|
---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML20217F6171999-10-0808 October 1999 Forwards Insp Repts 50-335/99-11 & 50-389/99-11 on 990827 & 990907-09.No Violations Identified.Matl Encl Contained Safeguards Info as Defined by 10CFR73.21 & Disclosed to Unauthorized Individuals Prohibited by Section 147 of AEA ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML20212M1601999-09-28028 September 1999 Refers to 990908 Engineering Meeting Conducted at NRC Region II to Discuss Engineering Issues at Lucie & Turkey Point Facilities.List of Attendees & Copy of Presentation Handout Encl ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML20209F1541999-07-0606 July 1999 Informs That NRC in Process of Conducting Operational Safeguards Response Evaluations at Nuclear Power Reactors. Plant Chosen for Such Review Scheduled for Wk of 990823-26 ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 ML20195F3871999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) IA-99-247, Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5)1999-06-11011 June 1999 Final Response to FOIA Request for Documents.App a Records Being Withheld in Entirety (Ref FOIA Exemption 5) L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML20207C7531999-05-17017 May 1999 Discusses Issue Identified by FPL in Feb 1998 Involving Potential for Fire to Cause Breach of Rc Sys High/Low Pressure Interface Boundary & NRC Decision for Exercise of Enforcement Discretion ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML20205M0431999-04-13013 April 1999 Eighth Partial Response to FOIA Request for Records.App Q & R Records Encl & Being Made Available in PDR ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl 1999-09-28
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML17241A5001999-10-21021 October 1999 Forwards Rev 3 to Emergency Response Data Sys (ERDS) Data Point Library for St Lucie Unit 1.Rev Provides Replacement Pages & Follows Format Recommended by NUREG 1394, ERDS Implementation, Rev 1,App C ML17309A9981999-10-19019 October 1999 Forwards Revised Epips,Including Rev 3 to EPIP-10 & Rev 25 to HP-202.EPIP-10 Added Onsite Monitoring Points,Made Administrative Changes & Incorporated New Attachments & HP-202 Added Red Team Survey Points ML17241A4811999-10-0101 October 1999 Reports Number of Tubes Plugged During Unit 1 Refueling Outage SL1-16,per TS 4.4.5.5.a ML17241A4701999-09-25025 September 1999 Forwards Info Requested by NRC Staff During 990916 Telcon to Complete Staff Review of Request for risk-informed Extension of Action Completion/Aot Specified for Inoperable Train of LPSI Sys at Plant ML17241A4721999-09-24024 September 1999 Forwards Rev 1 to Plant Change/Mod (PCM) 99016 to St Lucie Unit 1,Cycle 16 COLR, IAW TS 6.9.1.11.d.Refueling Overhaul Activities Are Currently in Progress & Reactor Operations for Cycle 16 Are Scheduled to Commence in Oct 1999 ML17241A4681999-09-22022 September 1999 Requests Restriction Be Added to Senior Operator License SOP-21093 for TE Bolander.Nrc Forms 369,encl.Encl Withheld Per 10CFR2.790(a)(6) ML17241A4671999-09-20020 September 1999 Forwards Completed NRC Form 536, Operator Licensing Exam Data, for St Lucie Units 1 & 2,as Requested in Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Exams. ML17241A4581999-09-13013 September 1999 Forwards Info Requested by NRC Staff During 990630 & 0816 Telcons,To Complete Review of Proposed License Amend for Fuel Reload Process Improvement Program ML17241A4531999-08-31031 August 1999 Informs That No Candidates from St Lucie Plant Will Be Participating in PWR Gfes Being Administered on 991006 ML17241A4521999-08-31031 August 1999 Withdraws Relief Request 16 & Suppl Relief Request 15 with Info Requested During 990526 Telephone Conference Re ISI Insp Plan,Third 10-yr Interval ML17241A4501999-08-26026 August 1999 Informs That FPL Has Reviewed Reactor Vessel Integrity Database,Called RVID2,re Closure of GL 92-01,rev 1,suppl 1. Requested Corrections & Marked Up Pages from Rvid 2 Database Summary Repts That Correspond to Comments,Attached ML17241A4371999-08-13013 August 1999 Forwards fitness-for-duty Program Performance Data for six- Month Period Ending 990630,per 10CFR26.71(d) ML17241A4461999-08-11011 August 1999 Requests That W Rept Entitled, Evaluation of Turbine Missile Ejection Probability Resulting from Extending Test Interval of Interceptor & Reheat Stop Valves at St Lucie Units 1 & 2, Be Withheld from Public Disclosure L-99-171, Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3)1999-07-29029 July 1999 Forwards Rev 56 to Physical Security Plan.Summary of Changes & Marked Up Copy of Revised Pages Also Encl.Encls Withheld from Public Disclosure Per 10CFR2.790(a)(3) ML17309A9911999-07-26026 July 1999 Forwards Revised EPIPs & Revised Procedures That Implement Emergency Plan as Listed.Procedures Provides Instruction for Operational Support Ctr (OSC) Chemistry Supervisor to Establish Remote Labs at Locations Specified ML17241A4221999-07-22022 July 1999 Forwards List of Proposed Licensing Actions for St Lucie Units 1 & 2,planned During Fys 2000 & 2001,in Response to Administrative Ltr 99-02, Operating Reactor Licensing Action Estimates. ML17241A4471999-07-22022 July 1999 Requests That Rev 1 to WCAP-14732 & Rev 1,Add 1 to WCAP-14732 Be Withheld from Public Disclosure ML17241A4151999-07-22022 July 1999 Forwards Revised Relief Request 25 for Second 10-yr ISI Interval for Unit 2 ML17241A4101999-07-16016 July 1999 Forwards FP&L Supplemental Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants ML17309A9881999-07-0707 July 1999 Forwards Rev 5 to EPIP-03, Emergency Response Organization Notification/Staff Augmentation. Rev 5 to EPIP-03 Was Revised