Updated Safety Analysis Report (Usar), Revision 18, Chapter 1 - Introduction and General Description of Plant
ML16305A303
Person / Time
Site: Clinton Constellation icon.png
Issue date: 10/31/2016
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML16305A350 List: ... further results
References
RS-16-196
Download: ML16305A303 (181)


Text

CPS/USAR CHAPTER 01 1-i REV. 13, JANUARY 2009 CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION OF PLANT TABLE OF CONTENTS PAGE 1. INTRODUCTION AND GENERAL DESCRIPTION OF PLANT 1.1-1

1.1 INTRODUCTION

1.1-1 1.1.1 Type of License Required 1.1-1 1.1.2 Identification of Applicant 1.1-1

1.1.3 Number

of Plant Units 1.1-1

1.1.4 Description

of Location 1.1-1 1.1.5 Type of Nuclear Steam Supply 1.1-1 1.1.6 Type of Containment 1.1-2 1.1.7 Core Thermal Power Levels 1.1-2

1.1.8 Scheduled

Completion and Operation Dates 1.1-2

1.1.9 Organization

of Contents 1.1-2 1.1.9.1 Subdivisions 1.1-2 1.1.9.2 Standard Format 1.1-2 1.1.9.3 References 1.1-2 1.1.9.4 Tables and Figures 1.1-3 1.1.9.5 Page Numbering 1.1-3 1.1.9.6 Revisions 1.1-3 1.1.9.7 Maintenance of the USAR 1.1-3 1.2 GENERAL PLANT DESCRIPTION 1.2-1 1.2.1 Principal Design Criteria 1.2-1 1.2.1.1 General Design Criteria 1.2-1 1.2.1.1.1 Power Generation Design Criteria 1.2-1 1.2.1.1.2 Safety Design Criteria 1.2-2 1.2.1.2 System Criteria 1.2-4 1.2.1.2.1 Nuclear System Criteria 1.2-4 1.2.1.2.2 Power Conversion Systems Criteria 1.2-5 1.2.1.2.3 Electrical Power Systems Criteria 1.2-5 1.2.1.2.4 Radwaste System Criteria 1.2-5 1.2.1.2.5 Auxiliary Systems Criteria 1.2-6 1.2.1.2.6 Shielding and Access Control Criterion 1.2-6 1.2.1.2.7 Nuclear Safety Systems and Engineered Safety Features Criteria 1.2-6 1.2.1.2.8 Process Control Systems Criteria 1.2-7 1.2.1.2.8.1 Nuclear System Process Control Criteria 1.2-7 1.2.1.2.8.2 Power Conversion Systems Process Control Criteria 1.2-7 1.2.1.2.8.3 Electrical Power System Process Control Criteria 1.2-7

1.2.2 Station

Description 1.2-8 1.2.2.1 Site Characteristics 1.2-8 CPS/USAR TABLE OF CONTENTS (cont'd)

