RCS level "S band is established below the RPV flange.

~

2. RCS level cannot be monitored with a loss of RCS inventory as indicated by an unexplained rise in floor or equipment sump level, Suppression Pool level, vessel make-up rate or observation of leakage or inventory loss.

4-8 Revision 69 11/12

GG FSAR

-TABLE 4-1 EMERGENCY ACTION LEVELS CA3 Inability to maintain plant in Cold Shutdown UNPLANNED loss of decay heat removal capability with irradiated fuel in the RPV Emergency Action Level{s): (1 or 2)

1. An UNPLANNED event results in RCS temperature Emergency Action Level{s): (1 or 2)

> 200 °F > the specified duration in Table C2. Note: The Emergency Director should not wait until the OR applicable time has elapsed, but should declare the event as soon as it is determined that the condition will

2. An UNPLANNED event results in RCS pressure rise likely exceed the applicable time.

> 10 psig due to a loss of RCS cooling.

1. An UNPLANNED event results in RCS temperature exceeding 200 °F.

TableC2 OR RCS Reheat Duration Thresholds

2. Loss of all RCS temperature and RPV level RCS Containment Duration Closure indication for.::. 15 minutes.

iii Intact N/A 60 minutes*

~

E Not intact Established 20 minutes*

~

-:R

c Not Established O minutes

_*If an RCS heat removal system is in operation within this time frame and RCS temperature is being reduced, then the EAL is not applicable.

ca u

cu c

0 (I)

(I) 0

...I 4-9 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS 8] Cold Shutdown CAS ~ CUS ~

Loss of all offsite and all onsite AC power to Div I and II AC power capability to Div I and II ESF busses ESF busses for~ 15 minutes reduced to a single power source for~ 15 minutes such that any_additional single failure would result

  • Emergency Action Level(s): in Station Blackout
  • Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as Emergency Action Level(s):

I D.

soon as it is detennined that the condition will likely exceed the applicable time.

Note: The Emergency Director should not wait until the applicable time has elapsed, but should declare the event as soon as it is detennined that the condition will 0

<( likely exceed the applicable time.

1. Loss of all offsite and all onsite AC power to Div I

'o and II ESF busses for~ 15 minutes.

1/J

1. a. AC power capability to Div I and II ESF g busses reduced to a single power source for

..J

~ 15 minutes.

b. Any additional single power source failure will result in station blackout.

CU&

Loss of required DC power for~ 15 minutes i

a.

Emergency Action Level(s):

Note: The Emergency Director should not wait until the 0

c applicable time has *elapsed, but should declare the

'o event as soon as it is detennined that the condition will II) likely exceed the applicable time.

.9 1. < 105 VDC on required vital DC busses for~ 15 minutes.

CU7 Inadvertent criticality Emergency Action Level(s):

1. UNPLANNED sustained positive period observed on nuclear instrumentation.

4-10 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS 8] Cold Shutdown Loss of all onsite or offsite communications capabilities Emergency Action Level(s): (1 or 2)

1. Loss of all onsite communication methods Cl) affecting the ability to perform routine c operations (See Table C3).

~cu u OR

  • c:::, 2. Loss of all offsite communication methods E affecting the ability to perform offsite notifications E (See Table C4).

0 0 Table C3 Table C4 0 Onsite Communications Offsite Communications Cl)

Methods Methods

...I Plant Radio System

  • All telephone lines (commercial & fiber Plant Paging optic)

System

  • Satellite telephone Sound Powered-1 Phones

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS 0 Startup 0 Hot Shutdown GI Damage to a loaded cask CONFINEMENT C'l BOUNDARY ca E

ca Q Emergency Action Level(s}:

~

fl) 1. Damage to a loaded cask CONFINEMENT ca BOUNDARY.

0

)

4-12 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS FG1 FU1 Loss of ANY Two Barriers AND Loss or Potential Loss or Potential Loss of ANY Two Barriers ANY Loss or ANY Potential Loss of EITHER Fuel Clad ANY Loss or ANY Potential Loss of Primary Loss of Third Barrier OR RCS Containment Emergency Action Level{sl:

Loss or Potential Loss of ANY Two Barriers Emergency Action Level{s}: Emergency Action Level{s}:

1.

Emergency Action Level{sl: 1. ANY Loss or ANY Potential Loss of EITHER Fuel 1. ANY Loss or ANY Potential Loss of Primary u,

1. Loss of ANY Two Barriers AND Loss or Clad or RCS Containment

..J Potential Loss of Third Barrier.

Ill ll..

u..

4-12a Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS Fission Product Barrier Matrix Fuel Clad Reactor Coolant System Primary Containment Parameter Loss Potential Loss Parameter Loss Potential Loss Parameter Loss Potential Loss FC1 Primary RC1 Drywell PC1 Primary 1. Rapid unexplained 1. Primary Containment Coolant activity > 300 Drywell pressure > 1.39 psig Coolant 131 None Pressure with indications of a reactor None Containment loss of pressure pressure > 15 psig

µCi/gm dose eq. 1

  • Conditions following initial and rising.

Activitv coolant leak in the drywell.

FC2 RPV RPV water level cannot pressure rise. OR RPV water level cannot be 2.a. DW H 2 concentration Water be restored and OR restored and maintained RPV water level cannot be >9%

Level maintained above -167 in. -- 2. Pressure response above -191 in. RC2 RPVWater restored and maintained OR or cannot be determined. None Level above -167 in. or cannot be not consistent with b. Ctrnt H2 FC3 Drywell Drywell radiation monitor None determined. LOCA conditions. concentration Radiation reading > 3000 R/hr in HDOL Unsafe Monitoring Zone.

FC4 ED Any condition in the opinion Any condition in the RC3 RCS 1. a. UNISOLABLE MSL 1 . RCS leakage > 50 OR Judgment of the Emergency Director opinion of the Emergency Leak Rate break as gpm inside the drywell.

indicated by the failure OR 3. RPV pressure and that indicates a loss of the Director that indicates a of both MSIVs in any 2:-UNISOLABLE RCS suppression pool Fuel Clad Barrier. potential loss of the Fuel one line to close leakage outside temperature cannot be Clad Barrier.

AND Primary Containment _ maintained below the HighMSLflow as indicated by any HCTL.

(P601-19A-E1) Area Temperature or annunciator Area Radiation level OR > Alert Value in Table Primary Containment Table F1 High Steam Tunnel F1. PC2 RPVWater flooding required by:

Parameter Area Temperature Alert Limit SAE/GE Limit Temperature (P601-19A-E3) annunciator Level None

. SAPS OR 185°F 250°F Directreport of steam MSL Pipe Tunnel Temp. (P601-19A/18A- (E31- release. PC3 Primary 1. a. Failure of all valves A3/A4) N604A, B,C, D, E. F) OR Containment In any one line to RHR-A Equip Area Temp.

165°F 225°F ~ Indication of an Isolation close.

(P601-20A-B1) (E31-N608A,N61 OA) UNISOLABLE Failure or AND 165°F 225°F Bypass b. Direct downstream feedwater, RWCU or pathway to the RHR-B Equip Area Temp. (E31-N608B,N61 OB)

(P601-20A-B1) RCIC break. environment exists 185°F 212°F OR after Primary RCIC Equip Area Temp. (E31-N602A/B)

(P601-21A-G3) 2. Emergency RPV Containment 170°F depressurization is ~solation-signal.

RWCU Pmp Rm 1 Temp NA 0 (P680-11 A-A 1) required. -

2. Intentional venting per 170°F EOPs or SAPs.

RWCU Pmp Rm 2 Temp NA None (P680-11 A-A2) RC4 Drywell Drywell radiation monitor OR Radiation reading > 100 R/hr with 3. UNISOLABLE RCS None leakage outside Monitoring indications of a leak in the Fuel Clad drywell. Primary Containment as indicated by any Area Radiation Level Area Temperature or Parameter Alert Limit SAE/GE Limit RC5 ED Any condition in the opinion Any condition in the Area Radiation level 10' MR/HR Judgment of the Emergency Director opinion of the > SAE I GE Value in RHR Room A Rad Bx 104 MR/HR Table F1.

{PB44-1A-D4l that indicates a loss of the Emergency Director that 10'MR/HR 4 RCS Barrier. indicates a potential _

RHR Room B Rad Bx 10 MR/HR (PB44-1 A-04) loss of the RCS Barrier.

10'MR/HR 4 RHR HX A Hatch Rad Bx 10 MR/HR

{PB44-1A-C4) 10' MR/HR 4 RHR HX B Hatch Rad CPB44-1A-C4)

Bx 10 MR/HR (Primary Containment Continued on next page) 10' MR/HR RCIC Room Rad Bx 104 MR/HR

{PB44-1A-D4l 4-13 Revision 69 11/12

GG rSAR TABLE 4-1 EMERGENCY ACTION LEVELS Fission Product Barrier Matrix Primary Containment (Cont.)

PC4 Primary Containment Containment radiation None monitor reading Radiation Monitoring >10.000 R/hr.

PCS ED Judgment Any condition in the Any condition in the opinion of the opinion of the Emergency Emergency Director that Director that indicates a indicates a loss of the potential loss of the Primary Containment Primary Containment Barrier. Barrier.

4-13a Revision 69 11/12

GG, FSAR TABLE 4-1 EMERGENCY ACTION LEVELS HAZARDS AND OTHER CONDITIONS AFFECTING [] Power Operations 0 Startop 0 Hot Shutdown [+/-] Cold Shutdown PLANT SAFETY HOSTILE ACTION resulting in loss of physical HOSTILE ACTION within the PROTECTED AREA HOSTILE ACTION within the OWNER CONTROLLED Confirmed SECURITY CONDITION or threat which

') indicates a potential degradation in the level of control of the facility AREA or airborne attack threat Emergency Action Level(s): . _safety of the plant Emergency Action Level(s): (1 or 2) Emergency Action Level(s): (1 or 2)

1. A HOSTILE ACTION is occurring or has occurred within Emergency Action Level(s): (1 or 2 or 3) the PROTECTED AREA as reported by the GGNS 1. A HOSTILE ACTION is occurring or has occurred within
1. A SECURITY CONDITION that does not involve a security shift supervision. the OWNER CONTROLLED AREA as reported by the
1. A HOSTILE ACTION has occurred such that plant HOSTILE ACTION as reported by the GGNS GGNS security shift supervision personnel are unable to operate equipment required security shift supervision.

to maintain safety functions.

2. A validated notification.from NRC of an airliner attack
2. A credible site specific security threat notification.

threat within 30 minutes of the site.

2. A HOSTILE ACTION has caused failure of Spent Fuel Cooling Systems and IMMINENT fuel damage is likely for a freshly off-loaded reactor core in pool.
3. A validated notification from NRC providing information of an aircraft threat.

I1121314151ol Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Other conditions exist which in the judgment of the Other Conditions exist which in the judgment of Emergency Director warrant declaration of a Emergency Director warrant declaration of a

  • Emergency Director warrant declaration of an ALERT the Emergency Director warrant declaration of an GENERAL EMERGENCY SITE AREA EMERGENCY UNUSUAL EVENT Emergency Action Level(s):

Emergency Action Level(s): Emergency Action Level(s): Emergency Action Level(s):

1. Other conditio.ns exist which in the judgment of the *

~ 1. Other conditions exist which in the judgment of 1. Other conditions exist which in the judgment of Emergency Director indicate that events are in 1. Other conditions exist which in the judgment of c,s c the Emergency Director indicate that events are the Emergency Director indicate that events are progress or have occurred which involve an actual the Emergency Director indicate that events 0 in progress or have occurred which involve actual or potential substantial degradation of the level of are in progress or have occurred which in progress or have occurred which involve iu actual or IMMINENT substantial core degradation or melting with potential for loss of or likely major failures of plant functions needed for protection of the public or HOSTILE ACTION safety of the plant or a security event that involves probable life threatening risk to site personnel or indicate a potential degradation of the level of safety of the plant or indicate a security threat Cl) i5 containment integrity or HOSTILE ACTION that that results in intentional damage or malicious damage to site equipment because of HOSTILE to facility protection has been initiated. No results in an actual loss of physical control of the acts; (1) toward site personnel or equipment ACTION. Any releases are expected to be limited releases. of radioactive material requiring facility. Releases can be reasonably expected that could lead to the likely failure of or; (2) that to small fractions of the EPA Protective Action offsite response or monitoring ate expected to exceed EPA Protective Action Guideline prevent effective access to equipment needed Guideline exposure levels. unless further degradation of safety systems exposure levels offsite for more than the for the protection of the public. Any releases are occurs.

immediate site area. not expected to result in exposure levels which exceed EPA Protective Action Guideline exposure levels beyond the site boundary.

4-14 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS HAZARDS AND OTHER CONDITIONS ./ Plant Modes: 1 Power Qperatlons 3 Hot Shutdown -1 Cold Shutdown AFFECTING PLANT SAFETY E Control Room evacuation has been Initiated and Control Room evacuation has been initiated 0 plant control cannot be established oc Emergency Action Level(s):

Di: 0 c5;;

... ftl Emergency Action Level(s): 1. 05-1-02-11* 1, Shutdown from the Remote Shutdown

... :I cu 1.- a. Control Room evaaiatlon has been initiated. Panel requires Control Room evacuation.

8cW!: ~

i b. Control of the plant cannot be established in accordance with 05-1-02-11-1, Shutdown froni the Remote Shutdown Panel, within 15 minutes.

HM !1! 21 31,j slo!

FIRE or EXPLOSION affecting the operability of plant FIRE in any table H-2 area not extinguished within safety systems required to establish or maintain safe 15 minutes of detection or EXPLOSION within the shutdown PROTECTED AREA Emergency Action Level(s); Emergency Action Level(s):

1. FIRE or EXPLOSION resulting in VISIBLE Note: The Emergency Director should not wait until the DAMAGE to any of the structures or areas in applicable time has elapsed, but should declare the event Table H2 containing safety systems or as soon as it is detennined that the duration has exceeded, or will likely exceed, the appllcable time.

components or Control Room indication of degraded performance ot: those safety systems.

1. Fire in any Table H-2 structure or area NOT extinguished:
a. Within 15 minutes of Control Room notification QB
b. Within 15 minutes of verification of a Control Room FIRE alarm.

QB

2. EXPLOSION within the PROTECTED AREA. *1 4-15 Revision 71 06/14

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS HAZARDS AND OTHER CONDITIONS AFFECTING [] Power Operations ~ Startup 0 Hot Shutdown 0 Cold Shutdown PLANT SAFETY Access to a VITAL AREA is prohibited due to toxic, Release of toxic, corrosive, asphyxiant or corrosive, asphyxiant or flammable gases which flammable gases deemed detrimental to NORMAL jeopardize operation of operable equipment required PLANT OPERATIONS to maintain safe operations or safely shutdown the reactor Emergency Action Level(s): (l or 2)

1. Toxic, corrosive, asphyxiant or flammable Emergency Action Level(s): gases in amounts that have or could adversely affect NORMAL PLANT OPERATIONS.

Note: If the equipment in the stated area was already OR inoperable, or out of service, before the event occurred, then this EAL should not be declared as it will have no 2. Report by Local, County/Parish or State adverse impact on the ability of the plant to safely . Officials for evacuation or sheltering of site operate or safely shutdown beyond that already personnel based on an offsite event.

allowed by Technical Specifications at the time of the event.

1. Access to the Control Room while in any operating mode or the Reactor Auxiliary Building while in modes 3 ,~. or S ONLY is prohibited due to toxic, corrosive, asphyxiant or flammable gases which jeopardize oper"tion of systems required to maintain safe op.erations or safely shutdown the reactor.

4-16 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS HAZARDS AND OTHER CONDITIONS AFFECTING

[D Power Operations 0 Startup 0 Hot Shutdown 0 Cold Shutdown PLANT SAFETY Natural or destructive phenomen a affecting the PROTECT ED AREA (1 or 2 or 3 or 4 Emergency Action Level{s): (1 or 2 or 3 or 4 Emergency Action Level(s):

or 5 or 6) or 5)

1. a. Seismic event > Operating Basis Earthquake 1. Seismic event identified by any 2 of the (OBE) as indicated by: following:

Seismic event confirmed by activated Receipt of EITHER of the following seismic switches as indicated by activation indications on SH13P856: of the Seismic Monitoring System: Strong

E (P856-1A-A5) 0 OR c

CD

.c 2. Tornado striking within PROTECT ED AREA D.. boundary.

CD

~u OR AND

J 3. Internal flooding that has the potential to affect

.::: ~rthqua ke confirmed by any of the following:

safety related equipment required by Technical c

I Earthquake felt in plant Specifications for the current operating mode National Earthquake Center in any Table H1 area.

0 Control Room indication of degraded i performance of systems required for the OR

.aca safe shutdown of the plant. 4. Turbine failure resulting in casing penetration z OR or damage to turbine or generator seals.

2. Tornado striking resulting in VISIBLE DAMAGE to any of the Table H2 structures or areas containing OR safety systems or component s or Control Room 5. Severe weather with indication of sustained indication of degraded performanc e of those safety high winds~ 74 mph within PROTECT ED systems. AREA boundary.

OR

3. Internal flooding in any of the Table H1 areas resulting in an electrical shock hazard that precludes access to operate or monitor safety equipment or Control Room indication of degraded performance of those safety systems.

OR (continued on next page) 4-17 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS HAZARDS AND OTHER CONDITIONS AFFECTING Plant Modes: 1 Power Operations 3 Hot Shutdown 4 Cold Shutdown PLANT SAFETY

+I 4. Turbine failure-generated PROJECTILES resulting c

0 in VISIBLE DAMAGE to or penetration of any of the

~ Table H2 structures or areas containing safety ftS c systems or components or Control Room indication Cl) of degraded performance of those safety systems.

E 0 OR cCl)

.c 5. Vehicle crash resulting in VISIBLE DAMAGE to any D. of the Table H2 structures or areas containing Cl)

> safety systems or components or Control Room

g indication of degraded performance of those safety 2 systems .

..... OR c= 6. Severe weather with indication of sustained high 0 winds~ 74 mph within PROTECTED AREA e boundary and re~ulting in VISIBLE DAMAGE to any of the Table H2 structures or areas containing

.aftS safety systems or components or Control Room z indication of degraded performance of those safety s stems.

Table H1 Table H2 Auxiliary Building Area Parameters Structures Contairiincj'"Functions or Systems Area Max Safe Operating Value Required for Safe Shutdown RHR Room A 93 FT. 6 IN. (P870-2A-E1) Unit I Containment RHR Room B 93 FT. 6 IN. (P870-10A-G1) Unit I Auxiliary Building RHR Room C 93 FT. 6 IN. (P870-10A-G2) Control Building RCIC Room 93 FT. 6 IN. (P870-2A-A1) Unit 1 Turbine Building LPCS Room 93 FT. 6 IN. (P870-2A-F1) Diesel Generator Rooms HPCS Room 93 FT. 6 IN. (P870-5A-H1) SSW Pum & Valve Rooms 4-17a Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS SYSTEM MALFUNCTION SG1 lffl 551 lffl SU1 Prolonged loss of all offsite and all onsite AC power Loss of all offsite and all onsite AC power to Div I, II AC power capability to Div I & II ESF busses reduced Loss of all offsite AC power to Div I & II ESF to Div I, II & Ill ESF busses & Ill ESF busses for~ 15 minutes to a single power source for~15 minutes such that any busses for~15 minutes additional single failure would result in station blackout Emergency Action Level(s):

Emergency Action Level(s): Emergency Action Level(s): Emergency Action Level(sl:

1. a. Loss of all offsite and all onsite AC power to Note: The Emergency Director should not wait until Note: The Emergency Director should not wait until Div I, II & Ill ESF busses. Note: The Emergency Director should not wait until the I

D.

AND the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the applicable time.

the applicable time has elapsed, but should declare the event as soon as it is determined that the condition has exceeded, or will likely exceed, the 0 b. Either of the following: applicable time.

<( applicable time.

0 1. Loss of all offsite and all onsite AC power to Div I,

1. a. AC power capability to Div I & II ESF busses rn Restoration of at least one emergency reduced to a single power source for~15 1. Loss of all offsite AC power to Div I & II ESF rn bus in < 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> is not likely. II & Ill ESF busses for2. 15 minutes.

0 minutes. busses for~ 15 minutes.

,...I RPV level can not be maintained b. Any additional single power source failure will

> -167 in. result in station blackout.

4-18 Revision 69 11/12

GG FSAR Automatic scram and all manual actions fail to utomatic scram fails to shutdown the reactor and the utomatic scram fails to shutdown the reactor and the shutdown the reactor and indication of an extreme manual actions taken from the reactor control console manual actions taken from the reactor control console challenge to the ability to cool the core exists are not successful in shutting down the reactor are successful in shutting down the reactor E

sII)

Emergency Action Level{s):

Emergency Action Level{s): Emergency Action Level{s):

~ 1. a. An automatic scram failed to shutdown the

1. a. An automatic scram failed to shutdown the 1. a. An automatic scram failed to shutdown the c reactor 0 reactor reactor as indicated by reactor power~ 4%

~ AND s b. All manual actions do not shutdown the reactor AND AND e as indicated by reactor power~ 4% b. Manual actions taken at the reactor control b. Manual actions taken at the reactor control D..

console do not shutdown the reactor as console successfully shutdown the reactor as

.su AND indicated by reactor power~ 4%. indicated by reactor power< 4%.

ns c. Either of the following exist or have occurred

~ due to continued power generation:

0 Core cooling is extremely challenged as

~ indicated by RPV level can not be

.a

  • restored and maintained > -191 in.

LL Heat removal is extremely challenged as indicated by RPV pressure and Suppression Pool temperature cannot be maintained in the EOP Heat Capacity Temperature Limit (HCTL) Safe Zone.

554 Loss of all vital DC power for ~ 15 minutes I

D..

Emergency Action LevelCs):

Note: The Emergency Director should not wait until 0 the applicable time has elapsed, but should declare c

the event as soon as it is determined that the 0 condition has exceeded, or will likely exceed, the II)

II) applicable time.

0

..J

1. < 105 voe on all vital DC busses for~ 15 minutes.

4-19 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS 556 ~ 5A6 Inability to monitor a SIGNIFICANT TRANSIENT in UNPLANNED loss of safety system annunciation or UNPLANNED loss of safety system annunciation progress indication in the Control Room with either (1) a or indication in the Control Room for.?. 15 minutes SIGNIFICANT TRANSIENT in progress, or Emergency Action Level{s): (2) compensatory indicators unavailable Emergency Action Level(s):

Note: The Emergency Director should not wait until Note: The Emergency Director should not wait until

  • c the applicable time has elapsed, but should declare Emergency Action Level(s): the applicable time has elapsed, but should declare 0

the event as soon as it is determined that the

~ CJ condition has exceeded, or will likely exceed, the Note: The Emergency Director should not wait until the the event as soon as it is determined that the applicable time has elapsed, but should declare the condition has exceeded, or will likely exceed, the

=c applicable time. event as soon as it is determined that the condition has applicable time.

..5:

exceeded, or will likely exceed, the applicable time.

le 1. a. UNPLANNED loss of> approximately 75% of 1. UNPLANNED loss of> approximately 75% of

.s ftS the following for .?. 15 minutes:

1. a. UNPLANNED loss of> approximately 75% of the the following for .?. 15 minutes:
  • c::; Control Room safety system annunciation. following for.?. 15 minutes: a. Control Room safety system annunciation.

c

~

c OR Control Rdom safety system annunciation. OR c

<( Control Room safety system indication. Control Room safety system indication.

OR b.

'o 0 Mm Control Room safety system indication.

0 0 b. A SIGNIFICANT TRANSIENT is in progress.

..J AND AND b. Either of the following:

c. Compensatory indications are unavailable.

OR

  • Compensatory indications are unavailable.

5U7 RCS Leakage

-c c, Cl)

..!!!~ Emergency Action Level(s): (1 or 2) gm 1. Unidentified or pressure boundary leakage 0..J oE

... Cl)

> 10 gpm.

CU -0 CJ OR Cl) >,.

0:: U) 2. Identified leakage > 35 gpm:

4-20 Revision 69 11/12

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS c Table S1 Table 52 SUS [ffl 0

~ 1---____;=0=n=si=te=C=o=m=m=u=n=ic=a=t=io::::n:::s:::M::e::::t:::::ho=d=s=-------i------=O=ff=s=ite=C::o::::::m:::m:::::u::n::::ic=a=t=io::n:::s::::M:::::e::::t::::h:::od=s=-----l Loss of all onsite or offsite communications ra Plant Radio System All telephone lines (commercial & fiber optic) capabilities u

"i: Satellite telephone

~ Plant Paging System Emergency Action Level(s): (1 or 2)

E Sound Powered Phones NRC phones (ENS, HPN, MCL. RSCL, PMCL)

E 1. Loss of all Table S1 onsite communications 0

0 In-plant Telephones methods affecting the ability to perform

'o routine operations.

Cl) OR s

...I 2. Loss of all Table S2 offsite communications methods affecting the ability to perform offsite notifications.

TableS3 SU9 [ffl Offgas Pre-TreatmeiitRadiation Monitor 1-----------....------ -------1 Fuel clad degradation Offgas Flow Radiation Monitor Limit c _____ (c_fm_)_ _ _ _ _ _ _ _ _(m_rl_hr_)_ _ _ _ Emergency Action Level{sl: (1 or 2)

8ra _

0 65 1400 1. Offgas Pre-Treatment radiation monitor (D17R604 or 1D17K612) reading> the Table "C

!.!! S3 Limit for the actual indicated Offgas flow 700 Cl Cl)66-130 indicating fuel clad*degradation > T.S.

c allowable limits.

c, 460 OR c 131-200

s "C

1 - - - - - - - - - - - + - - - - - - - - - - - - - i 2. Reactor coolant sample activity value 310 indicating fuel clad degradation > T.S.

ra 201-300 0 allowable limits

> 4.0 µCi/gm dose equivalent 1-131.

301-400 230 OR

- > 0.2 µCi/gm dose equivalent 1-131 for> 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />.

SU10 Inadvertent criticality Emergency Action Level(s):

1. UNPLANNED sustained positive period observed on nuclear instrumentation 4-21 Revision 69 11/12 -

GG FSAR TABLE 4-1 EMERGENCY ACTION LEVELS

"\

a, "C E a, Inability to reach required operating mode within I- "C

  • - a, Technical Specification limits u a, a, u CL >< Emergency Action Level(s}:

u,W

..c := 1. Plant is not brought to required operating u E a,*- mode within Technical Specifications LCO 1- ...I Action Statement Time 4-22 Revision 69 11/12

GO FSAR TABLE 4-2 Classification or'FSAR Design Bases Accidents Design Bases Accident Classification Seizure of one recirculation pump Unusual Event Recirculation Pllll\P shaft.break Unusual Event Rod drop accident Alert Instrument line break Unusual Event Steam system pipe break outside containment Site Area Emergency LOCA within reactor coolant pressure boundary Site Area Emergency Feedwater line break outside containment Site Area Emergency Main condenser Off Gas treatment system failure Site Area Emergency Liquid radwaste tank failure Alert Fuel handling accident outside primary containment Site Area Emergency Fuel handling accident inside primary containment Alert Note:

This table is provided for example purposes only. Classification was determined by applying Table 4-1 EAL criteria to each FSAR Design Bases Accident. This table is not procedurally implemented.

4-23 Revision 57 09/ 06

GG FSAR 5.0 ORGANIZATIONAL CONTROL OF EMERGENCIES 5.1 GGNS Organization The Grand Gulf Nuclear Station operating and licensing activities are under the control of the Site Vice President. The Site Vice President reports directly to the Senior Vice President and Chief Operating Officer. The Site Vice President is also assisted by the Director, Regulatory and Performance Improvement and the General Manager, Plant Operations.

5.2 Normal Station Organization The General Manager, Plant Operations is responsible for the overall management of the station.

The operating organization is in conformance with GGNS Technical Specification 5.3.l and includes personnel encompassing both the management and operating units. An organizational chart showing the functional levels is given in Figure 5-2. The administrative and technical support personnel staffing the GGNS organization are normally onsite daily Monday through Friday, holidays and off Fridays excluded. Plant Operations, Security, Maintenance, Chemistry, and Radiation Protection personnel are on duty 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day.

The Senior Manager, Operations; Senior Manager, Maintenance; Senior Manager, Production; Manager, Radiation Protection; and Manager Chemistry report directly to the General Manager, Plant Operations, who, in tum, reports to the Site Vice President.

Figure 5-3 indicates the emergency positions usually filled by these individuals.

5.2.1 General Manager, Plant Operations The General Manager, Plant Operations is responsible for the technical and administrative management of the day-to-day physical operation and maintenance of the plant as carried out by the Operations, Maintenance, Radiation Protection and Chemistry Departments.

5-1 Revision 70 11/13

GG FSAR 5.2.2 Senior Manager. Operations safe and efficient day to The Senior Manager, Operations is responsible for the functional, ures and the Technical day operation of the plant in accordance with established proced ons and is assisted by the Specifications. He reports to the General Manager, PlantOperati and Manager, Shift Ops.

Operations Manager, Shift; Operations Manager, Support; Training.

5.2.3 Senior Manager, Maintenance maintenance of all plant The Senior Manager, Maintenance is responsible for the

. He reports to the General components I equipment and plant modifications and construction ents from Mechanical, Manager, Plant .Operations and is assisted by the Superintend Electrical, I & C, Support and FIN Teams.

5.2.4 Manager, Radiation Protection and implementing the The Manager, Radiation Protection is responsible for establishing Protection reports to the GGNS Radiation Protection program. The Manager, Radiation tion Supervisors.

General Manager, Plant Operations and is assisted by Radiation Protec 5.2.5 Senior Manager, Production ies of daily maintenance The Senior Manager, Production manages and directs the activit schedule activities. He is scheduling, ongoing scheduling evaluations and site* integrated Supervisor Planning and assisted by the Superintendent, Online Maintenance Scheduling, General Manager, Plant Outage Manager. The Senior Manager, Production reports to the Operations.

5-2 Revision 70 11 / 13

GG FSAR J 5.2.6 Manager, Training The Manager, Training is responsible for the overall administration and documentation of the GGNS Training program. This position reports to the Director, Regulatory and Performance Improvement with a direct line of communication to the Site Vice President, and is assisted by the Training Superintendents.

5.2.7 Shift Technical Advisor The Shift Technical Advisor (STA) provides advanced technical assistance to the operating shift complement during normal and abnormal operating conditions. During his shift, the STA is available to perform the general duties described in GGNS FSAR Section 13.1. The Shift Technical Advisor reports directly to the Shift Manager.

5.2.8 Manager, Materials, Purchasing and Contracts The Manager Materials, Purchasing and Contracts is responsible for the coordination of Material Management, Purchasing and Contracts. Although this is a Corporate function, this position has a direct line of communication with the General Manager, Plant Operations.

The Supervisor, Procurement; and Supervisor, Materials; report directly to the Manager Materials, Purchasing and Contracts.

5.2.9 Director, Regulatory & Performance Improvement The Director, Regulatory & Performance Improvement is responsible for all licensing _

activities, administering the Corrective Action Program, and overseeing Emergency Preparedness activities. He reports to the Site Vice President and is assisted by the Manager, Regulatory Assurance; Manager, Performance Improvement; and Manager, Emergency Planning.

5-3 Revision 70 11/13

GG FSAR 5.3 Normal Station Shift Staffing During off-hour shifts, the plant is manned to maintain continuous operation as required by GGNS Technical Specifications.

5.4 Emergency Organization -

In the event of an emergency as defined in Section 4.0, the Emergency Organization is activated.

The organization has predefined primary and alternate personnel for the various positions specified to provide for an automatic manning of the Emergency Organization within the time necessary to respond to the emergency.

The Emergency Organization is shown in Figure 5-3. The prerequisites for personnel who fill the emergency positions are listed in EN-TQ-110-01. The Site Vice President, through GGNS Management, designates personnel for these emergency positions. The extent to which the Emergency Organization is activated depends upon the classification of the emergency (see Section 6.2).

5.4.1 Normal Station Shift _j The initial Emergency Organization consists of the normal operating shift with the Shift Manager serving as the Emergency Director. When the designated Emergency Organization personnel are available to augment the normal shift complement, the Shift Manager is relieved as EOF Emergency Director and the organizational control of the emergency shifts from the Shift Manager to the EOF Emergency Director. Shift staffing and augmentation capabilities are shown in Table 5-1.

5-4 Revision 70 11/13

GG FSAR 5.4.2 EOF Emergency Director (ED)

The ED is responsible for the direction of the total emergency response. The ED's responsibilities include:

a. Activation/operation of the EOF, assuming responsibility from the Shift Manager;
b. Classification of the emergency (non-delegable);
c. Recommend protective action recommendations (PAR' s) to the offsite agencies(non-delegable );
d. Notification oftheevent to the offsite agencies(non-delegable);
e. Coordinate accident information with offsite governmental agencies;
f. Request assistance from offsite agencies to support recovery operations;
g. Authorize radiation exposure in excess of 10CFR limits for the EOF personnel;
h. Approve press releases (non-delegable);
i. Direct the activities of the EOF organization in support of the Technical Support Center and offsite agencies. \.

5.4.3 EOF Manager The EOF Manager reports to the ED and oversees the activities in the EOF.

Responsibilities include:

a. Assures timely activation of the EOF;
b. Obtains additional resources as necessary to support EOF activities;
c. Assists the Radiological Assessment Coordinator with EOF Habitability;
d. Assist offsite authorities responding to the EOF;
e. Ensures the offsite notifications are conducted within the regulatory requirements.

5-5 Revision 61 03/09 I

5.4.4 Radiological Assessment Coordinator (RAC)

The Radiological Assessment Coordinator is responsible for conducting assessment activities for offsite radiological conditions. During operation of the EOF, the Radiological Assessment Coordinator reports to the ED. Responsibilities include:

a. Direct the activities of the Dose assessment/radiological field monitoring.
b. Provide input to the ED regarding protective actions.
c. Provide radiological /radiation protection support to the EOF.

/

d. Keep the ED appraised of offsite radiological conditions.
e. Prqvide overall liaison and coordination of efforts in the area of field team data with State Radiological Personnel.
f. Contact for NRC on Health Physics Network (HPN) Line (Can be designated
  • to a RP staff member) 5.4.5 Technical Advisor (TA)

The Technical Advisor reports to the ED. Responsibilities include:

a. Maintaining contact with the TSC and Control Room and obtains current plant status and emergency operations.
b. Monitor plant computer system parameters.
c. Recommend actions on classification of emergencies.

5-6 Revision 61 03 / 09 I

GG FSAR 5.4.6 Admin. & Logistics Coordinator The Admin. & Logistics Coordinator is responsible for providing support to the EOF Manager and the TSC Bmergency Response Organization. Responsibilities* include:

a. Manage logistics for supporting the onsite and offsite emergency response such as additional support personnel or equipment, meals, lodging, etc.
b. Manage 24 hr staffing for ERF's 5.4.7 Public InformationLiaison The Public Information Liaison reports to the EOF Manager and provides the primary interface between the JIC and EOF. Responsibilities include:
a. Ensuring JIC is provided with current plant status.
b. Reviews press releases and provide to the ED for approval 5.4.8 Offsite Communicator The Offsite Communicator reports to the ED. Responsibilities include:
a. Transmitting information to the offsite agencies as required by regulations.
b. Ensuring ED approves all notification forms to State/Local agencies.

5-7 Revision 61 03/09 I

GG FSAR 5.4.9 EOF Communicator The EOF Communicator reports to the EOF Manage'r. Responsibilities include:

a. Transmitting and receiving information from onsite ERF's.
b. Reviewing plant data and ensuring the EOF is notified of changing plant conditions.

J 5.4.10 Lead Offsite Liaison The Lead Offsite Liaison reports to the EOF Manager. Responsibilities include obtaining plant information and ensuring the offsite agencies located in the EOF and the offsite liaisons are briefed on the plant conditions.

5.4.11 Offsite Liaison

\

The Offsite Liaison reports to the Lead Offsite Liaison. Responsibilities include:

a. Obtaining plant information and ensuring the offsite agencies located in the EOC are briefed on the plant conditions.
b. Clarifying plant conditions, responding to questions, etc. for the offsite agencies.

5.4.12 Dose Assessor The Dose Assessor reports to the Radiological Assessment Coordinator.

Responsibilities include:

a. Calculate offsite dose projections.
b. Provide offsite dose projection information to the RAC.

5-8 Revision 62 10/ 09

GG FSAR 5.4.13 Offsite Team Coordinator (OTC)

The Offsite Coordinator reports to the Radiological Assessment Coordinator.

Responsibilities include:

a. Maintain communications with offsite monitoring teams (OMT).
b. Direct OMT based on radiological /met infonnation.
c. Log communications with OMT to include dose /air sample survey results,
d. Ensure radiological information is communicated to the RAC for possible modifications to the dose calculations.

5.4.14 Offsite Monitoring Team (OMT)

The Offsite monitoring team reports to the Offsite Team Coordinator (OTC).

Responsibilities include:

a. Perform activities directed by the OTC to support plume tracking and measurements.
b. Monitor self reading dosimeters and report results back to the OTC.

5.4.15 Information Technology CID Specialist - EOF The Information Technology (IT) Specialist reports to the Admin. & Logistics Coordinator and is responsible for monitoring facility equipment (computer related and communications) to ensure adequate operation.

I 5-9 Revision 61 03 / 09 I

GG FSAR 5.4.16 EOF Log Keeper The EOF Log keeper reports to the ED. Responsibilities include:

a. Maintain facility log
b. Ensure timeliness of facility briefs
c. Support the EOF Manager/ED as requested.

5-9a Revision 71 06 /14

GG FSAR 5.4.17 Emergency Plant Manager (EPM)

The EPM has the direct responsibility for accident' mitigation at the plant and performs these duties from the Technical Support Center (TSC). The EPM reports to the EOF ED. Responsibilities include:

a. Provide information and recommendations to the ED regarding the declaration of an emergency.
b. Coordinate the activities of the CR, TSC and OSC.
c. Direct personnel assembly, accountability and evacuation of non-essential personnel.
d. Provide information and recommendations to the ED regarding plant activities.
e. Direct the organization and coordination of repair corrective action teams.
f. Initiate protective actions at the site.
g. Authorize radiation exposure in excess of 10CFR20 limits to onsite personnel.
h. Make operational decisions involving the safety of the plant and its personnel and make recommendations to the Control Room Personnel.

5.4.18 TSC Manager The TSC Manager reports to the EPM. Responsibilities include:

a Perform technical assessments and communicating the conclusions to the EPM.

b. Assures staffing/timely activation of the TSC.
c. Set priorities for the Engineering and Technical personnel.
d. ~ conjunction with the EPM, make operational decisions concerning the safety of the plant.

5-10 Revision 71 06 /14

GG FSAR 5.4.19 TSC Com mun icato r ager . Resp onsib ilitie s include:

The TSC Com mun icato r repo rts to the TSC Man

a. Main tain facility log
b. Ensu re time lines s of facility brief s
c. Supp ort the EPM /TSC Man ager as requested 5.4.20 Secu rity Coor dina tor ent Com man d Post and repo rts to the The Secu rity Coor dina tor is locat ed in the Incid EPM . Resp onsib ilitie s inclu de:

the secu rity related response.

a Over all coor dina tion of the offsite assis tance for ent Com man d Post and Site* _

b. Desi gnat ed NIM S Liais on betw een the Incid Organization.

5.4.21 ENS Com mun icato r ager . Resp onsib ilitie s include:

The ENS Com mun icato r repo rts to the TSC Man with the NRC via the ENS phone.

a. Esta blish es and main tains com mun icati ons ide plan t status to the NRC as
b. Mon itor plan t com pute r para mete rs and prov requested.

5 -11 Revision 71 06/14

GG FSAR 5.4.22 Maintenance Coordinator The Maintenance Coordinator reports to the TSC Manager. Responsibilities include:

a. Communicate the request for repair and corrective teams to the OSC Work Control Coordinator.
b. Prioritizes the requests with the TSC Manager.

5.4.23 Engineering Coordinator The Engineering Coordinator reports to the TSC Manager. He is responsible for coordinating Engineering work requests with the Engineering support team.

5.4.24 Radiological Coordinator The Radi~logical Coordinator reports to the TSC Manager. Responsibilities include:

a. Radiological assessments and the development of radiological plans.
b. Keeping the TSC Manager informed of the radiological conditions.
c. Advise the TSC, OSC and EOF of changes in radiological release status.
d. Coordinate with the Security Coordinator to determine the routes to be used for evacuation of non-essential personnel and BRE's.
e. Arranging for additional radiation protection personnel, as necessary 5-12 Revision 71 06/14

GG FSAR 5.4.25 Operations Coordinator The Operations Coordinator reports to the TSC Manager. Responsibilities include: *

a. Coordinate TSC efforts in determining the nature and extent of emergencies pertaining to equipment and plant facilities in support of Control Room actions.
b. Assist the EPM in evaluating changes in event classification.
c. Ensure the Control Room, TSC, and EOF is informed of significant changes in everit status.
d. Coordinate operations activities outside of the Control Room with the TSC Manag_er and OSC Manager.

5.4.26 Engineers (MechanicaV I&C/ Electrical}

The Engineers*report to the Engineering Coordinator. The Engineers are responsible for responding to engineering requests form the Engineering Coordinator.

5.4.27 Reactor Engineer The Reactor Engineer reports to the TSC Manager. Responsibilities include:

a. Support the TSC in calculating and tracking core reactivity (core damage assessment).
b. Assist in Severe Accident Procedure jmplementation.

5-13 Revision 71 06 /14

GG FSAR 5.4.28 OSC Manager The OSC Manager has the overall responsibility for the activation and operation of the Operational Support Center. The OSC Manager reports to the EPM located in the TSC. Responsibilities Include:

a. Direct the activation, operation and deactivation of the OSC.
b. Ensures timely dispatching of the repair/corrective action teams, search and rescue teams, onsite monitoring teams and mobilizing other required support personnel:.
c. Ensures work task priorities are being main~ned.
d. Maintain OSC accountability.

5.4.29 Log Keeper OSC The Log Keep - OSC reports to the*OSC Manager. Responsibilities inc~ude:

a. Maintainfacility log.
b. Ensure timeliness of facility briefs.
c. Support the OSC Manager as requested.

5.4.30 Operations Support The Operations Support position reports to the OSC Manager and is manned by a spare Non-Licensed Operator. The Operations Support is responsible for supporting the OSC in locations of plant equipment. This position is filled as needed.

a. Supports OSC, as needed.
b. Ensures Shift Manager is informed of OSC teams and activities.
c. Identifies potential operational support needs.

5-14 Revisio~ 71 06/14

GG FSAR 5.4.31 Work Control Coordinator The Work Control Coordinatorteports to the OSC Manager. Responsibilities include:

a. Direct the formation, briefing and debriefing of repair and corrective action .

teams and offsite monitoring teams.

b. Maintain communications with the Maintenance Coordinator in the TSC.