to Transfer EP Responsibilities from Training Manager to Protection Svcs Manager ML17241A4011999-06-30030 June 1999 Forwards Info Copy of Florida Wastewater Permit (FL0002208) (Formerly NPDES Permit) Mod,Which Was Issued by Florida Dept of Environ Protection on 990604 ML17241A3971999-06-30030 June 1999 Forwards Suppl Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs, as Requested in 990317 Ltr ML17355A3661999-06-30030 June 1999 Forwards Florida Power & Light Topical QA Rept, Dtd June 1999.Encl I Includes Summary of Changes Made to Topical QA Rept Since 1998 ML17241A3951999-06-29029 June 1999 Provides Response to NRC Request for Info Re Y2K Readiness at Nuclear Power Plants.Gl 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants, Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML17241A3731999-06-17017 June 1999 Supplements Relief Requests 4,11 & 13 for Third ten-year ISI Interval with Info Requested During 990526 Telcon.Expedited Review Is Requested by 990730 to Avoid Negatively Impacting Upcoming St Lucie Unit 1 Refueling Outage (SL1-16) ML17241A3641999-06-14014 June 1999 Submits Supplement to Relief Request 24 with Info Requested by Nrc.In Addition Relief Request 24 Is Identical to St Lucie Unit 1 Relief Request 4 for Third ISI Interval Being Supplemented by FPL Ltr L-99-139 L-99-129, Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3)1999-06-0909 June 1999 Forwards Rev 55 to Physical Security Plan,Summary of Changes & Marked Up Copy of Revised Pages.With Directions for Incorporating Rev Into Plan & Copies of Replacement Pages.Rev Withheld,Per 10CFR2.790(a)(3) ML17241A3601999-06-0707 June 1999 Forwards Correction to Annual Radiological Environ Operating Rept for CY98.Util Has Identified Transcription Error on Last Page of Attachment C of Rept,Results from Interlaboratory Comparison Program 1998 ML17241A3561999-06-0707 June 1999 Forwards Rept Containing Brief Description & Summary of SEs for Changes,Tests & Experiments Which Were Approved for Unit 3 During Period of 970526-981209 ML20195F3941999-05-27027 May 1999 FOIA Request That Memo from J Calvo to Fl Lebdon Re TIA - St Lucie,Unit 1 Environ Qualification of Woodward Governor Controls Be Placed in PDR ML17241A3461999-05-24024 May 1999 Forwards Revised Relief Request 22 to Clarify Several Areas of Relief.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17241A3371999-05-20020 May 1999 Forwards Util Suppl to GL 95-07 Response Re pressure-locking & Thermal Binding of safety-related power-operated Gate Valves,In Response to NRC Second RAI Dtd 990225 ML17241A3391999-05-20020 May 1999 Forwards Notification of Change to Small Break LOCA ECCS Evaluation Model Used for St Lucie Unit 1.Anomaly Was Discovered & Corrected That Resulted in Reducing Calculated PCT for Limiting SBLOCA by More than 50 F ML17241A3301999-05-17017 May 1999 Forwards LER 99-004-00 Re as Found Cycle 10 Psv Setpoints Outside TS Limits,Which Occurred on 990415.Root Cause Determination Not Yet Complete.Suppl to Include Root Cause & Corrective Actions Will Be Submitted ML17309A9821999-05-10010 May 1999 Forwards Rev 36 to St Lucie Emergency Plan, Per 10CFR50.54(q).Executive Summary & Summary of Changes Incorporated by Rev,Encl ML17241A3221999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated IR 05000335/19980141999-04-29029 April 1999 Provides Confirmation of NRC Staff Conclusions Re Cited & non-cited Violations in Insp Rept 50-335/98-14 & 50-389/98-14.Utils Position Re Consideration of Multiple Spurious Actuations in Event of Fire,Reiterated ML17229B1071999-04-28028 April 1999 Forwards 1998 Annual Environ Operating Rept for St Lucie Unit 2. Rept Includes Discussions of 5-inch Barrier Net Maint & Taprogge Condenser Tube Cleaning Sys Ball Loss,As Agreed at First Biennial Sea Turtle Meeting Held on 980120 ML17229B1051999-04-22022 April 1999 Requests That Listed Individuals Be Placed on Official Serve List for Nuclear Matl Safety & Safeguards Info Notices ML17229B1061999-04-21021 April 1999 Notifies NRC of Change in Medical Status of Licensed Operator Pf Farnsworth (Docket 55-21285,license SOP-21094). NRC Form 3996, Medical Exam Certification, Encl.Encl Withheld Per 10CFR2.790(a)(6) ML17309A9851999-04-15015 April 1999 Requests That NRC Review Denial of Appeal from Assessment of Fees Assessed in 981101 Invoice RS0062-99 & Assessment of Fees in Invoice RS0182-99 Which Was Also Denied in 990305 Ltr.Both Invoices Are for Fees Re Inspector GG Warnick ML17229B0951999-04-0808 April 1999 Requests Approval of Encl Revised Relief Request 6,in Response to 990322 Telcon with NRC & 10CFR55.55a(a)(3). Request States That Visual VT-3 Exams Will Be Conducted IAW IWA-2213 & Repairs Will Be IAW Util ASME Section IX Program ML17229B0821999-04-0707 April 1999 Requests Approval of Interim Relief Request 26 Re Repair Requirements for Class 2 ECCS Piping,Per 10CFR50.55a(a)(3) & 50.55a(g)(iii).Alternative Actions Apply Guidance of GLs 91-18 & 90-05 & ASME Code Case N-513.Evaluation,encl ML17229B0851999-04-0505 April 1999 Requests Approval of Encl Relief Request 25 Which Proposes to Use Alternative Requirements of ASME Code Case N-613 in Lieu of Requirements of ASME Section XI Figures IWB-2500-7(a) & IWB-2500-7(b).Action Requested by Aug 1999 ML17309A9791999-03-31031 March 1999 Forwards Revised EPIPs Including Rev 2 to EPIP-00,rev 2 to EPIP-09,rev 2 to EPIP-10 & Rev 10 to HP-207.Summary of Revs Listed ML17309A9761999-03-23023 March 1999 Forwards Revised Epips,Including Rev 4 to EPIP-03, Er Organization Notification/Staff Augmentation, Rev 3 to EPIP-05, Activation & Operation of OSC & Rev 14 to HP-200, HP Emergency Organization. Changes to Epips,Discussed ML17229B0691999-03-19019 March 1999 Transmits TS Pages Requested by NRC for Use in Issuance of Proposed License Amend Re SFP Storage Capacity,Per Soluble Boron Credit ML17229B0721999-03-16016 March 1999 Requests Approval of Enclosed Relief Requests 23 & 24 Re ISI Plan for Second ten-year Interval.Nrc Action Is Requested to Be Complete by Aug 1999 to Support Planning for Spring 2000 Unit 2 Refueling Outage ML17355A2631999-03-12012 March 1999 Forwards FPL Decommissioning Fund Status Repts for St Lucie, Units 1 & 2 & Turkey Point,Units 3 & 4.Rept for St Lucie, Unit 2 Provides Status of Decommissioning Funds for All Three Owners of That Unit ML17229B0481999-03-10010 March 1999 Informs That Util Delivered Matls Requested in Encl 1 of NRC Ltr by Hand on 990308,as Requested by NRC Ltr Dtd 990218 1999-09-25