PAGE CHAPTER 01 1-ii REV. 13, JANUARY 2009 1.2.2.1.1 Location 1.2-8 1.2.2.1.2 Description of Station Environs 1.2-8 1.2.2.1.2.1 Meteorology 1.2-9 1.2.2.1.2.2 Hydrology 1.2-9 1.2.2.1.2.3 Geology 1.2-9 1.2.2.1.2.4 Seismology 1.2-10 1.2.2.1.3 Design Bases Dependent on Site Environs 1.2-11 1.2.2.2 General Arrangement of Structures and Equipment 1.2-11 1.2.2.3 Nuclear System 1.2-12 1.2.2.3.1 Reactor Core and Control Rods 1.2-12 1.2.2.3.2 Reactor Vessel and Internals 1.2-12 1.2.2.3.3 Reactor Recirculation System 1.2-13 1.2.2.3.4 Residual Heat Removal System 1.2-13 1.2.2.3.5 Reactor Water Cleanup System 1.2-13 1.2.2.3.6 Nuclear Leak Detection System 1.2-13 1.2.2.4 Nuclear Safety Systems and Engineered Safety Features 1.2-14 1.2.2.4.1 Reactor Protection System 1.2-14 1.2.2.4.2 Neutron Monitoring System 1.2-14 1.2.2.4.3 Control Rod Drive System 1.2-14 1.2.2.4.4 Control Rod Drive Housing Supports 1.2-14 1.2.2.4.5 Control Rod Velocity Limiter 1.2-15 1.2.2.4.6 Nuclear System Pressure Relief System 1.2-15 1.2.2.4.7 Reactor Core Isolation Cooling System 1.2-15 1.2.2.4.8 Emergency Core Cooling Systems 1.2-15 1.2.2.4.9 Containment Systems 1.2-16 1.2.2.4.9.1 Containment Functional Design 1.2-16 1.2.2.4.9.2 Residual Heat Removal System (Suppression Pool Cooling) 1.2-17 1.2.2.4.9.3 Residual Heat Removal System (Containment Spray) 1.2-17 1.2.2.4.9.4 Combustible Gas Control 1.2-18 1.2.2.4.10 Containment and Reactor Vessel Isolation Control System 1.2-18 1.2.2.4.10.1 Main Steamline Isolation Valves 1.2-18 1.2.2.4.10.2 Main Steamline Flow Restrictors 1.2-18 1.2.2.4.11 Process Radiation Monitoring System 1.2-19 1.2.2.4.11.1 Main Steamline Radiation Monitoring System 1.2-19 1.2.2.4.11.2 Containment Building Ventilation Radiation Monitoring System 1.2-19 1.2.2.4.11.3 Fuel Building Ventilation Radiation Monitoring System 1.2-19 1.2.2.4.12 Standby Gas Treatment System 1.2-19 1.2.2.4.13 Safety-Related Electrical Power Systems 1.2-19 1.2.2.4.14 Standby Liquid Control System 1.2-20 1.2.2.4.15 Safe Shutdown from Outside the Control Room 1.2-20 1.2.2.4.16 Main Steamline Isolation Valve Leakage Control System 1.2-20 1.2.2.4.17 Suppression Pool Makeup System 1.2-20 1.2.2.4.18 Control Room HVAC 1.2-20 1.2.2.4.19 Shutdown Service Water System 1.2-20 1.2.2.5 Power Conversion System 1.2-21 1.2.2.5.1 Turbine-Generator 1.2-21 1.2.2.5.2 Main Steam System 1.2-21 CPS/USAR TABLE OF CONTENTS (cont'd)

