Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20333A00027 November 2020Emergency Plan, Revision 81 and Revision 0 of the EAL Technical Bases DocumentSafe Shutdown
Unanalyzed Condition
Time of Discovery
Fitness for Duty
Health Physics Network
High winds
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Stroke time
Time to boil
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Cyber Security
Emergency Lighting
FLEX
Scram Discharge Volume
Earthquake
Fuel cladding
Pressure Boundary Leakage
Grace period
ML20071G83311 March 2020Emergency Plan, Revision 80Fitness for Duty
Health Physics Network
Fire Barrier
Emergency Lighting
Earthquake
GNRO-2019/00036, Correction to Gnro 2019-00017 Emergency Plan Revision 788 August 2019Correction to Gnro 2019-00017 Emergency Plan Revision 78Fitness for Duty
Health Physics Network
Emergency Lighting
Earthquake
GNRO-2019/00017, Emergency Plan, Revision 7814 March 2019Emergency Plan, Revision 78Fitness for Duty
Health Physics Network
Offsite Dose Calculation Manual
Cyber Security
Emergency Lighting
FLEX
Pressure and Temperature Limits Report
Surveillance Frequency Control Program
Process Control Program
Earthquake
Maintenance Rule Program
Fire Protection Program
Fire Watch
GNRO-2018/00035, Submittal of Emergency Plan, Revision 7730 July 2018Submittal of Emergency Plan, Revision 77
ML17283A1533 October 2017Attachment 1: Summary and Analysis of the GGNS Emergency Plan Changes, Revision 76
GNRO-2017/00062, Attachment 2: Grand Gulf, Emergency Plan, Revision 763 October 2017Attachment 2: Grand Gulf, Emergency Plan, Revision 76Safe Shutdown
Fitness for Duty
Health Physics Network
High winds
Fire Barrier
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Emergency Lighting
Earthquake
Pressure Boundary Leakage
ML17276B8613 October 2017Emergency Plan, Revision 76Safe Shutdown
Fitness for Duty
Health Physics Network
Fire Barrier
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Emergency Lighting
Earthquake
Pressure Boundary Leakage
ML17271A03527 September 2017Amended Emergency Plan 50.54(q)(3) for Revision 75
GNRO-2017/00015, Emergency Plan, Revision 7527 March 2017Emergency Plan, Revision 75
GNRO-2014/00086, Revision 72 to Emergency Plan10 December 2014Revision 72 to Emergency Plan
GNRO-2013/00089, Emergency Plan, Revision 7019 December 2013Emergency Plan, Revision 70Safe Shutdown
Fitness for Duty
Health Physics Network
High winds
Fire Barrier
Internal Flooding
Hydrostatic
Operating Basis Earthquake
Emergency Lighting
Earthquake
Pressure Boundary Leakage
GNRO-2012/00044, Request for Additional Information Regarding Proposed Emergency Action Levels Using Nuclear Energy Institute (NEI) 99-01 Rev. 518 August 2012Request for Additional Information Regarding Proposed Emergency Action Levels Using Nuclear Energy Institute (NEI) 99-01 Rev. 5
GNRO-2003/00067, Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology-LDC 2003-09316 December 2003Proposed Upgraded Emergency Action Levels (Eals) Using NEI 99-01 Revision 4 Methodology-LDC 2003-093Safe Shutdown
High winds
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Operating Basis Earthquake
Safeguards Contingency Plan
Earthquake
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Unidentified leakage