5.4.32 Mechanical /I & Cl Electrical Coordinator The Mechanical, I&C, and Electrical Coordinators report to the Work Control Coordinator. Responsibilities include:

a. Assist the conduct of the briefing and debriefing for the assigned tasks.
b. Ensures communications with repair and corrective action teams.

5.4.33 Rad Chem Coordinator The Rad Chem Coordinator reports to the Work Control Coordinator. Responsibilities include:

a. Determining emergency radiological survey requirements.
b. Ensur~ use of protective clothing, respiratory protection, and access control within the plant is deemed appropriate to control personnel exposures.
c. Ensures the dispatching of the onsite monitoring teams.
d. Ensures habitability of the OSC
e. Conduct/provide assistance for the rad briefings to support the dispatching of the repair/corrective action teams and chemistry/ RP sampling.
f. Communicate rad/chemistry sample results to the TSC and CR.

5 -15 Revision 71 06/14

GG FSAR 5.4.34 Company Spokesperson The Company Spokesperson is responsible for overall public information.

Responsibilities include:

a. Obtain briefing from the EOF ED to ensure timely development of news releases.
b. Ensures that news media briefings are he~d regularly during the course of the emergency.
c. Serves as spokesperson at media briefings.

5.4.35 Technical Advisor -JIC The Technical Advisor reports to the Company Spokesperson and is responsible for answering technical questions from the news media regarding the emergency situation.

5.4.36 JIC Mana$er The JIC Manager reports to the Company Spokesperson. Responsibilities include:

a. Overall activation and operation of the Joint Information Center.
b. Notify the Corporate Emergency Center.

5.4.37 Log Keeper - JIC The Log keeper- JIC reports to the JIC Manager. Responsibilities include:

a. Maintain facility log.
b. Support the JIC Manager as requested.

5 -16 Revision 71 06/14

  • cc FSAR*

.** T~elriquicy.Response Coordinator reports to the IlCManager/Responsil:>iliiie~******

  • Et1sures activ~tforl of rumor control acti~ities for response to questions from**;.*

the generaj public.

  • Monitor thi public/media inquiry calls ru1cl traclc trc:nds.
        • . The Press Release Writer reports to t1ie JIC Manager ~d ge11Crates press re1~s as *

>directed by the JIC .Manager.

Revision74

  • 12/15
  • I

GG FSAR TEXT DELETED 5 -18 Revision 71 06/ 14

GG FSAR 5.5 Recovery Organization Recovery after an emergency condition is handled by the Emergency Organizations. The EOF Emergency ~irector and Emergency Plant Manager may relieve personnel of t~eir emergency duties and return them to their normal responsibilities, retaining such personnel as necessary to staff a recovery organization.

The recovery organization depends upon the nature of the emergency and the situation which exists after the emergency. Specific organization structure and staffing is the responsibility of the Site Vice President at the time the recovery organization is instituted. Authority and responsibility of individuals who fill key positions in the recovery organization are the same as that held in the respective emergency organizations.

5-19 Revision 61 03/09 j

GG FSAR 5.6 Local Services Support The potential nature of some emergencies may warrant the utilization of offsite individuals, organizations, and agencies. As a result, local support service arrangements have been made with offsite groups to provide aid in the event of an emergency situation, including hostile ac;tion situations, at Grand Gulf. Support services encompass such things as medical assistance, fire control, evacuation, ambulance services, and law enforcement. Since it is imperative that the availability of these support agencies be on short notice, written agreements have been entered into with the organizations. The agencies, in the Letters of Agreement, have outlined their responsibilities, assuring their response to a call for aid. Copies of the appropriate Letters of Agreement have been included in Appendix D. The local services support groups are described in the foll<>wing subsections.

5.6.1 Medical Support In certain instances, medical emergencies may require the transport of an injured person from the Station to an offsite medical facility. Transportation of injured persons to the medical facility is normally provided by the regional ambulance service. In the event that these services are unavailable, provisions are in place to transport injured persons in company owned or private ve~cles. Ambulances are equipped with radios to maintain communications with the hospital. The primary medical facility for injured personnel, with or without contamination, is the Patient's Choice Medical Center located in Port Gibson approximately six miles from the plant site. This hospital has agreed to accept injured personnel and/or victims of radiation-related accidents for emergency medical and surgical treatment and observation. 'River Region Medical Center has agreed to serve as a back-up with the same emergency medical capabilities as Patient's Choice Medical Center.

5-20 Revision 71 06 /14

GG FSAR Hospital emergency kits for treatment of contaminated personnel are maintained at these faci I ities.

If medical treatment of the injured and/or contaminated personnel requires assistance or medical expertise beyond the capabilities of the local facilities, the patients would be transferred to a support hospital. GGNS has an agreement with The Ochsner Clinic to 1

provide hospital and medical services for injured/ contaminated or overexposed personnel.

5.6.2 Fire Support' When it is determined by emergency management personnel that offsite fire support is needed, the Claiborne County Fire Department, located approximately six miles from the plant and available 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day, is alerted.

Notification of a need, for offsite fire fighting assistance is made by means of a telephone call.

The Claiborne County Fire Department has an informal aid pact with the Port Gibson Fire Department. These two fire fighting groups have agreed, upon request, to furnish each other with fire fighting personnel, resources, and facilities and to render such fire protection services which may be necessary to suppress any fire or disaster which goes beyond the control of either of the agencies. In all cases where additional fire support groups would be .

brought in to assist at the Station, the Claiborne County Fire Department Fire Chief directs all offsite fire fighting personnel, while the GGNS Emergency Director retains overall responsibility for onsite emergency response. In instances where offsite fire fighting assistance is needed to fight a fire involving radioactive materials, radiological information and assistance is provided by knowledgeable members of the Emergency Organization.

5-21 Revision 64 11/10

GG FSAR 5.6.3 Law Enforcement Agencies The nature of a radiological emergency at the Grand Gulf Nuclear Station may require that the local law enforcement agencies be activated to assist in the emergency effort. Because it is essential that they be available during certain emergency situations, the Claiborne County Sheriff's Department and the Port Gibson Police Department have agreed to provide the following emergency support:

a. Controlling matters of civil disorder within Claiborne County (provided by Sheriffs Department) and within the city limits *of Port Gibson (provided by Sheriffs Department and Port Gibson Police Department)

.b. Communications

c. Furnishing personnel and equipment in accordance with Security Plans.
d. Controlling access to areas affected by the emergency
e. Directing area evacuation.
5. 7 Coordination with Governmental Agencies The close coordination between the local, State, and Grand Gulf Nuclear Station Emergency Plans serves to better ensure the safety and health of the general public. It also enables all emergency organizations to participate in the emergency effort with a minimum of confusion and hesitation. All participating agencies must have a clear picture of their responsibilities during an emergency effort, including hostile actions, which is provided for in their respective emergency plans arid procedures.

Figure 5-5 depicts the interrelationships among some of the various state and federal organizations which may respond to an emergency at GGNS. The Federal Response Management Organization is shown in Figure 5-6.

5-22 Revision 71 06/ 14

GG FSAR

5. 7 .1 Mississippi Emergency Management Agencv (MEMA) and Mississippi State Department of Health/Division of Radiological Health (DRH)

The Mississippi Emergency Management Agency is the designated* State authority and as such, has the responsibility for the general planning and coordination of the State of Mississippi's response to nuclear plant accidents as detailed in the "Mississippi Radiological Emergency Preparedness Plan, Volume III, to the Mississippi Comprehensive Emergency Management Plan". Some of the functions ofMEMA are (1) development and maintenance of State Plans and Procedures, (2) operation of the State Emergency Operation Center (BOC), (3) notification and warning in coordination with the Mississippi Highway Safety Patrol and the operators of fixed nuclear facilities, (4) communications, (5) assist local govemm~nts in the development and maintenance of plans and procedures, (6) public information, (7) training, (8) providing personnel for the Radiological Emergency Response Teams and (9} providing continuity of technical, administrative, and material resources. A letter (see Appendix D) from the Governor of Mississippi which implements the Mississippi Radiological Emergency Plan is a commitment from all state agencies to perform their functions delineated in the State plan as required by Mississippi law.

The Mississippi State Department of Health/Division of Radiological Health is charged with the responsibility to protect the public health and safety of the general populace from the hazards of radiation. With respect to radiological hazards resulting from incidents involving fixed nuclear facilities, the :functions of DRH include (1) act as lead agency for technical response, (2) accident assessment, (3) provide personnel and equipment for the Radiological Emergency Response Team, (4) advise State and local officials on implementation of protective actions based on accident assessment, (5) establish radiological exposure controls, (6) access/egress and reentry criteria, (7) Laboratory services, (8) coordinate offsite decontamination activities.

5-23 Revision 61 03/09 I

GG FSAR 5.7.2 Louisiana Department of Environmental Quality (LDEO) and Governor's Office of Homeland Security and Emergency Preparedness (GOHSEP)

The Secretary of the Louisiana Department of Environmental_ Quality under Act 97 of 1983 (L.R.S. 30:2001 et. ~~q.), also known as the Louisiana Environmental Quality Act, and specifically L.R.S. 30:2109, has the authority to develop and implement a statewide radiological emergency preparedness plan and coordinate the development of specific emergency plans for nuclear power facilities, including planned protective action for the population and the establishment of appropriate boundaries for which planning for nuclear emergencies is undertaken; to respond to any emergency which involves possible or actual release of radioactive material; to coordinate offsite decontamination efforts; to issue relocation and evacuation recommendations; and to otherwise protect the public welfare and safety in any ~anner deemed necessary and appropriate. As a result, the "Louisiana Peacetime Radiological Response Plan," which includes Attachment 2 for the Grand Gulf Nuclear Station, has been developed. Federal, State and local agencies are notified as required to provide assistance in evaluating the radiological hazard and providing implementation of appropriate protective actions in accordance with this plan. The Secretary of the LDEQ or his designee is responsible for notifying the public that a radiological incident has occurred and for providing an evaluation of the incident in terms of public health. If protective actions are indicated, specific guidance can be provided and the information released.

The Governor's Office of Homeland Security and Emergency Preparedness (GOHSEP) is responsible for coordinating all emergency actions of the various State and local agencies in the event that evacuation is necessary. Local law enforcement agencies, rescue squads, medical facilities and other parish and municipal agencies provide assistance pursuant to their agreements with local civil defense organizations as delineated in the local civil defense plans. The GOHSEP immediately notifies LDEQ in the event of a radiological emergency.

A letter (see Appendix D) from the Governor of Louisiana to implement the Louisiana Peacetime Radiological Response Plan is a commitment from all State agencies to perform their functions as delineated in the State plan as required by Louisiana.law.

5-24 Revision 61 03 / 09 I

GG FSAR

5. 7.3 Port Gibson/Claiborne County Civil Defense The Port Gibson/Claiborne County Civil Defense Director is the designated County authority and as such, has executive authority and responsibility for.the planning and coordination of the County's emergency response. The Dire'ctor has delegated responsibilities and tasks to the local support agencies and has established operating procedures to implement the "Port Gibson/Claiborne County - Radiological Emergency Preparedness Plan." Upon notification of a major emergency at the Grand Gulf Nuclear Station, the Civil Defense Director, as a primary duty, provides direction within the County boundaries. This duty includes, if required, the coordination with other agencies to inform the pubHc in affected portions of the County to take protective actions.

The Port Gibson/Claiborne County Civil Defense Director is responsible for activation of the Claiborne County Emergency Operations Center (EOC).

5.7.4 Tensas Parish Office of Homeland Security and Emergency Preparedness The President of the Tensas Parish Police Jury as the Chief Executive of Tensas Parish is respon~ible by law for emergency preparedness operations. The Emergency Preparedness I

Coordinator acts as his Chief.of Staff and ensures continuity of resources for sustained emergency operations. The Emergency Preparedness Coordinator is responsible for initiating the manning of the Tensas Parish Emergency Operations Center and for coordinating the involved agencies during the course of the radiological emergency as detailed in the "Tensas Parish Radiological Emergency Implementing Plan for Grand Gulf Nuclear Station."

5-25 Revision 61 03/09 I

GG FSAR 5.7.5 Nuclear Regulatory Commission (NRC)

The United States Nuclear Regulatory Commission, Region IV, dispatches* an Initial Response. Site Team (IRST}to GGNS upon declaration of a Site Area Emergency or General Emergency and may dispatch t~e team upon declaration of an Alert. Members of the team are assigned to the TSC, EOF and ENMC. Primary functions of the IRST are:

a. Oversee licensed activities to ensure a reasonable effort is being made to mitigate the accident.
b. Evaluate protective actions taking place and make an independent evaluation of recommended protective actions.
c. Evaluate direction being given to reactor operators to bring the plant to a stable condition, and
d. Oversee GGNS's ability to provide information to the news media and the public concerning information about the status of the plant and the offsite consequences.

The IRST has the capability to arrive at GGNS in approximately 4 - 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. Once notified, the plant shall maintain an open continuous communication channel with the NRC Operations Center via the NRC Emergency Notification System until terminated by the NRC Operations Center. The NRC Operations Center can be activated within 15 - 30 minutes during normal working hours and within 1 - 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> after normal working hours.

5-26 Revision 61 03 / 09 I

GG FSAR 5.7.6 Department ofEnergy (DOE)

\

The Department of Energy assists during an emergency by providing monitoring assistance through their Radiological Assistance Plan (RAP) and Interagency Radiological Assistance

  • Plan (IRAP) when requested in support of state and local monitoring operations. In addition, the Emergency Director may also request this assistance. Some of the specialized equipment I*

and services that DOE can provide are: alpha detection equipment, low energy gamma detectors and special aircraft monitoring. The Department of Energy can also assist in the radiation monitoring of food, water, livestock, and agricultural products. When deemed necessary, the DOE makes available special aerial radiological surveys and meteorological services. The estimated arrival time to the GGNS area for the DOE Region III Oak Ridge Operations team is 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

5.7.7 Institute ofNuclear Power Operations (INPO)

The Institute of Nuclear Power Operations provides emergency response as requested by GGNS. INPO can provide assistance in the following areas:

a. Location of sources of emergency manpower and equipment
b. Analysis of the operational aspects of the event
c. Organization of industry experts who could advise GGNS on technical matters.
d. INPO may be contacted by means of its 24-hour telephone number in the event

\

of a radiological emergency at GGNS.

5.7.8 U.S. Coast Guard.

The U.S. Coast Guard has jurisdiction over the traffic on the Mississippi River. Upon notification by the Mississippi State Emergency Management Agency of an emergency requiring traffic exclusion, the Captain of the Port exercise~ his authority to control marine traffic through the establishment of a safety zone in the immediate area.

5-27 Revision 68 08 / 12

GG FSAR

5. 8 Contractor Assistance Supplier), to provide both routine and GGNS has made provisions with General Electric (NSSS with GE Services Letter GE-SIL-324.

emergency technical assistance and support in accordance 5.9 Support for Federal Response nding NRC personnel within the Office and communications facilities are provided for respo the EOF. Additional State and TSC, EOF, and JIC, and for responding DOE personnel within al response, such as air fields, County (Parish) resources available to support the Feder ilities are described in Grand Gulf emergency operations centers, and communications capab Nuclear Station Supporting Emergency Response Plans.

5-28 Revision 70 11/13

GG FSAR TABLE 5-1 SHIFT STAFFING AND AUGMENTATION CAPABILITIES Major Position Title On Capability for Additions Functional Area Emergency Tasks or Expertise Location Shift (e) 90 Min(h)

Plant Operations and Emergency Direction and Control (f) Shift Manager (SRO) CR I -

Assessment of Emergency Director CR/EOF -

-- l(g)

Operational Aspects Control Room Supervisor (SRO) , CR I --

Nuclear Operator A (RO) CR 3(i) -

Auxiliary Operator (AO) CR 3 --

Firefighting, firefighting communications Shift Personnel (Operations) CR S(a) Provided by Claiborne County I Port Gibson Technical Support and Core/Thennal Hydraulics(d) Shift Technical Advisor CR l(c) --

, Coreffhennal Hydraulics Reactor Engineers/SRO/STA TSC/CR -- l(g)

Notification/, Offsite Notifications (State, Local, Federal) and Communicator CR/EOF 2 2(g)

Communication maintain communications, Notification of Plant On-Call emergency personnel Radiological Accident EOF Direction and Control

  • Senior Management EOF -- I

~sessment and Support of Operational Offsite Dose Assessment Radiological Assessment CR/EOF l(a) l(g)

!Accident Assessment Chemistry/Radio-Chemistry Chemist osc 1 1 Plant System Technical Support Electrical TSC/OSC -- 1 Engineering Mechanical TSC/OSC -- l*

!Repair and Corrective Mechanical Maintenance osc l(a) 2

!Actions Radwaste Operator osc l(a) I Electrical Maintenance/ I&C Maintenance osc 2 --

Electrical Maintenance osc -- 2 I&C Maintenance osc -- I 5-29 Revision 71 05 / 14

GG FSAR TABLE 5-1 SHIFT STAFFING AND AUGMENTATION CAPABILITIES Major Position Title On Capability for Additions Functional Area Emergency Tasks or Expertise Location Shift (e) 90 Min(h)

Radiation Protection -Access Control Health Physicist EOF/OSC 2 ll(b)

-HP coverage for repair, corrective actions, search and rescue/first-aid, and firefighting

-Personnel monitoring

-Dosimetry

-Surveys (offsite, onsite, and in-plant surveys on as needed basis only)

Rescue I First aid Rescue and First Aid osc 2(a) Provided by Claiborne County I Port Gibson Security Security, personnel accountability Security Personnel (See Security Plan)

Notes:

(a) May be provided by Shift Personnel assigned other duties.

(b) Must be trained for the Emergency Task being performed.

(c) STA staffing in accordance with GGNS Technical Specification.

(d) Core/Thermal Hydraulics is part of normal STA duties as listed in the Updated Final Safety Analysis Report and Technical Specifications.

(e) These ERO positions may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absences, provided action is taken to fill the required position.

This allowance is not applicable during declared emergencies.

(f) Overall directiop. of facility response is assumed from the Shift Manager (SRO) by the Emergency Director. Upon relief, the Shift Manager (SRO) resumes plant operational duties.

(g) These personnel will report and augment shift personnel as soon as possible without delay but no later than 75 minutes.

(h) If personnel are onsite they will report and augment the onshift personnel as soon as possible without delay, but no later than 45 minutes. Offsite personnel will report to their assigned facility as soon as possible without delay, but no later than 90 minutes.

(i) The role of the third RO may be :fulfilled using an AO as allowed by TRM based upon GGNS on-shift staffing analysis.

5-30 Revision 69 11 / 12

GG FSAR FIGURE DELETED FIGURE 5-1 5-31 Revision 61 03 / 09 I

GG FSAR NORMAL STATION ORGANIZATION SITE VICE PRESIDENT DIRECTOR, DIRECTOR, GENERAL MANAGER, EXECUTIVE ENGINEERING REGULATORY & PLANT OPERATIONS ASSISTANCE, SITE VP PERFORMANCE IMPROVEMENT MANAGER, t-*-*-*-*-*-*-*-*-- ------------------ ------------------ ----

DESIGN & MANAGER, PROGRAM PERFORMANCE MANAGER, MANAGER, MANAGER, MANAGER, MANAGER MANAGER, ENGINEERING IMPROVEMENT RADIATION PRODUCTION SITE OfERATIONS CHEMISTRY MAINTENANCE PROJECTS& PROTECTION MANAGER, MAINT REGULATORY SERVICES MANAGER COORDINATOR I SUPERVISOR, DPIC, ASSURANCE OUTAGE ALARA/ MAINTENANCE TECH.SUPPORT MANAGER, SUPERVISOR, EMERGENCY PLANNING SUPERINTENDENT, ASSISTANT MANAGER, ASSISTANT MANAGER, SUPERINTENDENT, PLANNING ,RP OPS l&C OPERATIONS SHIFT OPS SUPPORT SENIOR ADMIN SUPT., ONLINE ASSISTANT, MANAGER, SUPERVISOR MAINT SUPERINTENDENT, SITE ENG SECURITY RP SUPPORT SCHEDULING MECHANICAL WORK OPERATORS CONTROL MANAGER, SUPERINTENDENT, TRAINING ELECTRICAL SUPERVISOR, REACTOR SUPERINTENDENT, ENGINEERING FIN TEAM SUPT., OPS TRAINING MANAGER, SUPT., MATERIALS MAINTENANCE PURCHASING

&TECHNICAL & CONTRACTS -

TRAINING SUPERVISOR, SUPT., PROCUREMENT SIMULATOR&

TRAINING SUPERVISOR, SUPPORT MATERIALS MATERIAL, PROJECTS COORDINATOR SUPERVISOR, -

  • _ . - line of communication STORES - - - - - line of responsibility FIGURE 5-2 5- 32 Revision 70 11/13

GG A FSAR (Figure 5-4)

EMERGENCY ORGANIZATION EMERGENCY PLANT MANAGER -

RESIDES: TSC TSC COMMUNICATOR RESIDES: TSC I

SECURITY SHIFT I

SHIFT MANAGER I ~

SECURITY COORDINATOR OSCMANAGER I

SUPERVISOR TSCMANAGER RESIDES: CONTROL ROOM RESIDES: INCIDENT COMMAND RESIDES: OSC RESIDES: CENTRALALARM RESIDES: TSC STATION POST I

I I MAINTENANCE COORDINATOR RADIOLOGICAL COORDINATOR SHIFT TECHNICAL ADVISOR CONTROL ROOM SUPERVISOR LOG KEEPER - OSC RESIDES: TSC RESIDES: CONTROL ROOM RESIDES: TSC RESIDES: CONTROL ROOM RESIDES: OSC OPERATIONS COORDINATOR CONTROL ROOM OPERATOR TSC COMMUNICATOR

- RESIDES: CR WORK CONTROL COORDINATOR RESIDES: CONTROL ROOM RESIDES: TSC - RESIDES: OSC PLANT OPERATORS RESIDES: IN PLANT ENGINEERING COORDINATOR

......._ ENS COMMUNICATOR RESIDES: TSC I

1- RADCHEM COORDINATOR RESIDES: TSC RESIDES: OSC FIRE BRIGADE RESIDES: IN PLANT I

lI .- I REACTOR ENGINEER MECH. ENGINEER ELECT./ I & C ENG.

RESIDES: TSC RESIDES: TSC RESIDES: TSC FIGURE 5-3 5-33 Revision 70 11/13

GG FSAR EMERGENCY ORGANIZATION GG 'IESD~: E.OF FSAR EMERGENCY ORGANIZATION A

(Figure 5*3)

I I I

..-~i:a.oocr..~~"""'

a:iY~r~rU!t 1)7.liA!l."'.l!Sill'I mal'lr.fi:O.* l:IF I

I 1ECl-l'4~;;t,,. l>:lYOO!:: ,.IC, .U.lll>Gel';

RE.Ei:)E9 *.jlC l'E61lll:S: J~

.',:l'Al'U,1'.'IATin't A

~ooum;-:r. CD:'Ar..'l..,..TCR OF='lSITE TEN., CO'"..f<O.

WO:!:I. EOf I I I I Pll!i.r;: ltil'.~.tATl,.tf 1141!,lt'.'A,; ltiUl<°!'Nl::ll'IR~!:,: Ptt~~ ti!~.. l:C!~!: *..Dq-.<:=f'EA-~t:

J ,;-_..-:n11r.O,.>.ll.':ff .,...nrrr:n*

- H!::i3lll:S: 1:U!' 'IE90:3.. JIC I

11\UP.'!" IIESl't"NS:

rp.*J.

L:.11£l OffSllE>"1',iSO't RfEl:)E3. ,JC

- Rr5!)1ir.: !ilr-I iol'::'J'IT; 11:.1.Y."..i.i,1

'IE31'.lE.a E0:1 FIGURE 5-4 5-34 Revision 71 06 / 14

FSAR INTERRELATIONSHIPS OF EMERGENCY RESPONSE ORGRANIZATION (NRC)

CONTROL ROOM (NRC).

OPERATIONS TECHNICAL SUPPORT CENTER


1 1.......

I SUPPORT CEMIER ON SITE

ENTERGY i OFFSITE i OPERATIONS i

..........cEc ..........

FEDERAL SUPPORT (NRG) oNRC oFEMA FEMA SUPPORT GGNS ENTERGY OPERATIONS L.........................i GGNS/AGENCY AGENCY SUPPORT FIGURE 5-5 5-35 Revision 61 03/09 I

GG FSAR FEDERAL RESPONSE MANAGEMENT DIAGRAM GOVERNOR OR DESIGNATED REPRESENTATIVE NRC/FEMA JOINT COORDINATION FEDERAL TECHNICAL SUPPORT FEDERAL NON-TECHNICAL SUPPORT NRC FEMA COORDINATES COORDINATES NON-TECHNICAL TECHNICAl. ASPECTS ASPECTS OF OF FEDERAL RESPONSE FEDERAL RESPONSE NCS DOD DOC USDA OHHS FEMA EPA DOT DOE COORDINATES FEDERAL OFFS!TE RADIOLOGICAL UTILITY MONITORING SOURCE: FEDERAL REGISTER: 45FR84911 NRCI EPA DHHS DOC DOE DOD USDA UTILITY FIGURE5-6 5-36 Revision 61 03/09 I

GG FSAR 6.0 EMERGENCY MEASURES 6.1 Initiating Emergency Measures Emergency measures must be taken in response to an emergency condition. Upon recognizing and officially declaring that one of the four classes of emergencies exists, the emergency

  • organization is activated. Once activation has taken place, assessments of the condition are made, corrective and protective actions are taken and aid to affected persons is administered as required.

6.1.1 Emergency Suspension of Normal Quality Assurance Procedures and Administrative Controls, License Conditions, and Technical Specifications Should emergency circumstances require, reasonable actions that depart from normal Quality Assurance Procedures, Administrative Controls, License Conditions or Technical Specifications may be taken when this action is immediately needed to protect the public health and safety. These action may only be taken if no action consistent with normal Quality Assurance Procedures, Administrative Controls, License Conditions and Technical Specifications that can provide adequate or equivalent protection is immediately apparent.

At a minimum, approval by a licensed senior reactor operator is required before any such action may be taken.

6.1.2 Suspension of Normal Emergency Actions for Security Emergencies The Emergency Director and Emergency Plant Manager, upon the Emergency Director's evaluating and classifying a security emergency into any of the four emergency classifications discussed in 4.0, should only activate those personnel and facilities necessary to mitigate the emergency situation. This is the only exception to the personnel and facility activations described in the Plan and related implementing procedures; it is permitted because of the potential risk to personnel which a security emergency may present.

6-1 Revision 61 03/09

GG FSAR 6.2 Activation of Emergency Organization The initial step in declaring an emergency is to recognize that an unusual condition exists or has the potential for existing. The Emergency Action Levels, as specified in Section 4.0, provide the criteria for determining when an abnormal situation exists that requires the declaration of an emergency and the subsequent activation of the applicable portions of the Emergency Organization.

6.2.1 Control Room Operators Normally, initial recognition of conditions requiring emergency actions occurs in the Control Room. Sometimes these conditions are signaled by alarms or instrument readings.

If control room operators, or any other shift personnel, recognize an unusual condition or occurrence, it is their responsibility to immediately notify-the Shift Manager.

6.2.2 Shift Manager Upon notification of a

  • real or potential emergency conditic;m, the Shift Manager is responsible for determining whether or not the declaration of an emergency is required. If it

)

is, he is then responsible for the activation of the Plan and assuming the role of Emergency Director. If a specific action level has been reached or exceeded, he declares the appropriate emergency classification.

The Shift Manager takes the following actions to ensure the safety of plant personnel and the general public and the safe operation of the plant.

1. Classify the emergency and make the required notifications
2. Perform assessment actions

/

3. Perform any other emergency actions as appropriate.

6-2 Revision 43 10/ 00

GG FSAR 6.2.3 Shift Technical Advisor The Shift Technical Advisor advises and assists the Shift Manager on matters pertaining to I the safe operation of the plant.

6.2.4 Emergency Director The Plan is activated with the declaration of an emergency. The Shift Manager continues as the Emergency Director until properly relieved by the EOF Emergency Director. The Emergency Director shall ensure that notification is initiated within 15 minutes of an emergency declaration.

\

Primary Secondary

1. (a) Mississippi Emergency Management Agency (b) Mississippi Hwy Patrol
2. (a) Governor's Office of Homeland Security and (b) Louisiana Dept. of Envir. Quality Emergency Preparedness
3. (a) Claiborne County Sheriffs Dept (b) Claiborne County Civil Defense
4. (a) Tensas Parish Sheriffs Dept .

An example of the form that is used for Emergency Notification is shown in Figure 6-2 and included as part of the Emergency Preparedness Forms Control Process. Copies of this notification form are available in th~ appropriate emergency centers. The phone number is included on the form so states may call back to verify the authenticity of the accident.

In accordance with 10CFR50.72 the NRC Operations Center shall be notified by telephone immediately after notification of the appropriate state and local agencies and not later than one hour after the declaration of one of the Emergency Classes.

Upon arrival in the EOF, the EOF Emergency Director assumes the position of Emergency Director in accordance with Emergency Plan Procedures.

6-3 Revision 75 3/17

GG FSAR The Emergency Directpr evaluates th~ accident conditions and verifies that the correct emergency classification has been declared. He then activates the appropriate portions of the I

Emergency Organizations if that has not already been done by the Shift Manager. In any case, the Emergency Plant Manager is notified.

If an Unusual Event has been declared, those members of the operating shift needed to handle the emergency are activated. If the Emergency Director feels there is a reasonable possibility of escalation of the emergency to a higher classification, applicable portions of the Emergency Organization are activated.

If an Alert, Site Area Emergency or General Emergency has been declared, the entire Emergency Organization is activated.

6.3 Assessment Actions Continuous assessment throughout the course of an emergency. is necessary to effectively coordinate and direct the elements of the Emergency Organization. The initial assessment actions are dictated, ip part, by the Emergency Action Level that has been reached or exceeded.

6.3.1 Assessment Actions During Unusual Events An Unusual Event condition requires basic emergency assessments. Attention must be paid to parameters that may indicate a possible worsening of conditions, (i.e. radioactive releases).

6-4 Revision 61 03 / 09

GG FSAR 6.3 .2 Assessment Actions During Alerts The existence of an Alert condition requires the following assessment actions as applicable.

a. Increased surveillance of applicable in-plant instrumentation..
b. Visual observation of the affected plant area.
c. Onsite and offsite radiological monitoring if a radioactive release has taken place or is suspected.
d. Determination of offsite doses if applicable.

6.3.3 Assessment Actions During Site Area Emergencies I

In the event of a Site Area Emergency, assessment activities are more extensive than for an Alert. In addition to the activities that would be carried out during an Alert, the following activities would be performed as appropriate:

a. Monitor Meteorological data.
b. Dispatch radiological monitoring teams to offsite locations downwind of a release in conjunction with state radiological monitoring efforts.
c. Assess Offsite radioiodine thyroid doses.
d. Assess Offsite whole body dose.

6.3.4 Assessment Actions During General Emergencies In the event of a General Emergency, all assessment activities described for a Site Area Emergency will be conducted. Assessment of onsite and offsite exposures are performed regularly to determine if and when site or public sheltering and evacuations may be required; and the results, including methods and assumptions, are communicated to offsite officials.

6-5 Revision 43 10/00

GG FSAR 6.4 Corrective Actions Corrective Actions are performed by plant personnel who are technically trained and capable of implementing the station's Plan and procedures.

6.5 Protective Actions The protective actions to be implemented onsite are the responsibility of GGNS, while the States of Mississippi and Louisiana and the counties within the 10-mile EPZ are responsible for providing offsite protective actions. The states are specifically responsible for protective actions for the 50-mile ingestion pathway EPZ. A range of protective actions to protect onsite personnel during hostile action is provided to ensure the continued ability to safely shut down the reactor and perform the functions of the emergency plan 6.5.1 Protective Cover, Evacuation, Personnel Accountability

a. Grand Gulf Nuclear Station
1. When an Alert, Site Area Emergency or General Emergency is declared, all personnel in the protected area are advised of the emergency classification by use of the public address system. If a site evacuation is
  • ordered, the evacuation siren is sounded over the public address system in the protected area followed by an evacuation announcement and any special instructions. Non-essential personnel will evacuate immediately upon being notified.
2. Emergency personnel not assigned to the Control Room, Technical Support. Center, Central Alarm Station, and Secondary Alarm Station, report to the Operations Support Center for accountability. Non-emergency personnel are accounted for as they exit the protected area through Security Island. GGNS Security is responsible for performing an accountability survey of personnel in the protected area.. It is anticipated that accountability and identification of missing persons can 6-6 Revision 70 11 / 13

GG FSAR be accomplished in approximately 30 minutes. This infonnation is reported to the Emergency Plant Manager.

3. GGNS employees, contract personnel and visitors outside of the Protected Area, but within the Emergency Preparedness Owner Controlled Area are notified promptly of a site evacuation and given instructions by public address systems, telephone or security personnel equipped with portable PA systems. Non-essential personnel will evacuate immediately upon being notified. GGNS Security checks to ensure that all persons located in the Emergency Preparedness Owner Controlled Area were notified and evacuated as directed, and report the results to the Emergency Plant Manager. Security will complete the checks as soon as possible but not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> under most conditions.
4. Persons outside the Emergency Preparedness Owner Controlled Area, but in public access areas or passing through the site are notified of an emergency classification by the Alert Notification System activated by local authorities.
5. All site personnel are trained on site evacuation routes, escorted by someone who has been trained or receive a map which gives instructions and routes off .of the site. Site evacuation instructions and routes are specified in the evacuation announcement. Non-essential personnel are expected to evacuate GGNS property in the same vehicles which were used for initial access.
6. Emergency situations, as discussed in this section, include natural events as well as radiological incidents. The procedures to be followed in these evacuations are included in the Emergency Plan Procedures. Provisions are made for consideration of weather conditions, traffic or radiological impediments to evacuation.

6-7 Revision 61 03 / 09

GG FSAR

b. Offsite Areas The administration of protective actions for persons residing offsite is the responsibility of the States of Mississippi and Louisiana. Mississippi's responsibility is outlined in the "Mississippi Emergency Operations Plan" and Louisiana's responsibility is outlined in the "Louisiana Peacetime Radiological Response Plan." These plans are implemented in addition to the county or parish emergency plans. The county and parish within the 10-mile EPZ surrounding the Station are responsible for developing and submitting emergency plans which are coordinated with those of the States and Station. GGNS provides protective action recommendations to the state/local civil defense agencies. The minimum standard PAR for a General Emergency is to evacuate the 2 mile radius and 5 miles downwind, monitor and prepare the remainder of the 10 mile EPZ, and consideration of the use of potassium iodide in accordance with State Plans. (Source: NUREG 0654 FEMA

)

Rep 1, Rev 1, Supplement 3 "Guidance for Protective Action Strategies".) Evacuation will be recommended for 5 - 10 miles in the down wind sectors, if dose projections or actual field measurements correspond to radiation levels to the public that exceed the EPA Protective Action Guides (PAG's). Sheltering may be recommended instead of evacuation when appropriate. Recommendations are based upon emergency classification and projected dose to the public, and are consistent with EPA PAGs and FDA guidance. The Protective Actions Guides are summarized in Table 6-1. The methodology normally used for determining appropriate protective action recommendations is described in the Emergency Plan Procedures. Warning and/or advising the population-at-risk of an impending emergency is the responsibility of the counties or parishes affected. These counties 1or parishes are also responsible for the preparation and dissemination of informational material concerning protective actions for the general public. Written messages for emergency dissemination to the public have been prepared by the State of MississiJ?pi with supporting information provided by GGNS. These prepared messages are documented in the Mississippi Emergency Operations Plan, Volume II, Part 3, Radiological Emergency Response Plan, 6-8 ' Revision 72 11/14

GG FSAR Appendix 1 to Annex G - Public Information. Figure 2-5 shows the evacuation centers within the 50-mile EPZ.

I 6.6

  • Contamination Control Measures A monitoring and decontamination station is established at the Emergency Operations Facility (EOF) when directed by the Emergency Director. Emergency Organization personnel perform monitoring and decontamination in accordance with plant procedures.

When a site evacuation is ord,ered, non-essential personnel will be routed, as necessary, to evacuation/decontamination centers established by the state/local governments.

Onsite contamination control measures are implemented in Plant Aoministrative Procedures and other lower

)

level procedures. Plant procedures are designed to meet the requirements of 10CFR20, Appendix B.

Contamination control for offsite areas is provided for by the States of Mississippi and Louisiana. Guidelines are provided through the emergency response plans of those two states.

6. 7 Aid to Affected Personnel This section of the plan describes measures which are used to provide necessary assistance if individuals are injured and/or radiologically exposed or contaminated.

l 6.7.1 Emergency Personnel Exposure Although ~n emergency situation transcends the normal requirements for limiting exposure, there are suggested levels of exposure acceptable in emergencies.

, Three categories of risk versus benefit must be considered:

\

a. Saving of human life and reduction of injury
b. Protection of health and safety of the public and
c. Protection of property 6-9 Revision 61 03 / 09 I

GG FSAR In certain emergency situations, the acceptance of above normal radiation exposure may be warranted.

The following are exposure guidelines for individuals inclusive of support personnel and Entergy employees:

a. Support personnel are restricted to GGNS administrative limits and are equipped with appropriate dosimetry. In situations where it appears that the administrative limits may be exceeded, the individuals are relieved of duties involving additional radiation exposure.
b. Guidance for Emergency worker exposure is given-in the following table, which represents those extensions of GGNS administrative exposure limits for which authorization, by the Emergency Director or Emergency Plant Manager, is required prior to the exposure being received:

Guidance on Dose Limits for Workers Performing Emergency Services DOSE LIMITS ACTIVITY CONDITIONS (TEDE)

I

> 5 up to 10 Rem Protecting Valuable Property Lower dose not practicable

> 10upto25 Rem Life saving or Protection of large Lower dose not practicable populations

>25 Rem Life saving or Protection oflarge Only on a voluntary basis to populations persons fully aware of the risks involved Source: EPA 400-R-92-001 "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents" Table 2-2 6-10 Revision 61 03 / 09 I

GG FSAR Provisions have been made for 24-hour-per-day capability to determine the doses received by emergency personnel. Specific emergency procedures have been written for the issuance of permanent record dosimetry devices (or systems) and self reading dosimeters to emergency personnel. These procedures also provide instructions on how often to read dosimeters and keeping appropriate dose records.

The Emergency Director or Emergency Plant Manager may also authorize the use of I

radioprotective drugs for thyroid protection. Emergency personnel would take a pre-measured dose of the drug (such as KI tablets). These drugs are made available in the Control Room, Operations Support Center, Technical Support Center, Emergency Operations Facility, and the RCA entrance.

6. 7.2 Decontamination and First Aid Onsite personnel decontamination stations for emergency conditions are fully equipped with decontamination material and portable first aid kits. The primary decontamination center is locijted on the 133 foot level of the Unit II Turbine Building in the Radiation Protection Access Control Area. Alternate facilities are the showers in the Maintenance Shop (adjacent to the Administration Building) or EOF. The decontamination centers have provisions for disrobing, collecting contaminated clothing, showering of contaminated personnel, and clean clothing.

All personnel exiting from the controlled access area at Grand Gulf are monitored for contamination. The instruments used for this monitoring procedure are portal monitors and portable contamination survey instruments.

In situations when the portal monitors and/or the portable contamination survey instruments detect contamination, preventive measures must be initiated to mitigate the possibility of the spread of contamination.

6-11 Revision 65 04/11

GG FSAR The most effective measure .for the decontamination of the hands and other parts of the body is thorough washing of the affected areas. A member of the. Health Physics Section is

. to supervise ahy decontamination effort.

First Aid Courses are conducted for selected members of the Emergency Organization.

Personnel trained in first aid/CPR are available on each shift to administer first aid as required.

6. 7 .3 Medicaer~~nsportatio~

Transportation of injured persons from GGNS to the medical facility is normally provided by regional ambulance service in accordance with Letter(s) of Agreement (See Appendix D). In the event that these services are unavailable, provisions are in place to transport injured persons in company owned or private vehicles. Ambulance service can be requested by the local hospitals or GGNS. The ambulance maintains radio communications with the hospital while in transit. GGNS uses telephone communication to contact the hospital, thereby maintaining indirect communications with the ambulance.

6. 7.4 Medical Treatment In the event of a serious accident at Grand Gulf requiring medical treatment, Claiborne I County Medical Center has agreed to provide the required assistance. The hospital is equipped to handle contaminated injuries as well as injuries not related to contamination or over exposure. The River Region Medical Center and the Claiborne County Medical Center have emergency plans for the decontamination and treatment of the radioactively I

contaminated patient. Appendix B includes a list of typical equipment located at the hospitals.

6-12 Revision 75 3/17

GG FSAR River Region Medical Center and The Ochsner Clinic provide backup medical services if the Claiborne County Medical Center is unable to provide the required services. Letters of  !'

Agreement (Appendix D) have been obtaiqed to document these arrangements.

I 6-13 Revision 75 3/ 17

~-,,--.

GG FSAR TABLE 6-1

  • Protective Actions Guides for the Early Phase of a Nuclear Incident Projected Dose 1 Protective Action Recommendation or -

Classification

  • TEDE 1,000 to 5,000 mRem
  • Evacuation.
  • CDE (Thyroid) 5,000 to 25,000 mRem
  • Sheltering may be considered if benefit outweighs 'cost' of evacuation
  • SDE (Skin Dose) 50,000 to 250,000 mRem
  • Sheltering up to 10,000 mRem may be justified for special populatiqns
  • General Emergency Classification
  • Consider prophylactic use of potassium iodide in accordance with State Plans.

Note 1 - Dose that can be avoided if the protective action is implemented.

Source: 1) EPA 400-R-92-001 "Manual of Protective Action Guides and Protective Actions for Nuclear Incidents" Table 2.;;1

2) Food and Drug Administration Guidance, December 2001, "Potassium Iodide as a Thyroid Blocking Agent in Radiation Emergencies" 6-14 Revision 61 03/09

GG FSAR

)

FIGURE DELETED FIGURE 6-1 6

  • 15 Revision 26 6/94

GG FSAR Pag~ 1 of 1 Example of the GGNS Emergency Notification Form

  • Grand Gulf Emergency Notification Form
1. THIS IS GRAND GULF NUCLEAR STATION WITH MESSAGE NUMBER
2. Message was sent at _ _ _ from the Control Room at phone number
3. A(n) ______ has been Declared as of on _ _ _ _ due to _ _ __

EAL#----------

4. EAL

Description:

5. Recommended Protective Actions:. _ _ _ _ _ _ _ _ _ _ _ _ _ _ __
6. Reactor was *shutdown as of _ _ _ __ on _ _ __
7. Current Meteorological data is:

Wind Direction from _ degrees a t _ MPH Affected Sectors:

  • Stability C l a s s : - - - - - - - - - - - -

Precipitation:

\.