PAGE CHAPTER 01 1-iii REV. 13, JANUARY 2009 1.2.2.5.3 Main Condenser 1.2-21 1.2.2.5.4 Main Condenser Evacuation System 1.2-21 1.2.2.5.5 Turbine Gland Sealing System 1.2-21 1.2.2.5.6 Steam Bypass System and Pressure Control System 1.2-21 1.2.2.5.7 Circulating Water System 1.2-22 1.2.2.5.8 Condensate and Feedwater System 1.2-22 1.2.2.5.9 Condensate Cleanup System 1.2-22 1.2.2.6 Electrical Systems and Instrumentation and Control 1.2-22 1.2.2.6.1 Electrical Power Systems 1.2-22 1.2.2.6.1.1 138-kV Offsite Power System 1.2-23 1.2.2.6.1.2 345-kV Offsite Power System 1.2-23 1.2.2.6.1.3 Unit Auxiliary A-C Power System 1.2-23 1.2.2.6.1.4 Unit Class lE A-C Power System 1.2-23 1.2.2.6.1.5 Nuclear System Protection System Power System 1.2-23 1.2.2.6.1.6 Instrument Power System 1.2-23 1.2.2.6.1.7 Uninterruptible Power System 1.2-23 1.2.2.6.1.8 Unit Auxiliary D-C Power System 1.2-24 1.2.2.6.1.9 Unit Class lE D-C Power System 1.2-24 1.2.2.6.2 Nuclear System Process Control and Instrumentation 1.2-24 1.2.2.6.2.1 Rod Control and Information System 1.2-24 1.2.2.6.2.2 Recirculation Flow Control System 1.2-24 1.2.2.6.2.3 Neutron Monitoring System 1.2-24 1.2.2.6.2.4 Refueling Interlocks 1.2-25 1.2.2.6.2.5 Reactor Vessel Instrumentation 1.2-25 1.2.2.6.2.6 Process Computer System 1.2-25 1.2.2.6.3 Power Conversion Systems Process Control and Instrumentation 1.2-25 1.2.2.6.3.1 Pressure Regulator and Turbine-Generator Control 1.2-25 1.2.2.6.3.2 Feedwater Control System 1.2-25 1.2.2.7 Fuel Handling and Storage Systems 1.2-25 1.2.2.7.1 New and Spent Fuel Storage 1.2-25 1.2.2.7.2 Fuel Handling System 1.2-26 1.2.2.8 Cooling Water and Auxiliary Systems 1.2-26 1.2.2.8.1 Closed Cooling Water Systems 1.2-26 1.2.2.8.1.1 Component Cooling Water System 1.2-26 1.2.2.8.1.2 Turbine Building Closed Cooling Water System 1.2-27 1.2.2.8.2 Fuel Pool Cooling and Cleanup System 1.2-27 1.2.2.8.3 Plant Service Water System 1.2-27 1.2.2.8.4 Ultimate Heat Sink 1.2-27 1.2.2.8.5 Condensate Storage and Transfer System 1.2-27 1.2.2.8.6 Raw Water Treatment Plant and Makeup Water Treatment System 1.2-27 1.2.2.8.7 Potable and Sanitary Waste Water System 1.2-28 1.2.2.8.8 Plant Chilled Water Systems 1.2-28 1.2.2.8.9 Process Sampling System 1.2-28 1.2.2.8.10 Plant Equipment and Floor Drainage 1.2-28 1.2.2.8.11 Service and Instrument Air Systems 1.2-28 CPS/USAR CHAPTER 01 1-iv REV. 13, JANUARY 2009 1.2.2.8.12 Diesel Generator Fuel-Oil Storage and Transfer System 1.2-29 1.2.2.8.13 Auxiliary Steam Systems 1.2-29 1.2.2.8.14 Heating, Ventilation, and Air Conditioning/ Environmental Systems 1.2-29 1.2.2.8.15 Lighting Systems 1.2-30 1.2.2.8.16 Fire Protection System 1.2-30 1.2.2.8.17 Communication Systems 1.2-31 1.2.2.9 Radioactive Waste Systems 1.2-31 1.2.2.9.1 Gaseous Radwaste System 1.2-31 1.2.2.9.2 Liquid Radwaste System 1.2-31 1.2.2.9.3 Solid Radwaste System 1.2-32 1.2.2.10 Radiation Monitoring and Control 1.2-32 1.2.2.10.1 Process Radiation Monitoring 1.2-32 1.2.2.10.2 Area Radiation Monitors 1.2-32 1.2.2.10.3 Site Environs Radiation Monitors 1.2-32 1.2.2.11 Shielding 1.2-33 1.3 COMPARISON TABLES 1.3-1 1.3.1 Comparison with Similar Facility Designs 1.3-1 1.3.2 Comparison of Final and Preliminary Information 1.3-1 1.4 IDENTIFICATION OF AGENTS AND CONTRACTORS 1.4-1 1.4.1 Applicant 1.4-1 1.4.2 Architect-Engineer - Sargent & Lundy 1.4-1 1.4.3 General Electric 1.4-1 1.4.3.1 Nuclear Steam Supply System 1.4-1 1.4.3.2 Turbine-Generator 1.4-1

1.4.4 Constructor

1.4-2

1.4.5 Technical

Consultants 1.4-3 1.4.5.1 Dames & Moore 1.4-3 1.4.5.2 Hazleton Environmental Sciences Corporation 1.4-3 1.4.5.3 The Research Corporation of New England 1.4-4 1.4.5.4 Harza Engineering 1.4-4 1.4.5.5 Nuclear Services Corporation 1.4-4 1.4.5.6 Southwest Research Institute 1.4-4 1.5 REQUIREMENTS FOR FURTHER TECHNICAL INFORMATION 1.5-1 1.5.1 Current Development Programs 1.5-1 1.5.1.1 Instrumentation for Vibration 1.5-1 1.5.1.2 Core Spray Distribution 1.5-1 1.5.1.3 Core Spray and Core Flooding Heat Transfer Effectiveness 1.5-1 1.5.1.4 Verification of Pressure Suppression Design 1.5-1 1.5.1.5 Boiling Transition Testing 1.5-3 CPS/USAR CHAPTER 01 1-v REV. 13, JANUARY 2009