[Table view] Category:UTILITY TO NRC
MONTHYEARML17223A9401990-09-13013 September 1990 Forwards Evaluation of Potential Safety Impact of Failed Control Element Assemblies on Limiting Transients for Facility ML17223A9341990-09-10010 September 1990 Forwards Addl Info Re Generic Implications & Resolution of Control Element Assembly (CEA) Failure at Facility,Per NRC Request.Description of Testing Program for Old Style CEAs in Unit 1 Core Encl L-90-315, Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 81990-08-30030 August 1990 Advises That Util Has Completed Evaluation of NUREG-0737, Item II.D.1,SER Item 8 ML17223A9201990-08-28028 August 1990 Forwards Forms NIS-1 & NIS-2, Owners Rept for Inservice Insps as Required by Provisions of ASME Code Rules, Per 900725 Ltr ML17223A8911990-08-20020 August 1990 Forwards Corrected Monthly Operating Repts for Jul 1990 for St Lucie Units 1 & 2 & Summary of Operating Experience ML17348A5041990-08-17017 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 L-90-301, Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant1990-08-16016 August 1990 Discusses Generic Implications & Resolution of Control Element Assemblies Failure at Plant ML17223A8751990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor IR 05000335/19900141990-08-0909 August 1990 Responds to Violations Noted in Insp Rept 50-335/90-14. Corrective Actions:Rcs Flow Determination by Calorimetric Procedure Repeated W/Supervisor of Individual Observing & Individual Counseled by Supervisor ML17348A4701990-07-27027 July 1990 Forwards Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per Unsatisfactory Performance Testing ML17223A8621990-07-25025 July 1990 Advises That NIS-1 & NIS-2 Forms,As Part of Inservice Insp Rept,Will Be Submitted by 900831 ML17348A4281990-07-25025 July 1990 Forwards Decommissioning Financial Assurance Repts for Plants,Per 10CFR50.33(k) & 50.75(b) ML17223A8631990-07-25025 July 1990 Submits Addl Info Re Implementation of Programmed Enhancements Per Generic Ltr 88-17, Loss of Dhr. All Mods for Unit 1 Completed & Operational.Mods for Unit 2 Schedule for Upcoming Refueling Outage L-90-271, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders1990-07-20020 July 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-335/90-09 & 50-389/90-09.Corrective Actions:Procedural Expectation Re Hanging & Removal of Deficiency Tags Will Be Reemphasized to Personnel Generating Work Orders ML17223A8581990-07-19019 July 1990 Forwards Implementation Status of 10CFR50.62 Mod at Facility Re Requirements for Reduction of Risk from ATWS Events for Light Water Cooled Nuclear Power Plants ML17223A8491990-07-18018 July 1990 Responds to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. No Rosemount Transmitters Models 1153 Series B,1153 Series D & 1154 Mfg Prior to 890711 Supplied by Different Vendor ML17223A8521990-07-17017 July 1990 Forwards Addl Info Requested Re Generic Implications & Resolution of Control Element Assembly Failure at Plant.Encl Confirms Util Intent to Follow C-E Regulatory Response Group Action Program IR 05000335/19900131990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17223A8421990-07-0909 July 1990 Responds to Violations Noted in Insp Repts 50-335/90-13 & 50-389/90-13.Corrective Actions:Maint Personnel Counseled & Aware of Importance of Verifying Design Configuration Requirements ML17348A3881990-07-0505 July 1990 Requests Audit of NRC Records to Independently Verify Reasonableness of Charges Assessed Against Util,Per 10CFR170 Svcs ML17223A8391990-07-0303 July 1990 Forwards Results of Beach Survey Procedure & Reduction of Field Survey Data,Per Tech Spec 4.7.6.1.1.Unit 1 Updated Fsar,Section 2.4.2.2,concluded That Dune Condition Acceptable Per Tech Spec 5.1.3 ML17223A8381990-07-0202 July 1990 Requests Termination of Operator License for s Lavelle.Util Also Requests That Ltr Be Withheld (Ref 10CFR2.790) L-90-239, Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21)1990-07-0202 July 1990 Forwards Rev 6 to Guard Training & Qualification Plan.Rev Withheld (Ref 10CFR73.21) ML17223A8371990-06-27027 June 1990 Provides Details of Implementation Plan Re Recommendations & Schedular Requirements in Generic Ltr 89-10,per 891228 Ltr.Design Basis Review of safety-related motor-operated Valves & Determination of Switch Settings in Progress ML17308A4981990-06-27027 June 1990 Responds to Generic Ltr 90-04 Re Request for Info on Status of Licensee Implementation of Generic Safety Issues Resolved W/Imposition of Requirements or Corrective Actions ML17223A8341990-06-19019 June 1990 Forwards Corrected Proposed Tech Spec Figure 3.4-2 Per 900207 Application for Amend to License NPF-16,incorporating Revised Pressure/Temp Limits & Results of Revised Low Temp Overpressure Protection Analysis Into Tech Specs ML17223A8241990-06-18018 June 1990 Forwards Revised Combined Semiannual Radioactive Effluent Release Rept for Jan-June 