8. Current Release Conditions are as follows:

A RELEASE is occurring BELOW federally approved operating limits.

Release s~rted at _on __. Release stopped at _on __. Release duration was _ hours.

_,,. 9. Type of Release is as follows: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __

10. Release rates are as follows:

Noble gases Ci/sec - Iodines ___ Ci/sec

11. ESTIMATE OF PROJECTED OFF-SITE DOSE A. Projections for . hours based on Plant Data Dose Metric Site BoLinda 2 miles 5 miles 10 miles
12. Approved b y : - - - - - - - - - - - - - - - - - - - - -

FIGURE6-2 6-16 Revision 71 06/14

GG FSAR 7 .0 EMERGENCY RESPONSE FACILITIES AND EQUIPMENT 7.1 Facilities and Equipment and Equipment and Equipment Emergency planning requires the preinstallation of both facilities and equipment that allows the emergency organization to perfonn the following actions:

a. Assess the extent of the emergency
b. Perfonn the proper corrective actions to mitigate the effects of the emergency
c. Perfonn actions to protect onsite and offsite personnel
d. Provide infonnation to offsite support agencies
e. Perfonn the proper recovery actions Emergency facilities have been established by GGNS and offsite support agencies. Figure 7-1 identifies these facilities and their locations.

7.2 Control Room The Control Room contains those controls, instruments and communications equipment necessary for operation of the plant under both nonnal and emergency conditions. The ventilation system, shielding, and structural integrity are designed and built to pennit continuous occupancy during postulated accidents. During emergencies, the Control Room will provide for the classification, accident assessment, notification, and dose assessment functions if these functions are unavailable at the EOF or when being relocated to the Backup EOF.

7.3 Emergency Response Facilities 7.3.1 Technical Support Center (TSC)

The Technical Support Center (Figure 7-2) provides an area outside the Control Room that can accommodate management, engineering personnel and the NRC acting in support of the command and control function during emergency conditions and the emergency recovery operations. The TSC personnel primarily assist in accident assessment, provide 7-1 Revision 61 03 / 09

GG FSAR advice to the control room and communicate with Emergency Operations Facility (EOF) personnel regarding plant conditions and actions. Communications are also provided with the Control Room and OSC.

'J;he TSC area contains approximately 2,250 square feet. The TSC area i~. large enough .

to accommodate 25 people, including five NRC personnel, as well as furnishings, data displays, plant reference material, and communications equipment. The TSC is located

  • directly above and overlooking the Control Room on the mezzanine level (EL 177') of the control building. The control building .which houses the TSC is designed Safety Class
3. The control building structure is seismic Category I, and is designed to withstand tornadoes and extreme wind phenomena. The TSC is habitable to the same degree as the Control Room for all postulated accident conditions and is served by the Control Room ventilation system. The Backup TSC is located in the Maintenance & Engineering Building.

Emergency lighting is powered by the ESF AC buses, with backup emergency lighting provided by battery pack lighting units.

The TSC may be activated at any time, and shall be activated at 'an Alert, Site Area Emergency, or General Emergency. Once activated the TSC shall become operational as soon as possible (without delay) after declaration of any of these emergency classifications. When facility staffing can be accomplished with onsite personnel, it is the goal to become operational within 45 minutes. Otherwise offsite personnel shall provide shift augmentation in 75 minutes and be fully operational in 90 minutes.

A set of drawings and other records are accessible to the TSC personnel under emergency conditions. The documents include but are not l~ited to: Plant Technical Specifications, Plant Operating Procedures, Emergency Operating Procedures, and hard copies(stick file) 7-2 Revision 61 03/09

GG FSAR of P&ID's, architectural, electrical one lines, electrical schematics, logic diagrams, and loop diagrams. Radiation Control and Chemistry procedures to be used during an emergency situation are also available.

A Plant Display System (PDS) and a Safety Parameter Display System (SPDS) are provided to supply data which enable TSC personnel to evaluate the status of the plant and radiological and meteorological conditions. Status boards are used to display data needed in the TSC to analyze plant conditions.

A computer based system designed to provide atmospheric dispersion and radiological dose assessments of radioactive materials released from GGNS during emergency conditions is available.

7.3.2 Operations Support Center (OSC)

The OSC (Figure 7-3) provides an area for operations, maintenance, health physics, and chemistry personnel to assemble and be assigned to duties in support of emergency operations.

The location of the OSC is the Maintenance Shop of the GGNS Administration Building. In addition, an in-plant staging area is located at the Radiation Protection Access Control Area of the Unit II Turbine Building to which certain individuals are assigned in the event of an emergency. Other shift personnel and additional support personnel assemble at the OSC to provide assistance as necessary. A radio control console located in the maintenance area provides communications with the Control Room, TSC and EOF.

The OSC is required to be activated at the declaration of an Alert, Site Area Emergency, and General Emergency. Once activated, the OSC shall become operational as soon as possible (without delay) after declaration of any of these emergency classifications.

When facility staffing can be accomplished with onsite personnel, it is the goal to become operational within 45 minutes. The backup OSC is located in the Control Building(Elevation 148').

7-3 Revision 70 11/13

GG FSAR 7.3.3 Emergency Operations Facility (EOF)

The EOF (Figures 7-4 and 7-5) provides a location from which evaluation and coordination of all licensee activities related to an emergency is carried out. The EOF has the capability to obtain and display plant data and radiological information. The facility provides .

classification, accident assessment, notification, dose assessment, information to offsite groups, assesses the impact of the emergency offsite and provides the necessary support to assist the Emergency Organization.

The location for the EOF is in the Energy Services Center approximately 0.6 miles from the GGNS site. Figure 7-6 indicates the location of the EOF in relation to the plant. The EOF has a protection factor of 50 and its own ventilation system. The EOF contains the key technical personnel of the Emergency Organization. Space and communications are provided for federal, State, and local representatives at the EOF. The EOF provides a base of operation for Offsite Monitoring Teams and is the central point for the receipt of field monitoring data.

The EOF may be activated at any time, and shall be activated at an Alert, Site Area Emergency, and General Emergency declaration. Once activated, the EOF shaUbecome operational as soon as possible (without delay) after declaration of any of these emergency classifications. When facility staffing can be accomplished with onsite personnel, it is the goal to become operational within 45 minutes. Otherwise offsite personnel shall provide shift augmentation in 75 minutes and oe fully operational in 90 minutes.

7.3.4 Backup Emergency Operations Facility {BEOF)

The BEOF (Figure 7-7) is located at the Entergy Mississippi Baxter Wilson Steam Electric Station in Vicksburg, MS. In the unlikely event that the EOF had to be evacuated, the key EOF 7-4 Revision 75 3/17

GG FSAR personnel evacuate the area and relocate to the BEOF in accordance with Emergency Plan Procedure EN-EP-609. The BEOF is seventeen miles from the reactor. It is outside the ten mile EPZ but close enough to that responders can travel quickly to the site when it is deemed accessible by appropriate authorities.

The Control Room is notified of the situation and certain emergency response functions are transferred to the Control Room upon deactivation of the* EOF. Once activated, the BEOF establishes communications with the Control Room.

The BEOF contains the following:

  • Communic~tions equipment that allows contacting the other Emergency Response Facilities, Federal, State and local officials as* well as the capability of making Emergency Notifications.
  • Equipment necessary to perform radiological assessment and communicate* with field monitoring teams.
  • Capability to access plant drawings and procedures and.computer links to the site.
  • Capability to access plant data systems and perform event classification.

7.3.5 Media Centers GGNS utilizes the Joint Information Center (IlC) in Peari Mississippi as an information center during an emergency. The Joint Information Center (Figure 7-9) is the principle location for disseminating information about the emergency, arranges for timely exchange 'of information among designated GGNS, state, locai and federal spokespersons, media monitoring activities, responding to public and media inquires during emergencies, and performing rumor control function. Press conferences are held periodically, and equipment and facilities are available to support timely communication and information dissemination concerning plant conditions.

The Joint Information Center is activated a~ an Alert, Site Area Emergency and General Emergency.

7-5 Revision 72 11/14

. *. 7.3.6******A.lte111Jt~ F~cilities**

~

. .****. tbe event tliatprin1ary

.: ...* <:--<:.: .. <*<:.:.:-:. ;*:  ;*:<*~* *:* .. :: .. *.'.

and back-up facititie~ are unavailable at GONS there is an alternate **

  • .-> ... ;: . .:: ::.: :* .... : .. . , ... - .: :r.:. , . . . . . . . .

facility;avmla~lefo{the ~RO' **** : * * .**. *..*. *. *** **. ..... * ******************* ***

      • a; the tuster/Staging areads locirted ~( ilie **Baxter Wilson Ste$* Electric station
  • (BW$~S)iA*:Y~cksburg~.*Mississippi, apprpximately
  • 11. rniles :from *. Qrand, Gulf*... This,*,***

.**.facility, <:

which* is :co~located

>* . I : *.*: ....* * ... **.********* .............. 0 with the BEOF, :is intended fo host GONS*. personne}S ERO~ .::.

.. ' . . . . . . ' . . '. ' . : . : '.. . ..  : ..... : ... ' .. :. '~ /: .. . : .: .. : '~': .. ' .. ' .. '  : : .. : . ' . .. . ' ..

$ecuri1Y, RP etc., while preparing{o~ reentry to the p1allt \ .....******.*. * / .* .

  • The:
  • Altemat~: *TSC.: is: *located*. next*: to::. the:* Staging/Muster.: area *at*: .BWSE$:. in*. the *.

Vitksburg *Area*:Engineel"ing *Pflidi *1n~~ *office .bu.Hdirig: .has .pho~es,. .copier,.i *~AX:. a and Various CClll1pijte11>,. pl~t1¢rs .ancJ. pri~~erS avaiJal,le~:

  • The.*:*. c1J~C)t11e ** County***.* Emergency**
  • Operatio'ns :**Center; *
  • is ***. located * **in**.* ~e ;:**Port* . * .

Gibson/Cl:aib<>rrie Coun~ .Civil .Deferise *Offic~ i~ Port '.(:n.bso~. **'fhe center:is. equfpped \\Tith .

.col11IllU11icatfons :~ *tlte *.Contr6l* R~om, *TSC, *EOF;. the: S~te: E~~rgen<:y :operationsienter:

ill. Jackson: ~d *Stare. s~Jportirlg. agencies.* *
  • Functionally, *the. 'cent~t: *~ooi-dinates. :au.; local i

' etnerge~c;y operations. . .

        • 7.4.2. ****Mississippi Stat~ Emergency Openitibns* Center::.*
  • Tlte **. State**.* Emergency*: :Qperations ***Center*** (EOC) **. is***. located **. in ** Pearl* Mississippi,

.

  • approximately .60* mil~. :ftc>m: .the *.site.*** The: cerit~r h~ stipJii~s and* equiptnent .to* s~pport'.

' *~te. emergenc~ op~ratidr1~. activities,: including corntilunic~tion links with' other .ernergencyr

.*. opeI"llti~~. centers. .** outing ari emergency; .representatiVes frQm appr<>prfate state ll~OCies

. and: GGN8 assemble in the State EOC to coordirlate resporis~ efforts.: ...

. 7: .. 6****, 12/15**.

GG FSAR*

7.4.3 Tensas Parish Emergency Operations Center The Tensas Parish Emergency Operations Center is located adjacent to the Tensas Parish Sheriff's Office.

The center is equipped with communications to the Technical Support Center, Control Room, Emergency Operations Facility, Mississippi State Emergency Operations Center, the Louisiana State Emergency Operations Center (in Baton Rouge) and with Louisiana state supporting agencies. Functionally, the Tensas Parish BOC acts in parallel to the Claiborne County, Mississippi BOC and coordinate local emergency operations.

/

7.4.4 Louisiana State Emergency Operations Center The LDEQ and GOHSEP representatives report to the Louisiana Emergency Operations Center. in Baton Rouge, approximately 125 miles from the site, in the event of a nuclear I

emergency which requires activation of State resources. The center has equipment and supplies to support state emergency operations activities including communications links with other emergency centers.

7.5 Communications Systems The communications systems are designed to ensure the reliable, timely flow of information and action directives between all parties having jurisdiction and a role to play in the mitigation of emergencies at GGNS. Reliability is provided via (1) extensive redundancy, (2) dedicated communication equipment to preclude delays due to system overload, and (3) routine use and testing of many of the systems, which lowers the probability of undetected system failures.

Timeliness of infonnation flow is achieved by ( 1) prompt notification, (2) predefined lines of communications, (3) predefined emergency action levels and (4) predefined levels of 7-7 Revision 58 12/06

./

GG FSAR authority and responsibility. The GGNS communications netwo[k is formulated around this basic concept and is designed to channel information directly to the key parties having closely related functions, thus eliminating errors often associated with second hand information. By providing well defined and dedicated communications links, better accident management from. physically separate control and support centers can be achieved. Provisions. are made for State representatives to call and

  • verify the authenticity of the accident and obtain additional information. The essential communications links are manned continuously and are periodically tested to assure availability. Figure 7-12 shows the communications interfaces between the onsite and offsite emergency facilities.

7.5.1 Telephone System GGNS maintains telephone communication with the entire Entergy Corporation system via a Company-owned fiber-optic transmission system. Access to this mode of transmission is made via the plant telephone system. The GGNS plant telephone system also provides communications among the CR, TSC, OSC, EOF, nc and public.

7. 5 .2 Plant Paging System & Sound Powered Phones The plant paging system links together permanent plant ~tructures, including the TSC and OSC, through a network of phone stations and speakers. Sound powered phones are provided in the TSC and OSC to enable direct communication with the Control Room and all areas of the plant containing sound powered outlet boxes. Amplified headsets are provided in high noise areas to ensure adequate communications capability with the Control Room.

7-8 Revision 61 03 / 09.

GG FSAR 7.5.3 .Emergency Communications Equipment

a. Dedicated Communication Links The following dedicated telephone and/or system links are established to provide a continuous (24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />) means of communication during an emergency situation.
1. GGNS ORO Notification System An internet based notification. system to connect the facilities listed in Table 7-1. The GGNS ORO Notification System is used for initial notification and :ongoing communications to the locations listed in Table 7-1 for the duration of the emergency.

Utilization of this system by GGNS actiyates i the emergency response network by notifying* each location simul~eously.

The GGNS Operational Hotline (OHL) is used as a back-up to the ORO.

Notification- System.

2~ NRC Emerg~ncy

  • Telecommunication System - Consists of the following dedicated Federal Telephone System circuits to provide direct*

communication with the NRC Operations Center, Bethesda, MO:

a. Emergency Notification System (ENS) - is used to provide initial notification to, and ongoing **communication with, NRC personnel in an emergency. The ENS is available in the Control Room, TSC, and EOF.
b. Health Physics Network (HPN) - is used to provide requested radiological data to the NRC*in an emergency. The HPN is available in the TSC andEOF.
c. Reactor Safety Counterpart Link (RSCL) - is used by the NRC 1

Site team and NRC Base* Team to conduct internal NRC discussions on plant parameters without interfering with exchange of information between GGNS and NRC. This link may be used for discussions with the NRC Reactor Safety 7-9 Revision 71 06/14

GG FSAR personnel and GGNS plant Management. The RSCL is available in the TSC and EOF.

d. Protective Measures Counterpart Link (PMCL) - is used by the NRC Site team and NRC Base Team to conduct internal NRC discussions on radiological releases and meteorological conditions, and the need for protective actions without interfering with the exchange of information between GGNS and NRC.

This link may also be used for discussions with NRC Protective Measures personnel and GGNS plant management. The PMCL is available in the TSC and EOF.

e. Emergency Response Data System (EROS) - is used to transmit raw
  • reactor parametric data from GGNS balance of plant computer to the NRC Operations Center. The EROS is activated by GGNS at an Alert or higher declaration. The EROS is available in the GGNS Control.Room.
f. Management Counterpart Link (MCL) - is used for any internal discussion between NRC Executive Team Director and NRC Director of Site Operations or GGNS site management. The MCL is ava.ilable in the TSC and EOF.
g. Operational Counterpart Link (OCL) or Local Area Network (LAN) Access - is used by the NRC Base T earn and NRG Site Team to access products and services provided on the NRC
  • Operations Center's local area network. The OCL is available in the TSC and EOF.
3. The GGNS Computerized Emergency Notification System is used to notify GG NS emergency response personnel upon declaration of an

( emergency.

7-10 Revision 64 11/10

\

GG FSAR

a. The GGNS Computer Notification System is a hosted system that is a robust notification system that allows the ERO to be notified via a number of modalities (i.e. telephone, pager, SMS text, email, etc.) This system utilizes two data centers for all its productions systems in an Active-Active configuration. Data is*

continuously replicated between the two separate sites, and each site is cap ab le of providing a full range of services. If service is disrupted at either site, all traffic is dynamically rerouted to the other site so that systems remain constantly available.

b. The GGNS Computer Notification System is activated using any internet connected computer or touch tone telephone. Use of a password guards against unintended activation. The password is readily available to the control room operating staff.
c. The GGNS Computer Notification System can be activated for any emergency classification. On call or alternate emergency response personnel will be notified to fill required response

. positions.

b. UHF Radios

. 1.

  • Radios to connect the following facilities:
a. Control Room/TSC/EOF /CAS/SAS
b. Tensas Parish Sheriff Department
c. Claiborne County Sheriff Department The above mentioned UHF* radio system serves as an alternate means of communications to notify local authorities of an emergency at GGNS.
2. UHF radios 1, connect the Onsite and Offsite Monitoring Teams with the OSC and EOF respectively.
3. UFH radios are issued to OSC Emergency Response Team to connect them to the OSC.
c. Alarms A number of warning devices are used onsite to indicate unsafe or emergency conditions.
  • 7-11 Revision 66 08 / 11

GG FSAR

1. Lo9al Inplant Radiation Alarms.
2. Fire Alarm.
3. Site Evacuation Alarm.

7.5.4 Alert Notification System An Alert Notification System has been provided that meets the design objectives of NUREG-0654, Appendix 3. The basic system consists of 43 sirens located in Claiborne County and Tensas Parish. Institutions located in the 10-mile EPZ are supplied with tone I

activated receivers which supplement the siren system. Port Gibson/Claiborne County Civil Defense and Tensas Parish Office of Homeland Security and Emergency Preparedness are responsible for activating the portion of the system within their respective jurisdictions. In the event of a failure of the Alert Notification System the EPZ population will be notified by route alerting in accordance with state emergency plans. Additional alert notification details are addressed in local and state emergency plans, the GGNS Emergency Public Information publication, and the Alert Notification System Final Report. Figure 7-13 indicates the siren locations for the 10-mile EPZ.

As discussed in Section 8.7, an effort is made to provide information to the transient population concerning protective measures. The means of notifying the transient population is the Alert Notification System.

7.6 Assessment Facilities 7.6.1 Onsite Systems and Equipment

a. Control Room Parameters Appropriate parameters indicative of the status of the reactor and various plant systems are displayed in the control room.

7-12 Revision 75 3/17

GG FSAR The safety related control room display instrumentation that can be used to assess the condition of the plant is discussed in GGNS FSAR Section 7.5.

  • b. Area Radiation Monitoring System The area radiation monitoring system detects and measures gamma radiation levels at various locations. It also provides audible and visual alanns in areas monitored and in the control room, if gamma radiation exceeds a specified limit.

It provides visual indication in the area monitored and at a control room annunciator if there is a malfunction in any area monitor.

The containment area radiation monitors also provide information that can be used to determine the source tenn of a fission product release in the containment. An Emergency Plan Procedure contains guidance for the conversion of containment area radiation monitor readings in mR/hr or R/hr to offsite exposure.

Each area radiation monitoring channel consists of a detector and a local alann unit at a remote location ...and an indicator and tnp unit in the control room. A control room channel is provided with a detector in the control room. The area radiation monitor provided in the control room has no local alarm unit since the control room annunciator system provides alarms to the operators.

The following general areas are monitored by the Area Radiation Monitoring System:

1. Control Room
2. Radwaste building
3. Auxiliary building
4. Fuel storage and handling area 7-13 Revision 46 8/ 01

GG FSAR

5. Various valve operating stations
6. Containment
7. Drywell
8. Various Sampling rooms
9. Turbine building I 0. Radwaste Solidification Areas *
c. Process and Effluent Radiation Monitoring Systems.

The main objective of required radiation monitoring systems is to initiate appropriate protective action to limit the potential release of radioactive materials from the primary and secondary containment if predetermined radiation levels

, are exceeded in major process/effluent streams. An additional objective is to have radiation monitoring systems available during all operating and emergency conditions to provide control room personnel with an indication of the radiation levels in the major process/effluent streams and alarm annunciation if high radiation levels are detected.

Certain effluent radiation monitoring systems also provide information that can be used to determine the source term of an unplanned radioactive release. They are used to correlate the activity levels in an effluent stream along with system flow rates to determine release rates in Ci/sec. Using the determined release rates and the appropriate meteorological stability class, radiation dose projections can be estimated for various distances from the site.

Emergency Plan Procedures include guidance for the determination of release

. \

rates and dose projections when the effluent monitors are off scale or inoperable.

7 -14 Revision 61 03 / 09

GG FSAR The radiation monitoring systems (RMS) provided to meet these objectives are:

1. Main Steam Line RMS
2. Containment and Drywell Ventilation Exhaust RMS
3. Auxiliary Building Fuel Handling Area Ventilation Exhaust RMS
4. Auxiliary Building Fuel Handling Area Pool Sweep Exhaust RMS.
5. Turbine Building Ventilation Exhaust RMS
6. Radwaste Building Ventilation Exhaust RMS
7. Standby Gas Treatment System RMS
d. Fire Protection The fire protection system consists of an outside yard loop with three fire pumps and one jockey fire pump, hydrants, sprinkler systems, deluge C02 syst~ms, Halon systems, standpipe hose stations, portable fire extinguishers, ionization smoke detectors, heat sensors, alarm systems, fire barriers, two fire water storage tanks and associated piping, valves and instrumentation.

Three redundant 50 percent capacity pwnps ( 1 electric and 2 diesel driven) and closed-loop piping ensure delivery of extinguishing water with one pump and one leg of the piping loop out of service.

Fire and smoke detection systems are provided for the switchgear areas, battery rooms, control room, cable penetration areas, and other areas, based on the results of the fire hazards analysis included in the FSAR. In addition, a GGNS-owned fire truck is maintained onsite. The fire truck may be taken offsite for various reasons (i.e. training, vehicle maintenance, etc.).

7-15 Revision 59 06/07

GG FSAR

e. Geophysical Monitoring
1. Seismic Monitoring Activation of any accelerometer causes an audible and visual ann-unciation in the control room to
  • alert the plant operator that an earthquake has occurred. This annunciation is set to occur at 0.01 g vertical acceleration in the Horizontal or Vertical directions as detected at the Containment Basemat or Drywell, and may include other areas as determined by system requirements. The accelerometers trigger the initiation of the strong-motion accelerometers recording system at horizontal or vertical acceleration levels slightly higher than the expected background level, including induced vibrations from sources such as traffic, elevators, people, and machinery.

System equipment includes:

a. Six triaxial time/history strong-motion accelerometers (SMA)
b. Seven triaxial peak-recording accelerographs
c. Recording and playback equipment A cabinet located in the Control Room houses the recording, and calibration unit that is used in conjunction with the SMA sensors to produce a playback record of the earthquake. It also contains the audible and visual ,annunciators wired to display initiation of the time/history recorder, and the power supply components for all equipment contained within the cabinet and in the field. Equipment is installed in the cabinet I

for data analysis.

Should the GGNS seismic monitoring system fail, backup seismic information would be obtained through a coordinated effort with the 7-16 Revision 73 12/14

GG FSAR Mississippi Bureau of Geology. That agency receives se1sm1c information from Memphis, Tennessee, Panola County, Mississippi, and Mobile, Alabama. The Mississippi Bureau of Geology would be requested to obtain real-time seismic infonnation and to relay this information by telephone to GGNS. Although these seismic monitoring stations are located some distance from GGNS, because of the

(

sophistication of the detection equipment, they should be able to keep the GGNS site informed of any seismic activity within the state of Mississippi.

, 2. Meteorological Monitors The onsite meteorological tower, located approximately 5,JOO feet northwest of the control building is 162 feet high and has the-following instruments installed:

Surface Tipping bucket rain gauge Delta Temperature translator (utilizes 33 and 162 foot temperature sensors) 33 feet Wind speed sensor Wind direction sensor Temperature sensor Relative Humidity 162 fee(. Wind speed sensor Wind direction sensor Temperature sensor The meteorological system utilizes local digital storage modules and Plant Data System digital storage.

7-17 Revision 45 02/ 01

GG FSAR GGNS also utilizes a back-up meteorological system which provides meteorological information to the control room, if the primary/

meteorological system fails. The instrumentation on the backup system is listed below:

33 feet Wind speed sensor Wind direction sensor Temperature Sensor In the unlikely event that both the primary and backup meteorological

  • systems were inoperable, the tertiary means of obtaining wind speed and direction data would be through the National Weather Service or the U.S. Corps of Engineers, Waterways Experiment Station.

An. Uninterruptible Power Supply (UPS) is utilized to power the -

meteorological system instrumentation and components to ensure that a 90% data recovery is achieved. All components of the UPS/Back- up Power Supply are located at the Meteorological Station.

f. Hydrological Monitors A groundwater level monitoring program is established to provide data on the seasonal fluctuations of the regional groundwater operations to define the zone of depression caused by plant pumping operations and to monitor the level of the perched groundwater table at the plant site.. In the event that GGNS personnel were unable to conduct the hydrological sampling program, this information could be supplied by the U.S. Geological Survey, which monitors groundwater levels in the town of Port Gibson.

7-18 Revision 45 02/ 01

GG FSAR

g. In-Plant Airborne Iodine Monitorin2 In reference to Section 7.6.3.1 of GGNS Technical Requirements Manual, a program is established which ensures the capability to accurately determine the airborne iodine concentration in vital areas under accident conditions.

This program includes the following:

1. Training of personnel
2. Procedures for Monitoring, and
3. Provisions for maintenance of sampling and analysis equipment.

7.6.2 Offsite Monitoring Equipment and Facilities GGNS has been conducting and continues to conduct an environmental radiological monitoring program for the Station.

The ongoing objectives of the program are:

a. To ..determine whether any statistically
  • significant increase occurs in the concentration of radionuclides in critical pathways.
b. To detect any buildup of long-lived radionuclides in the environment.
c. To detect any change in ambient gamma radiation levels.
d. To verify that radioactive releases are within allowable limits and that plant operations have no detrimental effect on the health and safety of the public or on the environment.
e. To fulfill the radiological environmental surveillance requirements of the GGNS Technical Specifications.

The monitoring program provides the following: (1) the gathering of data on environmental radiation levels and the Station's degree of influence on these levels; (2) checks for specific radioisotopes to detect their introduction into the surroundings; (3) 7 -19 Revision 28 3/95

GG FSAR a background for ~ continually developing program of radiological assessment.

Ambient radiation is measured by dosimeters of legal record (DLR). These DLRs are installed at various onsite and offsite locations. The locations have been selected based on available meteorological data, prevailing wind direction and population concentration.

During normal operating conditions, quarterly measurements of the environmental dose rates are made. During an emergency, incremental and time integrated dose measurements can be made by selective and periodic changing of DLRs. The locations of existing environmental monitoring stations are given in the GGNS Technical Requirements Manual. Environmental monitoring stations have been located to ensure cmilpliance with the NRC Radiological Assessment Branch Technical Positions. for the

  • Environmental Radiological Surveillance Program.

7.6.3 Radiological Assessment Laboratories The GGNS Chemistry Department has isotopic analysis capability available for onsite I radiological analysis.

The Mississippi State Department of Health Laboratory, located in Jackson, MS, would be setup to receive samples in the event of a Site Area Emergency or General Emergency.

They could be expected to be ready within 1 to 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> of notification. This laboratory has the capability to measure beta-gamma emitters, including radioiodine in environmental samples (soil, vegetation, water, and air). Data from this laboratory may be provided to each agency's representative in the Emergency Operations Facility by radio communications established by each agency or by normal phone communications with the Mississippi State Department of Health or Louisiana Department of Environmental Quality. Additional mobile laboratories with similar capabilities are available from DOE, Region III, Oak Ridge, TN (estimated response time 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />) and EPA, Region IV, Montgomery, AL (estimated response time 9 hours1.041667e-4 days <br />0.0025 hours <br />1.488095e-5 weeks <br />3.4245e-6 months <br />).

7-20 Revision 65 04/11

GG FSAR 7 .6.4 Post-Accident Sampling Capability Through the use of installed emergency sampling equipment, measurements and analysis can be performed onsite to assess the magnitude of the radiological hazards associated with an emergency condition. Specifically, a system is installed to obtain samples from the following locations:

a. RHRAandB
b. Containment Atmosphere
c. Suppression Pool The offsite radiation monitoring teams have the capability to determine the extent of the radiological hazard in the environment. Environmental air samplers and portable equipment are available for the following assessment in the field within the 10-mile EPZ:
a. Beta-gamma radiation from the plume and/or ground contamination.
b. Iodine concentration and assessment of inhalation and thyroid dose by using air samplers with iodine specific cartridges and portable and fixed analyzers. The

. technique to be used to determine radioiodine concentrations in a radioactive plume is described in Emergency Plan Procedures. This technique allows the determination of radioiodine concentrations in the field with a minimum detectable activity of I x 10-7 uCi/cc in the presence of interfering noble gases and background radiation.

c. Water sampling for later analysis to assess contamination due to liquid release pathways can also be done by offsite monitoring teams.

The offsite monitoring teams dispatched from GGNS consist of 2 members. Transportation is available using designated GGNS vehicles, with normal deployment 7- 21 Revision 61 03 / 09

GG FSAR expected to be within approximately 90 minutes following notification.

Emergency Plan Procedures have been established that relate the various measured par~eters to integrated doses. Provisions have been made for estimating integrated dose from the projected and actual dose rates and for comparing these estimates with the protective action guides.

7. 7 Protective Facilities Emergency *situations may arise, whether it be man-made or natural causes, which require that protective action be initiated to assure the safety of personnel. Predetermined procedures to be initiated in the event of a fire, tornado, or earthquake are contained within the plant operating procedures. An important consideration in the protection of the Grand Gulf personnel is for the immediate removal of those personnel not essential for the control of the plant. Security Personnel would be examples of those required to remain onsite. In the event of an emergency situation, the appropriate notification is made. Upon notification, all personnel onsite should either assume their prearranged emergency responsibilities or should follow instructions given over the PA system. This permits accountability of personnel before leaving the site or being assigned to an emergency team.

7 .8 First Aid and Medical Facilities

\

First aid equipment and facilities at Grand Gulf are available to handle a wide range of emergency situations from minor first aid to transporting a seriously injured individual to an offsite medical facility. Readily available first aid is provided by Plant Staff personnel that are first aid trained. First aid kits containing items typically needed to care for minor injuries are located in the following areas:

a. Control Room
b. Maintenance Shop 7-22 Revision 51 02/04

GG FSAR

c. EOF A first aid treatment! room is located in the Health Physics Access Control Area on the 93 foot level of the Control Building and is equipped with normal industrial first aid supplies.

7.9 Rescue and Damage Control'EquipmentJ Rescue and damage control equipment consists of normal and special purpose tools and devices usedtin the course of maintenance and operational functions throughout GGNS. Personnel who are assigned to use rescue and damage control equipment in an emergency are familiar with the locations and use of specific equipment. To ensure that adequate supplies are available for usage during plant emergency con~itions, rescue and damage control equipment is located in the Maintenance Shop. Typical supplies contained in these cabinets are listed in Appendix B.

Bulky items, such as hydraulic jacks, cutting and burning rigs, and portable generators, are not stored in emergency facilities and may be obtained from maintenance control areas, the Warehouse, or Maintenance Shop.

The GGNS Maintenance and Operations Sections are responsible for inventories of tools, equipment, and* vehicles assigned to their respective section. As such, during work days, Supervisors in each section may aut;horize the use of tools, equipment, and vehicles as the situation demands. Furtherinore, the Shift Manager has immediate access to shops, tool cribs, lockers, vehicles, rescue and damage control equipment, and other material during backshifts and weekends.

I 7.10 Personal Protective Equipment To protect personnel remaining onsite and/or arriving o~ite during the emergency, quantities of personal protective equipment, including anti-contamination clothing and individual respiratory equipment are maintained on site. Protective . clothing and individual respirators/

7-23 . Revision 43 10/ 00

GG FSAR masks are stored in the emergency cabinets located in the Control Room, the TSC, the OSC, and the EOF. This equipment is inspected, inventoried, and operationally checked on at least a quarterly basis in accordance with Section 8.6.

7-24 Revision 61 03 / 09

GG FSAR TABLE 7-1*

GGNS ORO NOTIFICATION SYSTEM LOCATION (USUAL) CONTACT ALTERNATE Control Room Control Room Communicator Control Room Operator Emergency Operations Facility EOF Offsite Communicator Alt. EOF Offsite Communicator Entergy Operations Corporate Emergency Center Information Coordinator Logistics Coordinator Mississippi Emergency Management Agency Director, MEMA Comm. Officer, MEMA Mississippi Highway Safety Patrol Comm. Officer, MHP Dispatcher, MHP Claiborne County Civil Defense Director, CCCD Asst. Director, CCCD Claiborne County Sherifl's Department Sheriff, CCSD Dispatcher, CCSD Louisiana Department of Environmental Quality Secretary of LDEQ Radiological Emergency Planning & Response Staff Tensas Parish Sheriff's Office Sheriff, TPSO Dispatcher, TPSO Governor's Office of Homeland Security and Emergency Assistant Secretary, GOHSEP Comm. Officer, GOHSEP Preparedness -

7-25 Revision 71 06/14

GG FSAR GRAND GULF NUCLEAR STATION OFFSITE SUPPORT AGENCIES AND CONTRACTORS EMERGENCY FACILITIES EMERGENCY FACILITIES.

(ON OR NEAR SITE) (OFFSITE)

CONTROL ROOM JOINT INFORMATION MISSISSIPPI STATE NRC CENTER EOC HEADQUARTERS Location: El. 166' Control Bldg. Location: Location: Location Pearl, MS. Pearl, MS. Rockville, MD TECHNICAL ENTERGY* CLAIBORNE COUNTY NRC SUPPORT CENTER OPERATIONS EOC REGION IV CORPORATE Location: Adjacent EMERGENCY Location: Location To Control Room. CENTER Port Gibson, MS Arlington, TX Loqation:

Jackson, MS.

LOUISIANA STATE GENERAL ELECTRIC OPERATIONS EOC SUPPORT CENTER Location Location: San Jose, CA Location: Baton Rouge, LA Maintenance Shop TENSAS PARISH EMERGENCY EOC OPERATIONS FACILITY Location:

St. Joseph, LA Location: Energy Services Center EMERGENCY FACILITIES Figure 7-1 7-26 Revision 75 3/17

GG FSAR UPPER PART OF CONTROL ROOM GLASS NRCCAUC AS q

DOWN TO REST- COMM. COMMAND CENTER CONTROL ~OOM EMERGECV DORM t ROOM ROOM GAS 1

,nmm11 I I DI STORAGE m

TECHNICAL SUPPORT CENTE R FIGURE 7-2 7-27 Revision 41 3/00

GG FSAR Maintenance. Sha Ground Floor KITCHEN BREAK ROOM WOMEN MEN SECURITY ACCOUNTABILITY READER MACHINE SHOP I

I l osc PERSONNEL STAGING AREA I I- 1I

  • I j (! I
'I 1I~

__.__ -i--

Maintenance Shop, Mezzanine I

osc COMMAND CENTER osc TEAM BRIEF ROOM F1 osc UIPME ROOM osc ENG.

ROOM OPERATIONS SUPPORT CENTER FIGURE 7-3 7-28 Revision 46 08/ 01

)

GG FSAR STAIRS Exit 1"'-._

L, I I I *."-;

/ FEM.OJ \'--.i DOE

~j Communications ~

~*

Utility/Agency CC1J D Conference h j'

<)

1111--ci-*~ *ff~l~l-L-1.lL.ll.Uit-Jll--_J i~10 MEN'S RESTROOM/SHOVVER LJ

  • ____________..J.______f~ __ ......

nlJ

~

il

~

u_. ,-JI RESTROOMISHOWER

  • I ~

uU EXfT EMERGENCY OPERATIONS FACILlTY .,_,.,,..,...,..., """'° y LEVEL I FIGURE 7-4 7-29 Revision 61 03/og

GG FSAR EMERGENCY OPERATIONS FACILITY STAIRS

.... 2

. - EXIT

1. Office 1
2. storage 3.Kllehen
4. Dom,ato,y 3

4 CONFERENCE AREA -

2 I

EXIT EMERGENCY OPERATIONS FACILITY LEVEL II FIGURE 7-5 7 - 30 Revision 29 9/95

GG ISAR SWITCH YARD SITE PLAN SCALE-IN.*'40Cf'T.

EMERGENCY OPERATIONS FACILITY LOCATION Fl,GURE 7-6 7 - 31 Revision 24 6/93

GG FSAR

\

Restrooms Exit Computer Entrance I

~

Office opier/FAX Telecom Equipment Receptionist Office Office I

I Exit BEOF I

Supply Cabinet Office Office BEOF Command Center Office Office Dose Cale Computer Office Office Kitchen BACKUP EMERGENCY OPERATIONS FACILITY FIGURE 7-7 7-32 Revision 72 11/14

GG FSAR Alternate Facilities

,*-*-*-*-*-*-*-*-*-*-*-*-*-*-*-*- *-*-*- - -*-*-*~ Two Story Building

' (Staging/Muster Area)

Vicksburg Area Engineering Office (Alternate TSC)

I I

~

I

\ \

I Overflow Parking Area

-*-*-*-*-*- I I

I I

I Security I Baxter Wilson Steam/Electric Station I (BWSES) I I

I I

From Highway 61 South i

Figure 7-8 7 - 33 Rev 68 08/12

/

GG FSAR Joint lin:foirm:ati:0n Ce*nter !layout O*

II.;. *"--*

'l'i.l'l::lP. *l'J\ ....... ffl* iP.,li~i~

!111.1t:J1J;11n. c: ...... :1~1~1;10 O c:

(.) a>

L-. u S~ate, 0-*

Em: PIIO

J; 0 DDO(lBf I n;*_ ......

l:.L.

\. :M:ail1i111 GGNS l:nqui*IJY

!Response Comdiinatar iBniriaim,ce:

IMiEJMN OOOIEP

  • qfl

.z:[,J.__ _ _ _ _..,.

Pfit1111teml' Wi I'),..... FA.X 11!:: L~

IW' u,l"l i_1i1li"l1_E**rv

  • IL,'l:.J1; ~ - :M!ad1tii1DU)5 IA,U "'ili11l:JQ/80 II: Ir.- I. Ii""'

~:ti

.:I, t ,,_..._ _ _ _ _...

ll.11,.q I.I

~

iEln.te1ri-g(!I lab.d:e:

Gr-aplh.ocs

~

IFDGILJ'R:E 7-9 7-34 Revision 71. 06 /14

GG FSAR FIGURE DELETED 7-35 Revision 53 02/ 05

GG FSAR FIGURE 7-11 DELETED 7-36 Revision 53 02/ 05

GG FSAR GG' FSAR-communications Interfaces NRC GOVERNORS REGION Iv LOUISIANA OFFICE OF HOMELAND TENSAS PARISH DEPARTMENT SECURITY AND SHERIFF OF ENVIRONMENTAL EMERGENCY QUALITY I

PREPAREDNESS I- I I

- NRC HEAOQUARTERS SECURITY l  ! -***---****-**-*--****-*-***T-...........- .............................. _........

I CASJSAS I II

- i i I ENTERGY TECHNICAL EMERGENCY BACKUP OPERATIONS OPERATIONS EMERGENCY CONTROL ROOM SUPPORT OPERATIONS -

CORPORATE SUPPORT , OPERATIONS

, EMERGENCY CENTER FACILITY FACILITY CENTER CENTER I

I L------ -----f-L-- -----+_: I I

I I

i I

I I

I JOINT i_ *-* - *-*-. -* - . -

I I I I CLAIBORNE INFORMAT ION CENTER MISSISSIPPI MISSISSIPPI CLAIBORNE' COUNTY EMERGENCY COUNTY HIGHWAY CIVIL MANAGEMENT -- SHERIFF PATROL DEFENSE AGENCY GGNS ORO Notificaticn System and Operational Hot Line(OHL)

NRC FEDERAL EMERGENCYCOMMUNICATION SYSTEM UHF RADIO SOUND POWERED PHONES EOF/ENMC HOTLINE Communications Interfaces FIGURE 7-12 7-37 Revision 71 06/ 14

GG FSAR Siren Locations Figure 7-13 7-38 Revision 61 03/09

GG FSAR 8.0 MAINTAINING EMERGENCY PREPAREDNESS 8.1 Organizational Preparedness GGNS recognizes its responsibilities to take measures necessary to maintain emergency preparedness for all personnel who may be involved in a station emergency. The Site Vice President, through the Director, Regulatory and Performance Improvement has authority and responsibility for establishing management direction_ and control to assure that preparedness is maintained and that any required corrective actions are implemented.

The Manager, Emergency Planning is delegated the overall responsibility for implementation of the emergency preparedness program, including training, drills and exercises involving GGNS Emergency Organization Personnel. The Manager, Emergency Planning has access to and reporting relationships with Corporate Emergency Preparedness senior management and GGNS site senior management with oversight responsibility for Emergency Preparedness. These relationships assure site emergency preparedness and fleet emergency preparedness resources, priorities and performance standards are balanced for best performance.

The Manager, Training & Development is responsible for providing required Emergency Preparedness Training for personnel who are part of the GGNS Emergency Response Organization, commensurate with their positions in the emergency organization.

8.2 Training All Entergy Operations personnel who are part of the GGNS Emergency Response Organization are required to participate in a formal Emergency Preparedness Training Program. The overall program consists of the following:

a. Plant Access Training for all unescorted personnel in the protected area.
b. Emergency Preparedness Training Specialized (EPTS) and Emergency Plan Procedure training for all emergency response personnel as required.

I

c. Fitness For Duty (FFD) training for all emergency response personnel in the protected area and the EOF.

8-1 Revision 75 3/17

GG FSAR An orientation and training program is offered for all outside support agencies such as the local fire department, law enforcement, ambulance, hospital services, and civil defense/emergency preparedness.

8.2 .1 General Emergency Plan Training A program is developed to provide information on the Emergency Plan to all personnel (excluding visitors) coming on site for the first time and to all personnel participating in the annual retraining program. The following objectives are met:

a. To train personnel with respect to their responsibilities during an emergency situation
b. To keep personnel informed of any applicable changes to the Emergency Plan.