1.6 MATERIAL

INCORPORATED BY REFERENCE 1.6-1 1.7 DRAWINGS AND OTHER DETAILED INFORMATION 1.7-1 1.7.1 Electrical, Instrumentation, and Control Drawings 1.7-1 1.7.2 Piping and Instrumentation Diagrams, Mechanical, Physical, Electrical, and Other Drawings Used in the USAR 1.7-1 1.7.3 Other Detailed Information 1.7-1

1.7.4 Process

Diagrams and Other Figures 1.7-1 1.8 CONFORMANCE TO NRC REGULATORY GUIDES 1.8-1 1.9 SYMBOLS USED IN ENGINEERING DRAWINGS 1.9-1 1.10 ACRONYMS 1.10-1 CPS/USAR CHAPTER 01 1-vi REV. 13, JANUARY 2009 CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION OF PLANTS LIST OF TABLES NUMBER TITLE PAGE 1.3-1 Comparison of Nuclear System Design and Operating Characteristics 1.3-2 1.3-2 Comparison of Power Conversion System Design Characteristics 1.3-9 1.3-3 Comparison of Electrical Systems 1.3-11 1.3-4 Comparison of Containment Design Characteristics 1.3-12 1.3-5 Comparison of Structural Design Requirements 1.3-14 1.3-6 Comparison of Standby Gas Treatment Systems 1.3-15 1.3-7 Comparison of Radioactive Waste Management 1.3-16 1.3-8 Significant Design Changes From PSAR to FSAR 1.3-18 1.5-1 Summary of PSTF Tests 1.5-4 1.5-2 References 1.5-6 1.6-1 Referenced Reports 1.6-2 1.8-1 Conformance to IEEE Standards 1.8-2 CPS/USAR CHAPTER 01 1-vii REV. 13, JANUARY 2009 CHAPTER 1 - INTRODUCTION AND GENERAL DESCRIPTION OF PLANT LIST OF FIGURES NUMBER TITLE 1.1-1 Heat Balance at Rated Power DRAWINGS CITED IN THIS CHAPTER*

  • The listed drawings are included as "General References" only; i.e., refer to the drawings to obtain additional detail or to obtain background information. These drawings are not part of the USAR. They are controlled by the Controlled Documents Program. 197R567 Piping and Instrument Symbols (General Electric) 209A4756 Logic Symbols (General Electric) 209A7367 Solid State Logic Symbols (General Electric) 921D280 Instrument Symbols (General Electric)

EC-110 Graphic Symbols for power and Control Circuits EC-111 Graphic Symbols for Key Diagrams of Auxiliaries M01-1101 Site Development M01-1102 Site Development M01-1103 Site Development M01-1105 General Arrangement - Basement Floor Plan M01-1106 General Arrangement - Grade Floor Plan El. 737'-0" M01-1107 General Arrangement - Mezzanine Floor Plan El. 762'-0" M01-1108 General Arrangement - Main Floor Plan M01-1109 General Arrangement - Miscellaneous Floor Plans M01-1110 General Arrangement - Sections "A-A" and "B-B" M01-1111 General Arrangement - Sections "C-C", "D-D" and "E-E" M01-1112 General Arrangement - Sections "F1-F1", "F2-F2" and "G-G" M01-1113 General Arrangement - Sections "H-H" and "J-J" M01-1114 General Arrangement - Section "K-K" M01-1115 General Arrangement - Roof Plan M01-1116 General Arrangement - Circulating Water Screen House M01-1119 Makeup Water Pump House and Storage Tank Grade Floor Plan M05-1000 P&ID Index M05-1001 P&ID Symbols - S&L