1988. ML17223A8271990-06-18018 June 1990 Forwards Ma Smith 900601 Ltr to WR Cunningham of EPA Requesting Mod to Plant NPDES Permit to Permit Cleaning of Facility & to Establish Discharge Limits for Chemical Cleaning Wastes ML17348A2981990-06-12012 June 1990 Forwards Rev 16 to Topical QA Rept. ML17223A6761990-05-31031 May 1990 Advises That Air Operated safety-related Components Will Perform All Design Basis Events,Per 881227 Ltr.All Actions Required by Generic Ltr 88-14 Complete for Plant ML17348A2651990-05-29029 May 1990 Submits Rept Detailing Investigative Analysis of Unsatisfactory Blind Specimen Results,Identification of Causes & Corrective Actions Taken by Lab to Prevent Recurrence,Per 10CFR26,App A.2.8(e)(4) ML17223A6741990-05-22022 May 1990 Forwards Info Re Status of 10CFR50.62 Mods to Meet ATWS Requirements as of 900515.Plant Change/Mod Package Necessary for Installing ATWS Will Be Issued by 900630.Hardware Procurement for Diverse Scram Sys Approx 90% Complete ML17223A6361990-05-0808 May 1990 Forwards Final Response to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. One Untraceable Circuit Breaker Installed in Unit 2 Qualified SPDS & Replaced W/Traceable Breaker ML17223A6281990-04-21021 April 1990 Forwards St Lucie Unit 2 Annual Environ Operating Rept, Vol 1 1989. ML17223A6081990-04-13013 April 1990 Responds to Violations Noted in Insp Repts 50-335/90-02 & 50-389/90-02.Corrective Actions:Nuclear Plant Supervisor Required to Remain in Control Room During Significant Changes in Power Operation & Preventive Maint Upgraded ML17223A6071990-04-0505 April 1990 Responds to NRC Bulletin 89-001, Failure of Westinghouse Steam Generator Tube Mechanical Plugs. Removal & Replacement of Cold Leg Side Plugs of Heat Number 3513 for Unit 1 Completed During Refueling Outage ML17308A4911990-04-0202 April 1990 Forwards Description & Summary of Safety Evaluations of Plant Changes/Mods Reportable Per 10CFR50.59.Repair &/Or Replacement of Protective Coatings on Surfaces Inside Bldg Pose No Unreviewed Safety Question ML17223A5931990-03-30030 March 1990 Forwards Status of 10CFR50.62, Requirements for Reduction of Risk from ATWS Mods at Plant as of 900315.Diverse Scram Sys Module Prototype Fabrication in Progress ML17223A5921990-03-27027 March 1990 Forwards Addl Info on Proposed License Amend Re Increased Max Allowable Resistance Temp Detector Delay Time,Per 891219 Telcon & Advises That Util Request to Increase Plant Resistance Temp Detector Response Time Remain Unchanged ML17223A5831990-03-19019 March 1990 Forwards Response to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implications of Control Sys in LWR Nuclear Power Plants,' Per 10CFR50.54(f) ML17347B6191990-03-13013 March 1990 Provides Listing of Property Insurance Programs ML17223A5531990-03-0909 March 1990 Submits Results of Investigation of Error Detected in Dose Assessment During 900124 NRC Evaluated Exercise at Plant. Operator Error Caused Keyboard Hangup Requiring Computer Restart ML17223A5451990-03-0808 March 1990 Forwards Revised Tech Specs Re Steam Generator Tube Repairs, Per 890602 Telcon & Subsequent Discussions W/Nrc ML17308A4871990-03-0707 March 1990 Forwards Response to Eight Audit Questions & Licensing Bases Criteria to Resolve Station Blackout Issue.Util Currently Has Procedures to Mitigate Effects of Hurricanes & Tornados Which Meet or Exceed NUMARC 87-00 Guidelines ML17347B5881990-03-0101 March 1990 Responds to Generic Ltr 90-01, Request for Voluntary Participation in NRC Regulatory Impact Survey. Info Covers Time Spent by Key Power Plant Managers in Responding to Operational Insps & Audits ML17347B6031990-02-27027 February 1990 Requests Approval to Use Code Case N-468 at Plants ML17223A5321990-02-26026 February 1990 Forwards CEN-396 (L)-NP, Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2. ML20012A0011990-02-26026 February 1990 Notifies That Followup Actions Completed on Schedule & Incorporated Into Rev 25 to Plant Physical Security Plan,Per NRC 890605 Request ML17223A5411990-02-26026 February 1990 Provides Addl Info Re Proposed License Amends Re Moderator Temp Coefficient Surveillance Requirements,Per 891026 & 900109 Telcons IR 05000335/19890241990-02-22022 February 1990 Responds to Violations Noted in Insp Repts 50-335/89-24 & 50-389/89-24.Corrective Actions:Applicable Procedures Changed to Clarify Which Spaces & Blocks Required to Be Completed on Plant Work Order & QC Supervisor Counseled 1990-09-13
[Table view] |
Text
REGULATORY Ii eORMATION DISTRIBUTION SYS (RIDS)
ACCESSION, NBR: 7910250)33 DOC DATE: 79/10/22'OTARIZED j NO DOCKET St, Lucia Planti Unit li Flor ida Power L Light Co.
~
FACIL:50 335 05000335 AUTH NAMg~ AUTHOR AFFILIATION UHRIgiR ~ ED Florida Power 8 Light Co ~
R E C I P y hf A ME!, R E C I P I E NT AF F I L I AT I 0 N EISENHUT'iD.G. Division of Operating Reactors SUBJECTS )or wards response to NRC 790913 tr ry fol 1owup actions
.l r esul ting f rom NRC review of TMI '.Requir ements. r e emer gency operations ctr unsufficiently defined to designate dedicated primary L alternate locations.
DISTRIBUTION CODE!" A001S COPIESRECEIVEDiLTR 'NCL SIZE -
General Distr ibution for after Issuance of Operat7ng Lic 'ITLE; N 0TE S '>
4 ~ i, .
N ly $
I 1 ~ " "
I
~~~ ~~~~~~++~~~~yig~~~~ygyyiyy~~~+i~ye~~~~ay y~~yiy'y~j~~~m~~yyye~~~~~~~~~~gy~~~~~gg~~~~ye
$ 0 II lt ~ I s + I REC IP I Ehl T COP IES RECIPIENT COPIES ID CODE/NAME" LTTR ENCL ID CODE/NAME LTTR ACTION: 05 B'QRG A ~( ENCL'NTERNAL!
1 REG FIL ~
1 1 02 NRC- PDR 1 1 1 2 ' 2 10 TA/EDO 1 1-15 CORE= PERF BR 1 17 ENGRBR 1 1 18 REAC SFTY BR 1 1 19 PLANT SYS BR 1 1 20 EEB 1 1 21. EFLT TRT SYS 1 1 22 BRINKMAN 1. 1 OELD 1 0 EXTERNAL; 03 LPDR 1 1 00 NSIC 1 1 23 ACRS 1e MOD '.