In order to meet these objectives, instructions concerning the following are given to all personnel:

a. Signals and Alarms
b. Evacuation routes and procedures
c. Response during an emergency 8.2.2 Emer&ency Preparedness Training Specialized and Emergency Plan Procedure Trainin,:

Emergency Organization Personnel receive on an annual basis, training in emergency response. This training program ensures continued emergency preparedness of all persons who may participate in a station emergency. Emergency Preparedness Training Specialized (including the scope, nature and frequency) is provided and includes, but is not limited to, the following categories:

a. Directors or coordinators of the response organizations;
b. Personnel responsible for accident assessment;
c. Radiological monitoring teams and radiological analysis personnel; 8-2 Revision 23 6/92

GG FSAR

d. Security;
e. Repair and damage control/correctional' action teams;
f. First aid and rescue personnel;
g. Corporate support personnel filling GGNS Emergency Response Organization Positions;
h. Personnel responsible for transmission of emergency information and instructions.
i. Fire fighting Specific emergency'training courses and frequency are referenced in the Emergency Preparedness Training Program.

8.2.3 Orientation and Training Program for Offsite Support Agencies The Manager, Emergency Planning ensures training is provided for appropriate offsite support agencies. These agencies include local fire, law enforcement, ambulance, and hospital services. Assistance may be provided as needed by personnel from Training, J

Health Physics, Operations, Security, or Corporate Communications. This emergency plan training includes the following topics as a minimum:

a. Grand Gulf Nuclear Station site layout
b. Communications interfaces and procedures between the onsite organizations and the offsite support agencies
c. Expected responses to emergencies
d. Anticipated protective actions
e. Basic health physics and radiation protection
f. Primary and alternate plant access routes and access procedures.
  • Local civil defense/emergency preparedness personnel are provided training through participation in joint utility/ state/local status meetings, through invitations to attend the training offered to the agencies listed above, and through their respective state emergency 8-3 Revision 70 11/13

GG FSAR preparedness organization(s). Grand Gulf Nuclear Station may also provide assistance I '

in the training of other county/parish emergency organization personnel, if requested to do so. Emphasis is placed on the interfaces between the station iand the state and local emergency organizations, communications procedures, basic radiation protection, and the expected roles of the offsite response agencies.

8. 3 Drills and Exercises Periodic exercises are conducted to evaluate major portions of emergency response capabilities; periodic drills are conducted to develop and maintain skills; and deficiencies identified as a result of exercises and drills are utilized to update the Plan and procedures.

The general purposes of drills and exercises are as follows:

a. To test the effectiveness, timing and content of the Emergency Plan and Emergency Plan Procedures
b. To test the emergency facilities and equipment
c. To eQsure that emergency organization personnel are familiar with their duties and

/

responsibilities.

An exercise is an event that tests the integrated capability and a major portion of the basic elements existing within emergency preparedness plans and organizations. An exercise simulates an emergency resulting in potential or actual offsite radiological releases that would require response by offsite authorities. A limited exercise is an event that has limited objectives and tests one or more specific portions of the basic elements existing within emergency preparedness plans and organizations.

A drill is,: a supervised instruction period designed to test, develop and maintain skills. A drill may be a component of an exercise or limited exercise. Drills are supervised by qualified personnel and on~the-spot correction of erroneous performance is permi~ted.

8-4 Revision 26 6/94

GG FSAR

\

8.3.1 Drill and Exercise Scenarios Exercises and limited exercises are based upon preplanned scenarios with observers assigned to various locations to monitor the actions of the Emergency Organization personnel. The sequence of events normally followed for exercises is:

a. Prepare the scenarios and review them with key officials of participating organizations (the actual details of exercise scenarios are kept confidential)
b. Submit exercise scenarios to the NRC as required by 10CFR50 Appendix E.
c. Assign and brief observers - qualified observers from the utility, state/local government as well as observers from the NRC, FEMA, and the Regional Assistance Committee
c. Conduct the drill/exercise
d. Critique the drill/exercise as soon as practicable after it is conducted
e. Make necessary changes as a result of the critique review, and;
f. Provide documentation to the Manager, Emergency Planning, Director, Regul~tory and Performance Improvement and Site Vice President.

Drill scenarios are prepared by the individual responsible for conducting the drill, and are approved by the appropriate level of management. Drills may involve a single individual, section or department, or they may involve parts of the emergency organization.

State and local support agency participation during exercises are conducted under the biennial exercise requirements of 44CFR350. Scenarios, as appropriate, must emphasize coordination among onsite and offsite response organizations. The scenarios to be used for exercises are varied from year to year; operations in various weather conditions; during each eight-year cycle,one drill or exercise is held between 6:00 p.m. and 4:00 a.m.; some of the drills or exercises are unannounced. Offsite participation is not required for off-hours or unannounced drills and exercises. Scenarios include the following:

a. Basic objectives and appropriate evaluation criteria
b. Dates, locations, and organizations expected to participate
c.
  • Listing of simulated events 8-5 Revision 75 3 /17

GG FSAR

d. Time schedule (real and simulated)
e. Narrative summary including information such as simulated casualties, offsite fire department assistance, rescue_ of personnel, use of protective clothing, deployment of radiological monitoring. teams, public information activities, etc.

f Observer assignments and advance materials consisting of the scenario, evaluation criteria, performance objectives, and observer check sheets.

g. The opportunity for the ERO to demonstrate key skills specific to emergency response duties in their facilities.

8.3.2 Drill and Exercise Schedule The following drills and exercises are conducted to ensure that the Emergency Organization maintains a high degree of readiness.

a. Communications Drills Communications are tested on a monthly basis with the State and local governments within the plume exposure Pctthway of the Emergency Planning Zones (10 mile EPZ), and with the NRC.

Communications are tested on a quarterly basis with those State Emergency Response Organizations within the ingestion pathway (50 mile EPZ).

Communications drills include the aspect of understanding of the contents of messages. In addition, the communications drills may be utilized to review and update emergency telephone numbers.

8-6 Revision 75 3/17

GG FSAR Communications are tested annually with Federal emergency response organizations.

Communications are tested annually between the Control Room, TSC and the EOF, and between the site, state/local EOCs and field assessment teams.

b. Emergency Repair Team A drill is conducted on an annual basis to determine the effectiveness of the Emergency Repair Team members and their equipment.

8-6a Revision 75 3/17

GG FSAR

c. Fire Brigade Each fire brigade is drilled as required by UFSAR Section 9B.9.2. A drill is conducted on an annual basis to determine the effectiveness of the local fire department working in conjunction with the Fire Brigade. This annual drill shall involve the participation of at least one of the local fire departments.
d. Medical Emergency Drill
  • A medical emergency drill, involving a simulated contaminated individual, which contains provisions for participation by local support service agencies (i.e., ambulance and offsite medical treatment facility), shall be conducted annually. The offsite portion of the medical drill may be performed separately, or as part of an exercise or other scheduled drill.
e. Radiological Monitoring Drill Plant environs and radiological monitoring drills, both onsite and offsite, are conducted on an annual basis to *determine the effectiveness of the collection and analysis of sample media. The drills include the utilization of communication equipment and demonstrate proper record keeping procedures.
f. Health Physics Drill A Health Physics Drill is conducted on a semiannual basis and involves response to and analysis of simulated elevated airborne and liquid samples and direct radiation measurements in the environment.
g. Text Deleted
h. Radiation Emergency Exercise An exercise is conducted on a biennial basis. The exercise involves 8-7 Revision 75 3 /17

GG FSAR participation of offsite emergency support personnel within the local and State Emergency Organizations. This exercise simulates emergency conditions requiring the declaration of a Site Area Emergency or General Emergency.

At least every eight years, a joint exercise appropriate to a Site Area Emergency or General Emergency that involves Federal, State, and local emergency response personnel, organizations, and agencies is conducted. The scope of the exercise tests as much of the emergency plan (i.e., GGNS, State, and local) including the alert and notification system, as is reasonably achievable. The degree of public participation in this exercise is determined by the appropriate State agencies In each exercise cycle the scenarios are varied to provide the opportunity for the ERO to demonstrate proficiency in the key skills necessary to respond to the following:

1. Hostile action directed at the plant site.
2. No or minimal radiological release.
3. An initial classification of, or rapid escalation to, a Site Area or General Emergency.
4. Implementation of strategies, procedures and guidance developed under 10CFR50.54(hh)(2).
i. Radiation Emergency Drill Drill(s) are conducted periodically between exercises to ensure emergency response capabilities are maintained. At least one of the drill(s) include management and coordination of the emergency response, accident assessment, protective action decision making, and plant system repair and corrective actions. State and local agencies shall be allowed to participate in the drill(s) when requested.

8-7a Revision 75 '-3/17

GG FSAR

j. Hostile Action Based Exercise.

Hostile action based (HAB) exercises are performed in conjunction with a full scale exercise once every six years or once per eight year cycle. Full state participation is required every cycle, but states with more than one plume exposure pathway may alternate this participation between reactor sites.

k. Remedial Exercises.

Remedial exercises will be required if the emergency plan is not satisfactorily tested during the biennial exercise. State and local participation should be to an extent necessary to* show that appropriate corrective measures have been taken regarding the elements of the plan not properly tested.

8.3.3 Scenario Variety Documentation.

A record of scenarios shall be maintained documenting the content of scenarios used to meet the requirements of this Emergency Plan section.

8.4 Responsibilities The Manager, Emergency Preparedness is responsible for coordinating the implementation of the overall radiological emergency response planning and preparedness effort to incJude, but not be limited to:

a. Ensuring that the Emergency Plan complies with all Federal regulations, and that it is coordinated with the Grand Gulf Nuclear. Station Physical Security Plan and the emergency response plans of Claiborne County, Tensas Parish, and the States of Mississippi and Louisiana.

8-8 Revision 75 3/ 17

.~W'"'?'1

GG FSAR

b. Ensuring that Emergency Plan Procedures are consistent with Administrative, Security, Radiation Control, and Training Procedures, the Emergency Plan, and with each other.
c. Ensuring that training is offered annually for the emergency response personnel and local offsite support agencies and that training commitments for on-call emergency response personnel are met.
d. Ensuring that drills and exercises are conducted in accordance with. Section 8.3, and that necessary corrective actions are implemented.
e. Ensuring that the Plan and procedures are reviewed and updated on an annual basis
f. Ensuring that the commitments of the Public Information Program are met on an annual basis
g. Ensuring that maintenance and inventory of emergency equipment and supplies is performed on a quarterly basis.

The Manager, Emergency Planning interfaces with several organizations who have specific responsibilities for some of the above areas.

The Manager, Emergency Planning is responsible for ensuring that the commitments of the News Media Emergency Information Program and the Public Information Program are met.

He is also responsible for conducting specialized training and drills for personnel directly involved with these programs.

The Security Manager is responsible for revisions to the GGNS Physical Security Plan.

The Manager, Emergency Planning works with the above individuals, as well as with federal, state and loca~ personnel having responsibilities to the GGNS emergency preparedness program, to ensure that the commitments of the Plan are fully implemented.

Training opportunities are afforded to the Emergency Preparedness Staff to ensure that they are able to effectively carry out their assigned responsibilities.

8-9 Revision 70 11/13

GG FSAR 8.5 Review and Updating of the Emergency Plan and Emergency Plan Procedures The Plan shall be reviewed and updated as necessary on at least an annual basis. Letters of Agreement with offsite organizations and agencies are reviewed during the annual Plan review and updated as necessary. A change in original signatory(ies) to a given Letter of Agreement does not in itself require revision of that Letter. A change in applicability of content of a Letter of Agreement, however, does require a revision to that Letter.

,Emergency Plans of offsite organizations and agencies are reviewed as requested.

The Manager responsible for the Quality Assurance programs is responsible for conducting I an independent review of the Emergency Preparedness Program,. to verify compliance with the Quality Assurance Program Manual, the Fire Protection Plan, federal regulations, and operating license provisions. The review shall be conducted at intervals not to exceed 12 months or, as necessary, based on an assessment of performance indicators, and as soon as reasonably practicable after a change occurs in personnel, procedures, equipment, or facilities that potentially could adv~rsely affect emergency preparedness, but no longer than 12 months

\

after the change. In any case, all elements of the emergency preparedness program must be reviewed at least once every 24 months. The review must include an evaluation for adequacy of interfaces with State and local governments and drills, exercises, capabilities, and procedures. The results of the review, along with recommendations for improvements,. must be documented, maintained for a period of five years and reported to the Manager, Emergency Planning, Director, Regulatory and Performance Improvement, Site Vice President, and affected groups. The part of the review involving the evaluation for adequacy

  • of interface with State and local governments must be available to the appropriate State and local governments. In addition, the Manager, Emergency Planning, by virtue of his involvement with the Emergency Preparedness Program, provides an ongoing review.

Personnel performing reviews or audits of the Emergency Plan and/or Emergency Plan Procedures take into account and review corporate policy, state policy and plans, local plans, and the Vffious agreements and understandings with federal, state, and local support agencies and organizations.

s

  • r rr~~:r Revision 75 3/17 I

GG FSAR The Plan is a part of the GGNS FSAR,'but is maintained as a separate document. Document holders receive revisions to the Plan in a controlled manner as they are issued. Revised pages are dated and marked to show where revisions have been made.

The Manager, Emergency Planning is responsible for coordinating reviews and audits of 8-lOa Revision 70 11 / 13

GG FSAR the Emergency Plan and implementing procedures. In addition, the Manager, Emergency Planning, through letters, meetings, seminars, or other means available, ensures that all elements of the total emergency organizations are informed of revisions to the Plan.

Results of all exercises and each annual revision and change to the plan are reported to I reviewed by the Site Vice President, and Director, Regulatory and Performance Improvement, who provides management direction and control to ensure that all corrective actions are implemented.

8.6 Maintenance and Inventory of Emergency Equipment and Supplies The Manager, Emergency Planning, or his designee, is responsible for planning and scheduling the quarterly inventory and inspection of designated emergency equipment and supplies at GGNS. He, or his designee, ensures that identified deficiencies are corrected in a reasonable period of time.

All emergency equipment/instruments are inspected, inventoried and operationally tested on a quarterly basis and after each use. Lists of telephone numbers used in emergency response are reviewed and updated quarterly.

Designated emergency equipment and supplies and their storage locations are listed in Appendix B. Supplies having shelf-lives are checked and replaced as necessary.

Any deficiencies found during the inventory and inspection are either cleared immediately or documented for corrective action. There are sufficient reserves of emergency equipment/instruments available to replace any equipment which is removed from the emergency kits for calibration or repair. All emergency instruments are calibrated at the intervals specified by the FSAR, Section 12. A summary report of each inventory and inspection is prepared and submitted to file.

8-11 Revision 70 11 / 13

GG FSAR

8. 7 Educational lnfonnation to the Public Grand Gulf Nuclear Station, in conjunction with State and local agencies, provides the following written information to those members of the general public that reside within the 10 mile Emergency Planning Zone:
a.
  • Educational information on radiation
b. Personnel to contact for further information I
c. Protective measures, e.g. evacuation routes and relocation centers, sheltering, respiratory protection, radioprotective drugs
d. Special needs of the handicapped.

This information is disseminated via an Emergency Public Information publication mailed annually to residents of the, 10-mile EPZ, in accordance with the Public Education and Information Program included in Appendix H. This program addresses providing information to. the transient population. The Public Education and Information Program annually ensures the permanent and transient adult population within the plume exposure EPZ are provided an adequate opportunity to become aware of the above information.

8. 8 News Media Information A News Media Emergency Information Program was developed that includes details on arrange~ents for timely exchange of infonnation among the designated spokespersons and news media representatives. This program is included in Appendix H. The details for dealing with rumors are included in Emergency Plan Procedure 10-S-01-34. GGNS provides supporting informatio~ ~ state and local authorities to develop messages intended for the public. Messages to state and local authorities include infonnation concerning recommended protective actions.

This program also provides for an annual training session to acquaint the news media with the methodology to obtain information* during an emergency, as well as information about overall emergency preparedness for GGNS.

8-12 Revision 31 9/96

GG FSAR 9.0 RECOVERY In any declared Emergency, immediate actions are intended to limit consequence and provide maximum protection to plant personnel, the general public, and plant equipment. For a Site Area or General Emergency, once emergency phase corrective and protective actions have been implemented and effective controls established, emergency actions shift to the Recovery phase which includes reentry and recovery operations.

It is the responsibility of the Emergency Director to determine when the Recovery Phase can be initiated. The following criteria must be met before recovery operations can begin:

a. The plant must be in a controlled and stable condition
b. Release of radioactive material to. the enviromnent must be controlled and must be below any of the Emergency Action Level threshold values
c. Radiation levels must be stable or decreasing in all plant areas The Emergency Director discusses existing offsite conditions with appropriate State officials ptior to terminating a Site Area Emergency or General Emergency classification.

Recovery may be completed by the Emergency Organization before emergency termination. If recovery has .not *been accomplished by the tennination of the emergency, a recovery

_ organization is activated as described in Section 5.5. Its objective is to safely and effectively place the plant back in a safe operating condition or an acceptable long te1m condition.

Appropriate GGNS. and outside assistance *is mobilized to accomplish this objective. The Emergency Director is responsible for transmitting a notification to agencies com1ected to the GGNS Operational Hot Line (see Section 7.5.3.a.l) that the incident is terminated atid the pla11t is transitioning to the Recovery phase.

Recovery is conducted in compliance with nonnal occupational dose limits specified in 10CFR20. Significant release of radioactive materials during recovery is planned, controlled, and evaluated in advance for radiological impact, and appropriate offsite organizations and agencies informed of the scheduled release and estimated impact. Emergency Plan Procedures 9-1 Revision 76 9/17

GG FSAR provide methods of periodically estimating total population exposure.

9 .1 Recovery Operations The nature and extent of an emergency determine the required recovery operations and the size of the recovery organization that must be fom1ed. A recovery plan must be flexible enough to adapt to existing conditions. It is not possible to anticipate in advance all emergency conditions that may be encountered. General principles are addressed in this section that serve as a guide for developing a flexible plan of action. More detailed information is provided in Emergency Plan procedures.

The initial objectives of recovery operations are to determine damage to equipment, the installation of shielding, rope barriers and signs, the application of clearance tags, decontamination, and cleanup to place the plant in an acceptable long term condition. Other recovery operations are not initiated until the area affected by the emergency has been defined.

Particular attention is directed toward isolating and tagging out components and systems to control or minimize hazards. A systematic assessment is conducted to determine the extent of damage to plant equipment.

Once the initial objectives are completed, a detailed investigation of the accident causes and consequences, both to the plant and to the environment, is conducted. Repair work and modifications to plant equipment and/or changes to operating procedures are determined, approved, and performed. Test programs to confirm fitness for return to services are developed and implemented.

9-2 Revision 76 9/17

GG FSAR 9 .2 Reentry Operations Reentry operations are part* of the Recovery phase, and includes returning to areas that were precluded from enhy due to radiation levels or other hazards. For radiation hazards, an initial radiation assessment is performed to allow reentry and recovery operations. The following is a list of actions that should be performed prior to authorizing reentry operations into the affected areas:

a. Review available radiation survey data. Detennine plant areas potentially affected by radiation and/or contamination.
b. Review radiation exposure* margins of personnel who will participate m recovery operations. Detennine the need for, and source of additional personnel.
c. Review adequacy of radiation survey instmmentation and equipment (type, ranges, number, calibration, etc.).
d. Preplan survey team activities to include:
l. Areas to be surveyed
2. Anticipated radiation and contamination levels
3. Radiation survey equipment required
4. Shielding requirements and availability
5. Protective clothing and equipment required
6. Access control procedures
7. Exposure control limits and personnel dosimetry required
8. Decontamination requirements
9. Communications Initial reentry operations into plant areas include the following goals (in order of priority):
a. Determine recovery operation tasks (application of clearance tags, etc.)
b. Observe hazards or potential hazards limiting recovery operations
c. Conduct comprehensive radiation surveys of plant facilities and define radiological problem areas which could impede recovery operations
d. Post areas in the plant with radiological warning signs, and rope barriers.

9-3 Revision 76 9/17

GG FSAR Recovery operations are conducted in compliance with normal operational radiation exposure levels specified in 10CFR20. When possible, significant releases of radiation during recovery is planned, controlled, evaluated in advance for radiological impact, and appropriate offsite organizations and agencies informed of the scheduled release and estimated impact.

Emergency Plan . Procedures provide methods of peri~dically estimating total population exposure.

_)

9-4 Revision 43 10/ 00

APPENDIX A Emergency Plan Cross Reference and List of Procedures that Implement the Emergency Plan

GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN' SECTION PROCEDURES PROCEDURES (EPPI COMMENTS SECTION 1.0 DEFINITIONS requites no procedures*

. . SECTION 2.0 SCOPE AND APPLICABILITY contains no explicit actions or .responsibilities which should be implemented by procedures. There is an implicif

  • requiremmlt for a procedure to assure that chan&es to *any procedure - administrative, operational, security, radiation protection, or emergency -

be reviewed with respect to all related procedures to 888U1'e a coordinated emm-gency response will be provided when required.

2.1 Criterion for GGNS Emergency Plan Development 2.2 Applicability of -the Emergency Plan 2.2.1 General Information and Site Description 2.2.2 Population and Population Distribution 2.2.3 Emergency Plamring Zones 2.3 Scope of the Emergency Pim 2.3.1 Regulatory Requirements 2.3.2 1 Objectives of the Emergency Plan 2.4 1 Emergency PJm Interrelationships 2.4.1 Emergency Plan Procedures 2.4.2 Related Plans, Programs and Procedures 2.4.3 Participating Governmental Agencies Table 2-1 Public Facilities and Institutions 1 All emergency plan procedures prefaced with 10-S A-1 Revision 28 3/95

GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN1 SECTION PROCEDURES PROCEDURES {EPP) COMMENTS Table 2-2 Resident Population Distribution in Evacuation Area by Sector Figure 2-1 General Area Surrounding GGNS Figure 2-2 Site Layout Figure 2-3 Permanent Resident Population Distribution

/

Figure 2-4 Ten-Mile Emergency Planning Zone Figure 2-5 Fifty-Mile Emergency Planning Zone 3.1 1 Emergency Planning 3.2 Emergency Plan Steps 3.3 1,6 Emergency Direction and Assignments 4.1 Emergency Classification System 4.1.1 1,6 Unusual Event 4.1.2 1,6,34, EN-EP-609, 610 & 611 Alert 4.1.3 1,6,34, EN-EP-609, 610 & 611 Site Area Emergency 4.1.4 1,6,34, EN-EP-609, 610 & 611 General Emergency 4.2 Classification of postulated accidents.

Table 4-1 1, 38 Emergency Classification 5.1 Statement of GGNS organization.

5.2 Statement of normal station organization.

1 All emergency plan procedures prefaced with 10-5 A-2 Revision 72 11/14

GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN 1 SECTION PROCEDURES PROCEDURES {EPP} COMMENTS 5.2.l General Manager, Plant Operations 5.2.2 Manager, Operations 5.2.3 Manager, Maintenance 5.2.4 Manager, Radiation Protection 5.2.5 Manager, Planning, Scheduling and Outage 5.2.6 Manager, Training & Development 5.2.7 Shift Technical Advisor 5.2.8 Manager, Materials, Purchasing, and Contracts 5.2.9 Director, Nuclear Safety Assurance 5.3 Statement of normal station shift staffing.

5.4 Emergency Organization 5.4 Normal Station Shift 5.4.2 *EN-EP-801 22, EN-EP-609 Emergency Director 5.4.3 EN-EP-801 EN-EP-609 EOF Manager 5.4.4 EN-EP-801 EN-EP-609 Radiological Assessment Coordinator 5.4.5 EN-EP-801 EN-EP-609 Technical Advisor I.

5.4.6 EN-EP-801 EN-EP-609 Admin. & Logistics Coordinator I 5.4.7 EN-EP-801 EN-EP-609,34 Public Information Liaison I 5.4.8 EN-EP-801 6, EN-EP-609 Offsite Communicator I

1 All emergency plan procedures prefaced with 10-5 _A-3 Revision 75 3/17

GG FSAR EMERGENCY PLAN CROSS REFERENCE 1

EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN SECTION PROCEDURES PROCEDURES (EPP} COMMENTS 5.4.9 EN-EP-801 EN-EP-609 EOF Communicator 5.4.10 EN-EP-801 EN-EP-609 Lead Offsite Liaison 5.4.11 EN-EP-801 EN-EP-609 Offsite Liaison 5.4.12 EN-EP-801 12, EN-EP-609 Dose Assessor 5.4.13 EN-EP-801 EN-EP-609 Offsite Team Coordinator 5.4.14 EN-EP-801 EN-EP-609 Offsite Monitoring Team 5.4.15 EN-EP-801 EN-EP-609 Information Technology (IT) Specialist 5.4.16 EN-EP-801 EN-EP-610 EOF Log Keeper 5.4.17 EN-EP-801 EN-EP-610 Emergency Plant Manager (EPM) 5.4.18 EN-EP-801 EN-EP-610 TSCManager 5.4.19 EN-EP-801 EN-EP-610 TSC Communicator 5.4.20 EN-EP-801 1, EN-EP-610 Security Coordinator 5.4.21 EN-EP-801 EN-EP-610 ENS Communicator ,

5.4.22 EN-EP-801 EN-EP-610 Maintenance Coordinator 5.4.23 EN-EP-801 EN-EP-610 Engineering Coordinator 5.4.24 EN-EP-801 EN-EP-610 Radiological Coordinator 1 All emergency plan procedures prefaced with 10-S A-4 Revision 75 3/17

GG FSAR EMERGENCY PLAN CROSS REFERENCE 1

EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN SECTION PROCEDURES PROCEDURES (EPP) COMMENTS 5.4.25 EN-EP-801 EN-EP-610 Operations Coordinator 5.4.26 - EN-EP-801 30 Engineers (Mech./I&C/Elect.) I 5.4.27 EN-EP-801 EN-EP-610,35 Reactor Engineer r 5.4.28 EN-EP-801 EN-EP-611 OSC Manager I 5.4.29 EN-EP-801 EN-EP-611 Log Keeper - OSC I-5.4.30 EN-EP-801 EN-EP-611 Operations Support 5.4.31 EN-EP:-_801 EN-EP-611 Work Control Coordinator 5.4.32 EN-EP-801 EN-EP-611 Mechanical/l&C/Electrical Coordinator 5.4.33 EN-EP-801 EN-EP-611, Rad Chem Coordinator 5.4.34 EN-EP-801 34 Company Spokesperson 5.4.35 EN-EP-801 34 Technical Advisor -:)IC 5.4.36 EN-EP-801 34 JIC Manager 5.4.37 EN-EP-801 34 Log Keeper - JIC 5.4.38 EN-EP-801 34 Inquiry Response Coordinator 5.4.39 EN-EP-801 34 Press Release Writer 1 AU emergency plan procedures prefaced with 10-5 A-5 Revision 75 3/17

~ - -

GG FSAR EMERGENCY PLAN CROSS REFERENCE 1

EMERGENCY PLAN ADM1NISTRATIVE EMERGENCY PLAN SECTION PROCEDURES PROCEDURES (EPP) COMMENTS 5.5 EN-EP-611 Recovery Organization 5.6 Local services support (normal 10CFR20 limits on exposure or contamination) 5.6.1 Description of medical support 5.6.2 Fire Support 5.6.3 Law Enforcement Agencies 5.7 Coordination with Governmental Agencies.

5.7.1 MEMA and Miss. Div. of Radiological Health 5.7.2 LDEQ AND LHLS/EP 5.7.3 Port Gibson/Claiborne Co. Civil Defense 5.7.4 Tensas Parish Office of Homeland Security and Emergency Preparedness 5.7.5 6 NRC 1 All emergency plan procedures prefaced with 10-S A-Sa Revision 72 11/14

GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINIS1RATIVE EMERGENCY PLAN1

  • SECTION PROCEDURES PROCEDURES (EPP) COl\1MENTS 5.7.6 DOE 5.7.7 INPO 5.7.8 U.S.C.G.

5.8 EN-EP-609 Contractor Assistance 5.9 Support for Federal Response Table 5-1 6 Minimum shift staffing Figure 5-1 Deleted Figure 5-2 Normal Station Organization Figure 5-3 Emergency Organization Figure 5-4 Emergency Organization Figure 5-5 Interrelationships of Emergency Response Organizatio~s Figure 5-6 Federal Response Management Diagram 6.1 Initiating emergency measures 6.1.1 22 Plant Administrative Procedures 6.1.2 EN-EP-610 Security Plan 6.2 Activation of emergency organization 6.2.1 Control room operators 6.2.2 Shift Superintendent 1 All emergency plan procedures prefaced with 10-S A-6 Revision 72 11 / 14

GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINIS1RATIVE EMERGENCY PLAN1 SECTION PROCEDURES PROCEDURES {EPP) COMMENTS 6.2.2 Shift Manager 6.2.3 STA 6.2.4 1,6,34 Emergency Director 6.3 Assessment Actions 6.3.1 1 Assessment actions-during Unusual Events 6.3.2 Assessment actions during Alerts 6.3.3 Assessment actions during Site Area Emergencies 6.3.4 1 Assessment actions during General Emergencies 6.4 Corrective Actions 6.5 Protective actions 6.5.1 Protective cover, evacuation, personnel accountability 6.5.1.a 11, EN-EP-609 GGNS 6.5.1.b 11 Offsite areas 6.6 11 Contamination Control Measures 6.7 Aid to affected personnel 6.7.1 17,20 Emergency Personnel Exposure 6.7.2 11 Decontamination and First Aid 6.7.3 19 Medical Transportation 1 All emergency plan procedures prefaced with 10-S A-7 Revision 72 11 / 14

GG FSAR EMERGENCY PLAN CROSS REFERENCE 1

EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN SECTION PROCEDURES PROCEDURES (EPP) COMMENTS Table 6-1 12 Recommended Protective Actions Figure 6-1 Deleted Figure 6-2 6, EN-EP-609 Emergency Notification Form 7.1 Facilities and Equipment 7.2 Control Room 7.3 39 Emergency Response Facilities 7.3.1 EN-EP-610 TSC 7.3.2 EN-EP-611 osc 7.3.3 EN-EP-609 EOF 7.3.4 EN-EP-609 BEOF 7.3.5 34 Joint Information Center 7.4 County and State Emergency Centers 7.4.1 Claiborne County EOC 7.4.2 Mississippi State EOC 7.4.3 Tensas Parish EOC 1 All emergency plan procedures prefaced with 10-S A-8 Revision 72 11 /14 l

GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN 1 SECTION PROCEDURES PROCEDURES (EPP) COMMENTS 7.4.4 Louisiana State EOC 7.5 Ol-S-10-5 Communications Systems 7.5.1 Telephone System .

\

7.5.2 Plant Paging System & Sound Powered Phones 7.5.3 01-S-10-5 1,6, EN-EP-611 Emergency Communications Equipment 10-S-01-6 7.5.4 Alert Notification System 7.6 Assessment Facilities 7.6.1 12 Onsite Systems and Equipment 7.6.2 Offsite Monitoring Equipment and Facilities 7.6.3 14 Radiological Assessment Laboratories 7.6.4 'Post-Accident Sampling Capability 7.6.4 Ol-S-10-5 28 Designated Emergency Vehicles 7.7 11 Protective Facilities 7.8 Ol-S-10-5 First Aid and Medical Facilities.

7.9 01-S-10-5 Rescue and Damage Control Equipment 7.10 Ol-S-10-5 Personal Protective Equipment Table 7-1 EN-EP-609 GGNS Operational Hot Line Figure 7-1 Emergency Facilities 1 All emergency plan procedures prefaced with 10-S-OJ,.. A-9 Revision 75 3/17

GG FSAR EMER GENC Y PLAN CROS S REFE RENC E 1

ADMINISTRATIVE EMERGENCY PLAN EMERGENCY PLAN COMMENTS PROCEDURES PROCEDURES (EPP)

SECTION Technical Support Center Figure 7-2 Operations Support Center Figure 7-3 Emergency Operations Facility Level I Figure 7-4 Emergency Operations Facility Level II Figure 7-5 Emergency Operations Facility Location Figure 7-6

. Backup Emergency Operations Facility Figure 7-7 Deleted Figure 7-8 Joint Information Center Layout Figure 7-9 Deleted Figure 7-10 Deleted Figure 7-11 Communications Interfaces Figure 7-12 Siren Locations Figure 7-13 Organizational Preparedness 8.1 Training 8.2 EN-TQ-110

)

General Emergency Plan Training 8.2.l EN-TQ-110 Emergency Preparedness Training Specialized and 8.2.2 EN-TQ-110 Emergency Plan Procedure Training Revis ion 70 11 / 13 A-10 1 All emerg ency plan proce dures prefac ed with 10-S GG FSAR EMERGENCY PLAN CROSS REFERENCE EMERGENCY PLAN ADMINISTRATIVE EMERGENCY PLAN1 SECTION PROCEDURES PROCEDURES (EPP) COMMENTS 8.2.3 Ol-S-10-3 Orientation and Training Program for Offsite Support Agencies 8.3 37 Drills and Exercise 8.3.1 Drill and Exercise Scenarios 8.3.2 Drill and Exercise Schedule 8.4 01-S-10-3 Responsibilities 8.5 Ol-S-10-3 Review of Emergency Plan and Emergency Plan Procedure 8.6 Ol-S-10-3, 5 39 Maintenance and Inventory of Emergency Equipment and Supplies 8.7 01-S-10-3 Educational Information to the Public 8.8 34 News Media Information 9.1 EN-EP-613 Recovery Operations 9.2 23, EN-EP-613 Reentry Operations Appendix A Reserved AppendixB List of supplies Appendix C Reserved Appendix D Letters of Agreement from offsite organizations AppendixE Evacuation Time Estimates 1 All emergency plan procedures prefaced with 10-5 A-11 Revision 76 9 /17

GG FSAR EMERGENCY PLAN CROSS REFERENCE 1

EMERGENCY PLAN ADMINISTRATIVE . EMERGENCY PLAN SECTION PROCEDURES PROCEDURES (EPP) COMMENTS AppendixF Index of Supporting Plans Appendix G Reserved AppendixH 34 News Media Emergency Information Program and Public Education and Information Program Appendix I Reserved

(

1 All emergency plan procedures prefaced with 10-S A-12 Revision 70 11 / 13

GG FSAR 1

LIST OF PROCEDURES THAT IMPLEMENT THE EMERG ENCY PLAN 10-5-01-1 Activation of Emergency Plan (EPP-1)

(EPP-1) Upon recognition that abnormal plant or site conditions exist, this procedure will be used by the operator to determine the appropriate EAL(s), properly classify the emergency condition and action to be taken for the emergency classification.

10-5-01-2 Unusual Event (EPP-2)

DELETED - Superseded by 10-5-01-1.

)

10-5-01-3 Alert (EPP-3)

DELETED - Superseded by 10-5-01-1.

10-S*:01-4 Site Area Emergency (EPP-4)

DELETED - Superseded by 10-5-01-1.

10-5-01-5 General Emergency (EPP-5)

'DELETED - Superseded by 10-5-01-1.

10-5-01-6 ; Notification of Offsite Agencies and Plant On-Call Emergency Personnel (EPP-6)

This procedure lists the methods of notifying Emergency Organization Personnel; for notifying Federal, State, and local authorities; for notifying outside service agencies; and for keeping the proper communication J;"ecord.

10-5-01-7 Activation of Emergency Facilities (EPP-7)

DELETED-Superseded by 10-5-01-3, 10-5-01-29, 10-5-01-30, and 10-S-01-33 10-5-01-8 Fire (EPP-8)

DELETED - Superseded by 10-5-03-2 10-5-01-9 Release of Toxic Material (EPP-9)

DELETED - Superseded by 10-5-01-1 (EPP-1) and 10-5-01-29 (EPP-29) 10-5-01-10 Natural Occurrences (EPP-10)

DELETED - Superseded by 05-1-02-Vl-1, 05-1-02-VI-2, and 05-S-02-Vl~3..

10-5-01-11 Evacuation of Onsite Personnel (EPP-11)

This procedure provides the guidelines for evacuation and accountability of personnel during an emergency. /

10-5-01-12 Radiological Assessment and Protective Action Recommendations (EPP-12)

This procedure provides guidance for performing radiological assessment during

. emergencies.

lQ.;.S-01-13 Onsite Radiological Monitoring (EPP-13).

DELETED-Superseded by 10-S-01-14 (EPP-14) 10-5-01-14 Emergency Radiological Monitoring (EPP-14)

This procedure provides guidelines for performing radiological surveys outside of the restricted area during emergency conditions._ Instructions for dose rate measurements and collection and analysis of radioiodines are included.

A-13 Revision 31 9/96

GG FSAR LIST OF PROCEDURES THAT IMPLEMENT THE EMERGENCY PLAN 10-5-01-15 Site Access Point Operations (EPP-15)

DELETED 10-5-01-16 Personnel Accountability (EPP-16)

DELETED-Superseded by lO~S-01-11 (EPP-11) 10-5-01-17 Emergency Personnel Exposure Control (EPP-17)

This procedure provides gi.Iidelines for the issuing dosimetry and RWP access during emergencies.

10-5-01-18 Personnel Search and Rescue (EPP-18)

This procedure provides guidelines for performing search and rescue operations in order to locate and/ or rescue individuals that have not been accounted for.

10-5-01-19 Personnel Injury (EPP-19)

This procedure provides for handling those individuals who have been injured and must be transported off site.

  • 10-5-01-20 Administration of Thyroid Blocking Agents (EPP-20)

This procedure provides guidance on the use of potassium iodide as a thyroid blocking agent to prevent thyroid uptake of radioactive iodine and the subsequent dose.

10-5-01-21 Evacuating Personnel and Vehicle Contamination Control* (EPP-21)

DELETED-Superseded by 10-5-01-11 (EPP-11)

EN-EP-613 Recovery This procedure provides guidance for the Recovery phase of on emergency and the formation of a Recovery organization.

10-5-01-23 Reentry (EPP-23)

This procedure provides general guidance for the Reentry Operations.

10-5-01-24 Maintenance of Emergency Preparedness (EPP-24)

DELETED - Superseded by 01-5-10-5.

10-5-01-25 Onsite Personnel Response (EPP-25)

DELETED-Superseded by 10-5-01-11 (EPP-11) 10-5-01-26 Offsite Emergency Response (EPP-26)

This procedure provides instructions for offsite emergency personnel that are ordered to report to the site during an emergency.

10-5-01-27 Public Information (EPP-27)

DELETED - Superseded by 10-5-01-34 10-5-01-28 Control of Designated Emergency Vehicles (EPP-28)

. This procedure provides a description of the administrative controls over company-owned A-14 Revision 76 9/17

GG FSAR LIST OF PROCEDURES THAT IMPLEMENT THE EMERGENCY PLAN vehicles designated for use during an emergency.

EN-EP-611 Operations Support Center (OSC) Operations This procedure provides general instructions for the Operations Support Center (OSC) including: facility activation, personnel responsibilities, staffing and coordination of Emergency Response Teams.

EN-EP-610 Technical Support Center (TSC) Oper_ations This procedure provides general instructions for the TSC including: facility activation, personnel responsibilities, staffing and coordination between the Control Room, and the Operations Support Center.

EN-EP-609 Emergency Operations Facility (EOF) Operation This procedure provides instructions for the activation operation of the EOF.

10-5-01-34 Joint Information Center (TIC) Operations (EPP-34)

This procedure provides instruction for dissemination of public information and the activation and operation of the ENMC and EIC.

10-5-01-35 Core Damage Assessment (EPP-35)

This procedure provides guidance for determining if core damage may or has occurred, and estimating amount of reactor core damage under accident conditions.

10-S-01-36 Incident Command Post (ICP) Operation This procedure provides general instructions for the activation and operation of the Incident Command. Post 10-S-01-37 Communication Drill This procedure provides guidance for performing communication drills.

10-S-01-38 EAL Contingency Planning This document identifies*the plant instruments that are the designated indicators of Emergency Action Level (EAL) entry criteria. It then analyzes each primary instrument for backup/alternative indications allowed by the EAL, Instrument redundancy and Correlation between EAL requirements by Operating Mode versus related Tech Spec/TRM/ODCM. This procedure is entered when any of the equipment listed in the attachments is identified to be out of service

  • IO-S-01-39 Grand Gulf Equipment Important to Emergency Response This procedure ensures that when equipment important to emergency response(emergency preparedness [EP] equipment) is removed from service for maintenance or is in a degraded condition, the correct restoration priority is assigned, compensatory measures are implemented, and the equipment is restored to a functional condition promptly EN-TQ-110 Emergency Response Organization Training Program This procedure describes and implements training for GGNS ERO to ensure a constant state of preparedness for and during emergencies.

A- 15 Revision 75 3/17

GG FSAR GENCY PLAN LIST OF PROCEDURES THAT IMPLEMENT THE EMER 01-5-10-3 Emergency Planni ng Depar tment Responsibilities zational structure of the This proced ure describes the responsibilities and organi l maintenance of the Emergency Planni ng staff, provid es guidance for the overal es for maintenance and Emergency Plaftning progra m, and defines the responsibiliti control of the GGNS Emergency Plan.

EN-EP-306 Drills and Exercises exercise, proced ure for This proced ure describes the type and frequency of drills and review and approv al of condu cting a drill or exercise, and metho d for manag ement drills and exercises.

01-S-10-5 Contro l of Emergency Response Equip ment and Facilities inspection, mainte nance This proced ure prescribes the requir ement s for the inventory, and operability checks of Emergency Facilit ies and Equip ment.

01-S-01-8 Emergency Prepar edness Action Tracking System DELETED - Super seded by 01-5-10-3.

EN-EP-801 Emergency Response Organ ization ed to an ERO positio n and The proce dure outlines responsibilities for person nel assign rt an emerg ency for other compa ny person nel who may be called upon to suppo to an ERO positio n.

respon se effort, but are not directl y assign ed A- 16 Revision 75 3/17

GG FSAR This appendix contains a list of supplies by general category maintained in the emergency kits and lockers located in the various emergency facilities.* Detailed lists of the inventory are maintained in accordance with 01-S-10-5, Control of Emergency Response Equipment and Facilities.

EMERGENCY EQUIPMENT MAINTAINED IN THE CONTROL ROOM/TSC/OSC/EOF A. Protective. Equipment B. Radiological Monitoring Equipment C. Communications Equipment D. Emergency Supplies EMERGENCY EQUIPMENT MAINTAINED IN THE BEOF A. Communications Equipment EMERGENCY EQUIPMENT MAINTAINED AT RIVER REGION MEDICAL CENTER AND CLAIBORNE COUNTY HOSPITAL A. Protective Equipment B. Radiological Monitoring Equipment C. Emergency Supplies EMERGENCY FOOD AND WATER SUPPLIES A. Emergency food and water supplies are maintained in the Control Room envelope in sufficient quantity to maintain five people for five days.

B. Emergency food and water supplies are maintained in the EO F in sufficient quantity to maintain seven people for five days.