SOT 2s 979 TOTAL NUMBER OF COPIES'EQUIRED)'LTTR ENCL
II '
II I
H II I~ V I
I I
H I A 1 C
1 O. BOX 629100, MIAMI, FL 33162
+All@<
=:e~as4'fX J
FLORIDA POWER 5 LIGHT COMPANY October 22, 1979 L-79-292 Office of Nuclear Reactor Regulation Attention: MT. Darrell G. Eisenhut, -Acting Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D. C. 20555
Dear Mr. Eisenhut:
Re: .St. Lucie Unit 1 Docket No. 50-335 NUREG-0578 We have r'eviewed your letter of September 13, 1979 regarding the followup actions resulting from NRC staff review of the TMI-2 event, and our response for St. Lucie Unit is attached. While we are attempting to meet the 1
staff's proposed schedule, this will not be possible in every instance.
We believe that the commitments made in our response represent a realistic and reasonable schedule.
Very tr y ours, obert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/cph Attachment cc: Mr. James P. O'Rei lly, Region II Harold F. Reis, Esquire v
$0 ~Pp )p Q,
y II1 OP 50 ) 35 PEOPLE... SERVING PEOPLE
ATTACHMENT 2.1.1 EMERGENCY POWER SOURCES The pressurizer heaters are fed from the 480 volt pressurizer heater busses 1A3 and 1B3 with one-half of the backup heaters and one-half of the proportional heaters on each bus. Following diesel start and load sequencing, the two pressurizer heater busses can be manually loaded onto the 4.16 KV emergency diesel busses lA3 and 1B3 respectively via the closure of class 1E circuit breakers. Power to the two power operated relief valves (PORV) is supplied from the 125 VDC lA and 1B battery busses. The blocking valves (2) are powered from 480 VAC vital busses 1A5 and 1B5 respectively.and are automatically reloaded onto the 1A5 and 1B5 busses as part of the diesel loading automatic sequenci ng. Pressurizer level i nstruments LT-1110X and LT-1110Y are powered from vital busses 1A6 and 1B6 (via power panels PP-101 and PP-102) which upon loss of power are also automatically sequenced onto the diesel generators. In view of the above, St- Lucie Unit 1 is considered to be in compliance with the intent of Recommendation 2. 1. 1.
2.1.2 RELIEF AND SAFETY VALVE TESTING A program for testing power operated relief valves and safety valves used for pr'imary system pressure control under design basis operating conditions is being developed by the C-E Owners Group. This program includes definition of test conditions and qualification requirements for all specified valves in operating reactors designed by Combustion Engineering (C-E). The results of this program will be made available to the generic efforts being undertaken by the industry (through for example the Electric Power Research Institute, EPRI, and the Nuclear Safety Analysis Center, NSAC) no later than January 1, 1980. These results will also be available for discussions with the NRC Staff to establish generic resolutions no later than Ja'nuary 1, 1980. St. Lucie Unit 1 will comply with the schedule for completion of the test program which is agreed to during these generic resol uti ons meet i ngs.
2.1.3.a DIRECT INDICATION OF VALVE POSITION St. Lucie Unit 1 will comply with the intent of recommendation 2.1.3.a. We currently intend, pending final design review, to install acoustic-type (accelerometer) flow monitors on each pressurizer code safety and power operated relief valve and are currently evaluating vendor proposals. The final design will be submitted for implementation review by January 1,,1980. Should other methods'or indication become available, consideration will be given to such designs.
43, k
4 I
h fl I
r 4
y I
4 v
4 M
~
I ill 4
if4 ~
h~
ha V II 4
,(
I
~ 4
)
'I I,'
4" 4
4 t'l I'f ay
'I'f 4
I 4
4 I
~
tf '4
-'l 4
I 44'it V
I,,
V I It \4 I,
ly IPIL i
.t.. 4 4
Il aa Ilt 4
I k
4 If 4 I I I ~ at Kh ~ I Il V Vf II I'
4>>
lf 4 ~
h hf 'ki/ 4 4 -4 4'4 V
~ a ~
~ ~
ff ht tI t
~ I
~ V fy II
'I V,.i'fk h
y,hh tl
,S al' 4 II 4 ~ I I 4
4 I 4 ' fl II
~ I & It I4 ~ 4 4 4 I 4 . 4 I I V
~
4 Kathy I I
4 v i ~ ~ hk I 4LM 4fl 4 ~ I ~
Ill (Ih 4 fC I 4 4 t'I
~ .4 t ki
'41$ 4 t* 4 4yy I
/
I I I' 4 fk j lt 4 V Ih,
~ I
2.1.3.b INSTRUMENTATION FOR INADE UATE CORE COOLING St. Lucie Unit 1 is proceeding with the purchase of a Subcooling Meter for installation in the control room. The meter will continuously display the margin to saturation in units of either temperature or pressure through the use of a selector switch. A vendor has been selected and advised of our decision in order to expedite delivery in parallel with the processing of documents required for the purchase of the equipment.
The procedures to be used by an operator to recognize inadequate core cooling will be developed based on analyses being performed as required by Item 2.1.9, Transient 8 Accident Analysis, Analysis of Inadequate Core Cooling. The guidelines for the procedures are being developed by the C-E Owners Group and will be available for discussions with the NRC Staff to establish generic resolutions no later than January 1, 1980.
Both the need for and feasibility of reactor vessel water level instruments are being evaluated by the C-E Owners Group. The functional requirements and a conceptual design for a reactor'essel level measurement device are being developed as part of this effort. A survey of currently available technology and assessment of the feasibility of various alternatives will be included in the overall evaluation. If requi red as a result of the generic resolutions di scussions with the NRC Staff, the functional requi rements and conceptual design will be submitted for proposal review by the NRC Staff prior to implementation. The installation schedule for such a device, should it be deemed necessary, will be established during the Proposal Review.
2.1.4 DIVERSE CONTAINMENT ISOLATION The original plant design provides for containment isolation on the receipt of either a high containment pressure signal or a high containment radiation signal. Additionally,'he design has been changed to add the Safety Injection Actuation Signal (SIAS) as an input'to the containment isolation circuitry (CIAS). Receipt of SIAS will now automatically initiate containment isolation. Neither SIAS nor CIAS can be reset while an initiating signal is present, and resetting of either SIAS or CIAS will not result in the reopening of any valves. Therefore St. Lucie Unit 1 complies with the intent of recommendation 2.1.4.