B-1 Revision 75 3/17

GG FSAR APPENDIXC Reserved C-1 Revision 23 -6/92

APPENDIX D Letters of Agreement

GG FSAR U. S. Department of Energy, Qak Ilidge Operations Port Gibson/Claiborne Collllty* Civil. befet1se Council Tensas Parish Office ofHontel~d Security and D-8>

Emergency Preparedness**** *

.Port Gibson Police Department:*:

n~9**

  • Claiborne Collrtty.Sherilfs Departmen t* D-JO *l Clai b<>me Co\lllty Fite Depart01ent
  • 1 1
Claiborne*. County Hospital D~13
  • RJver Ilegioil *Medical* C!enter ***
  • Text Deleted INPO D-19<

. Governor's Office:ofHomeland Security and

  • 0-29 Emerg~ncy :Preparedness . . .
  • 0~34 .

Metro Ambulance sJrvice$ *(RUl°tll), *Ine.* *

  • Revision74 12/15

,July 14, 2014 Mr. Alain Grosjean Senior Project Manager Entergy Nuclear 450 Broadway Buchanan! Nevv York .I 0511

Dear l'v1r. Grosjean:

LETTER OF AGREEMENT - RADIATION EMERGENCY ASSISTANCE CENTER/TRAINING SITE (REAC/TS) SUPPORT I Please reference your letter dated July I, 2014, requesting that the Department of Energy (DOE)

REAC!TS facilities and team continue to be available to provide back-up capability and assistm1ce to the Entergy Nuclear 1s nuclear facilities in the event of a radiological emergency.

This response constitutes our agreement to provide this service upon your request. The agreement remains in effect until terminated in \\'Ti ting by either party.

We wish to remind you that our REAC/TS facilities in the Oak Ridge Institute for Science and Education (ORISE) are government controlled and operated by the Oak Ridge Associated Universities under contract ivith DOE. Therefore, REAC/TS is prohibited from competing with commercial firms that can provide radiological emergency services. Only if the magnitude or uniqueness of a radiological emergency exceeds your in-house and commercially available capabilities \vould REAC/TS be authorized to provide back-up services.

Sinc,e these facilities are government controlled, no fee or retainer is required to assure the availability of back-up services by REAC/TS. However, if you utilize the services of REA CITS}

vve should expect to recover those costs that could reasonably be related to handling such an incident, including alJ charges billed to DOE or ORISE by hospitals and physicians. Information concerning the REAC/TS facilities, staff, services available, and procedures for seeking REAC/TS assistance can be obtained by direct contact with the REAC/TS Director 1 Dr. Albert WHey, ORISE, Post Office Box 117, Oak Ridge, Tennessee 37831, or at telephone number (865) 576"313 L Sincerely, 4

Michele G. Branton Contracting Officer I s Rcpresentati ve cc:

l\fatthe1.v P, A1bet1} ORJSE Albert L Wiley, ORISE D-2 Revision 72 11/14

GG FSAR

\

TEXT DELETED D-3 Revision 70 11/13

GG FSAR TEXT DELETED D-4 Revision 51 02/ 04

GG FSAR PHIL BRYANT GOVERNOR.

October 16, 2012 Mike Perito Vice President Operations Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, Mississippi 39150

Dear Mr. Perito:

Radiological., security and other emergencies could occur at the Grand. Gulf Nuclear Staci.on and pose threats to the people of the State of Mississippi and jeopar dize the safety of plant employees.

As Governor of the State of Mississippi; I assure you that in the event of an emergency at the Grand Gulf Nuclear Station, I will exercise my authority to provide assistance as delineated in the Mississippi Radiological Emergency Prepan.-dness Pfan, Volume HI, of the Mississippi Comprehensive Emergency Management Plan.

This letter may be made part of the Grand Gulf Nuclear Station Emergency Plan, and may be used to indicate a commitment by the State of Mississippi to respond to an emergency at the Grand Gulf Nucle ar Station.

STATE OF MISSISSIPPI

  • OFFICE OF THE GOVE RNOR POST OFFICE BOX 139 *JACKSON.MISSISSIPPI 39105
  • TELEPHONE: (601} :359-3150
  • FAX: (oOI) 359,3741
  • www.go vemm:brynnc-.co D-5 Revision 70 09 / 13

GG LOA No. 10008476 FSAR March 3, 2008 Page 1 of 4 LETIER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the MISSISSIPPI EMERGENCY MANAGEMENT AGENCY This re-stated Letter of Agreement hereby supercedes and replaces Letter of Agreement No. 10008476 dated October 24, 2002 between Entergy Operations, Inc. and the Mississippi Emergency Management Agency.

In regard to the preparation, maintenance, and implementation of the Emergency Plan required by the Nuclear Regulatory Commission, Entergy Operations, Inc. (Entergy Operations), acting as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf), and the Mississippi Emergency Management Agency (MEMA), acting on behalf of the State of Mississippi, undertake and agree as follows:

MEMA will maintain the Mississippi Radiological Emergency Preparedness Plan, Vol Ill, of the Mississippi Comprehensive Emergency Management Plan, prepared pursuant to the Letter of Agreement between the parties dated June 3, 1981, for the State of Mississippi and approved by the Federal Emergency Management Agency (FEMA) and will provide assistance to Entergy Operations and will support the Grand Gulf .Emergency Plan, as required by the Nuclear Regulatory Commission, in the following areas:

A. MEMA shall provide overall coordination of emergency management arrangements between Entergy Operations and various Mississippi state agencies and local governments, which are providing assistance to Entergy Operations in the event of an emergency at Grand Gulf.

B. MEMA shall assist in maintaining the Grand Gulf Emergency Plan and in conducting a program of training for the State and local personnel involved in providing emergency assistance to Entergy Operations.

r-

e. MEMA shall maintain and op~rate a communications system necessary for the effective implementation of the Grand Gulf Emergency Plan.

D. MEMA shall ensure evacuation signs are available as necessary for the effective implementation of the Grand Gulf Emergency Plan.

D-Sa Revision 60 07I 08

GG FSAR LOA No. 10008476 Page 2*of 4 E. MEMA agrees to take whatever additional action and to provide additional services, as Entergy Operations shall reasonably request, in the implementation of the Grand Gulf.

Emergency Plan. If it is determined that Entergy Operations' request for additional services is*

unreasonable due to excessive costs or due to the fact that the additional services differ materialty from other services performed under this Agreement, then MEMA shall have no obligation to perform such services unless the parties mutually agree upon an equitable adjustment and modify this Agreement accordingly.

II A. MEMA agrees to provide the above described assistance and support, and Entergy Operations agrees to provide MEMA. in consideration thereof, an amount of money, not to exceed

$266,250 per year as allocated to MEMA and county governments as shown on Attachment A hereto. Distribution to MEMA will be made on January 1, April 1, July 1, and October 1 of each year and paid directly to the counties on an annual basis. These funds shall be used to cover the actual expenses incurred by state agencies and local governments in support of the Grand Gulf Emergency Plan.

B.. MEMA and local governments agree to keep and maintain detailed records of expenses incurred in support of the Grand Gulf Emergency Plan. Such records shall be in auditable form and will be subject to audit by Entergy Operations.at any time within a five-year period following expenditures.

Ill All of the equipment and facilities purchased pursuant to this or any previous Agreement shall remain the property of the Owners of Grand Gulf Nuclear Station.

IV Unless terminated in accordance with, this paragraph, this Agreement will remain in effect throughout the operational term of Grand Gulf which has an estimated forty (40) year operational design life. Entergy Operations may terminate this Agreement at any time upon thirty (30) days written notice. If the parties are unable to negotiate and equitable adjustment for changed conditions in accordance with Article V, MEMA may terminate this agreement by giving Entergy Operations thirty (30) days prior written notica.

D-Sb Revision 60 07 /08

GG FSAR LOA No. 10008476 Page 3 of 4 v

The Parties recognize that MEMA's performance of its obligations under this Agreement in the manner and for the amounts of money set forth herein, is predicated upon conditions prevailing on the effective date of this Agreement. The conditions referred to include, but are not limited to, economic and monetary conditions, and conditions resulting from actions created by governmental*

authorities, laws, and regulations in force on and after the date of this Agreement. If it is mutually determined that such conditions change so as to materially differ from such conditions existing on the effective date of this Agreement, and significantly impair or make economically impractical the ability of MEMA to fulfill its obligations hereunder, then an equitable adjustment will be negotiated by the parties and the costs and other applicable terms of this Agreement will be modified accordingly.

Accepted and Agreed ENTERGY OPERATIONS, INC., MISSISSIPPI EMERGENCY MANAGEMENT as Agent for the Owners AGENCY By:

b-.

Title:

Vice President, Operations Date: 3-5-~oog D-Sc Revision 60 07 /08

GG FSAR LOA NO. 10008476 AMENDMENT NO. 17 to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the MISSISSIPPI EMERGENCY MANAGEMENT AGENCY

1. The first paragraph of Section I of the Letter of Agreement is hereby amended to read as follows:

"MEMA will maintain the Mississippi Radiological Emergency Preparedness Plan Vol. Ill of the Mississippi Comprehensive Emergency Management Plan, prepared pursuant to the Letter of Agreement between the parties dated June 3, 1981, for the State of Mississippi and approved by the Federal Ernergency Management Agency (FEMA) and will provide as~istance to Entergy Operations and will support the Grand Gulf Emergency Plan, including events involving hostile actions against the plant, as required by the Nuclear Regulatory Commission, in the following areas:*

All other terms and conditions, except as duly modified by this Amendment, shall remain in full force and effect.

Accepted and Agreed to:

ENTERGY OPERATIONS,. INC., MfSSISSIPPI EMERGENCY MANAGEMENT as Agent for the Owners

  • AGENCY David Bauer By:

-&-~ 2014.032716:31:52 By: /~.,{ff~ J{J,/.5fi4;;:;)

\~ ..u........._ -05'00' Dave Bauer

Title:

Manager, Strategic Sourcing Materials

Title:

Date: March 27. 2014 Date:

10008476-17 MEMA PAGE I OF I GGNS D-Sd Revision 75 3/17

GG FSAR LOA No. 10008476 CHANGE ORDER NO. 20 THIS CHANGE ORDER is issued pursuant to Agreement No. 100008476 effective January 1, 1992 between Entergy Operations, Inc. ("Entergy Operations") and Mississippi Emergency Management Agency ("Contractor"). Inasmuch as it has been agreed to by both parties concerned, the following changes are hereby incorporated into the Agreement No.10008476 effective February 16, 2016.

1. Paragraph C of Section I. of the Letter of Agreement is hereby amended to read as follows:

"MEMA shall maintain and operate a communications system necessary for the effective implementation of the Grand Gulf Emergency Plan; and will support Tensas Parish, Louisiana emergency plan communications ifrequested. and within the capability of MEMA" All other terms and conditions, except as duly modified by this Change Order, shall remain in full force and effect.

Accepted and Agreed to:

ENTERGY OPERATIONS, INC., MISSISSIPPI EMERGENCY MANAGEMENT as Agent for the Owners AGENCY By: Kimberly- Kimberly Peyton By:

2016.02.22 Peyton 16:03:36 -06*00*

Kimberly Peyton/ Tracy Askew

Title:

Procurement Specialfst Manager r

Title:

Date: February 16, 2016 Date; Dlgitall)I $1gnQd by Tracy L Aslr.ew

. ON:! en:Tr.:icy L ~~w. o"MP&C.

    • 'Ou:::PNPS.

,;jnai("'taskew@o11ntergy.com, c~us*

oat,.: 2016.02..22 t6!l2.'42 *06'00' 100084 76-20 PAGE 1 OF 1 Rev02 03/20/14 GGNS D-SE Revision 75 3/17

GG FSAR TEXT DELETED 0-Sf Revision 75 3/ 17

GG FSAR JOHN BEL EDWARDS GO\'lm.NOR

~tate of 1!.oui.siana JAMES .WASKOl\l DlRl<<:'l'Olt Governor's Office of Homeland Security an,d Emergency Preparedness January 14, 2016 Mr. Kevin Mulligan Vi~e President of Operations Grand Gulf Nuclear Station Post Office Box 756 Port Gibson, MS 391,so

Dear Mr. Mulligan:

I am fully aware that emergencies (radiological, securityl etc.) could occur at Grand Gulf Nuclear Station. These emergencies could pose a threat to the people of the State of Louisiana.

As Director of the Governor's Office of Homeland Security and Emergency Preparedness (GOHSEP) for the State of Louisianat I assure you that in the event of an emergency at Grand Gulf Nuclear Station, I wm exercise my authority to provide assistance as delineated in the Louisiana Peacetime Radiological Response Plan for the health and safety of Louisiana citizens, and provide interstate and interlocal cooperation with the State. of Mississippi within the capabilities of our State, if reqµested. 'v This letter may be part of the Grand Guff Nuclear Station Emergency Plan and may be used as an indication of the commitment by the State of Louisiana to respond to an emergency at Grand Gulf Nuclear Station.

Sincerely, 7667 Independence Boulevard

  • Baton Rouge, Louisiana 70806 * (225) 925.7500
  • Fax (225) 925-7501 D-6 Revision 75 3/17

GG FSAR LOA No. 10008488 October 24, 2002 Page 1 of 2 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the PORT GIBSON/CLAIBORNE COUNTY CIVIL DEFENSE COUNCIL This re-stated Letter of Agreement hereby supercedes and replaces the Agreement (NGSM1148) between Entergy Operations, Inc. and the Port Gibson/Claiborne County Civil Defense Council dated July 16, 2002 as amended.

In regard to the protection of the residents of Port Gibson and Claiborne County,.

Mississippi in the event of a nuclear incident at Grand Gulf Nuclear Station, Entergy Operations, Inc. (Entergy Operations), acting as agent for the Owners o~ Grand Gulf Nuclear Station (Grand Gulf), and the Port Gibson/Claiborne County Civil Defense Council undertake and agree as follows:

Entergy Operations shall be responsible for:

All onsite operations relating to an incident at Grand Gulf; Notification of the Port Gibson/Claiborne County Civil Defense Council during declared emergencies in accordance with the Grand Gulf Emergency Plan; Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Emergency Plan; Inviting the Port Gibson/Claiborne County Civil Defense Council to participate in all exercises; Reviewing the Port Gibson/Claiborne County Radiological Emergency Plan as requested; and, Disseminating a Public Information publication to the residents of the 10-mile Emergency Planning Zone (EPZ) in accordance with the Grand Gulf Emergency Plan.

10008488 D-7 Revision 49 03 / 03

GG FSAR LOA No. 10008488 Page 2 of 2 II In the event of a nuclear incident at Grand Gulf the Port Gibson/Claiborne County Civil Defense Council shall be responsible for:

Implementation of the Port Gibson/Claiborne County Radiological Emergency Plan; I

Activation of the Port Gibson/Claiborne County Emergency Operations Center (EOC);

Initiation of protective actions for Claiborne County, including GGNS site property located outside the GGNS Emergency Preparedness* Owner Controlled Area, bc1sed on the * * .

emergency classification of the incident; and, Coordination of additional emergency actions as may ~e necessary.

Ill Unless terminated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of Grand Gulf which has an estimated forty (40) year '

operations design life. Either party may terminate this Agreement at any time upon sixty (60) days written notice to the other.

Accepted and Agreed ENTERGY OPERATIONS>> INC., PORT GIBSON/CLAIBORNE COUNTY CIVIL as Agent for the Owners DEFENSE COUNCIL tray: By:

Title:

Vice President, Operations

Title:

Date: Date:

10008488 D-7a Revision 49 03 / 03

GG FSAR LOA NO. 10008488.

AMENDMENT NO. 06.

to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the PORT GIBSON/CLAIBORNE COU"1\' CIVIL DEFENSE COUNCIL

t. Section II of the Letter of Agreement is hereby amended to read as follows:

"In the event of a nuclear or hostUe action incident at Grand Gulf Nuclear Station, the Port Gibson/Claiborne County Civil Defense Council shall be responsible for the following:

Implementation of the Port Gibson/Claiborne County Radiological Emergency Plan; Activation .of the Port Gibson/Claibome County Emergency *operations Center (EOC);

Initiation of protective actions based on the emergency classificatic;,n of the incident: and, Coordination of additional emergency actions as may be necessary." _

All other terms and conditions, except as duly moC,itied by this Change Order, shall remain In full force and effect.

Accepted and Agreed to:

ENTERGY OPERATIONS, INC., PORT GIBSON/CLAIBORNE COUNTY CIVIL as Agent for the Owners DEFENSE COUNCIL D191UIIJ 11Qntd tr, l1111cn Ollplty

.I DN:m*F1111Cn(htpllly,o*MP&C.

By: _ , - . . . , ! , , ~ oue,:.Onllactt. By:

  • lffllllefcNi,lt0e111n;y.mm.c-US D11r.ZOlf.OU7 IU9:l9.05'00'

Title:

Sr. Procurement Specialist

Title:

Date: March 27, 2014 Date:

D-7b Revision 71 06/14

GG FSAR LOA No. 10008371/02 June 1, 2004 Page .1 of 2 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the TENSAS PARISH OFFICE OF HOMELAND SECURITY AND EMERGENCY PREPAREDNESS This re-stated Letter of Agreement replaces the existing Agreement dated April 1, 1999 and Amendment No. 01 thereto, dated March 1, 1999.

In regard to the protection of the residents of Tensas Parish, Louisiana in the event of a nuclear incident at Grand Gulf Nuclear Station, Entergy Operations, Inc. (Entergy Operations),

acting as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf), and the Tensas Parish Office of Homeland Security and Emergency Preparedness undertake and agree as follows:

Entergy Operations shall be responsible for:

All onsite operations relating to an incident at Grand Gulf; Notification of the Tensas Parish Office of Homeland Security and Emergency Preparedness during declared emergencies in accordance with the Grand Gulf Emergency Plan; Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Emergency Plan; Inviting the Tensas Parish Office of Homeland Security and Emergency Preparedness to participate in all exercise;

  • Reviewing the Tensas Parish Radiological Emergency Plan as requested; and, Disseminating a Public Information publication to the residents of the 10-mile Emergency Planning Zone (EPZ) in accordance with the Grand Gulf Emergency Plan.

II In the event of~ nuclear incident at Grand Gulf the Tensas Office of Homeland Security and Emergency Preparedness shall be responsible for.

Implementation of the Tensas Parish Radiological Emergency Plan; Activation of the Tensas Parish Emergency Operations Center (EOC);

Initiation of protective actions based on the emergency classification of the incident; and, Coordination of additional emergency actions as may be necessary.

D-8 Revision 52 07/04

GG FSAR LOA No. 10008371/03 June 1, 2004 Page 2of 2 Ill Agreement will remain in effect Unless terminated in accordance with this paragraph, this, has an estimated forty {40) year operations throughout the operational term of Grand Gulf, which at any time upon sixty (60) days written design life. Either party may terminate this Agreeme'nt notice to the other.

Accepted and Agreed:

ENTERGY OPERATIONS, INC., TENSAS PARISH OFFICE OF as Agent for System Energy HOMELAND SECURITY AND Resources, Inc. and South EMERGENCY Mississippi Electric Power Association PREPAREDNESS

  • ~ y: 7~ @ ~ By:_}?,~~-~-~.. . ,___.__ . _

Title:

V<<& ~I j -. -I t ) ~ Title :_U______.,_7'r!e-----=1o---~-------

(p I I y/o 'f Date:_b__._/...;_;;J5=--}-0-.:..'f _ _ __

Date:

D-8a Revision 52 07/ 04

GG FSAR LOA N0.10008371 AMENDMENT NO. 03 to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the TENSAS PARISH OFFICE OF HOMELAND SECURITY

1. Section II of the Letter of Agreement is hereby amended to read as follows:

"In the event of a nuclear or hostile action incident at Grand Gulf Nuclear Station, the Tensas Parish Office of Emergency Preparedness shall be responsible for the following:

Implementation of the Tensas Radiological Emergency plan;

\

Activation of the Tensas Parish Emergency Operations Center (EOC);

Initiation of protective adions based on the emergency classification of the incident; and,

. Coordination of additional emergency actions as may be necessary."

All other terms and conditions, except as duly modified by this Change Order, shall remain in futi force and effect.

Accepted and Agreed to:

ENTERGY OPERATIONS, INC., TEN$AS PARISH OFFICE OF HOMELAND as Agent for the Owners SECURITY

Title:

Sr. Procurement Specialist

Title:

Date: March 27, 2014 Date:

D-8b Revision 71 06/14

GG FSAR LOA No. 10008370 April 1, 1'994 AMENDMENT NO. 02 to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the PORT GIBSON POLICE DEPARTMENT Th is restated Letter of Agreement, in regard to the protection of the residents of Port Gibson and Claiborne County, Mississippi in the event of a nuclear incident at Grand Gulf Nuclear Station, Entergy Operations, Inc. (Entergy Operations), acting as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf), and the Port Gibson Police Department undertake and agree as follows:

Entergy Operations sh.all be responsible for:

All onsite operations relating to an incident at Grand Gulf; Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Emergency-Plan; and, Inviting the Port Gibson Police Department to participate in all exercises.

D-9 Revision 60 07 /08

GG FSAR LOA No. 10008370 Page 2* of 2 II In the event of a nuclear incident at Grand Gulf the Port Gibson Police Department shall be responsible for:

Assisting in traffic control; Providing back-up communications as necessary; Jnitiating protective actions as required; Coordinating the evacuation of personnel within the Port Gibson city limits as necessary; and, Coordinating additional emergency actions as may be necessary.

Ill Unless terminated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of ~rand Gulf which has an estimated forty (40) year operations design life. Either party may terminate this Agreement at any time upon sixty (60) days written I

\

notice to the other.

Accepted and Ag reed ENTERGY OPERATIONS, INC., PORT GIBSON POLICE DEPARTMENT as Agent for the Owners By: By:

Title:

M 1/£4~

Title:

Date:

4#~/07 Date:

Revision 60 07 /08

GG FSAR LOA NUMBER: NGS00060/01 EFFECTIVE DATE: March 1, 1999 AMENDMENT NO. 01 to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the PORT GIBSON POLICE DEPARTMENT This Amendment is issued pursuant to the terms and conditions of Agreement No.

NGS00060 (formerly G-3908) effective April 1, 1994 by and between Entergy Operations, lr:,c.

(Entergy Operations) and the Port Gibson Police Department. Inasmuch as it has been agreed to by both parties concerned, the following change is hereby incorporated into the Agreement.

The effective date of this Change Order is November 18, 1998:

. 1) The following new Section IV, Year 2000 Warranty, is hereby added to

~~~~~ .

IV If the Port Gibson Police Department, in providing materials and/or services to Entergy Operations under this Agreement in any way uses or relies upon any hardware, software, or firmware of the Port Gibson Police Department~ and/or materials of services to one or more third parties, that is dependent in any manner on the use of date-related data (collectively, the "Support Items"), the Port Gibson Police Department will ensure that such Support Items are Year 2000 Compliant. If the Port Gibson Police Department is or becomes aware that any Support Item is not Year 2000 Compliant, the Port Gibson Police Department shall immediately notify Entergy Operations in writing of such noncompliance without delay. Without limiting any other remedies Entergy Operations has under this Agreement or by law, the Port Gibson Police Department agrees to work diligently to correct any such noncompliance at no cost to Entergy Operations and to a schedule satisfactory to Entergy Operations.

D-9b Revision 39 7/99

GG FSAR

. AU other termq ~nd oondltfons. except as duty rnad1f1ad by. Jhl~ Ghange Order, ijf)ttU remai tfi full fore(t and effeot.

Accepted t\t'\ci Agreed:

PORT GIBSON POLJCE OEPAR¥~~T . *'

D-9c Revision 39 7/99

)

GG FSAR LOA No. 10008370 AMENDMENT NO. 03 to the t.En&R OF AGREf;MENT between ENTERGY OPIMTrONS, INC.

andU-e PORT GIBSON POL.ICE DEPARTMENT

1. The ffrst paragraph of the Letter of Agreement la hereby amended to read as fotloWS:

-rhis rstated a..tter or Agreement, in regard to the protaeaon of the residents of Port GibeOn end CraJbome County, M"msissippi in the f\r*nt ot a nuclear or hostile action inaJclem at Grand Gulf Nuclear Station, Entergy Operaaons, Inc. {Entergy Operat;one), acting as agent for the Owrter1 NUCiear Statton (Grand Gulf). and tt,1 PQ,t Gibson Polioe Department undertake and of Grand Gulf agree as foffow,:"

)

AC'cea,tet.1 end Agreed ENTERGY OP&RATIONS, INC., PORT GIBSON POUC& DEPARTMENT es Agent for the OWnera

.. Ol~llglll !dbf~

C
hlpll!Y

.. EIHI CP="8ncer C1lll*1,

.J--..s. .!!>> ~-...... a=MP&Gm -C~

- ~ i!rm11IMkl d~.eeffl, c,,,dr,P9,'

~ .: * .o..:201~:01271~aa1

~*. -05W Sr. Proc:uremeat Specialist Trtle:

March 27. 2014 Date:

PORT GIBSON POLICE DEPARTMENT 806 FARMER STREET

/

I P:~i G!9SO~, MS 39150

{ijOU 437..::5.1.0.l D-9d Revis ion 71 06/14

  • * * * * *  : * * **.** * *** ** :\ < .....:. . .*. . . .*.****.. . **. *.*.: .: *

.. .  ::Th~ Glai~otjie :C6~t; Sheriff D~pantllenfLetter f\greett1e11t~ *

  • **w~ich d¢tails support for: an emergency involving GGNS, is on **
... :**.* tile ltf ~c:cordan~e with federal :regulations dealing with :**.*.. :.
.* protection :of informatiort ¢cu:ic¢ming '.t1te: physica,l se¢urity *.. **

' ' ' . ' . :. ' ' ' '  : .' . ~ .. . : . " ... ' .. . ' . .. . .. . . . . . . .. . . .

  • Revision 7'4* 12/ts* .

GG

. *FSAR D<.; 11.: Revision 74 *.12/15 ..

GG FSAR TEXT DELETED D- lla Revision 75 3/17

GG FSAR LETTER OF AGREEMENT NO. 10411959 (formerly G-3909)

April 24, 2014 LETTER OF AGREEMENT Between ENTERGY OPERATIONS. INC.

and the CLAIBORNE COUNTY FIRE DEPARTMENT In regard to the protection of the residents of Port Gibson and Claiborne County, Mississippi in the event of a nuclear or hostile action incident at Grand Gulf Nuclear Station, Entergy Operations, Inc.

(Entergy Operations). acting .as agent for the Owners of Grand Gulf Nuclear Station (Grand Gulf). and the Claiborne County Fire Department undertake and agree as follows:

Entergy Operations shall be responsible for:

All onsite operations relating to an incident at Grand Gulf; Notification of the Port*Gibson/Claibome County Civil Defense Council during declared emergencies in accordance with the Grand Gulf Emergency Plan; Providing training for appropriate local offsite support agencies in accordance with the Grand Gulf Emergency Plan~ and.

  • Inviting the Claiborne County Fire Department to participate i~ annual fire drills.

II In the event of a* nuclear incident at Grand Gulf the Claiborne County Fire Department shall be responsible for.

Dispatching men and equipment as available to fight fires; Assisting local law enforcement officials in evacuation; Maintaining fire protection surveillance; an~.

Assisting in decontamination, as necessary.

D-12 Revisi~71 06/14

GG FSAR Ill Entergy Operations will, to the extent possible, fill Self Contained Brea1hing Apparatus bottles for the Cta.bome County Fire Department. This service will be coordinated through a representative designated by Entergy Operations. Entergy Operations will only fill those bottles with a current hydrostatic test date and that exhibit no signs of damage.

  • IV Unless terminated.in accordance with this paragraph, this Agreement will remain in effect throughout the operr;rtional term of Grand Gulf which has an estimated forty (40) year operations design life. Either party may terminate this Agreement at any time upon sixty (60) days written notice to the other.

Accepted and Agreed ENTERGY OPERATIONS, INC., CLAIBORNE COUNTY FIRE DEPARTMENT acting as agent for the.Owners Digit.ally signed by Franc:es Chii,ley By: .l.

  • DN: c11::Frances Chiple/, o:oMP&C.

....J',1\.-.c.a..s. s~ ~

em*f'chlplee!lentergy.A':Dl'II, ocUS Oate: 201'1.l>0.241 S;28;19-0S'OO' Tatle: Sr. Procurement Specialist Date: April 24, 2014 D-12a Rev~sion 71 06/14

  • -*-******--------------~------*-'-----------,-------------------------

GG FSAR LOA No. 10008 493-06 Janua ry 19, 2009 LETTE R OF AGRE EMEN T betwe en ENTE RGY OPER ATION S, fNC>>

and the CLAIB ORNE COUN TY HOSP ITAL (Note: Amend ment 05 was internal to Enterg y Opera tions.)

e Order 06 to Chang e Order This restat ed Letter of Agree ment (desig nated ~s Chang 1

e in name from Patien t's Choice Medica l Cente r of Claiborne

04) is issued to reflect the chang County to Claibo rne County Hospital.

inated /injure d individuals In regard to the treatm ent ahd care of radioactively contam as agent for the Owner s of Grand Gulf Nuclea r Station Enterg y Opera tions, Inc., acting and Claibo rne Count y Hospi tal ("Claib orne County Hospit al")

( Enterg y Opera tions") ,

0 this restate d Letter of Agree ment undertake and agree as follows in or ill person nel from A The Claibo rne Count y Hospital wm accep t and treat injured inated or overex posed as a result of an Grand Gulf Nuclea r Station that are radioactively contam m, the Claibo rne Gulf Nuclea r Station . As a minimu incident during the operat ion of Grand aid s to provid e decon tamina tion 1 first County Hospit al wm mainta in the capab ility and facilitie Station person nel that are of injured or ill Grand Gulf Nuclea r and emerg ency medica l treatm ent s and facilities will be availab le 24 radioactively contam inated or overexposed. These service rred to anothe r hospit al should the tre~tm ent required hours per day. Patien ts may be transfe Hospit al.

extend beyond the capab ilities of the Claibo rne County tions assista nce. develo p a.* The Claibo rne County Hospitat wm. with Enterg y Opera l person nel in admitt ing radioactively and maintain the proced ures to be followe d by the hospita contam inated /expos ed person nel.

Ho$pital an emerg ency C. Enterg y Opera tions will supply to the Claibo rne Count y l, and neces sary to treat kit containing supplie s not norma lly stocke d by the hospita by Enterg y Opera tions. The emerg ency kit will be mainta ined contaminated person nel. This use it as directe d in the' for the kit and Claiborne County Hospit al will provide storag e space nt to Paragr aph I.B above .

procedures develo ped pursua decon tamina tion of D. .Entergy Opera tions will provid e training on treatm ent and rne Count y Hospit al person nel on an annual radi.oact1vely contam inated individ uals for the Claibo n mutua lly agreea ble to both parties .

basis at a time and locatio ency drills design ed to E. The Claibo rne Count y Hospital will partici pate in the emerg g for Grand Gulf Nuclea r Station . These drills will test the compe tence of the emerg ency plannin .

and at times mutua lly agreea ble to both parties be scheduled on dates

.1.

GON.!J 10008493-00 Claiborne County Kospitaf 0-13 Revision 70 11 / 13

GG FSAR )

LOA No. 10008493.;06 Page 2 of 2 II A. Charges for the services specified in Section LA. above wil I be paid to the Claiborne County Hospital by Entergy Operations on the basis of .the standard fee charged by the Claiborne County Hospital for each service provided.

B. The Claiborne County Hospital wm submit invoices to Entergy Operations when services as provided by this Agreement have been rendered. Such invoices shall reference the Agreement No. shown on the first page of this Agreement and shall be mailed to: Entergy Operations, Inc., P.O. Box 7561 Port Gibson, MS 39150, Attn: Accounts Payable*

Contracts.

A. If the Claiborne County Hospital, in providing seivices to Entergy Operations under this Agreement, in any way uses or relies upon any hardware, software, or firmware of the Claiborne County Hospital, and/or materials or services of one or more third parties, that is dependent in any manner on the use of date-related data (collectively, the "Support ltems)1 the Claiborne County Hospital shall ensure that such Support Items are Year 2000 Compliant. If the Claiborne County Hospital is or becomes aware that any Support Item is not Year 2000 Compliant, the Claiborne County Hospital shall immediately notify Entergy Operations in writing of such noncompliance without delay. The Claiborne County Hospital agrees to work diligently to correct any such noncompliance at no cost to Entergy Operations and to a schedule satisfactory to Entergy Operations.

B. Unless terminated in accordance with this Paragraph l!l.8 1 this Agreement will remain in effect through the operational term of Grand Gulf Nuclear Station, which has an estimated forty (40) year operational design life. Either party may terminate this Agreement at any time upon thirty {30) days written notice to the other.

Accepted and agreed to:

ENTERGY OPERATIONS, INC., CLAIBORNE COUNTY HOSPITAL'-

as Agent for the Owners tirgita11y'iif;rt*d byf,~nt<t!

Chipl~y By: J~s. .$ ~  :~~~;.~;:~:*Cl>ipl~y.o,-t.lN,!,

<ni~lf ol{h;~le~IH!j)',f.lllll,t*US Dal~: W\J,06.0713:49:11'*05'W

Title:

Sr. Procurement Specialist, Contracts Date: June 7, 2013 10008493,06 C!aiMme COOnty Hosp11a1 -2* GGNS, D-14 Revision 70 11 / 13

GG FSAR LOA No. NGS00807 Effective Date: February 17, 2002 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and VICKSBURG HEALTHCARE LLC, d/b/a RIVER REGION HEALTH SYSTEM This Letter Of Agreement No. NGS00807 supercedes and replaces Letter of Agreement No. NGSM1190J01, dated January 20, 2000.

In regard to the tr~atment and care of radioactively contaminated/injured individuals Entergy Operations; Inc., acting as agent for the Owners of Grand Gulf Nuclear Station

("Entergy Operations }, and Vicksburg HealthCare LLC, d/b/a River Region Health System 11

{hereinafter "The Medical Center"} undertake and agree as follows:

A. The Medical Center will accept and treat injured or ill personnel from Grand Gulf Nuclear Station that are radioactively contaminated or overexposed as a result of an incident during the operation of Grand Gulf Nuclear Station. As a minimum, The Medical Center will maintain the capability and facilities to provide decontamination, first aid and emergency medical treatment of injured or ill Grand Gulf Nuclear Station personnel that are radioactively contaminated or overexposed. These services and facilities will be available 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per qay.

Patients may be transferred to another hospital should the treatment required extend beyond

  • the capabilities of The Medical Center.

B. The Medical Center will, with Entergy Operations assistance, develop and maintain the procedures to be followed by the hospital personnel in admitting radioactively contaminated/exposed personnel.

C. Entergy Operations will supply to The Medical Center an emergency kit .

containing supplies not normally stocked by the hospital, and necessary to treat contaminated personnel. This emergency kit will be maintained by Entergy Operations. The Medical Center will provide storage space for the kit and use it as directed in the procedures developed pursuant to Paragraph I.B above .

. D. Entergy Operations will provide training on treatment and decontamination of radioactively contaminated individuals for The Medical Center personnel on an annual basis at a time and location mutually agreeable to both parties.

D-15 Revision 47 02/02 NGSOOB07

GG FSAR LOA No. NGS00807 Page 2of 2 E. The Medical Center will participate in emergency drills designed to test the competence of the emergency planning for Grand Gulf Nuclear Station. These drills will be scheduled on dates and at times mutually agreeable to both parties.

II A.. Charges for the services specified in Section I.A. above will be paid to The Medical Center by Entergy Operations on the basis of the standard fee charged by The Medical Center for each service provided~

8. The Medical Center will submit invoices to Entergy Operations when services as provided by this Agreement have been rendered. Such invoices shall reference the Agreement No. shown on the first page of this Agreement and shall be mailed to: Site Business Management, Entergy Operations, Inc., P. 0. Box 756, Port Gibson, MS 39150.

Ill Unless .terminated in accordance with this paragraph, this Agreement will remain in effect through the operational term of Grand Gulf Nuclear Station, which has an estimated forty (40) year operational design life. Either party may terminate this Agreement at any time upon thirty (30) days written notice to the other.

Accepted and agreed:

ENTERGY OPERATIONS, INC., VICKSBURG HEALTHCARE LLC, d/b/a as Agent for System Energy RIVER REGION HEALTH SYSTEM Resources, Inc. and South Mississippi Electric Power Association By: ft/d<<tira< / / ' ~

Title:

Vice President. Operations - GGNS Date: ~ auA

  • Z/3 _. * 'Z,,tJ() z._,

D-16 Revision 47 02/02 NGS00807

GG FSAR CONTRACTNO . 10008449 CHANGE ORDER NO. 003 THIS CHANGE ORDER is issued pursuant to Contract No.10008449 effective February 17, 2002 between E-ntct*gy Operations, Inc. C'Entergy Operations!') and IUver Region Health Systems( 11 Contra.ctor'l Inasmuch as it bas been agreed to by both parties concerned, the.

following changes ate hereby ilicorporated into the Contract No. l 0008449 effective June 9, 2016.

J.. The Contractor's name. is hereby changed. to Merit. HeaUli River Region.

AU other terms and conditions, exce1lt as duly modified by this Change Ordet, shall remain in fu Uforce and effect Accepted and Agreed to:

ENTERGY ()PERATlONS, INC., Merit Health RiYer Regiou as Agent fo.r the Owners By: By:.

ci~*~~lty Glenn KJ.ltc-M Glenn K ~: cn*Glenrl K. Heffrt, ~-'VG>*

....et1li!,vj10~,-c,,s.1~

cw,.Gril,~.c11 GultN~iffr~.

Hebert* eff!Jli;.oltel>eefl~mm C3te.*. 2:11,;_.ci!i. f.i, !IUOcl.$ .J)S'flO' Gle.ntl K Hebert

Title:

Sr Proctul!:111ent Specialist

Title:

Date: June 9, 2016 Date:

D-17 Revision 75 3/17

GG FSAR TEXT DELETED D-18 Revision 47 02/ 02

GG

      • FSAR

. .  : . \:.. . .

Not~mberS+2013*

  • AGR .m,!B i'f BE1"\\7EEN PAR.TIES Emerge~cyRespo~e ~s~inceAgr~enlcnt*{bC1"es einaf ter **:. *
    • This .Nud~ar Power Plantentere d into by and among INPO and electr ic: utiliti -that have
  • ** * "Agreementlhas been tteia l nuclear pO\'Ve! plants under a: **

responsibility: for the consttuction Of operntion of CO~ on pumiant to Title 1Oofilie Code of

  • license issued by the U.S. Nuclear Regwatocy Commissi s and thath ave subscribe<! countapart

. FederalRegulations.(htttinafte:r "nu~learpowerplant 1

')

o (hereinafter*~'Parties~)i .* . .

signa~e pages 1n*:***_: the f0t111. attach~ heret .....  :*: .*.

anct agieemcnt

  • fbrtb*11~em thcit ,vitb respect to* their:
.;tie Patties ~isb. to s~t understanding an emergency occurs at a nudear **.
  • nlUNal undertaking to each other Ul the situation Wherein lfof a Party or wherein an.eventarises *************
  • . powei..plant under me control of ot operated on beha by or on behalf ofa Party~ and a request **
  • during the ttansportabon of nuclear mat~ials sl.tipp e4 assist ance is provided. F~ purpos.e,s of this . .
      • for assistance is issued to anoth er Party and such*

as an e\~ent wam mting dassi fic:at ion 35 a

  • . agreemenf.;a nu~lear pov.rcr plant emergency is defined to damage fueL - * * , *
  • sHe area emergency or gr~~t er and ~at bas the poteJ1 tial and conditions under which such assistance : :

.This .:\.gr~emends fatended only to defin~ the tenns -.

  • . **,viU be rendered and receivedtlt 1s unde rstood that this Ag.rttnlentd~s. nof itopose *any:*.*****: *. **.
  • obUgatie>µ on any .Party to render or continue to rende r any such ~ssistanceF but this Agr ~eJi t ***

.*records *the underst~dili.g of the Parties. with resp~

cno the rigllts ~nd obligations th:n w~dl be . .

ttacbmqit A{'~Coordmatfon A~e;ment o~ .

  • . ** iri.cw:rcd in responding to requests fo(ilSSistance.:.AO;.?ffi:;. arid Their.Member Utilitiesn.

.Sharing Emergency Information Among EPRI,:[N"P EPRL INPO; and NEL

  • de$aibes the responsibilities: and expected 3ctiot1S fof

. :. NOW. !HEREFO:RE+J tis agreeddhat:f.. :* *:

may be gi: .ren ill. response 10: a L. *Ass.istarice rendered by a Party as d~scribed hereunder aiisilig at a nuclear power pl311t or _***

1 genq *

. request by any Party for help followilig an emer is given, it* shall be**

assistance during the transportation .of D\1Clear materiaJsi** If SUCh

renctcredfu accordance with. the *tmns and cond itions .her en **.* .

n as the- ~equesting ~ ompany" and the **

    • 2,. The Party th~t requests as~~ance shall ~ know
    • ~arty furnishinJ ~tan cesh allb ~ known as.the Respondirig.C~pany/~** '.

d and/or ac~ t respc,nsive assistance 3.* Assistance shall be de.tined as the requested,~ offere a Responding Company,* as ...

to a requestunde( the. tenn.s of this Agreemen*t* by .... .

documented in an Assistanc.e Agreement. < ** * . .

dclcumentthatmay b1{as informal as>

Assi~tance Agreement shall be defineias a sc*oping

.4; with docum entationJin emergency:*****

  • an email; f~ or phone. request (follo wed d :upon Assistmcc, that rctere nces ***

. d.tcusnstances .that lists the requested, offered and agreeesting at1d Responding Pari1 es/:

this Agreement; and that is agreed to by both the Requ 1

D-19 Revision 74 12/1 5

  • GG FSAR AGREEME?vT Bm',7EEN PARTIES ..

00 . . ... ... ... . ..

. *. *R.equ,sting (:ompany. shall notify-INPO: ora R~ponding Con1pany of the type of ..

.assisfan~e requested and the anticipated dW'ation during which such assistance is desired/ ...

IfIN'J>O, is contacted* directly~ then INPO shallidentify 3Ild contact the appropriate *\ .. * * *. *. * *.

Respondfui? Companies. to *ask for help iii responding to *an-emergency>:: *If a: R.esporiding :*

Company~ called directlYctthen. the Responding Company niay furnish such assistance *

  • . thafis: within :the scope of this agrttment;, Except as* such compru:iics may agree< .*. **: * *. ***. *. **. *
othef\\ise; Requesting. Company shall ~. responsible for det~rinmitig tht pro<:e~ttrts to be*:**

followed relative to the* furnishing of such*assistanc~ directirig<the work, :uid making any**

.. reports JO govemmen"41l authorities ~ the news medfa rcgarduig the emergency orthe ***..

. fum.ishing of assistance pl.u-suant to this Agreement;: Requesting Cc>mpany ~ball notify *: **.

Responding Coinpany when its as$istanccds no longer needed:

(b)':':': \. *:.:. **:* .*: '.  :**: .. . . *:- .. '  : :: .. . . .. :.. .

The furnishing ohssistante hereunder shall be deemed to have comnienc:ed when *.* :: ..

  • per!>onnel *oftbt'! Respond.mg Company are: assigned to other than normal duties or* ..

transponatfon of equipment. commcnccii pursuant to a* detenriination by the Responding ..

  • Company to provide as.sjstante to a Requ~tlng Company under this Agreement ancl shall' .
  • be dtt1Ued tQ have tenninated when the transportation ofsuch persoru1el or equipment:**

.its hours). is completed./ . . .. . . ..

.ot

. back :f() working base; home. (for :personnel rellmlmg other .than regular working : '

at .

{c) .. *.. * .. . .. . . .. . . ..

all

  • The Responding Company shall make arrangements for the transportation of its *

...* per.;oruiehnd equ~pment mun arid to their working base or home~ . .. ..

~~). . . . . , . . . . ..

. *. Employ~ of Responding Company shall at all times continue:to be employtes of the

.Responding Company: and shall at no time ,and for n.:, pwpost be deemed to be servants~: *.

agents~ e111ployees, .or repre.scritathies. of the Requesting Company. . ..

{b) .. . .** *.* .. . :* .* .***: . . .*_.* . .* . ***** . . : ...

Wages,. hours; and other temis. and conditiODS of employment applicable to personnel of *: ,*

.the R.cspooding Company shall.~ those of the Rispondiiig Company~ Work procedure~.

securityT and safety rules for such personnelshall be those of the Requesting Company~ ***

(~)*._.. .

~

Uolcss othenwise agreed,. all personnel of the Responding Company shall be equipped by ..

. the Responding: Company with srich normal working and protective equipment auhallbe *

.compatible with* the circumstanc:es un~ which said pmonnel shall function hereunder; Requesting <;ampany shall infonn Responding Company of any specific ~quip111ent **

whicli may be reqµired in a pill'ti¢ular situatio~ **.

  • 2 i 0-20. Revision 74 12/15**

-.. GG fSAR.

AGREEMENT BETWEEN PAR.TIES:*

w Responding Company shall furnish the requested personnel and equi~t to .the extent --

-that tbe Responding Company may det~e to do sofu it$ sole judgmcntm& : -- -

discretioli **) *

. .  :.. *:.>) . *.  ::*:< :***. :_: . *.> .* . . . .* . .

(b) * : __ --. :  :. . : *- <. _- -- . .. . . -- *: .. *... -

Any infurination which Responding:Company may provide to Requesting Company _

(mcludmg drawings~ reports, .and analyses} or which Requesting Company pr~wides :t~

  • -:llcsponding Company wµich either the Responding Company 9r the Requesting : :*_: __
  • 1
  • Company:considers -propri.etary or confidential shall .be* so -designated.: Such proprietary

. : : .* mformation: shall be held in: confidence and shall be used exclusively in c:orutectfon witll *. :.

. :.. :the emergency at the nuclear PO\\'Cf plant at. Vvhiclt th~ emergency has occurredJfududing *

.* necessary disdo*sure~ on a proprietaiybasis to others in thatconnection)and shallnot be: *

. **:*published or othenvise disdoscd to others~ except as may .be required by law** The.:. , 1

-- restrictions set forth' in this section 7~Cb) shall no*t apply to inforinati"on that.the Receiving Companf can establish by documentary e\ridencet *_. _* * \ __ . . -*-*-* *-_ _** **_**_:: _

(1) is or has becoinc generally known tof,or readily ascertainable bj\ the public tvithout fault or omission of either pariy *or. its employees origents; or ** _ __

(2)v.~as alteady known toJhe '.Receiving Company.prior to the first disclosure ofsuch*-*

information. by the disciosing p~ or : > ... * ..*...-.. ' . .. . .. . . . . . . . . . .. .. .

(3)was received by the Receiving .Company without festnctions as to it~ use from a *: *-

tfilrdi.pai'tywhols lawfullym possession and not restricted as to*the use"thcreof: or .

-(4)was.fudependently de\oeloped through persons who have notfum,::either duectly or:

mdirectly, acce~. to ot knawledge cifSUJJiliir infcmnatioo ptO\'lded by the other party. *

  • c* >  :- - - - - -- - - *-*- -. - - - -

_--Responding Company shall have the right; at any time and lli its sole Judgment and .-**-

discretion and without any: obligation. to -Requesting *Company,* to withdraw personnel and*_*

equipment furnished to. tbe Reque$ting Company :ind retum such personnel and - -- -

equip111ent .10- its wodwig base;. Without limiting Responding Company's* rights under the:**

preceding sentence;: Responding Company shallatte.mptto schedule .any such wiihdra,val *-

ofits personnel or equipment to accommodate the netds of Requesting Company~ ;

Responding Company shall give .written notice ;Jt Ieast24 hom-s in advance to Requesting Company of the p~nent withdrawal of personnel or equipment :furilished/ Responding --

Company's withdn\,*al: of .pmonnel _or equipment* shall not affect any obligations* which:

~ay have been incurr:ed h~eundcr prior tQ such withdrawal or whkh mai arise>otit of... .

events occurring prior to such withdrawal.

_$~- All time -sheets and work records penainini to Responding Comp:uiy personnel and*** -

equipment shall be kept by the R¢.5ponding Company" The Responding Company shill *:

furnish the Requesting Company with a detailed statement ofall costs and e.~penses paid

. or incun'ed by the- Responding Company in connection with the fwnishing of assistance:: -*_*--

- to the Requesting Company; which statement shall be patd by Requesting. Company -* * *

\Vithin tbirly (30) days after teceipt, *-

  • 3 D-21
  • Revision 74 12/15 <

GG FSAR**

AGREEME?-rr BETWEEN PAR.TIES .

  • . The Requ~g. Company shall reimburse Responding: Company for all direct and ***

. indirect :costs and e."tpensesr: nor including a: pi:ofit;i incuiled by Responding Company in:* *

giving assistance p-ursuant to this Agreement~ inclu~ing* but not linlited to co~ and*:***. .*.

expenses related to or resulting from compliance.with: governmental requirements such as:*:*

.. **. Titie 10 of the Code ofFederalRegulations Part 20;: Sllch costs and e:i,.-penses_ shall be .*.

computed in accordance with Responding Comp=in.ys.standard rates and accounting:.*

practices; in duding such ovetbeads as are detemiined: by Responding Company to*~***

appµcable to such direct and indirect costs and expenses incurred by Responding. . . . .

  • Compatty;. Requesting Company shall have lhe right ro request: a third party audirthe

.records. of Resptm<ifi,lg q,lllpany ~lative to \VOrk p¢onne<1 pursuant to t1us ~.\~eement. *.:

10; (a) * . *** ... * . ** * * * ** . . *. * *. *::* ** ** ..

to

. In addifio~ and subject the provisions ofparagrapb lO(b) her~f, Requesting Company. *

  • ~hall iildemnify.and hold Respondw.gCompany;Jts officers~, dire~torstand tmployees;* :

. ***jointly and severally, harmless: from arid against any and. all lliibili ty 91'. tois:; damage~**.*** .

. . cost, or expense urhich any ofthem may.incur by rcasoiu,fbodily injfuy;jru:luding but *..

not limited* to death, to *any person ot persons, or by reason of daniage to *or destruction of *.

any propert}'t including but not limited to any property located atth~ site of the *** ...

  • Requesting tompanys nuclear power plant .or the loss .of use of anypropeny~ which**:.
  • res1.1lts from funushing 3 ssistancf! pursuant* to* this Agreement~ whetl,\er. due in. whole or iil
      • part:to any act or :omission,. .or. negligence* ofResponding Company,Jts *officersi directors,, :.
  • or employees~ . : . . . .. . . . . . .. . . .. . .

... . (b). ** ... **.. *. . . * * . *. . . :* ...* *. . . . **.*.. :.... ** *. .* .... *..

.. .Where payments are made bJt Responding Company or its insurers to Responding . .. .. . .

.c omp:uiis officers~. directors,. or employees or their benefidaries for bodily: injury or .** :.

. death resulting from furnishing assistance pursuant to this*Agrttm.ent; including 1Jut,11ot

. !united to workers( compensation, disability. pension plan;. medical and hospitalization. or other such *payments; Requesting Company shall make reunbursement. to Responding . *:.*

  • Company to *the e.'=.tentweb payments incre:ise. the Responding Company's *employees~*....

related costs. whether such increase in costs occur in the form* of an increase. in premfums *..

  • .*or. contnbutfons~ a reduction in dividends or premium refunds~ or othen\iise: R~questing *** *

. Company shall also reimburse Responding Company fonmy deductible amounts or for *

  • any amounts paid by Responding Compruiy as a sclf.;;insuter,Resporidfug Company \Vill *..

. request its msurertowaive any rlghtofsubrogation it may have against Requesting ..... .

Company as uesultofany payment describ~d in. this paragµpb lO{b)wµif;h su¢h ttl5'lfet **

  • may 111ake on behalf ~fResponcling _Company because of Responding Company's
  • fumisw.ng of assistance p~suantto ~ Agreement * * **

4 D-22 Revision 74 *12/15

GG: -

FSAR

. AGREriiarrBET\VEEN PARTIES *

(c) . . --- -. -_-- ----- -_ - . - - - _- .. -.*. . .. . . *. * . - - -

Kewonding(;ompanyn1akes nf.iwarrantywith respecttoany goods orserykesprovidtd.*

. ****: _to Requesting Company'.;11.ld NO WARR.~!:¥~ J;:ITHERl!XPRESS OR'DlmLIEDi *. *: --<* ** *

. ORA.LOR \VRIITEN. ~R.UL APPLY TO THE GOODS OR. SERYJCES PROVIDED1 **

  • :_INCLUDING. \\11THOUT LIMITATION~ THEWARRANTlES OF** -*-
  • _*- .** -* -- ***. *

---* MERCHANTABII.lTYAND OF FITNESS FOR SPECIFIED OR INTENDED*:* -:

. _: _J*'UR.PQSE. All equipment: and:~erviccs futnished by Re.sponding <;ompany p~ant to .***

- this Agreement are furnished as i.s;,*, *

(d) ..... ****** **  :*. :_ . :  :. . ; .. _* . . -___ .. _- ...... *_

.. * ..****** _ln tlle(event anydaimor:clemand is made or suit~ acnoa*or.proceeding is filed against*-** *...

  • :. Res-p*onding Company/its .officers. airectorn. or employees~jointiy or severally,' alleging *.. :
  • . -liability for which R.eques~g Company shall indemnify and hold harmi~ss Responding :--

- _-Company; its' officmx directors; and employees U;Udei' this paragraph: *10 hereof~* .

  • Responding Company shall promptly notify :Requesting Compariytberco(~ and*** -

Requesting Company~ atits sole cost and c.'=pensei shall senle;_compromise, or defen? the

.same. in* such manner as it fa. its. sole disc:retfon deems :necessary or prudentrR.espondmg *:.;.

  • ... Company shall cooperate with Requesting Company til the -resolution:of anY such matter; **-*
  • lb Requesting Company settles a liability suit with a 3rd party thannvolves a'.: -

. Responding Company; Requesting Company will en.sure the Responding :Compnay is

  • rtleased from liability.: < * * * * ** * * * * *** ***** *** * * *

.- (e)

Each Parry to this Agreement.agrees to carry the amount .of financ,ial protection required :, __ ._

-. by the 1tcimiC: Energy Act on 954; as amendedf and self.;irisur~ce or coµiprehensive  ::*

liability uisurance~. including contractual liability coverage;. covering the indemnification ..

and defense-obligations seHorth herein; subj(ct to such fypes and amounts ofself,;, : *.

  • * -. insurance, retentions; *or deductibles as arc consistentwith stillldard business practice in the lll.dUStty; : . .- . . . .

. (f) *. ... . . .*. ..** .. .. . .  ;

_ In the event a Responding Company ptovides assistance pursuant .to this Agr.eement

  • _
through an.affiliate* or subsidiruy, the indemnification provided in this p.,ragraph _10 to the* -*** *
  • :*-Officers, di.rectors, and employees of that Responding. Companyjs.ball apply :v;ith. equal* -
  • force to the officers, directors; and employees of that affiliate or subsidiat}\
  • 11; -Each Party shall provide the Institute of Nuclear Power Operations* (hereinafter i'1NP01 *.

with an executed counterpart signature page to this Agr~ement and to any amendments or . :-:

attac:b.ments hereto/rms. Agreement shau become effective .when -counterpart signature** _. -

-*pages executed by at ieast two Parties shall have been received by INPO. This Agreement

. shall remain.in effect as to any P~ until such Party has with<irawn from the Agreement *

  • is provided below
    < - * *- * - -- *-

5 D-23 Revision 74 12/15 '

FSAR*

AGREEMDITBET\VEEN PARTIES* ...

12~ (a) ** * ...... ****.******* *** ****: * ** ** .. ... *.. . **.***. ** . . ** . *** * * * .

Jll.IPO may provide certain administr.1ti\te and emeliency response support smices in ****

. . *t\lrtberance of this Agreement. such as maintaining and distributing the Parties a roster ** to

  • of the signatorle$ to this Agreement; providing copies of the Agreement and *any **

amendments. thereto to all Patties: and preparing and distributing to the. Parties other

  • documents~* .mth* as a list* of sources of emergency manpower. and. equipment. *INPO may***

.pro\l'idc such other services as may be requested of INPO from time to time bY the

  • Parties~ The. Panie!i recognize that INPO shall not be responsible for unplementing~ ,*

enforcing. or.inte:r:preting this AgreCDJ~t * . ... . .... . . . . . ....

(b) *** ****** *****. ** .. . .**... . . .********. . . *** .... *.*. .. . . . .*. . . ....*

..The Parties shall defend; indemnify, and hold harmless 1NPO/ its officers;* directors~ and

  • employees, jointly and severally~ from and against any and all liability or loss,> <l'Ullagt:,

cost. or C1i.1)tnSe which results from performance of INPO's functions* described in***

paragraphs 12(a) and* 12(c)of. this Agreement. *Each Party hereby e..~ressly \\~aives any *

  • .. right il may have fo assert any d3im against INPO/it~ *officers.; director$~ O.I' einployees ****
  • arlsilig out. of itii or their perfom1ance *of INPO's functions* described in paragraphs l2(a) andl2(c).

(t). *. *. ...... . . * . ..... . .* . . . . .... . . . ...

FoUowing rui emerg¢ncy at .1 nuclear pcnver plant the Reqnestilig Comp*any mayt011tact INPO *for help mlocating and CCJOrdinating delivery of request~ resources* a11d *. *

equipment. B~ed on'that contact .from tlle Rcqllcsting Company; ~PQ tvillprqceed to .... *.

.*locate requested* equipment and human* reso\trces *and coordinate assistance* delivery~ This* **

. agreement does not pr~clude the Requesting Company from C01l!acfutg other Parties . .

(llespon~ingCompanies)for :.tss~rance/:*In either case theAssista:nceAgiecments wm***

  • lie establishedbenv~* the* R~questiog c:'on1pany and Responding *Coµipaniesi **

(d)  : ..*** << ... *... * *. ..*.*... *.. *. . . . *..... ***. ..* ... **. . ... * *....... * . .

If INPO fumishes assistance *and unless otherwise agreed by. INPO and the Reqµ.estfug ***

    • Company, the Requesting Company and*ThJPO sllaU fuwe the same rights and. obligations .*

as ifINPO were a Responding Company (indudmg but not limited to the Jlequesting: ...

  • .* . Companys.obligations*to INPO,:itsofficets,* directors~ and employees under paragraph***
  • . 10 hereof), excevt that paragrapb.s 8 and; 9 andl.O(e) sllall notapply to lNPff . .
13. Thisigr~enf ,vffi 1lOt deaie any rights or defenses 1ll favor: cifany entity or person not*: .*

. . .*a signatory.to th.is Agretmentexcept to the Cl\1Cntprovidedin this paragraph and fa/

  • parngraphs 10 and12 of this Agreement This agreement shall be binding.upon and inure to the benefit of each si~itory to this Agreem~t :md the subsidiaries and affiliates l.'>f' each such signatory~ * * * * **** ** * * * * * ** ** *
  • Revision 74 .12/15 *.

GG FSAR

.*** .* AGREB*IENT BETWEEN PARTIES**.** ... * .. .

. -.~

1:t Excep{as o~erwise provided in patagraph 15, :uiy Partyinaywithdraw from this * **

INPO *with a ~opyto all *

. )\gt~m cntup on :it least tbirtyOO) days priorl\-~ttennotice to

      • of the other Parties~ :Notice .of Withdrawal shall not affect any obligat ions which may have.*

e date* of such notice or ~thich niay arise out*:.** *

. *been incurred hereunder prior to the effectiv

  • ohvents occurring pripr fo the :d3te. No Pany may withdr aw fulm this Agreem ent while*

it is rtceivi ng assistan ce pursua nt to this Agree .m~. * * ... '

15 ~* Ibis A~eemenl may bebeatnend~ d: by the agreement *ofa majority of the Parties hereto.* :

effecthre and binding upon all Parties thirty {30); days after ** *:*

  • . Such amendment shall d by at least a*::.

.INPO bas received counterpart si.gnature pages for the amendmentc.~ecutc POsha llnotify all Parties when at least a *..

majori tyofth ePartie s*to the Agrceµ1ent:IN amend ment to the Agreeh ieni.No amendm ent****

m:ij oritf Qf the: Parties have e..xec:uted an: effectiv e:

may .been incwre d:hereu ndet prior to the

..*. shall .affect any obligation* that ha,re

. date ofsucll amendment or. thal may arise .out of events occurring priono that date.: ..

aw from *this* *

  • . Notwithstanding the* first sentence of paragraph 14, any Party may. withdrthirty (3Q)'day during the
    • .Agreement by submitting ,~ntten notice to lNP.O at any time per1od prior to. the... effectiv. e. <Lite of such amend ment \vith a copy to all of the other*

Parties. .. . . *

  • urienforceab1e as to any : *

. 16; Ihny.provision of this Agreement is determined to be*invafid Of

. .Party otherwise~: such detttm.ination sbhll not affect the: validit or y Qr en.fm:ccability of the ..

ons. of this Agreement as to . that Party "or Qthenvise~: * . .

other provisi . .

17. Iri the event (i) an en1crg6J.cy <><: at a ntit:lea r pQwer plant under the control of:or:

. ..*operated on bi?half of aParty~, ~ran ev~t associ:ned w1th tr.lrispottation of nude.at* **

is issued to***

materials shipped by or on behalf of a Party; (ii)~1requcst fot assistant¢ d (iii.lsµ ch assista llcfis provi~ ~ :. .

anoth~ Party hereto in respect tQ* such emerg¢ncy;::m State in which the this Agreement shallb e constru ed in accord ance with the law of the ari~iug c,ut of such nuclear po\\'~f pla*1tis located With* respect to all rights :iild obligatitlns

.emergency.* . . .

ute the entire

18. This Agreement~ together with the attachments hcreto~::shall ~onstit plant *.

. agreement between and among *the parties hereto relating to nuclear power ce *

  • emergency response; This agreemen~ once $igncd/ superse des previou s assistan
    • agr~~cnts among; the parties hereto~.***
  • 7 D.-25 Revisi on74* 12/l5

GG FSAR COUNttRPART SIGNATURE PAGE***

,, .: . ::*:: :.:::*::;::.<: ... :::.,,* : I  :.:,  : *<:. : . * :::::, ;-::  :-.: ,.:" ,., '  :'* *: ' ' ' ' '

. The undersigned company hereby agrees to become n Pnrty to the Nuclear Power Plant Emcrg cy Response Assistance Agreement and its atfuchm~nt~;: *

. ~Ji; "1Jl\3 * *~*******.*~*~=~~-r.***~-i>_.._:;

  • ~------

. By._**....;,,............~:::::::s:~~~~~..;,__,-~..:...:....-

(Corporate Officer Signuture)

  • Primed Name:. ____***~*~......:: *. *---.  :.....A(.....;Q;..;;i.
  • P.:i:.....::. . .* - -
  • ~1-**>--S. . . .___F.....;:c_r_.t?. .f:s..::11S_

D-26 *

  • Revision74 12/15

GG. ..

FSAR In ~rderto ~ovide tor th~. e"fficlent and timely transfer. of teclulical and public infonnatfon* ..

. .**regarding emergende$iatm1clear po,,rer stations and Jo maxiinizeJheit*assistance wlcs their : . fo

      • utility members and the industry/ the Electric Power Research Institute (EPRI)~ the Institute of Nuclear Power. Opera~ions (INPO)fand .the Nuclear Energy* Institute (NEI) have agreed *to
  • coordinate their actions and activitie$* as outlmediri. this agreement....... . . .

.1lis ~cogwzed that the piimary respoUSibilily. for rdease* of~pt)JOJltia,e inforinaUOO cbnceming media *rests *with the. aff~ted utility; The an emergency situation. to the public. and the ne\\is

  • . ptirpose.()fthi$agreem~tis to pro.vi~ a coordinated process by which the industry**-*** . _**
  • organizations can effecti\tely. convey ~~nnatiC>n .to the. rest* of the .industry and to the medfa;i i:n ..

order to lessen the burden on the afi'e~tt!d utilitj\ *

  • .*.\greement:

1~ *An1o~g the three _organizations involved in this coordination agreement; NEI ~'ill p~llvide .*.

.**jnfonnation concerning fadusuywide implicatioo.s of all emergency and Will use existing .. . . .

.*mechanisms :and..*niedia ..

..contacts......

to di~seminate timely infomution regar<ting the. emergency. *..... .

  • ** NEI \\;111 develop and. issttef:iri.c:dordmation Vr'itli the affected utility; appropriate public -

statemcnts*to the ne'\1\rs.medfa~ as-necessary;<*

. ** NEI tvill pro:vi,de iilf6mtatio~ abouf t11~ ~erg~y and as.so(iated press releases to its *

. :members.and other industry org~ations~-*** ... ... . . . .

  • ( .* NEl abo andEPR.L "'ill ... OL1ke

.all relevant . . , . . irifonnatio~ . . . ~\131lablc . . to '.Edison Electric lnsti1Ute (EEi)

    • *
  • NEl Will maintain. *an emergency r ~ e *capability for ~onsultatfon on regulatorfissues .

and handle inqutrles from:media~-

government; and other..organizations and:individuals~

. 1.:Among the organizations.: ThIPo wiU coordinate ass~tance requests* fr6m the.utility to other

  • *INPO members and . . ..

partidpantSt.

    • *:fi\l""PO will notifyNEI and EPRlofU~S.,events classified Alert or higher crnon~lJiSi

. events classified as. level 4 or higher on the Intem.ationalNuclear Events Scale~ ***

    • ** ~~o willprovide co~catfons to its membf!ts;p31tic:ipantsT EPRI and NElto. . . .

facilitate the: flow *ofte~bnical iniotmation about the emergency anct share information ;

. *provided by the affected utility on a selected basis. * .

0~27. Revision 74:12/15 -

GG*

FSAR**

fMO~C f Capability: to furnish EPRl iUld NElteduuca l.: ...

.... .*. JNI>o ~ill :maintain.~* emergency 1ergency~s obtained from the.utility and/or availab le inits**** ** *

  • . jp.fonnation relevant to the.e11 o\\tn d3tabases.

" *. INPo Will maintaul infunnatiOn onplant industry as!istantt capabilities includingt ****.

lized or emergency response knowledge> ** : *. *.*.*. *

  • . o Petsom1el with specia o.***Emergency* response equipment available for shal"ing. with th~ affected utility~'

~. *

  • lNPO \\'ill toordinate me delivery ofp~o ns and material :~der its Nuqleat PCJw~ Plant***

and Transportation Agrttments, as requested by the affected: ,nility.

  • .3. Alllong the ~r~n,ztation ationsand:. EPRIW m ~aiii1a1n an rm~ge ncytesponse capability and "ill 1ie ** ****

a,~ilable .for consul tct conduct in-depth analys es* of the emergency as appropriate;> *

  • BOth EPRI and INPO the will be availabt,. to assist affected unfity tl!rough their,echnical

.. analysis*andevents:inalysis.cap3bilities~.iespective1y~ EPR1 and .INPO*

,vill coordinate *

  • such' efforts with each. other~:. . .. . . . . " . ..:.. ,: . .

ing emergency'** *

. .4;

  • EPlU, lNPO.~ and NElwill develop and share written procedures govern ation 9femergeudes:.:
  • notifications and specifying pc,ints of contact to provide for cross~notific 10 o;..28
  • Revisfon 74: 12/15 . *

~Entergy GG FSAR Grand Gulf Nuclear Station 7003 Bald Hill Road PO Box 756 Port Gibson, MS 39i 50 LOA No. I 0008376/04 January 1, 2012 LETfER OF AGREEMENT BETWEEN ENTERGY OPERATIONS, INC.

AND GOVERNOR,S OWICE OF HOMELAND SECURITY AND EMERGENCY PREPAREDNESS (GOHSEP)

Be it known, on this Id day of January, 2012 the Governor's Office of Homeland Security and Emergency Preparedness (hereinafter sometimes referred to as "GOHSEP") and the Entergy Operations, Inc. P. 0. Box 756, Port Gibson, MS 39150 (hereinafter sometimes referred to as "Entergy Operations'*) do hereby enter into a Letter of Agreement under the following conditions.

This re-stated Letter of Agreement (LOA) replaces the existing Agreement dated August 29, 2006, re-stated LOA dated, June 1, 2004, and the original Agreement dated April 1, 1996 thereto. The following constitutes an agreement between Entergy Operations, acting as agent for the owners of Grand Gulf Nuclear Station (GGNS),

and the OOHSEP in regards to support of the emergency preparedness efforts of GGNS. The parties undertake

~~as~~= .

I DESCRIPTION OF SERVICES

  • On an on-going basis, OOHSEP agrees to provide the following services:. .

A. GOHSEP will maintain adequate and well trained staff to provide 24n Communications Desk Operations and response capability, serving as the primary warning point for notification of fixed nuclear facility emergencies.

B. GOHSEP will provide a full-time professional level staff member to conduct, as appropriate, radiological emergency preparedness training for local and Louisiana state personnel.

C. GOHSEP will participate in drills, exercises and exercise scenario development, and will serve as an exercise evaluator/controller in support of GGNS as these activities are conducted throughout the year.

D. OOHSEP will develop, coordinate and maintain Louisiana state level implementing procedures which address Louisiana state response to a Fixed Nuclear Facility (FNF) emergency.

E. OOHSEP will provide response to actual events as requested by the OONS, or as required by law, the Feder.!! Emergency M~gemen! Agmc~* {F~\.fA}, ::net the Unit=! Stat= Mucl~ar Regulatccy Commission (NRC).

F. GOHSEP will provide annual calibrations and non-technical maintenance* to all radiation detection equipment furnished to the local Off Site Response Organizations by the GGNS.

, II PAYMENT TERMS*

A. GOHSEP agrees to provide the above described assistance and support and Entergy Operations agrees to provide to OOHSEP, in consideration thereof. the sum of $62.156,66 per year. Entergy Operations shall make equal payments ofStS,539.16 per quarter to OOHSBP at the beginning ofeach quarter, except the initial payment which will be made within thirty (30) days following execution of this Agreement.

B. GOHSEP shall submit quarterly invoice.,, referencing Agreement No. 10008376, at lmst thirty (30) days prior to the start of each quarter. Such invoices shall be mailed to:

Site Business Management Entergy Operations> Inc.

P. 0. Box756 Port Gibson. MS 39150 Pagel ofl D-29 Revision 68 08.112

GG Grand Gulf Nuclear Station

~Entergy FSAR 7003 Bald Hill Road PO Box 756 Port Gibson, MS 39i 50 LOA No. 10008376/04 January 1, 2012 Ill TERMINATION A Unless temtinated in accordance with this paragraph, this Agreement will remain in effect throughout the operational term of GGNS which has an estimated forty {40) years operational design life.

B. Either party may terminate this Agreement upon one hundred twenty (120) days written notice to the other. In the event of termination, OOHSEP, suf:lsequent to its !'eceipt of any quart.erly payment as specified in Paragraph II above, shall return to Entergy Operations a pro-rata portion of such compensation, based on GOHSEP's costs actually incurred pursuant to the Agreement prior to the termination.

IV PERIOD OF PERFORMANCE The Parties recogDize GOHSEP's performance of its obligation under this Agreement in the mannec and in the amounts set f ~ is predicated upon conditions prevailing on the effective date of this Agreement. The conditions referred to include, but are not limited to, economics and monetary conditions, and conditions created by actions of governmental authorities, laws and regulations on the date of this Agreement. If it is mutually determined that conditions change so as to materially differ from such conditions existing on the effective date of this Agreement and threaten to significantly impair or to make economically impractical the ability to GOHSEP to fulfill its contractua_l obligations hereunder, then an equitable adjustment wiU be negotjated by the parties and compensation and other applicable terms of this Agreement will be modified in writing.

v TERM OF AGREEMENT This Agreement will be effective on the ltt day of January. 2012. ~ will remain in effect hereafter, unless the terms are negotiated and agreed to in writing by both parties based on changes as described in Paragraph IV above.

ACCEPTED AND AGREED:

ENTERGY OPERATIONS, INC. GOV"eRNOR 'S OFFICE OF HOMELAND and sr, as Agent for Entergy Mississippi

~ llkctrre Powrc Association SECURITY AND EMERGENCY

~ - f r Z _ A T E . OF By: ~~ . By:~~

P~'.-c

  • Name: L!1-,1 I N* -~l'

, pc:."

  • (',.*I * /

PrintName: ~ \ ~ ' - Pnnt .;-1... , \J *1 _;::,;

Title:

.J\~ ()tZ.c.-rt?:,~, w<c:rN~

Title:

_ _  !---'_,_*1_~_2_,.....E_c_*1 _~_;z ______

µ_(_,

/__,.J Date: - - ~....... . . ____ Date: _ _;;.._*+r ..;_l--"'~-+-!_I_L RO\fEO , I fEB l i ?.0\1 GOr\SEP P&ae2of2 D-30 Revision 68 08/ 12 ( ~.

D<;::7

GG FSAR LOA No. 10008376 AMENDMENT NO. 14 to the LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and the GOVERNOR'S OFFICE OF HOMELAND SECURITY

1. Section I Item E is hereby amended to read as follows:

"E. GOHSEP will coordinate response efforts to actual events, including hostile actions directed toward the plant. as requested by Grand Gulf Nuclear Station, or as required by law, the Federal Emergency Management Agency (FEMA), and the United States Nuclear Regulatory Commission (NRC)."

Accepted and Agreed:

ENTERGY OPERATIONS, INC., GOVERNOR'S OFFICE OF HOMELAND as Agent for System Energy Resources, Inc. and SECURITY South Mississippi Electric Power Association By: By:

Title:

  • Category Leader

Title:

Date: March 31, 2014 Date:

D-31 Revision 71 06/14

GG FSAR TEXT DELETED D- 32 : Revision 27 10/94

GG FSAR TEXT DELETED .

D - 33 Revision 27 10/94

GG FSAR LOA No. 10008477/05 February 19, 2013 Page 1 of 2 LEITER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and OCHSNER CUNIC FOUNDATION This letter of Agreement supersedes and cancels Agreement No. 10008477/04 dated J June 1, 2004 between the parties, including all amendments thereto.

In regard to the transportation and treatment of injured or ill personnel from Grand Gulf Nuclear Station (Grand Gulf)., Entergy Operations., Inc. (Entergy Operations), acting as agent for the Owners, and the Ochsner Clinic Foundation (OCF) undertake and agree as follows:

A. OCF will accept and treat injured or iH personner from Grand Guff Nuclear Station whether or not they are radioactivefy c~ntaminated or overexposed/ provided that the maximum contamination does not exceed SR/hr at one (1) meter from the patient. As a minimum, OCF shall maintain the capability and facilities to provide decontamination, first aid, and emergency medical treatment to injured or ill personnel from Grand Gulf Nuclear Station. These services and facilities will be available 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> per day. Patients may be transferred from OCF to another hospital should the treatment required as a resurt of the injury extend beyond the capabillties of the Ochsner Clinic Foundation.

B. OCF will accept, via the appropriate heUcopter carrier, injured or ill personnel from Grand Gulf Nuclear Station, Claiborne County Hospital, or River Region Medical Center.

It will be left to these facilities to determine the helicopter carrier.

D-34 Revision 70 11/13

GG-FSAR LOA No.10008477/05 February 19J 2013 Page 2 of 2 II A. Entergy Operations .shall pay one hundred percent (100%} of OCF's billed fees for the services specified in this Letter of Agreement within.thirty (30) days following receipt of OCF's invoice(s).

B. OCF will submit invoices to Entergy Operations when services as provided by this Agreement have been rendered. Such invoices shall reference the Agreement No.

shown on the first page of this Agreement and shall be mailed to: Site Business Management, Entergy Operations, Inc. P.O. Box 756, Port Gibson, MS 39150.

C. If Ochsner 1s emergency room or hospital is on patient diversion due to exceeding their patient treatment capacity Ochsner has the right to refuse care under this agreement.

Ill Unless terminated in accordance with this paragraph, this Agreement will remain in effect through the operational term of Grand Gulf Nuclear which has an estimated forty (40) year operationar design Ufe. Either party may terminate this Agreement at any time upon thirty (30) days written notice to the other.

Accepted and agreed:

ENTERGY OPERATIONS, INC., OCHSNER CLINIC FOUNDATION as Agent for the Owners A.lexa nder H* : Fleteher lJlgitallyslgnedby;\lexanderll D~:cn-Alexa noer U.fle1d1e,,o, ou, By:

By:

FI etcher cmail=.i!letcJ@en!e19y.com,c.:.::US Oate:201.3.02.1909:41-(14 .()(JOO'

Title:

Title:

Sr. Procurement Specialist"."" Contracts Date: Date:

February 19, 2013 D-35 Revision 70 11 / 13

GG FSA R TEXT DEL ETE D D-36 Revision 53 02/ 05

GG FSAR LOA No. 10195761 Page 1 of 3 LETTER OF AGREEMENT between ENTERGY OPERATIONS, INC.

and METRO AMBULANCE SERVICE (RURAL), INC., D/B/A AMERICAN MEDICAL

RESPONSE