2.1.5.a DEDICATED PENETRATIONS FOR EXTERNAL HYDROGEN RECOMBINERS St. Lucie Unit 1 is equipped with 2 hydrogen recombiners located within the containment. This recommendation is therefore not a ppl i cab 1 e.
~ 4 a
~ ~ ~
h ll ah I w N
I I NNN NN r jl I 4 I
4 I I ~ N 11 a I I
N 44 'lr U 'a, N ~
,la U N h 4
4 4' ~ ~ II 4 .Nw w ~ 4 II r
r ~ 4 40 N I II h r El <<
w N
H
)~ a(
N<<c 4 1 W>>I a
- g <<EO( ~ 'r I 4- . 4 h N
'I I
>>lr)1 I N C
4 I ' ( fh N Ul ~ ~I I
'I I
44<<'r if>>~.
I
~ "~ I I 4 r jl 4 I 'WI>> I I~ I
,Il a N j I . N I N N
a I
h 4 I~ '<<'
a <<
N r ,,r, r W
~ F 44 W w'NN I a a I
44 4 N'. llwj N
( 4 N
~ I O ~ '$,',
( ~ 4=
h I 'I 41 h Nw U a I,'a N a I
~ rh U I ~ OM I ~ Wa N
~
2.1.5.c HYDROGEN RECOMBINER OPERATING PROCEDURES A detailed review of the existing bases and procedures for reccmbiner use at St. Lucie Unit 1 has been conducted in response to NUREG-0578 and other NRC documents. Our review has concluded that no changes are necessary at this time, and that St. Lucie Unit 1 complies with the intent of this item.
- 2. 1.6. a SYSTEMS INTEGRITY FOR'HI GH RADIOACTIVITY FP&L is currently developing a program which will identify leaks in systems outside containment that could possibly contain highly radioactive fluids during a serious transient or accident. The program will identify applicable systems, develop procedures, and establish inspection frequenci es and acceptance criteria. Our preliminary evaluations i ndicate that applying thi s program to gaseous systems will be considerably more difficult than to the liquid systems, however, our intent is to complete the short term leakage reduction program during the unit's 1980 refueling outage.
2.1. 6.b PLANT SHIELDING REVIEW Ebasco is reviewing the St. Lucie Unit 1 plant design to identify locations where additonal shielding may be required in'order to conduct post-accident operations. This revi ew is schedul ed for completion prior to January 1, 1980.'ose calculations affecting personnel access and sensitive equipment will be completed by July 1, 1980. Any additional shielding which may be required as a result of these reviews will be installed on a schedule which will be submitted following the completion of the reviews.
2.1.7.a AUTO INITIATON OF AUXILIARY FEED A Plant Change/Modification (PCM) has been engineered which provides for automatic starting of all three auxiliary feedwater pumps installed at St. Lucie Unit 1. This PCM provides for safety-grade system which allows use of the steam generator low level trip to initiate the pump start. Initial investigations into equipment procurement i ndicate that delivery schedules for qualified components may severely, delay implementation of the PCM. Additionally, the PCM, which was generated as a result of commitments made in response to IE Bulletin 79-06b, does not incorporate the automatic opening of the AFW pump flow control valves. Engineering efforts to resolve this matter are in progress, but may prove extensive due to potential requirements for complex circuitry and/or new safety analyses relative to postulated accidents such as main steam line break and the reactivity restart analyses. It is anticipated that such analyses would be performed on a generic basis through the C-E Owners
'Group. We expect that the complete safety-grade system could be installed and operational prior to returning to power operation following the scheduled 1981 refueling outage. The concept of a dedicated operator such as is currently in effect at St. Luci e Unit 1 is considered to be an adequate interim measure.
F E 'I ~
vc "VC v IF.K II I
I~ l Pl KV,'ll II f
fl t
.I Jil V;I i F IF I I Kl l C I L
P w h ~
th>> Vh ~ r 'I
+ II
'I I. t h f I'I i',(
f' If F I p K= tl
= - VIIV
~ ~
I ' t
, ~
i I N l IF 'h ~
I f If IK I' = lc I ,C I
1 Jl l,'Iw 'III' h w
~v w ~ h',V ft h C ' cfh I I k I r'I P 'I I A 1 t f tr i Flat
') I .l h -
h L h - k '
I I,
1 I,'I h I l
. i '4 ) h httll , i I(
Oc h'L ' h I ' ~
It r
I ~ t ~V l',
ft tl t
hi h Vh IClilt, 'It 'hh',, t hf r c
I1 "
) tf i ht K.
t P I rl tt
'll tr V
, ~ i: I I ~ ic lc C
",iC ', II
>IVFL ll r P V' lt Il
2.1.7.b AUXILIARY FEED FLOW INDICATION The St. Lucie Unit 1 design incorporates safety-grade auxiliary feedwater flow indication in the control room which currently meets the intent of this recommendation.
2-1.8.a POST ACCIDENT SAMPLING In conjunction with Section 2. 1.6.b above, a design revi ew is in progress to identify areas where the post-accident sampling capability can be improved. This review is scheduled for completion by January 1, 1980. Additionally, plant procedures are undergoi ng a detailed review in order to accompli sh the same end including the minimization of personnel exposure. Procedure revisions are scheduled for completion by July 1, 1980. If plant modifications are required, a description of arly such modifications and a schedule for implementation will be submitted to the NRC.
If the radiological spectral analysis cannot be performed in a prompt manner with existing equi pment, design modifications, equipment procurement, or contractural arrangement will be undertaken to accompli sh a spectral analysis. The two hour time restriction is considered to be neither practical nor critically essential. It should be noted that we anticipate complex and potentially insurmountable difficulties in complying with the requirements regarding chlorine and boron analyses. Our'nvestigations indicate that a highly-radioactive chloride and boron analysis'ould not be performed on-site. A contractural arrangement is being investigated along with on-line boron-monitoring capabilities. Following the resolution of these specific requirements, an implementation schedule-will be submitted to the NRC.