In regard to the transportation and treatment of radioactively contaminated/injured individuals, Entergy Operations, Inc., acting as agent for the Owners of Grand Gulf Nuclear Station ("Entergy Operations"), and Metro Ambulance Service (Rural), Inc., d/b/a American Medical Response ("AMR") undertake and agree as follows:

A. AMR will provide, when requested by Entergy Operations, ambulance service to treat and transport injured or ill personnel from Grand Gulf Nuclear Station to the Claiborne County (Mississippi) Hospital or other local hospitals.

B. AMR will, with Entergy Operations assistance, develop and maintain procedures to be followed by AMR personnel when transporting radioactively contaminated personnel from Grand Gulf Nuclear Station.

C. AMR will maintain radio communications with local hosp'itals and will respond to calls for assistance at Grand Gulf Nuclear Station forwarded by those hospitals for Entergy Operations.

D. AMR agrees to comply with all applicable Grand Gulf Nuclear Station security and radio communications procedures. Entergy Ope'rations will provide copies of applicable procedures and will brief AMR personnel on applicable portions of those procedures.

E. AMR agrees thatt upon request, Entergy Operations Health Physics personnel may accompany, in AMR's ambulance(s), Entergy Operations personnel being transported by AMR.

F. Entergy Operations will provide training on the treatment and decontamination of radioactively contaminated individuals for AMR personnel on an annual basis at a time and location mutually agreeable to both parties.

D-37 Revision 60 07 /08

GG FSAR LOA No. 10195761 Page 2 of 3 the competence G. . AMR will participate in emergency drills design ed to test

. These drills will be of the emerg ency planni ng for Grand Gulf Nuclear Station ble tq both parties .

scheduled on dates and at times mutually agreea II will be paid to A. Charg es for the services specified in Section I.A above basis *of the standa rd fee charg ed by AMR for each AMR by Entergy Opera tions on the service provided.

  • replacement B. Enterg y Operations will reimburse AMR for a tempo rary servic es under this Agreement is ambulance while any AMR ambul ance used to provide transp orting a patien t from Grand inoperative due to clean- up and decontamination after reimbu rse AMR for a perma nent Gulf Nuclear Station. Enterg y Operations will nently inoper ative due to replacement ambul ance if any AMR is rendered perma Gulf Nucle ar Station . Until such time as a replacement contamination from the Grand to reimbu rse AMR for any ambulance becom es available, Entergy Operations agrees lost transport revenues.

AMR will submi t invoices to Entergy Opera tions when services as*

C.

invoic es shall reference provided by this Agree ment have been rendered. Such Busin ess Manag ement ,

Agreement No. 10195761 and shall be mailed to: Site MS 39150 .

Enterg y Opera tions, Inc., P. 0. Box 756, Port Gibso n, Ill um standards of A. AMR agree s to at all times to carry at least the minim Missis sippi for ambulances; to insurance as set forth by the Depar tment of EMS of Automotive-Comp ensati on and include General Liability, Medical Malpractice, Worke rs' Liability coverages.

IV of A. AMR agree s to notify the Grand Gulf Nuclea r Station Office of the termin ation of AMR's Emergency Prepa redne ss within two (2) workings days contract with the Claibo rne Count y Hospital.

this Agreement

8. Unless termin ated in accordance with this Sectio n IV. B, ional term of Grand Gulf Nucle ar Station, which will remain in effect throug h the operat Either party may terminate this has an estimated forty (40) year operations design life.

to the other.

Agree ment at any time upon thirty (30) days written notice D-38 Revision 60 07 I 08

GG I FSAR Loa No. 10195761 Page 3 of 3 v

A. Compliance. The parties will comply in all material respects with all applicable federal and state laws and regulations including, the federal Anti-kickback 1

statute.

B. Compliance Program and Code of Conduct. AMR has made available to each party a copy of its Code of Conduct, Anti-kickback policies and other compliance policies, as may be changed from time-to-time, at AMR's web site, located at www.amr.net, and each party acknowledges receipt of such documents. AMR warrants that its personnel shall comply with AMR's compliance policies, including training related to the Anti-kickback Statute. ,,

C. Non-Exclusion. Each party represents and certifies that neither it nor any practitioner who orders or provide Services on its behalf hereunder has been convicted of any conduct that constitutes grounds for man*datory exclusion as identified in 42 LJ.S.C.§ 1320a-7(a). Each party further represents and certifies that it is not ineligible to participate in Federal health care programs or in any other state or federal government payment program. Each party agrees that if DHHS/OIG excludes it, or any of its practitioners or employees who order or provide Services, from participation in Federal health care programs, the party must notify the other party within five (5) days of knowledge of such fact, and the other party may immediately terminate this Agreement.

unless the excluded party is a practitioner or employee who immediately discontinues ordering or providing Services hereunder.

D. Referrals. It is not the intent of either party that any remuneration, benefit or-privilege provided for under the Agreement shall influence or in any way be based on the referral or recommended referral by either party of'patients to the other party or its affiliated providers, if any, or the purchasing, leasing or ordering of any services other than the specific services described in this Agreement. Any payments specified herein are consistent with what the parties. reasonably believe to be a fair market value for the services provided.

Accepted and Agreed:

ENTERGY OPERATIONS, INC., METRO AMBULANCE SERVICE (RURAL),

as Agent for the Owners INC., D/B/A AMERICAN MEDICAL RESPONSE

~By: c~ . **~*-:-:,

_:;A:<:::~ '"' v By:

Title:

- - Vice President, Operations -

Title:

GGNS Date: Date:

D-39 Revision 60 07 /08

GG FSAR LOA r.Jo. 10195761 AMENDMENT NO. 01 to the LETTER OF AGREEMENT between

\

ENTERGY OPERATIONS, INC.

and METRO AMBULANCE SERVICE* (RURAL), INC., D/8/A AMERICAN MEDICAL RESPONSE

1.Section I Item A of the Latter of Agreement is hereby amended to read as follows:

"A. AMR will provide, when requested by Entergy Operatjc;>r~s. af1lbulance service to treat and ttansport Injured or ill personnel, including thqse persons injured in a hostile action directed .toward .the Plant; from Grand Gulf Nuclear Station to the*Claiborne County (Mississippi) Hospital or other local hospitals."

/

Accepted and Agreed:

I ENTERGY OPERATIONS, INC., METRO AMBU.LANCE SERYI_CE (RUR,1'L), INC.,

as Agent for the Owners D/B/A AMERICAN MEDICAL RESPONSE I By~'i?------=-----=-

DigltaU)' signed by Frances

  • Chlple11 -

DN: cn=Frances Chipley, JA-u.S S. ~ 'g=MP&C,ou=C!Jnlracts, By: em~!~fchlplc@entergy.com, c=US .... -

Date: 20 I4.03.Z7 16:03:47 -os*oa

Title:

Sr. Procurement Specialist

Title:

Manager o~ Operations Date: March 27, 2014 Date: April 3, 2014 D-40 Revisi*on 71 -06/14

GG FSAR APPENDIXE Executive Summary of the Evacuation Time Estimates For Grand Gulf Nuclear Station November 2012 The.entire Evacuation Time Estimates Study can be found in GIN 2013/00190.

E-ii Revision 70 11 / 13

GG FSAR EXECUTIVE

SUMMARY

This report describes the analyses undertaken and the results obtained by a study to develop Evaluation time Estimates (ETE) for the Grand Gulf Nuclear Station (GGNS) located in Claiborne County, Mississippi. ETE are part of the required planning basis and provide Entergy and State and local governments with site~specific information needed for Protective Action decision-making.

In the performance of this effort, guidance is provided by documents published l;>y Federal Governmental agencies. Most important of these are: 1

  • Criteria for Development of Evacuation Time Estimate Studies, NUREG/CR-7002, November 2011.
  • Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants, NUREG 0654/FEMA-REP-1, Rev. 1, November 1980.
  • Development of Evacuation Time Estimates for Nuclear Power Plants, NUREG/CR-6863, January 2005.
  • 10CFR50, Appendix E - "Emergency Planning and Preparedness for Production and Utilization Facilities"
  • Overview of Project Activities This project began in April, 2012 and extended over a period of six months. The major activities performed are briefly described in chronological sequence:
  • Attended "kick-off' meetings with Entergy personnel, and emergency management personnel representing state and local governments.
  • Accessed U.S. Census Bureau data files for the year 2010. Studied Geographical Information Systems (GIS) maps of the area in the vicinity of fhe GGNS, then conducted a detailed field survey of the highway network
  • Synthesized this information to create an analysis network representing the highway
  • system topology and capacities within the Emergency Planning Zone (EPZ), plus a Shadow region covering the region between the EPZ boundary and approximately 15 miles radially frorn the plant
  • Designed and sponsored a telephone survey of residents within the EPZ to gather focused data r,eeded for this ETE study that were not contained within the census database. The survey instrument was reviewed and modified by the licensee and offsite response organization (ORO) personnel prior to the survey
  • Data collection forms (provided to the OROs at the kickoff meeting) were returned with data pertaining to employment, transients, and special facilities in each county and parish.

Grand Gulf ES-1 KLD Associates, Inc Evaluation Time Estimates Rev.1 E- 1 Revision 70 11 /13

GG FSAR

  • The traffic demand and trip-generation rates of evacuating vehicles were estimated from the gathered data. The trip generation rates reflected the estimated mobilization time (i.e., the time required by evacuees to prepare for the evaluation trip) computed using the results of the telephone survey of EPZ residents.
  • Following F~deral guidelines, the EPZ is subdivided into 16 PAS I PAA. These PAS I PAA are then grouped within circular areas or "keyhole" configurations (circies plus radial sectors) that define a total of 41 Evacuation Regions.
  • The time-varying external circumstances are represented as Evacuation Scenarios, each described in terms of the following factors: (1) Season (Summer, Winter); (2) Day of Week (Midweek, Weekend); (3) Time of Day (Midday, Evening); and (4) Weather (Good, Rain). One special event scenario involving a football game at Alcorn State University was considered. One roadway impact scenario was considered wherein in a single lane was closed on US 61 northbound for the duration of the evacuation.
  • Staged evacuation was considered for those regions wherein the 2-mile radius and sectors downwind to 5 miles were evacuated.
  • A rapidly escalating accident at GGNS that quickly assumes the status of General Emergency such that the Advisory to Evacuate is announced in a timely manner following the siren notification, and no early protective actions have been implemented.
  • While an unlikely accident scenario, this planning basis will yield ETE, measured as the elapsed time from the Advisory to Evacuate until the stated percentage of the population exits the impacted Region, that represent "upper bound" estimates.

This conservative Planning Basis is applicable for all initiating events.

  • If the emergency occurs while schools are in session, the ETE study assumes that the children will be evacuated by bus directly to reception centers located outside the EPZ. Parents, relatives, and neighbors are advised to not pick up their children at school prior to the arrival of the buses dispatched for that purpose. The ETE for schoolchildren are calculated separately.
  • Evacuees who do not haye access to private vehicle will either ride-share with relatives, friends or neighbors, or be evacuated by buses provided as specified in the county evacuation plans.

Those in special facilities will likewise be evacuated with public transit, as needed: bus, van, or ambulance, as required. Separate ETE are calculated for the transit-dependent evacuees for homebound special needs population, and for those evacuated from special facilities.

Computation of ETE A total of 492 ETE were computed for the evacuation of the general public. Each ETE quantifies the aggregate evacuation time estimated for the population within one of the 41 Evacuation Regions to evacuate from that Region, under the circumstances defined for one of the 12 Grand Gulf ES-2 KLD Associates, Inc.

Evaluation Time Estimates Rev.1 E-2 Revision 70 11 /13

GG FSAR Evacuation Scenarios (41 x 12 = 492). Separate ETE are calculated for transit-depen dent evacuees, including schoolchildren for applicable scenarios.

Except for Region R03, which is the evacuation of the entire EPZ, only a portion of the people within the EPZ would be advised to evacuate. That is, the Advisory to Evacuate applies only to those people occupying the specified impacted region. It is assumed that 100 percent of the people within the impacted region will eva.cuate in response to this Advisory. The people occupying the remainder of the EPZ outside the impacted region may be advised to take shelter.

The computation of ETE assumes that 20% of the population within the EPZ but outside the impacted region, will elect to "voluntarily" evacuate. In addition, 20% of the population in the Shadow Region will also elect to evacuate. These voluntary evacuees could impede those who are evacuating from within the impacted region. The impedance that could be caused by voluntary evacuees is.considered in the computation of ETE for the impacted region.

Staged evacuation is considered wherein those people within the 2-mile region evacuate immediately, while those beyond 2 miles, but within the EPZ, shelter-in-place. Once 90% of the 2-mile region is evacuated, those people beyond 2 miles begin to evacuate. As per federal guidance, 20% of people beyond 2 miles will evacuate (non-compliance) even though they are advised to shelter-in-place.

The computational procedure is outlined as follows:

A link-node representation of the highway network is coded. Each link represents a unidirectional length of highway; each node usually represents an intersection or merge point. Tl)e capacity of each link is estimated based on the field s_urvey observations and on established traffic engineering procedures.

The evacuation trips are generated at locations called "zonal centroids" located.within the EPZ and Shadow Region. The trip generation rates vary over time reflecting the mobilization process, and from one location (centroid) to another depending on population density and on whether a centroid is within, or outside, the impacted area.

The evacuation model computes the routing patterns for evacuating vehicles that are compliant with federal guidelines (outbound relative to the location of the plant), then simulate the traffic. flow movements over space and time. This simulation process estimates the rate that traffic flow exits the impacted region.

The ETE statistics provide the elapsed times for.90 percent and 100 percent, respectively, of the population within the impacted region, to evacuate from within the impacted region. These statistics are presented in tabular and graphical formats. The 90th percentile ETE have been identified as the values that should be considered when making protective action decisions because the 1OOth percentile ETE are prolonged by those relatively few people who take longer to mobilize. This is referred to as the "evacuation tail" in Section 4.0 of NUREG/CR-7002.

The use of a public outreach (information) program to emphasize the need for evacuees to minimize the time needed to prepare to evacuate (secure the home, assemble needed clothes, Grand Gulf ES-3 KLD Associates, Inc.

Evaluation Time Estimates Rev.1 E-3 Revision 70 11 /13

GG FSAR medicines, etc.) should also be considered.

Traffic Managenient This study references the comprehensive traffic management plans provided by Claiborne County, MS and Tensas Parish, LA. Due to the limited traffic congestion within the EPZ, no additional traffic or access control 'Tleasures have been identified as a result of this study.

\

Selected Results l

A compilation of selected information is presented on the following pages in the form of Figures and Tables extracted from the body of the report; these are described below.

Figure 6-1 displays a map of the GGNS EPZ showing the layout.of the 16 PAS I PAA that comprise, in aggregate, the-EPZ.

Table 3-1 presents the estimates of permanent resident population in each PAS I PAA based on the 201 O Census data.

Table 6-1 defines each of the 41 Evacuation Regions in terms of their respective groups of PAS I PAA.

Table 6-2 lists the Evacuation Scenarios.

Tables 7-1 and 7-2 are compilations of ETE. These data are the times needed to clear the indicated regions of 90 and 100 percent of the population occupying these regions, respectively. These computed ETE include consideration of mobilization time and of estimated voluntary evacuations from other regions within the EPZ and from the Shadow Region.

Tables 7-3 and 7-4 presents ETE for the 2-mile region for un-staged and staged evacuations for the goth and 1oath percentiles, respectively.

Table 8-7 presents ETE for the schoolchildren in good weather.

Table 8-1 O presents ETE for the transit-dependent population in good weather.

Figure H-8 presents an example of an Evacuation Region (Region ROB) to be evacuated under the circumstances defined in Table 6-1. Maps of all regions are provided in Appendix H.

Conclusions General population ETE were, computed for 492 unique cases - a combination of 41 unique Evacuation Regions and 12 unique Evacuation Scenarios. Table 7-1 and Table

}-2 document these ETE for the 90th and 1OOth percentiles. These ETE range from 1:25 (hr:min) to 2:30 at the ~0th percentile.

Inspection of Table 7-:1 and Table 7-2 indicates that the ETE for the 1OOth percentile are significantly longer than those for the 90th percentile (see Figures 7-8 through 7-19). This is due to the fact that the resident mobilization curve has a long "tail";

relatively few evacuees take a long time to mobi'lize.

Inspection of Table 7-3 and Table 7-4 indicates that a staged evacuation provides no 1

benefits to evacuees from within the 2 mile region and unnecessarily delays the evacuation of those beyond 2 miles (compare Regions R02, R04 through R09 with Grand Gulf ES-4 KLD Associates, Inc.

Evaluation Time Estimates Rev.1 E-4 Revision 70 11/13

GG FSAR Regions R35 through R41, respectively, in Tables 7-1 and 7-2). See Section 7.6 for additional discussion.

Comparison of Scenarios 1O (winter, midweek/weekend, evening) and 11 (winter, weekend, evening) in Table 7-2 indicates that the special event does not materially affect the ETE at the 1ooth percentile, but increases the ETE at the goth percentile for regions including PAS I PAA 6 by up to 35 minutes. See Section 7.5 for additional discussion.

Comparison of Scenarios 1 and 12 in Table 7-1 indicates that the roadway closure -

the closure of one lane on US 61 northbound from the boundary of Port Gibson to the EPZ boundary (by the Claiborne County line) - does not have an impact on the goth percentile ETE. See Section 7.5 for additional discussion.

Throughout the evacuation the EPZ is free from congestion, with the exception of the exit roadways from the Alcorn State University. The most congested area in the network is SR 522 from the University to US 61 SB. By 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and 20 minutes after the Advisory to Evacuate, traffic is moving at free-flow speed (LOS A) on all roadways within the EPZ (Scenario 6, R03). See Section 7.3 and Figures 7-3 through 7-7.

Separate ETE were computed for schools, medical facilities, transit-dependent persons, homebound special needs persons and correctional facilities. The average single-wave ETE for schools and medical facilities are within a similar range as the general population ETE at the goth percentile; the ETE for transit-dependents, homebound special needs persons and the correctional facility are slightly longer on average. See Section 8.

Table 8-5 indicates that there are sufficient transportation resources available to evacuate the public schools in both the county and parish, ,but not all the transit dependent population within the EPZ in a single wave. There are also not enough ambulances to evacuate the bedridden population in a single wave. The second-wave ETE for ambulances and special needs population does exceed the general population ETE at the goth percentile. See Sections 8.4 and 8.5.

The general population ETE at the 1oath percentile closely follows the trip generation time due to a lack of congestion within the EPZ. The goth percentile ETE are less sensitive to truncating the tail of the mobilization time distribution, since the mobilization time of the bulk of evacuees is unchanged. See Table M-1.

The general population ETE is insensitive to the voluntary evacuation of vehicles in the Shadow Region (tripling the shadow evacuation percentage does not increase goth or 1ooth percentile ETE). See Table M-2.

Population changes of 50 and 75% do not result in ETE changes which meet the criteria for updating ETE between decennial Censuses. A population increase of 160%

is needed to increase the goth percentile ETE by 30 minutes; See Section M.3.

Grand Gulf ES-5 KLD Associates, Inc.

Evaluation Time Estimates Rev.1 E-5 Revision 70 11 /13

"Tl cc*

c a3

~

...Ji.

G) ~

G) rJ1 ~

z m

(/') ~~

I m

<>> "U N

"U

-~~

tegend 1lf!1ti/W~

('-..*~~-

..... (? f'Atif PAA

...... ~

u)

"" *.,;. 2* ~. ;o Mlh~ Rings

GG FSAR Table 3-1. EPZ Permanent Resident Population I I

2007 Popu lation 2010 Popu lation PAS/ PAA I 2000 Popu lation I 104 100 43 1

356 342 305 2A 150 144 151

.28 983 946 961 3A I

506 487 388 38 2,892 2,778 2,407 4A 564 541 453 48 i

I 163 156, 138 5A 396 381 356 58 2,057 2,258 2,629 6

3 3 28 7

163 148 126 8

1,892 1,708 1, 185 9

431 388 394 10 1,530 1,381 1,403 11 12 - - -

12,190 11,761 10,967 TOTAL

-10.03%

EPZ Popu lation Grow th (2000 to 2010):

ES-7 KLD Associates, Inc.

Grand Gulf Rev.1 Evaluation Time Estimates.

E-7 Revision 70 11/13

/

GG FSAR Table 6.1. Description of Evacuation Regions PAS!PM Region Description 1 2A 28 3A 38 4A 48 5A 58 6 7 8 9 10 11 12 R01 2-MileRing x R02 5-Mile Ring x x x x x x R03 FullEPZ x x x x x x x x x x x x x x x x Evacuate 2-Mile Radius and Downwind to 5 Miles PAS!PM Region Wind Direction Toward 1 2A 28 3A 38 4A 48 5A 58 6 7 8 9 10 11 12 R04 WSW,W,WNW x x NIA NNE Refer !O Region 01 R05 NE.ENE x x R06 E x x x RO? ESE, SE, SSE x x x ROB w x x x R09 SSW x x NIA SW Refer to Region 01 Evacuate 2-Mile Radius and Downwind to EPZ Boundary PAS!PM Region Wind Direction Toward 1 2A 28 3A 38 4A 48 5A 58 6 7 8 9 10 11 12 NIA4 N Refer to Region 04 R10 NNE x x x R11 NE. ENE x x x x R12 E x x x x x R13 ESE x x x x x x x R14 SE x x x x x x x R15 SSE x x x x x x R16 s x x x x x x R17 SSW x x x x R18 SW x x x x R19 WSW x x x x x x R20 w x x x x x x Grand Gulf ES-8 KLD Associates, Inc.

Evaluation Time Estimates Rev.1 E-8 Revision 70 11/13

GG FSAR PAS/PM 5A - 58 6 7 8 9 10 11 12 1 2A 28 3A 38 4A 48 Region Description x x x x R21 WNW x x x x x R22 NW,NNW x Evacuate 5-Mile Radius and Downwind to EPZ Boundary PAS/PM 5A 58 6 7. 8 9 10 11 12 1 2A 28 3A 38 4A 48 Region Wind Direction Toward Refer to Region 02 NIA N x x x x R23 NNE x x x x x x R24 NE. ENE x x x x x x x R25 E x x x x x x x x x

-* R26 ESE x x x x x x x x x x R27 SE x ( x x x x x x x x R28 SSE x x x x x x x x x R29 s x x x x x x x x R30 SSW x x x x x x x x x x x R31 SW' x x ~

x x x x x x x R32 WSW,W x x x x x x x x x x x x R33 WNW x x x x x x x R34 NW,NNW x x x Evacuate 2-Mile Radius and Staged Downwind to5 Miles PAS/PM 58 6 7 8 9 10 11 12 1 2A 28 3A 38 4A 48 5A Region Wind Direction Toward x x R35 5-MileRing x x x x x R36 WSW,W,WNW, x Refer to Region 01 NIA NNE

  • R37 NE, ENE x x R38 E x x x R39 ESE.SE, SSE x x x R40 s x x x R41 SSW x x Refer to Region 01 NIA SW ES-9 KLD Associates, Inc.

Grand Gulf Rev.1 Evaluatl?n Time Estimates E-9 Revision 70 11/13

GG FSAR Table 6-2. Evacuation Scenario Definitions Scenario Season 1 Day of Week Time of Weather Special Day 1 Summer Midweek Midday Good* None 2 Summer Midweek Midday Rain None 3 Summer Weekend Midday Good None 4 Summer Weekend Midday Rain None 5 Summer Midweek, Evening Good None Weekend 6 Winter Midweek Midday Good None

\.__,

7 Winter Midweek Midday Rain None 8 Winter Weekend Midday Good None r

9 Winter Weekend Midday Rain None 10 Winter Midweek, Evening Good None Weekend Alcorn State University 11 Winter Weekend Evening Good football game

~12 Winter Midweek Midday Good Roadway Impact - Lane Closure on US 61 i

1 Winter assumes that school is in session (also applies to spring and autumn). Summer assumes that school is not in session.

Grand Gulf ES-10 KLD Associates, Inc.

Evacuation Time Estimate Rev.1 E- 10 Revision 70 11 /13

GG FSAR Table 7-1 . Time to Clear the Indicated Area of 90 Percent of the Affected Population Summer Summer Summer Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1) -r2) (3) (4) (5) (6) (7) (8) 9) (10) (11) (12) Scenario:

Middav Midday Evenina Middav Midday Evening Evening Middav Region Good 13_ain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather Weather Weather Weather Weather Weather Event Impact Entire 2-Mile Reaion, 5-Mile Reoion, and EPZ R01 1:30 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 R01 R02 2:10 2:15 2:05 2:05 2:00 2:10 2:10 2:05 2:05 2:00 2:00 2:10 R02 R03 2:20 2:20 2:05 2:05 2:00 2:15 2:15 2:00 2:05 2:00 2:30 2:20 R03 2-Mile Reaion and Kevhole to 5 Miles R04 1:30 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 R04 ROS 2:05 2:05 2:05 2:05 2:00 2:05 2:05 2:05 2:05 2:00 2:00 2:05 R05 R06 2:05 2:10 2:05 2:05 2:00 2:05 2:10 2:05 2:05 2:00 2:00 2:05 R06 R07 2:10 2:10 2:05 2:05 2:00 2:05 2:10 2:00 2:05 2:00 2:00 2:10 R07 ROB 2:05 2:10 2:00 2:05 2:00 2:05 2:10 2:00 2:05 2:00 2:00 2:05 ROB ROS 2:00 2:05 2:00 2:05 2:00 2:00 2:05 2:00 2:05 2:00 2:00 2:00 ROS 2-Mile Rec ion and Kevhole to 10 Miles R10 2:05 2:05 2:05 2:05 2:05 2:05 2:05 2:05 2:05 2:00 2:00 2:05 R10 R11 2:05 2°:05 2:05 2:05 2:00 2:05 2:05 2:05 2:05 2:00 2:00 2:05 R11 R12 2:05 2:10 2:05 2:05 2:00 2:05 2:10 2:05 2:05 2:00 2:00 2:10 R12 R13 2:15 2:15 2:05 2:05 2:00 2:10 2:15 2:05 2:05 2:00 2:00 2:15 R13 R14 2:15 2:15 2:05 2:10 2:05 2:15 2:15 2:05 2:05 2:05 1:55 2:15 R14 R15 2:10 2:15 2:00 2:05 2:00 2:10 2:10 2:05 2:05 2:00 1:55 2:10 R15 R16 2:10 2:15 2:00 2:05 2:00 2:10 2:10 2:00 2:05 1:55 2:30 2:10 R16 R17 2:10 2:10 2:00 2:00 1:55 2:00 2:05 2:00 2:00 1:55 2:30 2:10 R17 R18 2:10 2:10 2:00 2:00 1:55 2:05 2:05 2:00 2:00 1:55 2:30 2:10 R18 R1!f 2:10 2:10 2:00 2:00 1:55 2:05 2:05 2:00 2:00 1:55 2:30 2:10 R19 R20, 2:19 2:20 2:00 2:00 2:00 2:15 2:15 2:00 2:00 1:55 1:55 2:15 R20 R21 2:10 2:10 2:00 2:00 1:55 2:10 2:10 1:55 2:00 1:55 1:55 2:10 R21 R22 2:05 2:05 2:00 2:00 1:55 2:05 2:05 1:55 2:00 1:55 1:55 2:05 R22 Grand Gulf ES-11 KLD Associates, Inc.

Evacuation Time Estimate Rev_ 1 E- 11 Revision 70 11/13

GG FSAR Summer Summer Summer Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) Scenario:

Midday- Midday Evening Midday Midday .Evening. Evening Midday Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather Weather Weather Weather Weather Weather Event Impact

.. 5-Mile Re~ ion and Keyhole to EPZ Boundary R23 2:10 2:15 2:05 2:10 2:00 2:10 2:15 2:05 2:05 2:00 2:00 2:10 R23 R24 2:10 2:15 2:05 2:10 2:00 2:10 2:15 2:05 2:05 2:00 2:00 2:10 R24 R25 2:10 2:15 2:05 2:05 2:00 2:10 2:15 2:05 2:05 2:00 2:00 2:10 R25 R26 2:15 2:15 2:05 2:10 2:00 2:10 2:15 2:05 2:05 2:00 2:00 2:15 R26 R27 2:15 2:15 2:05 2:10 2:00 2:15 2:15 2:05 2:05 2:00 1:55 2:15 R27 R28 2:15 2:15 2:05 2:10 2:00 2:10 2:15 2:05 2:05 2:00 1:55 2:15 R28 R29 2:15 2:15 2:05 2:05 2:00 :2:10 2:10 2:05 2:05 2:00 2:30 2:15 R29 R30 2:15 2:15 2:05 2:05 2:00 2:10 2:10 2:00 2:05 2:00 2:30 2:15 R30 R31 2:15 2:15 2:05 2:05 2:00 2:10 2:10 2:00 2:05 2:00 2:30 2:15 R31 R32 2:15 2:15 2:05 2:05 2:00 2:15 2:15 2:05 2:05 2:00 2:00 2:15 R32 R33 2:15 2:15 2:05 2:05 2:00 2:15 2:15 2:05 2:05 2:00 2:00 2:15 R33 R34 2:10 2:15 2:05 2:05 2:00 2:10 2:15 2:05 2:05 2:00 2:00 2:10 R34 Staged Evacuation Mile Region, 2-Mile Region and Keyhole to 5 Miles R35 2:10 2:15 2:05 2:05 2:00 2:10 2:10 2:05 2:05 2:00 2:00 2:10 R35 R36 1:35 1:35

  • 1:45 1:45 1:45 1:35 1:35 1:40 1:40 1:45 1:45 1:35 R36 R37 2:05 2:05 2:05 2:05 2:00 2:05 2:05 2:05 2:05 2:00 2:00 , 2:05 R37 R38 2:05 2:10 2:05 2:05 2:00 2:05 2:10 2:05 2:05 2:00 2:00 2:05 R38

- R39 2:10 2:10 2:05 2:05 2:00 2:05 2:10 2:00 2:05 2:00 2:00 2:10 R39 R40 2:05 2:10 2:00 2:05 2:00 2:05 2:10 2:00 2:00 1:55 1:55 2:05 R40 R41 2:00 2:05 2:00 2:00 1:55 2:00 2:05 2:00 2:00 1:55 1:55 2:00 R41 Grand Gulf ES-12 KLD Associates, Inc.

Evacuation Time Estimate Rev.1 E- 12 Revision }O 11 /13

GG FSAR the Affected Population Table 7-2. Time to Clear the Indicated Area of 100 Percent of -

Winter Winter Winter Summe r Summer Summer Winter Summer Midweek Midwee k Weeken d Midweek Weekend Midweek Weekend Midwee k Weekend Weekend (12) Scenario:

(6) (7) (8) (9) (10) (11)

(1) (2) (3) (4) (5)

Scenario: Midday Eveninq Eveninq Midday Midday Eveninq Midday Midday Good Special Roadway Region Rain Good Good Rain Good Rain Region Good Rain Good Event Impact Weather Weather Weather Weathe r Weather Weather Entire 2-Mile Region, 5-Mile Region, and EPZ R01 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 R01 4:45 4:50 4:50 4:50 4:50 R02 4:50 4:50 4:50 4:50 4:50 4:50 R02 4:50 4:50 4:55 4:55 4:55 R03 4:55 4:55 4:55 4:55 4:55 R03 4:55 4:55 4:55 4:55 2-Mile Region and Keyhole to 5 Miles R04 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R04 4:50 4:50 4:50 4:50 ROS 4:50 4:50 4:50 4:50 4:50 4:50 ROS 4:50 4:50 4:50 4:50 4:50 R06 4:50 4:50 4:50 4:50 4:50 R06 4:50 4:50 4:50 4:50 4:50 R07 4:50 4:50 4:50 4:50 4:50 4:50 R07 4:50 4:50 4:50 4:50 4:50 R08 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 - 4:50 4:50 R08 4:50 4:50 4:50 4:50 4:50 R09 4:50 4:50 4:50 4:50 4:50 4:50 R09 4:50 2-Mile Re~ ion and Keyhole to 10 Miles R10 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R10 4:55 4:55 4:55 4:55 4:55 R11 4:55 4:55 4:55 4:55 4:55 4:55 R11 4:55 4:55 4:55 4:55 4:55 R12 4:55 4:55 4:55 4:55 4:55 4:55 R12 4:55 4:55 4:55 4:55 4:55 R13 4:55 4:55 4:55 4:55 4:55 4:55 R13 4:55 4:55 4:55 4:55 4:55 R14 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R15 R14 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R15 4:55 4:55 4:55 4:55 4:55 R16 4:55 4:55 4:55 4:55 4:55 4:55 R16 4:55 4:55 4:55 4:55 4:55 R17 4:55 4:55 4:55 4:55 4:55 4:55 R17 4:55 4:55 4:55 4:55 4:55 R18 4:55 4:55 4:55 4:55 4:55 4:55 R18 4:55 4:55 4:55 4:55 4:55 R19 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R19 4:55 4:55 4:55 4:55 4:55 R20 4:55 4:55 4:55 4:55 4:55 R20 4:55 4:55 4:55 4:55 4:55 R21 4:55 4:55 4:55 4:55 4:55 4:55 R21 4:55 4:55 4:55 4:55 4:55 'R22 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R22 4:55 4:55 4:55 KLD Associates, Inc.

ES-13 Grand Gulf Rev.1 Evacuation Time Estimate Revision 70 11/13 E- 13

GG FSAR Summer Summer Summer Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1) (2) (3) (4) (5) (6) (7) (8) 9) (10) (11) (12) Scenario:

Middav Midday Eveninq Middav Midday Evening Evening Midday Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather Weather Weather Weather Weather Weather Event Impact 5-Mile Re~ ion and Keyhole to EPZ Boundary R23 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R23 R24 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R24 R25 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R25 R26 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R26 R27 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R27 R28 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R28 R29 4:55 4:55 4:55 4:55 _ 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R29 R30 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R30 R31 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R31 R32 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R32 R33 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R33 R34 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 4:55 R34 Staqed Evacuation Mile Region, 2-Mile Region and Keyhole to 5 Miles R35 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R35 R36 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R36 R37 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R37 R38 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R38 R39 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R39 R40 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R40 R41 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R41 Grand Gulf ES-14 KLD Associates, Inc.

Evacuation Time Estimate Rev.1 E-14 Revision 70 11 /13

GG FSAR Table 7-3. Time to Clear 90 Percent of the 2-Mile Area within the Indicated Region Summer Summer Summer Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) Scenario:

Midday Midday Evening Midday Midday Evening Evening *Midday Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather Weather Weather Weather Weather Weather Event Impact 2-Mile and 5-Mile Region R01 1:30 1:30 1:25 1:25

  • 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 R01 R02 1:30 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 R02 2-Mile Region and Kevhole to 5 Miles R04 1:30 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 R04 ROS 1:30 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 ROS R06 1:30 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 R06 RO? 1:30 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 RO?

ROB 1:30 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 ROB R09 1:30 ,-- 1:30 1:25 1:25 1:30 1:30 1:30 1:30 1:30 1:25 1:25 1:30 R09 Staged Evacuation Mile Region, 2-Mile Region and Keyhole to 5 Miles R35 1:35 1:35 1:45 1:45 1:45 1:35 1:35 1:40 1:40 1:45 1:45 1:35 R35 R36 1:35 1:35 1:45 1:45 1:45 1:35 '1-:35 1:40 1:40 1:45 1:45 1:35 R36 R37 1:35 1:35 1:45 1:45 1:45 1:35 1:35 1:40 1:40 1:45 1:45 *1:35 R37 R38 1:35 1:35 1:45 1:45 1:45 1:35 1:35 1:40 1:40 1:45 1:45 1:35 R38 R39 1:35 1:35 1:45 1:45 1:45 1-;35 1:35 1:40 1:40 1:45 1:45 1:35 R39 R40 1:35 1:35 1:45 1:45 1:45 1:35 1:35 1:40 1:40 1:45 1:45 1:35 R40 R41 1:35 1:35 1:45 1:45 1:45 1:35 1:35 1:40 1:40 1:45 1:45 1:35 R41 Grand Gulf ES-15 KLD Associates, Inc.

Evacuation Time Estimate Rev.1 E- 15 Revision 70 11 /13

GG FSAR Table 7-4. Time to Clear 100 Percent of the 2-Mile Area within the Indicated Region Summer Summer Summer( Winter Winter Winter Winter Summer Midweek Weekend Midweek Midweek Weekend Midweek Weekend Midweek Weekend Weekend Scenario: (1) (2) (3) (4) (5) (6) (7) (8) 9) (10) (11) (12) Scenario:

Midday Midday - Evening Midday Midday Evening Evening Midday Region Good Rain Good Rain Good Good Rain Good Rain Good Special Roadway Region Weather Weather Weather Weather Weather Weather Event Impact 2-Mile and 5-Mile Region R01 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 4:45 R01 R02 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R02 2-Mile Region and Keyhole to 5 Miles R04 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R04 ROS 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 ROS R06 4:50 . 4:50 4:50 4:50 4:50 4:50 4:50 4:50 *4:50 4:50 4:50 4:50 R06 R07 4:50 4:50 4:50 4:50 4:50 - 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R07 ROB 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 ROB R09 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R09 Staged Evacuation Mile Region, 2-Mile Region and Keyhole to 5 Miles R35 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R35 R36 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R36 R37 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R37 R3B 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R3B R39 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R39 R40 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R40 R41 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 4:50 R41 Grand Gulf ES-16 KLD Associates, Inc.

Evacuation Time Estimate Rev.1 E-16 Revision 70 11 /13

GG FSAR Table 8-7. School Evacuation Time Estimates- Good Weather Travel Dist. Time Driver Dist. Travel EPZ from Mobili- To Time to Bdry EPZ Second Second Zation Loading EPZ Average EPZ To Bdryto ETEto Bus Ready Wave Wave Time Time Bdry Speed Bdry ETE RC. RC. R.C. For Second ETE ETEto School (min) (min} (mi} (mph} (min) (hr:min) (min} (min} (hr:min} Wave (min} (hr:min} RC.

CLAIBORNE SCHOOLS A. W. Watson Elementary School 90 15 6.1 42.8 9 1:55 39.1 ,52 2:50 240 4:25 5:15 Richardson Headstart 90 15 5.9 43.8 8 1:55 39.1 52 2:45 240 4:25 5:15 Child Day Care Kindergarten 90 15 5.9 43.8 8 1:55 39.1 52 2:45 240 4:25 5:15 Heavenly angels Daycare 90 15 4.2 51.3 5 1:50 39.1 52 2:45 238 4:20 5:10 Port Gibson Hioh 90 15 5.6 47.0 7 1:55 39.1 52 2:45 239 4:25 5:15 Claiborne Countv Vo-Tech 90 15 5.7 45.0 8 1:55 39.1 52 2:45 240 4:25 5:15 Katherine's Daycare and Leaming 90 15 6.1 42.9 9 1:55 39.1 52 2:50 240 4:25 5:15 Port Gibson Middle School 90 15 4.7 48.0 6 1:55 39.1 52 2:45 238 4:20 5:15 Concerned Citizens Davcare 90 15 4.7 48.0 6 1:55 39.1 52 2:45 238 4:20 5:15 Chamberlain-Hunt Academv 90 15 4.7 48.0 6 1:55 39.1 52 2:45 238 4:20 5:15 Little Kids Universitv 90 15 4.7 48.0 6 1:55 39.1 52 2:45 238 4:20 5:15 Claiborne Educational Foundation 90 15 4.2 51.3 5 1:50 39.1 52 2:45 238 4:20 5:10 God's Little Bee's Child Care 90 15 6.2 46.9 8 1:55 39.1 52 2:45 240 4:25 5:15 Alcorn State Universitv 90 15 0.4 28.5 1 1:50 38.1 51 2:40 232 4:10 5:00 TENSAS SCHOOLS Newellton Christian Academy 90 15 1.3 31.0 3 1:50 25.9 35 2:25 230 4:10 4:45 Newellton Elementary 90 15 1.3 31.0 3 1:50 25.9 35 2:25 230 4:10 4:45 Little Green Nursery 90 15 3.7 33.7 7 1:55 25.9 35 2:30 180 3:25 4:00 Tensas Academv 90 15 3.7 33.7 7 1:55 -35A 47 2:40 180 3:25 4:10 Tensas High School 90 15 2.5 37.7 4 1:50 35.4 47 2:40. 180 3:20 4:10 Tensas Elementary 90 15 2.5 37.7 4 1:50 35.4 47 2:40 180 3:20 4:10 Maximum for EPZ: 1:55 Maximum: 2:50 2:50 Maximum: 4:25 5:15 Averaae for EPZ: 1:50 Average: 2:45 2:45 Average: 4:10 5:00 Grand Gulf ES-17 KLD Associates, Inc.

Evacuation Time Estimate Rev.1 E-17 Revision 70 11 /13

GG FSAR Table 8-10. Transit-Dependent Evacuation Time Estimates-Good Weather One-Wave Two-Wave Route Bus Mobilization Route Speed Route Pickup ETE Distance Travel Unload Driver Route Pickup ETE Number Number (min) Length (mph) Travel nme (hr:min) to R.C. Time to (min) Rest Travel Time (hr.min)

(miles) Time (min) (miles) R.C. (min) Time (min)

(min) (min) (min) 1 1 105 12.4 55.0 14 30 2:30 - 22.0 29 5 10 59 30 4:45 2 3 105 6.0 52.4 7 30 2:25 39.1 52 5 10 67 30 5:10 2 120 - 6.0 51.7 7 30 2:40 39.1 52 5 10 67 30 5:25 3 1 105 7.5 55.0 8 30 2:25 25.9 35 5 10 53 30 4:40 4 2 105 5.6 39.8 8 30 2:25 35.4 47 5 10 63 30 5:00 2 120 5.6 42.6 8 30 2:40 35.4 47 5 10 64 30 5:15 5 1 105 1.2 41.4 2 30 2:20 33.4 45 _5 10 48 30 4:40 1 120 1.2 41.3 2 30 2:35 33.4 45 5 10 48 30 4:55 6 4 105 3.1 39.3 5 30 2:20 38.1 51 5 10 60 30 5:00 2 120 3.1 39.3 5 30 2:35 38.1 51 5 10 60 30 5:15 7 2 105 5.5 55.0 6 30 2:25 18.1 24 5 10 37 30 4:15 1 120 5.5 55.0 6 30 2:40 18.1 24 5 10 37 30 4:30 Maximum ETE: 2:40- Maximum ETE: 5:25 Average ETE:

  • 2:30 Average ETE: 4:55

\

Grand Gulf ES-18 KLD Associates, Inc.

Evacuation Time Estimate Rev.1 E-18 Revision 70 11 /13

GG FSAR legend 1:( ~(;NS GJ FAS/PAA E11zH.:uate

...,,... 2~ lVlO Mi111 Ring~

.StKtor Soi.mdadus Figure H-8. Region ROB Grand Gulf ES-19 KLD Associates, Inc.

Evacuation Time Estimate Rev.1 E- 19 Revision 70 11 /13

APPENDIXF List of Supporting Plans

GG FSAR APPENDIX F - LIST OF SUPPORTING PLANS

1. Mississippi Radiological Emergency Preparedness Plan; Volume m, to the Mississippi Comprehensive Emergency Management Plan
2. Port Gibson/Claiborne County - Radiological Emergency Preparedness Plan
3. Louisiana Peacetime Radiological Response Plan; Supplement II, Fixed Nuclear Facilities to Louisiana Emergency Operations Plan, Attachment 2, Grand Gulf Nuclear Station
4. . Louisiana Peacetime Radiological Response Plan; Supplement II, Fixed Nuclear Facilities to Louisiana Emergency Operations Plan Attachment 2, Grand Gulf Nuclear Station, Enclosure I, Tensas Parish Radiological Emergency Response Plan
5. Hospital Emergency Department Management of Radiation Accidents

.J F-1 Revision 33 9 / 97 ,,

GG FSAR APPENDIXG NUREG 0654 Cross Reference G-1 Revision 75 3/ 17

GG FSAR Planning Standards and Evaluation Criteria A. Assignment of Responsibility (Organization Control)

Planning Standard Primary responsibilities for emergency response by the nuclear facility licensee, and by state and local organizations within the Emergency Planning Zones have been assigned, the emergency responsibilities of the various supporting organizations have been specifically established, and each principal response organization has staff to respond and to augment its initial response on a continuous basis.

Evaluation Criteria Cross Reference to Plan

1. a. Each plan shall identify the state, local, federal Sections 2.4.3, 5.6, 5.7, 5.8 and private sector organizations (including utilities), that are intended to be part of the overall response organization for Emergency Planning Zones. (See Appendix 5).
b. Each organization and suborganization having an Sections 2.3 .1, 2.3 .2, 2.4.1, 2.4.2, operational role shall specify its {All) concept of 5.0 operations, and its relationship to the total effort.
c. Each plan shall illustrate these interrelationships Figure 5-5 in a block diagram.
d. Each organization shall identify a specific Sections 5.4.1, 5.4.2, individual by title who shall be in charge of the emergency response.
e. Each organization shall provide for 24-hour per Sections 5.4, 7.5, Table 5-1 day emergency response, including 24-hour per day manning of communications links.
2. a. Each organization shall specify the functionsN/A and responsibilities for major elements and key individuals by title, of emergency response, including the following:

Command and Control, Alerting and Notification, Communications, Public Information, Accident Assessment, Public Health and Sanitation, Social Services, Fire and Rescue, Traffic Control, Emergency Medical Services, Law Enforcement, Transportation, Protective Response (including authority to request federal assistance and to initiate other protective actions), and Radiological Exposure Control.

The description of these functions shall include a clear and concise summary such as a table of primary and support responsibilities using the agency as one axts, and the function as the other. (See Section B for licensee.)

b. Each plan shall contain (by reference to specific acts, NIA codes or statutes) the legal basis for such authorities.
3. Each plan shall include written agreements referring to the Appendix D concept of operations developed between federal, state, and and local agencies and other support organizations having G-2 Revision 75 3/ 17

GG FSAR organizations having an emergency response role within the Emergency Planning Zones. The agreements shall identify the emergency measures to be provided and the mutually acceptible criteria for their implementation, and specify the arrangements for exchange of information. These agreements may be provided in an appendix to the plan or the plan itself may contain descriptions of these matters and a signature page in the plan may serve to verify the agreements. The signature page format is appropriate for organizations where response functions are covered by laws, regulations or executive orders where separate written agreements are not necessary.

4. Each principal organization shall be capable of continuous Section 5.7 (24-hour) operations for a protracted period. The individual in the principal organization who will be responsible for assuring continuity of resources (technical, administrative, and material) shall be specified by title.
8. Onsite Emergency Organization Evaluation Criteria Cross Reference to Plan
1. Each licensee shall specify the onsite emergency Section 5.2, 5.4, Fig 5-2, 5-3 organization of plant staff personnel for all shifts and its relation to the responsibilities and duties of the normal staff complement.
2. Each licensee shall designate an individual as emergency Sections 5.4.1 coordinator who shall be on shift at all times and who shall have the authority and responsibility to immediately and unilaterally initiate any emergency actions, includi,ng providing protective action recommendations to authorities responsible for implementing offsite emergency measures.
3. Each licensee shall identify a line of succession for the Section 5.4.2 emergency coordinator position and identify the specific conditions for higher level utility officials assuming this function.
4. Each licensee shall establish the functional responsibilities Sections 5.4.2 assigned to the emergency coordinator and shall clearly specify which responsibilities may not be delegated to other elements of the emergency organization. Among the responsibilities which may not be delegated shall be the decision to notify and to recommend protective actions to authorities responsible for offsite emergency measures.
5. Each licensee shall specify the positions or title and major tasks Sections 5.4, Table 5-1 to be performed by the persons to be assigned to the functional areas of emergency activity. For emergency situations, specific assignments shall be made for all shifts and for plant staff members, both onsite and away from the site. These assignments shall cover the emergency functions in Table 8-1 entitled, "Minimum Staffing Requirements for Nuclear Power Plant Emergencies." The minimum on-shift staffing levels shall be as indicated in Table 8-1.

G-3 Revision 75 3/17

GG FSAR within a The license e must be able to augme nt on-shi ft capabilities ency. This capabi lity short period after declar ation of an emerg B-l. The implem entatio n schedu le shall be as indica ted in Table ors, auxilia ry operat ors and the shift technic al for license d operat letter to adviso r on shift shall be as specifi ed in the July 31, 1980 in the other staffin g all power reacto r license es. Any deficie ncies be capabl e ofaugm entatio n within require ments of Table B-1 must ber 1, 1981, and such deficie ncies must be fully 30 minute s by Septem remov ed by July 1, 1982.

among the Figure 5-5

6. Each license e shall specif y the interfaces betwee n and of emerg ency activity , license e headqu arters onsite functional areas t, local service s suppor t, and state and local govern ment suppor ted in a block diagra m respon se organi zation . This shall be illustra cal suppor t center and the operat ional and shall includ e the onsite techni center and the license e's near-s ite Emerg ency suppor t (assem bly)

Operat ions Facilit y (EOF) .

admin istrativ e Sectio ns 5.4

7. Each license e shall specify the corpor ate manag ement, plant staff as and techni cal suppor t person nel who will augme nt the ed in the table entitle d "Minim um Staffin g Requir ements for specifi B-1) and in the follow ing areas:

Nuclea r Power Plant Emerg encies ," (Table Sectio ns 5.4.6 a.\ logistic,s suppor t for emerg ency person nel, e.g.,

transpo rtation , comm unicat ions, tempo rary quarters, food and water, sanitary facilities in the field, and specia l equipm ent and supplies procur ement; Sectio ns 5.4.24, 5.4.27,

b. techni cal suppor t for planni ng and 5.5 reentry /recov ery operat ions; Sectio ns 5.4.2
c. manag ement level interface with govern menta l author ities; and Sectio ns 5.4.2
d. re lease of inform ation to news media during an emerg ency (coord inated with govern mental author ities).

Sectio n 5.8

8. Each license e shall specify the contra ctor and private organi zation s who may be requested. to provid e technical assistance to and augmentation of the emerg ency organi zation .

by Sections 5.6, 5.7.3, 5.7.4,

9. Each license e shall identif y the service s to be provid ed D ng emerg encies , e.g., police , ambul ance, Appen dix local agenci es for handli l, hospita l, and fire-fig hting organi zation s shall be medica and specified. The licensee shall provid e for transportation who may also be contam inated .

treatment of injured person nel Copies of the arrang ements and agreem ents reache d with append ed contra ctor, private , and local suppor t agenci es shall be te the author ities, to the plan. The agreements shall delinea ctor, responsibilities, and limits on the action s of the contra zation, and local service s suppor t groups .

private organi G-4 Revision 75 3/17

GG FSAR C. Emergency Response Support and Resources Planning Standard Arrangements for requesting and effectively using assistance resources have been made, arrangements to accommodate state and local staff at the licensee's near-site Emergency Operations Facility have been made, and other organizations capable of augmenting the.planned response have been identified.

Evaluation Criteria I. The Federal government maintains in-depth capability to assist licensees, states and local governments through the Federal Radiological Monitoring and Assessment Plan (formerly Radiological Assistance Plan (RAP) and Interagency Radiological Assistance Plan (IRAP). Each state and licensee shall make provisions for incorporating the federal response capability into its operation plan, including the following:

a. specific persons by title authorized to request Sections 5.4.2 federal assistance; see A. I :d, A.2.a.
b. specific federal resources expected, including Sections 5.7.5, 5.7.6 expected times of arrival at specific nuclear facility sites; and
c. specific licensee, state and local resources Section 5.9 available to support the federal response, e.g.,

air fields, command posts, telephone lines, radio frequencies and telecommunications centers.

2. a. Each principal offsite organization may dispatch NIA representatives to the licensee's near-site Emergency Operations FaciHty. (State technical analysis representatives at the nearsite EOF are preferred.)
b. The licensee shall prepare for the dispatch of a Sections 5.4.11 representative to principal offsite governmental agency operations centers.
3. Each organization shall identify radiological laboratories Section 7.6.3 and their general capabilities and expected availability to provide radiological monitoring and analyses services which can be used in an emergency.
4. Each organization shall identify nuclear and other Sections 5.6, 5.7, facilities, organizations or individuals which can 5.8 be relied upon in an emergency to provide assistance. Appendix D Such assistance shall be identified and supported by appropriate letters of agreement.

D. Emergency Classification System Planning Standard A standard emergency classification. and action level scheme, the bases of which include facility system and effluent parameters, is in use by the nuclear facility licensee, and state and local response plans call for reliance on information provided by facility licensees for determinations of minimum initial offsite response measures.

G-5 Revision 75 3 / 17

GG FSAR Evaluation Criteria Cross Reference to Plan

1. An Jmergenc y classification and emergency action level Section 4.1 scheme as set forth in Appendix l must be established by Table 4-1 by the licensee. The specific instruments, parameters or equipment status shall be shown for establishing each emergency class, in the in-plant emergency procedures.

The plan shall identify the parameter values and equipment status for each emergency class.

2. The initiating conditions shall include the example Sections 4.1, 4.2 conditions found in Appendix 1 and all postulated Table 4-2 accidents in the Final Safety Analysis Report (FSAR) for the nuclear facility.
3. Each state and local organization shall establish an NIA emergency classification and emergency action level scheme consistent with that established by the facility licensee.