2.1.8.b HIGH RANGE RADIATION MONITORS Florida Power 8 Light is proceeding to design, procure and install noble gas monitors in plant effluent lines and high range containment radiation monitors. We anticipate that installation of this system can be accomplished during or prior to the unit's schedul-ed 1981 refueling outage.
2.1.8.c IMPROVED IN-PLANT IODINE INSTRUMENTATION In view of the lead time involved in obtaining the equipment necessary to comply with this requirement, as well as the time needed to engineer and install the modification, we estimate that we will be unable to meet implementation schedule date of January 1, 1980. FPSL will, however, make every effort to acccmplish the installation of this system at the earliest date practical.
2.1.9 TRANSIENT AND ACCIDENT ANALYSIS The response to Transient and Accident Analysis requirements is being developed by the C-E Owners Group in conjunction with generic resolution meetings with the NRC Bulletins and Orders Task Force.
~
~ 4 V I 4 4 V I If 4
tt<< I 4 It<<
Mt) foal Ll 3>> s
~ <<I I, , 4 4" 1 ., f
'l4<<ILM,P y, l<<
=f 4'<<'
~ I I ~V <<<<<<'U 4
~:<<tl 4 ) 'll >> I >>- C I
I " tf r 1 'V<<- t tl
' 4 I<< VV I t If' 4, PS i tf Vf. lt
>>4<< I III I' f P4 LL V ',0 <<
It << ~ <<) If ), I' I' 1<<
Pt e' If
<<,.': IM I
~,
4
<< t <<
V "'
r 4
t 1 I
,"t r ~ *
~ I
' PI 4 4 4 ',
~
I 4 <<P I ~ ~ <<4
~ fi 'i" e VV L<< ilt >> I <<I), V V<<t<<<<<< ' 4 I I;, 4 4 I
, ~ ) .'
'J
--" )'" t<<. I IIV ~ ~4 f<<r II
~,I t>><<V>>>>PI I P 1'
f 0) t>>
)i'ttf P
If
,L
. <<MC VV>>
wy 1
,V1 <<'P I<<
f V 'V 4 t
'I I V
<< I f.". J-'y [ ftl ty t
fl " ~
P<<
,)4 C 4 t'II@
~
~
7
<<4.'V<<l I 4 4
P V -
<<4 l<<4 '4,
, It
.S .P yl 4
<< P
' ) 4I<<, :~ t ~ 4 I' I <<
PI 1 "t. 4 S'-
~ <<L I<< ~ PM ~
j-f,,
ff II 0~ ~ ,. <<y I ft) 1- ~ pr, l <<<<tt ) M)r*j 4" ') '<<
~ <<
V>>P 4 4 If I" I
1 )4" I I
t I<<
4
,f 4'4 PJJ )
~
<<)
I~
These responses will be submitted on the schedule agreed to by that task force and the C-E Owners Group and will be referenced for specific application to St. Lucie Unit 1.
CONTAINMENT PRESSURE MONITOR A system for the monitoring of St. Lucie Unit 1 containment pressure is currently in the design stage. Installation of the complete system is scheduled for completion prior to returning to power operation following the unit's scheduled 1981 refueling outage.
CONTAINMENT WATER LEVEL MONITOR k
A system for the monitoring of St. Lucie Unit 1 containment water level is currently in the design stage.. Installation of the complete system is scheduled for completion prior to returning to power operation following the unit's scheduled 1981 refueling outage.
CONTAINMENT HYDROGEN MONITOR A system for the monitoring of St. Luci e Unit 1 containment hydrogen concentration is currently in the design stage. Installation of the complete system is scheduled for completion prior to returnin'g to power operation following the unit's scheduled-= 1981 refueling outage.
RCS VENTING The functional requirements and conceptual design of a system for remote venting of the RCS are being developed by both the C-E Owners Group and our Architect-Engineer (Ebasco, Inc.). These requirements and a conceptual design will be available for discussions with the NRC Staff to establish generic resolutions no later than January 1, 1980. A decision concerning installation of an RCS venting system in St. Lucie Unit 1 will be made following completion of the generic resolution meetings.
2.2.1.a SHIFT SUPERVISOR RESPONSIBILITIES Plant procedures and practices in this area are undergoing review to ensure that reactor operations command and control'esponsibilities and authority are properly defined. Procedure revisions or other changes required as a result of this revieii will be incorporated by January 1,'980. An operational policy directive specifying the duties, responsibilities, authority and lines of command covering the control room operators, the shift technical advisor and the shift supervisor will be issued by FPEL's corporate management by January 1, 1980.
2.2.1.b SHIFT TECHNICAL ADVISOR FPEL will establish technical advisors, either on call or on each shift; during'eriods when St. Lucie Unit 1 is operating in Modes 1 through 4 as defined in the Technical Specifications. '
minimum of 2 qualified individuals would be on call at all times and would be
P ~
1' Yl A UC UC 't
~ ~ 'I 4
o, 4 ~
I Ml 1 'I ~
t 1 I t i 4 f ff>>f(
~ '.>>l 1 f'Mt 4
lt 4 I 1 I ~ I
/ t 1 It Ill 1 ~,
t 1 4 4 ~
'1 ~
'4 " tl I vt I 'l (r 1 I. I 1(
r r V>> "U(r I
YM II(
P I v>> It 1 ~ tlk f 'I ~ 1 I [ << ~ >>1", 4 U 1
t' ~ /( M Mt ~
1 1 M Y P 1 1
4" " ~ I t tl P tl ~
4\4 1 44 4 1 ft 1 4
~ t Nt
' t r>> 4 C
~ t 1
il ~ f~ l
~ 1 I ~
t~
~ . II, t * ~
'Vf(VU ',ff J ftt 1
P r II 4 I'1' <<.4>> JU 4
)
P f M.YP I
t 4 ft 4 M 4 JJ 1 M~ I>>I
>>1 r J, ttl>>
O',
t
/ f'I. ~ f
~ 1/t ~
44
>> "ffYl'
/
t r
t 4 / Ctl I 4' fl <<
1 ~ ~
't I
P/f lv VJY" lit II ll ~ '
capable of responding within 45 minutes. Each individual on call will be supplied with two-way radios to enable communications with the plant. Coverage will commence on January 1, 1980. The technical advisor's primary function will be one of assessment and diagnosis accidents or abnormal transients. He may be assigned other 'uring collateral duties that will not interfere with his primary function. Training of technical advisors is scheduled to be completed by January 1, 1981, but this schedule may be impacted by the availability of simulator training time. At such time that the man-machine interface is improved as a result of such activities as improved control room design and/or operator qualification, FPEL may elect'to designate a qualified member of the operating shift to perform the accident/transient function. Operational experience evaluation and assessment may be performed by the technical advisor or other functional organizations either onsite or at FP8L's General Office.