4. Each state and local organization should have NIA procedures in place that provide for emergency actions to be taken which are consistent with the emergency actions recommended\ by the nuclear facility licensee, taking into account local offsite conditions that exist at the time of the emergency.

E. Notification Methods and Procedures Planning Standard organizations and Procedures have been establishe d for notification, by the licensee of state and local response y personnel by all response organizati ons; the content of initial and followup for notification of emerge~c to response organizati ons and the public has been establishe d; and means to provide early messages y Planning notification and clear instruction to the populace within the plume exposure pathway Emergenc Zone have been established.

I Evaluation Criteria Cross Reference to Plan Sections 4.1, 6.2.2,

1. Each organization shall establish procedures which describe 6.2.4 mutually agreeable bases for notification of response Figure 6-2 organizations consistent with the emergency classification and action level scheme set forth in Appendix 1. These procedures shall include means for verification of messages.

The specific details of verification need not be included in the plan.

Sections 4.0, 6.2, 7.5.3.a.3

2. Each organization shall establish procedure s for alerting, notifying, and mobilizin g emergenc y response personnel.

G-6 Revision 75 3/17

GG FSAR

3. The l1censee in conjunction with state and local Section 6.2.4 organizations.shall establish the contents of the initial Figure 6-2 emergency messages to be sent from the plant. These measures shall contain information about the class of emergency, whether a release is taking place, potentially affected population and areas, and whether protective measures may be necessary.
4. Each licensee shall make provisions for followup Section 6.2.4 messages from the facility to offsite authorities Figure 6-2 which shall contain the following information if it is known and appropriate:
a. location of incident and name and telephone number (or communications channel identification) of caller; 1
b. date/time of incident;
c. class of emergency;
d. type of actual or projected release ( airborne, waterborne, surface spm), and estimated duration/impact times;
e. estimate of quantity of radioactive material released or being released and the points and height ofreleases;
f. chemical and physical form ofreleased material, including estimates of the relative quantities and concentration of noble gases, iodines and particulates;
g. meteorological co.nditions at appropriate levels (wind speed, direction (to and from), indicator of stability, precipitation, if any);
h. actual or projected dose rates at site boundary; projected integrated dose at site boundary;
i. projected dose rates and integrated dose at the projected peak and at 2, 5 and l Omiles, including sector(s) affected;
j. estimate of any surface radioactive contamination inplant, onsite -or offsite;
k. licensee emergency response actions underway; I. recommended emergency actions, including protective measures;
m. request for any needed onsite support by offsite organizations; and
n. prognosis for worsening or termination of event based on plant information.
5. State and local government organizations shall establish a NIA system for disse~inating to the public appropriate information contained in initial and followup messages received from the licensee including the appropriate notification to appropriate broadcast media, e.g., the Emergency Broadcast System (EBS).
6. Each organization. shall establish administrative and physical Section 7.5.4 means, and the time required for notifying and providing prompt instructions to the public within the plume exposure pathway Emergency Planning Zone. (See Appendix 3.) It shall be the licensee's responsibility to demonstrate that such means exist, regardless of who implements this requirement. It shall be the responsibility of the state and local governments to activate such a system.
7. Each organization shall provide written messages intended for Sections 6.5.1, 8.7 the public, consistent with the licensee's classification scheme. Appendix H In particular, draft messages to the public giving instructions with regard to specific protective actions to be taken by occupants of affected areas shall be prepared and included as part of the state and local plans. Such messages sh.ould include the appropriate J aspects of sheltering, ad hoc respiratory protection, e.g., handkerchief G-7 Revision 75 3/17

GG FSAR over mouth, thyroid blocking or evacuation .. The role of the licensee is to provide supporting information for the messages'. For ad hoc respiratory protection see "Respiratory Protective Devices Manual" American Industrial Hygiene Association, 1963 pp. 123-126.

F. Emergency .Communications .

Planning Standard Provisions exist for prompt communications among principal response organizations to emergency personnel and to the public.

Evaluation Criteria Cross Reference to Plan

l. The communications plans for emergencies shall include organizational titles and alternates for both ends of the communication links. Each organization shall establish reliable primary and backup means of communication for licensees, local, and state response organizations. Such systems should be selected to be compatible wi!h one another. Each plan shall include:
a. provision for 24-hour per day notification jo Sections 5.2, 5.4, and activation of the state/local emergency 7.5 response network; and at a minimum, a telephone link and alternate, including.24-hour per day manning of communications links that initiate emergency response actions.
b. provision for communications with contiguous Section 6.2.4, 7.5 state/local governments within the Emergency Planning Zones;
c. provision f<:>r communications as needed with Section 6.2.4, 7.5 federal emergency response organizations;
d. provision for communications between the nuclear Section 7.5 facility and the licensee's near-site Emergency Operations Facility, state and local emergency operations centers, and radiological monitoring teams;
e. provision for alerting or activating emergency Section 6.2 personnel in each response organization; and
f. provision for communication by the licensee with Section 7.5 NRC headquarters and NRC Regional Office Emergency Operations Centers and the licensee's near-site Emergency Operations Facility and radiological monitoring team assembly area.
2. Each organization shall ensure that a coordinated Sections 6.7.3 communication link for fixed and mobile medical support facilities exists.
3. Each organization shall conduct periodic testing of Sections 7.5, 8.3.2 the entire emergency communications system (see

~valuation criteria H.10, N.2.a and Appendix 3).

G-8 Revision 75 3/ 17

GG FSAR G. ,Public Education and Information Planning Standard basis on how they will be notified and what their Information is made available to the public on a periodic to a local broadcast station and remaining indoors),

initial actions should be in an emergency (e.g., listening ination of information during an emergency the principal points of contact with the news media for dissem establi shed in advance, and procedures for coordinated (including the physical location or locations) are dissemination of information to the public are established.

Cross Reference to Plan.

Evaluation Criteria Section 8.7

l. Each organization shall provide a coordinated H Appendix periodic (at least annually) dissemination of information to the public regarding how they will be notified and what their actions should be in an emergency. This information shall include, but not necessarily be limited to:
a. educational information on radiation;
b. contac t for additional information;
c. protective measures, e.g., evacuation routes and relocation centers, sheltering, respiratory protection, radioprotective drugs; and
d. specia l needs of the handicapped.

e, but are not necessarily limited to:

Means for accomplishing this dissemination may includ in utility bills; posting in public areas; and information in the telephone book; periodic information publications distributed on an annual. basis.

nent and Section 8.7

2. The public information program shall provide the perma H EPZ an Appendix transient adult population within the plume exposure of the inform ation annual ly.

adequate opportunity to become aware al that is The programs should include provision for written materi le in a residen ce during an emerg ency. Updated likely to be availab Signs or other information shall be disseminated at least annually.

s or other means , placed in measures (e.g., decals, posted notice also be hotels, motels, gasoline stations and phone booths) shall inate to any transie nt popula tion within the plume used to dis~em re pathwa y EPZ approp riate inform ation that would be helpful exposu

. Such notices should refer the if an emerg ency or accident occurs ne directo ry or other source of local emerg ency transient to the telepho and guide the visitor to approp riate radio and televis ion information frequencies.

Section 7.3.5

3. a. Each principal organization shall designate the H Appendix points of contac t and physical locations for use by news media during an emerg ency.

' I

b. Each licensee shall provide space which may be used for a limited number of the news media at the nearsite Emergency Operations Facility.

Revis ion 75 3/17 G-9

GG FSAR Sections 5.4.34

4. a. Each principal organization shall designate a Appendix H spokesperson who should have access to all necessary information.

Sections 7.3.5, 8.8

b. Each organization shall establish arrangements Appendix H for timely exchange of information among designated spokespersons.

Sections 7.3.5

c. Each organization shall establish Appendix H coordinated arrangements for dealing with rumors.

Section 8.8

5. Each organization shall conduct coordinated programs Appendix H at least annually to acquaint news media with the emergency plans, information concerning radiation, and points of contact for release of public information in an emergency.

H. Emergency Facilities and Equipment Planning Standard ncy response are provided and maintained.

Adequate emergency facilities and equipment to support the emerge Cross Reference to Plan Evaluation Criteria Sections 7.3.1, 7.3.2

1. Each licensee shall establish a Technical Support Center and an onsite operations support center (assembly area) in accordance with NUREG-0696, Revision 1.

Sections 7.3.3, 7.3.4

2. Each licensee shall establish an Emergency Operations Facility from which evaluation and coordination of all licensee activities related to an emergency is to be carried out and from which the licensee shall provide information to federal, state and local authorities responding to radiological emergencies in accordance with NUREG-0696, Revision 1.

NIA

3. Each organization shall establish an emergency operations center for use in directing and controlling response functions.

Section 4.1, 5.4, 6.1,

4. Each organization shall provide for timely activation 6.24, 7.3 and staffing of the facilities and centers described in the plan.
5. Each licensee shall identify and establish onsite monitoring systems that are to be used to initiate emergency measures in accordance with Appendix 1, as well as those to be used for conducting assessment.

The equipment shall include:

Section 7.6

a. geophysical phenomena monitors, (e.g., meteorological, hydrologic, seismic);

G-10 Revisi on 75 3/ 17

GG FSAR

b. radiological monitors, (e.g., process, area, Section 7.6 emergency, effluent, wound and portable monitors and sampling equipment);
c. process monitors, (e.g., reactor coolant system Section 7.6 pressure and temperature, containment pressure and temperature, liquid levels, flow rates, status or lineup of equipment components); and
d. fire and combustion products detectors. Section 7.6
6. Each licensee shall make provision to acquire data from or for emergency access to offsite monitoring and analysis equipment including:
a. geophysical phenomena monitors, (e.g., Section 7.6 meteorological, hydrologic, seismic);
b. radiological monitors including ratemeters and Section 7.6 sampling devices. Dosimetry shall be provided and shall meet, as a minimum, the NRC Radiological Assessment Branch Technical Position for the Environmental Radiological Monitoring Program; and
c. laboratory facilities, fixed or mobile. Section 7.6
7. Each organization, where appropriate, shall provide Section 7.6.2 for offsite radiological monitoring equipment in the vicinity of the nuclear facility.
8. Each licensee shall provide meteorological Section 7.6.1.e.2 instrumentation and procedures which satisfy the criteria in Appendix 2, and provisions to obtain representative current meteorological information from other sources.
9. Each licensee shall provide for an onsite operations Section 7.3.2 support center (assembly area) which shall have Appendix B adequate capacity, and supplies, including, for example, respiratory protection, protective clothing, portable lighting, portable radiation monitoring equipment, cameras and communications equipment for personnel present in the assembly area.

IO. Each organization shall make provisions to inspect, Sections 8.6 inventory and operationally check emergency Appendix B equipment/instruments at least once each calendar quarter and after each use. There shall be sufficient reserves of instruments/equipment to replace those which are removed from emergency kits for calibration or repair. Calibration of equipment shall be at intervals recommended by the supplier of the equipment.

11. Each plan shall, in an appendix, include identification Appendix 8 of emergency kits by general category (protective equipment, communications equipment, radiological G-11 Revision 75 3/17

GG FSAR monitoring equipment and emergency supplies).

12. Each organization shall establish a central point Section 7.3.3 (preferably associated with the licensee's near-site Emergency Operations Facility), for the receipt and analysis of all field monitoring data and coordination of sample media.

I. Accident Assessment Planning Standard Adequate methods, systems and equipment for assessing and monitoring actual or potential offsite consequences of a radiological emergency condition are in use.

Evaluation Criteria Cross Reference to Plan

l. Each licensee shall identify plant system and effluent parameter Section 7.6.1 values characteristic of a spectrum of off-normal conditions Table 4-1 and accidents, and shall identify the plant parameter values or other information which correspond to the example initiating conditions of Appendix l .' Such parameter values and the corresponding emergency class shall be included in the appropriate facility emergency procedures. Facility emergency procedures shall specify the kinds of instruments being used and their capabilities.
2. Onsite capability and resources to provide initial values and Sections 7.6.1, 7.6.4 continuing assessment throughout the course of an accidi;nt shall include post-accident sampling capability, radiation and effluent monitors, in-plant iodine instrumentation, and containment radiation monitoring in accordance with NUREG-0578, as elaborated in the NRC letter to all power reactor licensees dated October 30, 1979.
3. Each licensee shall establish methods and techniques to be used for determining:
a. the source term ofreleases ofradioactive Section 7.6.1 material within plant systems. An example is the relationship between the containment radiation monitor(s) reading(s) and radioactive material available for release from containment.
b. the magnitude of the release ofradioactive Section 7.6.l materials based on plant system parameters and Table 4-1 effluent monitors.
4. Each licensee shall establish the relationship Sections 7.6.1, 7.6.2 between effluent monitor readings and onsite and offsite exposures and contamination for various meteorological conditions.
5. Each licensee shall have the capability of acquiring and evaluating Section 7.6.1 meteorological information sufficient to meet the criteria of Appendix 2. There shall be provisions for access to meteorological information by at least the nearsite Emergency Operations Facility, the Technical Support Center, the Control Room and an offsite NRC G-12 Revision 75 3 / 17

GG FSAR center. The licensee shall make available to the state suitable meteorological data processing interconnections which will permit independent analysis by the state, of facility generated data in those states with the resources to effectively use this information.

6. Each licensee shall establish the methodology for Section 7.6.1 determining the release rate/projected doses if the instrumentation used for assessment are offscale or inoperable.
7. Each organization shall describe the capability and Sections 7.3.3, 7.6.2, resources for field monitoring within the plume 7.6.4 exposure Emergency Planning Zone which are an intrinsic part of the concept of operations for the facility.
8. Each organization, where appropriate, shall provide Sections 7.5.3, 7.6 methods, equipment and expertise to make rapid assessments of the actual or potential magnitude and locations of any radiological hazards through liquid or gaseous release pathways. This shall include activation, notification means, field team composition, transportation, communication, monitoring equipment and estimated deployment times.
9. Each organization shall have a capability to detect and Section 7.6 m~asure radioiodine concentrations in air in the plume exposure EPZ as low as I Oel uCi/cc (microcuries per cubic centimeter) under field conditions.

Interference from the presence of noble gas and background radiation shall not decrease the stated minimum detectable activity.

10. Each organization shall establish means for relating the various Section 7.6 measured parameters (e.g., contamination levels, water and air activity levels) to dose rates for key isotopes (i.e., those given in Table 3, page 18) and gross radioactivity measurements.

Provisions shall be made for estimating integrated dose from the projected and actual dose rates and for comparing these estimates with the protective action guides. The detailed provisions shall be described in separate procedures.

11. Arrangements to locate and track the airborne NIA radioactive plume shall be made, using either or both federal and state resources.

J. Protective Response Planning Standard A range of protective actions have been developed for the plume exposure pathway EPZ for emergency workers and the public. Guidelines for the choice of protective actions during an emergency, consistent with federal guidance, are developed and in place, and protective actions for the ingestion exposure pathway EPZ appropriate to the locale have been developed.

G-13 Revision 75 3/ 17

GG FSAR Evaluation Criteria Cross Reference to Plan I. Each licensee shall establish the means and time required to warn or advise onsite individuals and individuals who may be in areas controlled by the operator, including:

a. Employees not having emergency assignments; Section 6.5. l
b. Visitors; Section 6.5.I
c. Contractor and construction Section 6.5. l personnel; and
d. Other persons who may be in the public access Section 6.5.l areas on or passing through the site or within the owner controlled area.
2. Each licensee shall make provisions for evacuation Section routes and transportation for onsite individuals to some suitable offsite location, including alternatives of inclement weather, high traffic density and specific radiological conditions.

I

3. Each licensee shall provide for radiological Sections 6.5.l, 6.6 monitoring of people evacuated from the site.
4. Each licensee shall provide for the evacuation of Sections 6.5. l, 6.6, onsite non-essential personnel in the event of a 6.7.2 Site or General Emergency and shall provide a decontamination capability at or near the monitoring point specified in J .3.
5. Each licensee shall provide for a capability to account for Section 6.5. l all individuals onsite at the tirpe of the emergency and ascertain the names of missing individuals within 30 minutes of the start of an emergency and account for all onsite individuals continuously thereafter.
6. Each licensee shall, for individuals remaining or arriving onsite during the emergency, make provisions for:
a. Individual respiratory protection; Section 7.10
b. Use of protective clothing; and Section 7.10
c. Use ofradioprotective drugs, (e.g., individual Section 6.7.l thyroid protection).
7. Each licensee shall establish a mechanism for recommending Sections 4.1, 6.5. l
  • protective actions to the appropriate state and local authorities. Table 6-1 These shall include Emergency Action Levels corresponding to projected dose to the population-at-risk, in accordance with Appendix l and with the recommendations set forth in Tables 2.1 and 2.2 of the Manual or Protective Action Guides and Protective Actions for Nuclear Incidents (EPA-520/1-75-001).

As specified in Appendix l, prompt notification shall be made directly to the offsite authorities responsible for implementing

)

G-14 Revision 75 3/17

GG FSAR protective measures within the plume exposure pathway Emergency Planning Zone.

Appendix E

8. Each licensee's plan shall contain time estimates for evacuation within the plume exposure EPZ. These shall be in accordance with Appendix 4.

Each state and local organization shall establish a capabi lity for NIA 9.

tive measu res based upon protec tive action implementing protec guides and other criteria . This shall be consis tent with the recommendations of EPA regarding exposure resulting from passage of radioactive airborne plumes, (EPA-52011-75-00-1) ctive and with those of DHEW (DHHS)IFDA regarding radioa ination of human food and animal feeds as publis hed contam in the Federal Register of December 1, 1978 (43 FR 58790)

10. The organization's plans to implement protective measures for the plume exposure pathway shall include:

Appendix E

a. Maps showing evacuation routes, evacuation areas, 2-4, 2-5 Figure preselected radiological sampling and monitoring points, relocation centers in host areas, and shelter areas; (identification of radiological sampling and monitoring points shall include the designators in Table J-1 or an equivalent uniform system described in the plan);

Figure 2-3, 2-4

b. Maps showing population distribution around the E Appendix nuclear facility. This shall be by evacuation areas (licensees shall also present the information in a sector format);

Sections 6.5.1, 7 .5.4

c. Means for notifying all segments of the transient and resident population; Means for protecting those persons whose mobility NIA d.

may be impaired due to such factors as institutional or other confinement; Provisions for the use ofradi oprote ctive drugs, NIA e.

particularly for emergency workers and institutionalized persons within the plume exposure EPZ whose immediate evacuation may be infeasible or very difficult, including quantities, storage, and means of distribution.

State and local organizations' plans should NIA f.

include the method by which decisions by the State Health Department for administering radioprotective drugs to the general population are made during an emergency and the predetermined conditions under which such1drugs may be used by offsite emergency workers; Means of relocation; NIA g.

Revis ion 75 3/17 G-15

GG FSAR

h. Relocation centers in host areas which are atNI A least 5 miles, and preferably 10 miles, beyond the boundaries of the plume exposure emergency plannin g zone; (see J.12).
i. Projected traffic capacities of evacuation NIA routes under emergency conditions;
j. Control of access to evacuated areas and NIA organization responsibilities for such control; NIA
k. Identification of and means for dealing with potential impediments (e.g., seasonal impassability of roads) to use of evacuation routes, and contingency measures; I. Time estimates for evacuation of various sectors NIA and distances based on a dynamic analysis (time-motion study under various conditions) for the plume exposure pathway emergency planning zone (see Appendix 4); and Section 6.5.1
m. The bases for the choice or recommended E, Appendix protective ~ctions from the plume exposure pathway during emergency conditions. This shall include expected local protection afforded[;]

in residential units or other shelter for direct and inhalation exposure, as well as evacuation time estimates.

ion afforded.

21 The following reports may be considered in determining protect nts Sheltering Concepts with (1) "Public Protection Strategies for Potential Nuclea r Reacto r Accide 77-172 5), Sandia Labora tory.

Existing Public and Private Structures" (SAND Radiolo gical Emerge ncy Measur es for Nuclea r Reacto r Accidents Involving (2) "Examination of Offsite

(

Core Melt" (SAND 78-0454), Sandia Laboratory. s Against Nuclear and Shelter ing as Protect ive Action (3) "Protective Action Evaluation Part II, Evacuation

), U.S. Environmental Protection Accidents Involving Gaseous Releases" (EPA 52011-78-00IB Agency.

Each state shall specify the protective measures to beused for the NIA 11.

ingestion pathway, including the method s for protect ing the public form consumption of contaminated food-stuffs. This shall include criteria for deciding whether dairy animals should be put on stored ination, feed. The plan shall identify procedures for detecting contam for estimating the dose commitment conseq uences of uncont rolled ingestion, and for imposing protection procedures such as n,

impoundment, decontamination, processing, decay, product diversio and. monito ring data, and preservation. Maps for recording survey key land use data (e.g., farming), dairies, food processing plants, irs water sheds, water supply intake and treatment plants and reservo shall be mainta ined. Provisi ons for maps showin g detailed crop and information may be by including reference to their availability location and a plan for their use. The maps shall start at the facility date and include all of the SO-mile ingestion pathway EPZ. Up-to-G-16 Revision 75 3/17

GG FSAR lists of the name and location of all facilities which regularly process milk products and other large amounts of food or agricultural products originating in the ingestion pathway Emergency Planning Zone, but located elsewhere, shall be maintained.

12. Each organization shall describe the means for registering and NIA monitoring of evacuees at relocation centers in host areas.

The personnel and equipment available should be capable of monitoring within about a 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> period all residents and transients in the plume exposure EPZ arriving at relocation centers.

K. Radiological Exposure Control Planning Standard Means for controlling radiological exposures, in an emergency, are established for emergency workers. The means for controlling radiological exposures shall include exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Action Guides.

Evaluation Criteria Cross Reference to Plan I. Each licensee shall establish onsite exposure guidelines consistent with EPA Emergency Worker and Lifesaving Activity Protective Actions Guides (EPA 520/1-75/001) for:

a. removal of injured persons; Section 6.7
b. undertaking corrective actions; Section 6.7
c. performing assessment actions; Section 6.7
d. providing first aid; Section 6.7
e. performing personnel Section 6.7 decontamination;
f. providing ambulance service; and Section 6.7
g. providing medical treatment services. Section 6.7
2. Each licensee shall provide an onsite radiation protection Section 6.7.1 program to be implemented during emergencies, including methods to implement exposure guidelines. The plan shall identify individual(s), by position or title, who can authorize emergency workers to receive doses in excess of IO CFR Part 20 limits. Procedures shall be worked out in advance for permitting onsite volunteers to receive radiation exposures in the course of carrying out lifesaving and other emergency activities. These procedures shall include expeditious decision making and a reasonable consideration ofrelative risks.
3. a. Each organization shat I make provision for 24-hour-per-day Section 6.7.l capability to determine the doses received by emergency personnel involved in any nuclear accident, including volunteers. Each organization shall make provisions for distribution of dosimeters, both self-reading and permanent record devices.

___,-1 G-17 Revision 75 3/17

GG FSAR

b. Each organization shall ensure that dosimeters Section 6.7.1 are read at appropriate frequencies and provide for maintaining dose records for emergency workers involved in any nuclear accident.
4. Each state and local organization shall establish N/A the decision chain for authorizing emergency workers to incur exposures in excess of the EPA General Public Protective Action Guides (i.e., EPA PAGs for emergency workers and lifesaving acti~ities).
5. a. Each organization as appropriate, shall specify Sections 6.6, 6.7 action levels for determining the need for decontamination.
b. Each organization, as appropriate, shall Section 6.7.2, 6.7.3, 6.7.4 establish the means for radiological decontamination of emergency personnel wounds, supplies, instruments and equipment, and for waste disposal.
6. Each licensee shall provide onsite contamination control measures including:
a. area access control; Section 6.6
b. drinking water and food supplies; Table B-1
c. criteria for permitting return of areas and Section 9.0 items to normal use, see Draft ANS I 13. 12.
7. Each licensee shall provide the capability for Section 6.7.2 decontaminating relocated onsite personnel, including provisions for extra clothing and decontaminants suitable for the type of contamination expected, with particular attention given to radioiodine contamination of the skin.

L. Medical and Public Health Support Planning Standard Ar-angements are made for medical services for contaminated injured individuals.D Evaluation Criteria Cross Reference to Plan

1. Each organization shall arrange for local and backup hospital Sections 5.6.1, 6.7.4 and medical services having the capability for evaluation of radiation exposure and uptake, including assurance that persons providing these services are adequately prepared to handle contaminated individuals.

G-18 Revision 75 3/ 17

GG FSAR 1/ The availability of an integrated emergency medical services system and a public health emergency plan serving the area in which the facility is located and, as a minimum, equivalent to the Public Health Service Guide for Developing Health Disaster Plans, 1974, and to the requirements of an emergency medical services system as outlined in the Emergency Medical Services System Act of 1974 (P.L.93-154 and amendments in 1979 P .L.96-142), should be apart of and consistent with overall state or local disaster control plans and should be compatible with the specific overall emergency response plan for the facility.

2. ~ach licensee shall provide for onsite first aid capability Section 6.7
3. Each state shall develop lists indicating the location of public, NIA private and military hospitals and other emergency medical services facilities within the state or contiguous states considered capable of providing medical support for any contaminated injured individual. The listing shall include the name, location, type of facility and capacity and any special radiological capabilities. These emergency medical services should be able to radiologically monitor contamination personnel, and have facilities and trained personnel able to care for contaminated injured persons.
4. Each organization shall arrange for transporting Sections 5.6.1, 6.7.3 victims of radiological accidents to medical support facilities.

M. Recovery and Reentry Planning and Postaccident Operations Planning Standard General plans for recovery and reentry are developed.

Evaluation Criteria Cross Reference to Plan

1. Each organization, as appropriate, shall develop general plans Sections 5.5, 9.0 and procedures for reentry and recovery and describe the means by which decisions to relax protective measures (e.g.,

allow reentry into an evacuated area)* are reached. This process should consider both existing and potential conditions.

2. Each licensee plari shall contain the position/title, authority and Sections 5.4.2, 5.5, responsibilities of individuals who will fill key positions in the 9.0 facility recovery organization. This organization shall include technical personnel with responsibilities to develop, evaluate and direct recovery and reentry operation~. The recovery organization recommended by the Atomic Industrial Forum's "Nuclear Power Plant Emergency Response Plan" dated October 11, 1979, is an acceptable framework.
3. Each licensee and state plan shall specify means for Section 9.0 informing members of the response organizations that arecovery operation is to be initiated, and of any changes in the organizational structure that may occur.
4. Each plan shall establish a method for periodicallj Section 9.0 estimating total population exposure.

G-19 Revision 76 9 /17

GG FSAR N. Exercises and Drills Planning Standard Periodic exercises are (will be) conducted to evaluate major portions of emergency response capabilities, periodic drills are (will be) conducted to develop and maintain key skills, and deficiencies identified as a result of exercises or drills are (will be) corrected.

Evaluation Criteria Cross Reference to Plan

l. a. An exercise is an event that tests the integrated Section 8.3 capability and a major portion of the basic elements existing within emergency preparedness plans and organizations. The emergency preparedness exercise shall simulate an emergency that results in offsite radiological releases which would require response by offsite authorities. Exercises shall be conducted as set forth in NRC and FEMA rules.
b. An exercise shall include mobilization of statearid local Section 8.3 personnel and resources adequate to erify the capability to respond to an accident scenario requiring response.

The organization shall provide for a critique of the annual exercise by federal and state observers/evaluators. The scenario should be varied from year to year such that all major elements of the plans and preparedness organizations are tested within a five-year period. Each organization should make provisions to start an exercise between 6:00 p.m. and midnight, and another between midnight and 6:00 a.m. once every six years. Exercises should be conducted under various weather conditions.

Some exercises should be unannounced.

2. A drill is a supervised instruction period aimed at testing, developing and maintaining skills in a particular operation. A drill is often a component of an exercise. A drill shall be supervised and evaluated by a qualified drill instructor. Each organization shall conduct drills, in addition to the annual exercise at the frequencies indicated below:
a. Communication Drills Section 8.3.2 Communications with state and local governments within the plume exposure pathway Emergency Planning Zone shall be tested monthly. Communications with federal emergency response organizations and states within the ingestion pathway shall be tested quarterly.

Communications between the nuclear facility, state and local emergency operations centers, and field assessment teams shall be tested annually. Communication drills shall also include the aspect of understanding the content of messages.

b. Fire Drills Section 8.3.2 Fire drills shall be conducted in accordance with the plant (nuclear facility) technical specifications.
c. Medical Emergency Drills Section 8.3.2 A medical emergency drill involving a simulated contaminated individual which contains provisions for participation by the local support services agencies* (i.e., ambulance and offsite G-20 Revision 75 3/17

GG FSAR medical treatment facility) shall be conducted annually. The offsite portions of the medical drill may be performed as part of the required annual exercise.

d. Radiological Monitoring Drills Section 8.3.2 Plant environs and radiological monitoring drills (onsite and offsite) shall be conducted annually. These drills shall include collection and analysis of all*sample media (e.g., water, vegetation, soil and air), and provisions for communications and record keeping. The state drills need not be at each site.

Where appropriate, local organizations shall participate.

e. Health Physics Drills Section 8.3.2

( l) Health Physics drills shall be conducted semiannually which involve response to, and analysis of, simulated .elevated airborne and liquid samples and direct radiation measurements in the environment. The state drills need* not be at each site.

(2) Analysis of inplant liquid samples with actual elevated radiation levels including use of the post-accident sampling system shall be included in Health Physics drills by licensees annually.

3. Each organization shall describe how exercises and drills are to be carried out to allow free play for decision making and to meet the following objectives. Pending the development of exercise scenarios and exercise evaluation guidance by NRC and FEMA the scenarios for use in exercises and drills shall include but not be limited to, the following:
a. The basic objective(s) of each drill and Section 8.3. l exercise and appropriate evaluation criteria;
b. The date(s), time period, place(s) Section 8.3. l and participating organizations;
c. The simulated events; Section 8.3. l
d. A time schedule of real and
e. A narrative summary describing the conduct of the Section 8.3.l exercises or drills to include such things as simulated casualties, offsite fire department assistance, rescue of personnel, use of protective clothing, deployment of radiological monitoring teams, and public information activities; and -
f. A description of the arrangements for and advance
  • Section 8.3.l materials to be provided to official observers.
4. Official observers from federal, state or local governments Section 8.3. l will observe, evaluate, and critique the required exercises.

A critique shall be scheduled at the conclusion of the exercise to evaluate the ability of organizations to respond as called for in the plan. The critique shall be conducted as soon as practicable after the exercise, and a formal evaluation should result from rthe critique.

G-21 Revision 75 3/ 17

GG FSAR

5. Each organization shall establish means for evaluating Sections 8.3, 8.4, 8.5 observer and participant comments on areas needing improvement, including emergency plan procedural changes, and for assigning responsibility for implementing corrective actions. Each organization shall establish management control used to ensure that corrective actions are implemented.
0. Radiological Emergency Response Training Planning Standard.

Radiological emergency response training is provided to those who may be called on to assist in an emergency.

Evaluation Criteria Cross Reference to Plan

l. Each organization shall assure the Sections 8.1,8.2,8.4 training of appropriate individuals.
a. Each facility to which the plant applies shall provide Sections 8.2, 8.4 site specific emergency response training for those offsite emergency organizations who may be called -

upon to provide assistance in the event of an emergency. 1

b. Each offsite response organization shall NIA participate in and receive training. Where mutual aid agreements exist between local agencies such as fire, police and ambulance/rescue, the training shall also be offered to the other departments who--

are members of the mutual aid district.

1/ Training for hospital personnel, ambulance/rescue, police and fire departments shall include the procedures for notification, basic radiation protection, and their expected roles. For those local services support organizations who will enter the site, training shall also include site access procedures and the identity (by position and title) of the individual in the onsite emergency organization who will control the organizations' support activities.

Offsite emergency response support personnel should be provided with appropriate identification cards where required.

2. The training program for members of the onsite emergency Section 8.3 organization shall, besides classroom training, include practical drills in which each individual demonstrates ability to perform his assigned emergency function.

During the practical drills, on-the-spot correction of erroneous performance shall be made and a demonstration of the proper performance offered by the instructor.

3. Training for individuals assigned to licensee first aid teams Section 6.7.2 shall include courses equivalent to Red Cross Multi-Media.
4. Each organization shall establish a training program Section 8.2 for instructing and qualifying personnel who will implement radiological emergency response plans.

The specialized initial training and periodic retraining programs (including the scope, nature and frequency) shall be provided in the following categories:

I G-22 Revision 75 3/ 17

GG FSAR.

a. Directors or coordinators of the response organizations;
b. Personnel responsible for accident assessment;
c. Radiological monitoring teams and radiological analysis personnel;
d. Police, security and fire fighting personnel;
e. Repair and damage control/correctional action teams (onsite);
f. First aid and rescue personnel;
g. Local support services personnel including Civil Defense/Emergency Service personnel;
h. Medical support personnel;
i. Licensee's headquarters support personnel; 2/ If state and local governments lack the capability and resources to accomplish this training, they may look to the licensee and the Federal government (FEMA) for assistance in this training.
  • NRC and FEMA encourage state and local governments which have these capabilities to continue to include them in their training programs.
j. Personnel responsible for transmission of emergency information and instructions.
5. Each organization shall provide for the initial Section 8.2 and annual retraining of personnel personnel with emergency response responsibilities.

P. Responsibility for the Planning Effort: Development, Periodic Review and Distribution of Emergency Plans Planning Standard Responsibilities for plan development and review and for distribution of emergency plans are established, and planners are properly trained.

Evaluation Criteria Cross Reference to Plan,

1. Each organization shall provide for the training of Section 8.4 individuals responsible for the planning effort.
2. Each organization shall identify by title the Sections 8.1, 8.4 individual with the overall authority and responsibility for radiological emergency response planning.
3. Each organization shall designate an Emergency Sections 8.1, 8.4 Planning Coordinator with responsibility for the development and updating of emergency plans and coordination of these plans with other response organizations.
4. Each organization shall update its plan and Sections 8.4, 8.5 agreements as needed, review and certify it to, be current on an annual basis. The update shall take into account changes identified by drills and exercises.
5. The emergency response plans and approved changes to Section 8.5 the plans shall be forwarded to all organizations and G-23 Revision 75 3/17

GG FSAR appropriate individuals with responsibility for implementation of the plans. Revised pages shall be dated and marked to show where changes have been made.

6. Each plan shall contain a detailed listing of Appendix F supporting plans and their source.
7. Each plan shall contain as an appendix listing, Appendix A by title, procedures required to implement the plan.

The listing shall include the section( s) of the plan to be implemented by each procedure.

8. Each plan shall contain a specific table of contents. Appendix G Plans submitted for review should be cross-referenced to these criteria.
9. Each licensee shall arrange for and conduct independent Section 8.5 reviews of the emergency preparedness program at least every 12 months. (An independent review is one conducted by any competent organization either internal or external to the licensee's organization, but who are not immediately responsible for the emergency preparedness program.) The review shall include the emergency plan, its implementing procedures and practices, training, readiness testing, equipment, and interfaces with state and local governments. Management controls shall be implemented for evaluation and correction of review findings. The result of the review, along with recommendations for improvements, shall be documented, reported to appropriate licensee corporate and plant management, and involved federal, state and local organizations, and retained for a period of five years.
10. Each organization shall provide for updating Section 8.6 telephone numbers in emergency procedures at least quarterly.

G-24 Revision 75 3/17

APPENDIXH I. News Media Emergency Information Program for GGNS Il. Public Education and Information Program for GGNS

GG FSAR INTRODUCTION This section of the Emergency Plan deals with responses to an emergency in relation to news media activities, employee information, inquiry response, and coordination of public information activities with local, state, and federal agencies. It also describes the training to be conducted to ensure effective dissemination of information during an emergency.

The first part of this section is a brief synopsis of the overall news media emergency information program organized according to emergency classifications. This is implemented by Ol-S-10-6, 1O-S-01-6, 10-S-01-34.

The final part of this document is a description of public information-education activities underway for residents in the Grand Gulf area and the general public.

H-1 Revision 61 03 / 09 ,

GG FSAR I. NEWS MEDIA EMERGENCY INFORMATION PROGRAM LO PURPOSE The News Media Emergency Info'rmation Program establishes the means of keeping media personnel informed of an emergency situation at Grand Gulf Nuclear Station (GGNS).

2.0 RESPONSIBILITIES FOR ACTIVATING THE PROGRAM Activation of the news media program begins with a call from the GGNS Computer Notification System or Emergen.cy Director to the Company Spokesperson.

The Company Spokesperson determines, following consultation with the Emergency Director, whether the situation warrants media notification. Initial decisions are determined to a great extent by the classification given to the incident, of which there are four.

3.0 Deleted 4.0 OVERALL INFORMATION FLOW l

4.1 Company Spokesperson GGNS management or designee fills the Company Spokesperson position throughout an emergency.

4.2 Unusual Event Normally only the Company Spokesperson is called. He I she may:

a. Stand by and follow developments
b. Consider additional notifications*
c. Consider drafting news bulletin H-2 Revision 64 11/10

GG FSAR 4.3 Alert/S~~e Area Emergency/General Emergency Actions initiated at the Alert level continue through a Site Area Emergency and General Emergency. At these levels of an emergency the EOF sends information to the Company Spokesperson, or designee.

4.3. l Company Spokesperson:

a. Reports to the Joint Information Center
b. Establishes, contact with the EOF
c. Coordinates directly with State representatives at the JIC
d. Ensures that the Inquiry Response is activated and provided with news bulletins to use in response to inquires from the media and public.
e. Issues news bulletins and conducts news briefings once the JIC is operational 4.3.2 Inquiry Response Coordinator:
a. Reports to the JI C
b. Ensures that the Inquiry Response is operational and establishes contact with the JIC
c. Ensures that current news bulletins are provided to the Inquiry Response Staff 4.3.3 News Briefings - News briefings are conducted at the JIC as needed and news media inquiries are referred to the JIC. Copies of news bulletins are also available to the Inquiry Response and the Entergy Operations CEC.

4.3.4 Coordinating News Releases from the JIC - GGNS Personnel issue bulletins concerning conditions at the plant. Statements relative to offsite conditions and H-3 Revision 61 03/09

GG FSAR operations are done by the Governor's Press Secretary and/or the Director of the Mississippi Emergency Management Agency or their designee .

. Statements relative to Louisiana conditions and operations are done by a representative for the State of Louisiana.

4.3.5 Contacts with other agencies - The JIC assumes responsibility when it is activated for sharing bulletin messages with CCCD, TPHS/EP, MEMA, LDEQ, NRC Regional Office, and other government agencies with representatives at the JIC. The JIC is responsible for sending bulletin messages to the Entergy Operations CEC, Inquiry Response, and SMEPA.

5 .0 EXCEPTIONS Exceptions to this information flow plan are made in case of either a rapidly developing - or rapidly terminating - emergency at Grarid Gulf.

5 .1 Rapidly Developing Emergency - In this circumstance the Company Spokesperson, in consultation with the ED, is authorized to issue news bulletins.

5.2 Rapidly Terminating Emergency - In this case a public statement is developed by the Company Spokesperson detailing the nature of the incident and telling how it was resolved. This statement is given to the news media as rapidly as possible.

6.0 TRAINING Individuals involved in the GGNS News Media Emergency Information Program complete training activities and participate in drills/ exercises in order to be thoroughly familiar with their duties. Training is documented by the Manager, Emergency Preparedness.

H-4 Revision 61 03/09

GG FSAR 6.1 News Media Training - An annual program is provided to acquaint the news media with the methodology for obtaining information during an emergency as well as infonnation about overall emergency preparedness for GGNS. The training includes information about the plant, radiation, and the roles of emergency news centers.

6.2 Overall Training - Appropriate training activities are conducted annually for those involved in the News Media Emergency Information Program.

II. PUBLIC EDUCATION AND INFORMATION PROGRAM FOR GGNS 1.0 Purpose and Objectives This program acquaints the general public with the emergency preparedness plans made in connection with the operation of Grand Gulf Nuclear Station (GGNS) located in Claiborne County in Southwest Mississippi.

Entergy Operations, Inc., operator of the facility, has established a policy of full disclosure. of any incident relating to the safety of operation of the plant.

Entergy Operations therefore, maintains a free and open relationship with the public and others concerned with the safety of operations in the vicinity of GGNS.

2.0 Methods To Reach The Public Prior To Emergency Situations Several communication methods are used to acquaint the public with plans made for their protection during any emergency at GGNS. These methods are described below:

2.1 Material Placed in Schools: Literature is offered to schools in the area, both in Claiborne County and Tensas Parish. The information tells locations of shelters and reception centers for students in Claiborne County, Mississippi, and Tensas Parish, Louisiana.

H-5 Revision 61 03/09 I

GG FSAR 2.2 Distribution of an Emergency Information Publication:

and emergency

-This publication contains basic information on nuclear power ution of the publication planning to aid the public during any emergency. Mass distrib annually.

in the Claiborne County and Tensas Parish areas is conducted tion, especially 2.3 Display of Posters: One of the ways to acquaint the overall popula of posters with a transients, with the emergency plans is the placing in public places map of the evacuation routes and other pertine nt information.