2.2.1.c SHIFT TURNOVER PROCEDURES An existing plant procedure e is being revised to incorporate a shift turnover checklist for shift supervisors. This revised procedure will become effective no later than January 1, 1980. The need to extend this checklist concept to other operations, technical, and/or maintenance personnel is being evaluated.
2.2.2a CONTROL ROOM ACCESS An existing plant procedure is being revised to limit control room access consistent with the recommendations of NUREG-0578. The revised procedure will become effective no later than January 1, 1980.
2.2.2.b ONSITE TECHNICAL SUPPORT CENTER St. Lucie Unit 1 has designated the training classroan area (formerly the Unit 2 control room located adjacent to the Unit 1 control room) as the onsite Technical Support Center. Control room communications and as-built drawings for Unit 1 will be available in the Technical Support Center by January 1,, 1980. Specific instrumentation, additional communication, and data requirements are undergoing evaluation with the intent to begi n installation of selected equi pment by January;1, 1980. An overall scope and implementation schedule will also be submitted at this time.
1 2.2.2.c ONSITE OPERATIONAL SUPPORT CENTER St. Lucie Unit 1 has designated the first floor maintenance area of the service building as the on-site Operational Support Center.
Communications equipment to and from the control room presently exists in this area- The Emergency Plan will be revised to reflect the existence of this center and to establish the methods and lines of communication and management by January 1, 1980.
T I <<'
<<))Ia>> If >>1 r>>) f<<1 a<<rr,>> I' I (
'" 1
', I fI fh l tfta I I >>>><<I- (E a If ~<< It
) >>
I a.
.. 'fr(,',4, 'x;, t,<<,.,a 1>> ~ 1'I>> <<<<I-rafa il':
a rt f ~
h
'I 1
~ ~
r
)1 I ~
k
')J II Ca>>I if;='.I<< l
<<'I I<<
." rw 1 >> ~ i
~
.)1
~ 0 <<' I
,<<') h,,'>0, 1 l i II <<J If
<<Ja I ll i<<MI Li<<)
Itt v, at >>I tf>>
~ '
I!r 1", I I<<1
)>> )
h 'll'Mr f .11 I 4
~ lf
~ ~ 1'
'>>l f>> r ff t<< I ~ +r
>>l>> I . ) I -I t "'t>>'a~ I) h I, )~;I,( VII
~ >>1 ~ 4 jf tr iv 1 "'>>
t I If
~1
',',I I II l1 J 1>> ).
~ it 1 ( <<avta .,<', r
'I
~
I i ~ 1(lti>> l al.l, <<, 1, I 1 <<
~'
ll
)1 f." ~ ~ ~
lf f >> tf ~ <<a
'\
~ Ir
>>it>> I.a I a I 1 ~ Ii 1
r 4 .ka<<, ~
a 'P fl <<
ff I' P <<
Encl. 8 NEAR TERM EMERGENCY PREPAREDNESS IMPROVEMENTS Florida Power 5 Light is in general agreement with the required improvements contained in Enclosure 8 to your September 13, 1979 letter.'e believe we can implement these improvements consistent with the NRC schedule with the exceptions noted in Section 2. 1.8 in addition to three other areas of concern as discussed in the following paragraphs.
Each of our sites has, in the past, routinely conducted site test exercises in conjunction with local, State, and Federal officials on an annual basis. The 1980 tests are scheduled to be conducted during August/September. As the improvements to the emergency plan are not scheduled for completion until June, 1980, we believe the present test exercise schedule is reasonable and can commit to meeting this requirement by October 1, 1980.
Regarding the upgrading of the emergency plans, we agree in principle with the recommendation to upgrade to Regulatory Guide 1.101.
However we cannot at this time ccmmit to the action level criteria as contained and described in that document and in NUREG-0610, DRAFT EMERGENCY ACTION LEVEL GUIDELINES FOR NUCLEAR POWER. We require a stlona time to review the draft criteria. e elieve we can forward our position on this item to the NRC by January 1, 1980.
With respect to the Emergency Operations Center, we believe that specific requirements are not sufficiently defined to enable FP8L to designate dedicated primary and alternate locations at this time.
Considering the level of construction underway on Unit 2 we believe that more than adequate space would be available if required. Once the criteria are firm, we will provide the NRC with primary and alternate locations and a schedule for implementation of upgo'ding requi rements.
\
I rt , ~ tll tPI 'l 'Ir"t ~
('II r
~,r,ttr,I
=
ftr 'I
~
f t
If
<<t.
t rr ff vt 4 '
II
'I
!It I!
r t I I II
'I
~ I t, I, I'at t r "r I w I It~ f' r I t' 't r g I r,r
~ '8 fills)~ '
I It
~t
',l I t kr ft Ifltl IItftIr rI I I I
~ I' J
rf tr vt't I II I II I I'I, I 'I
,'tC>>
Il Jtt,v '.'Itt, ktt t.; P f: t I
,ri v
I I
i If r
VIII~
fl I
I H
/5 'I I I~ it ~1 V It t I I,lift
- j I I'I 5 Jr j*a r t Xrr I. I. v tkf I
'I tr = *I I "'r o,
1'I I IIt \
t I
fg I I I IIt II tl I t'f, I
fl *r lt
STATE OP PLORXDA )
) ss.
COUNTY OP DADE )
E. A. AQomat
, being first Quly sworn, deposes anQ says=
That he is Executive Vic . Pgc. of .Florida Power 5 Light Company, the Licensee herein' That he has executeQ the foregoing document; that the state-ments made in this saiQ document are true and correct'o the best of his knowledge, information, and belief:, and that he is authorized to execute the document on behalf of said Licensee H. A. Adomat Subscribed anQ sworn to before me this day of NOTAR P .BLXC, in and or th Coun y of Dade, State of Florida "/>'thRr p~ ~pyy ~ rLORlOA Sl1
-~'O'L ps' MAYH><
Ply commission expires:
Ej /fE'/
l t
I 0
%s