Text

Revision 12 January 2007 P&ID Color Coding Key for Piping Energy and Physical Separation Designation Physical Separation Division Color Energy CategoryP&ID Designation X (Non-Divisional) Black High PWA High NPWA

  • Moderate
            • //////-----I Yellow High PWA High NPWA
  • Moderate
            • //////-----II Blue High PWA High NPWA
  • Moderate
            • //////-----III Green High PWA High NPWA
  • Moderate
            • //////-----NOTES:The drawings in Figure 3.6-1 should not be used for detailed information and are not updated unless a change affects divisional separation or high-energy lines. Detail information should be

taken from P&IDs in the controlled drawing program. High PWA - those lines which are considered to be high energy (refer to subsection 3.6.1.1.1.b) and therefore subject to pipe rupture analysis. High NPWA - those lines which are considered to be moderate energy and not subject to pipe rupture analysis. Those lines fall under the definition in subsection 3.6.2.1.4. These lines operate within the pressure and temperature conditions specified for high energy for short operational periods, or they are high energy but exempted under the size criteria (less than or

equal to 1 nominal pipe size). Moderate - those lines which are considered to be moderate energy (refer to subsection 3.6.1.1.1.c).

  • There is no differentiation between moderate energy and low energy. CLINTON POWER STATION UPDATED SAFETY ANALYSIS REPORT Figure 3.6-1 Sheet 1 of 111 DIVISIONAL SEPARATION AND HIGH ENERGY P&IDs - NOTES Revision 12 January 2007 NOTE: The drawings in Figure 3.6-1 should not be used for detailed information and are not updated unless a change affects divisional separation or high-energy lines. Detail information should be taken from P&IDs in the controlled drawing program.

INDEX OF SYSTEMS Sheet Number(s)

System 5 to 10 Main Steam 11 to 13 Extraction Steam 14 Reactor Feedwater 15 Condensate 16 Condensate Booster 17 to 21 Feedwater Heater Drains - Turbine Cycle 22 & 23 Feedwater Heater Miscellaneous Vents and Drains 24 to 27 Turbine-Generator Miscellaneous Vents and Drains 28 & 29 Turbine Gland Steam Seal System 30 to 33 Auxiliary Steam 34 to 38 Component Cooling Water 39 to 41 Containment Monitoring System 42 & 43 Diesel Generator Fuel Oil System 44 to 46 Fuel Pool Cooling and Cleanup 47 to 51 Shutdown Service Water 52 Combustible Gas Control System 53 Suppression Pool Makeup 54 MSIV Leakage Control System 55 & 56 Nuclear Boiler 57 to 59 Reactor Recirculation 60 Low Pressure Core Spray 61 High Pressure Core Spray 62 to 65 Residual Heat Removal 66 to 69 Reactor Water Cleanup

CLINTON POWER STATION UPDATED SAFETY ANALYSIS REPORT Figure 3.6-1 Sheet 2 of 111 DIVISIONAL SEPARATION AND HIGH ENERGY P&IDs INDEX OF SYSTEMS Revision 12 January 2007 NOTE: The drawings in Figure 3.6-1 should not be used for detailed information and are not updated unless a change affects divisional separation or high-energy lines. Detail information should be taken from P&IDs in the controlled drawing program.

INDEX OF SYSTEMS Sheet Number(s)

System 70 Standby Liquid Control 71 Control Rod Drive 72 & 73 Reactor Core Isolation Cooling 74 to 76 Off Gas 77 & 78 Floor Drain Readwaste Process 79 to 81 Chemical Radwaste Reprocessing and Disposal Radwaste Evaporator 82 & 83 Radwaste Sludge Process Concentrate Tank 84 to 90 Control Room HVAC 90A Laboratory HVAC System 91 Diesel Generator Room Ventilation 92 Fuel Building HVAC 93 & 94 Standby Gas Treatment System 95 Shutdown Service Water System 96 & 97 Drywell Cooling Chilled Water System 98 Drywell Purge 99 Containment Building HVAC 100 to 102 Essential Switchgear Heat Removal 103 & 104 ECCS Equipment Room Cooling 105 & 106 Refrigeration Piping Switchgear Heat Removal 107 Combustible Gas Control System 108 & 109 Radwaste Floor Drain Process 110 & 111 Control Rod Drive System CLINTON POWER STATION UPDATED SAFETY ANALYSIS REPORT Figure 3.6-1 Sheet 3 of 111 DIVISIONAL SEPARATION AND HIGH ENERGY P&IDs INDEX OF SYSTEMS CPS/USAR Revision 12 January 2007

Figure 3.6-1 Sheet 4 of 111 has been deleted

MAtN STEAM UN£"'{}"

  • 1<4!N STUN LU£ "'C* 8 NllCl£All S.VOY IRAtED 1lEMS ME SHOWN CN 1HIS IRll#9C .=" .. !Bl3*0003 RtACTOR POCSSURE V<:SSEL K 2801 RElflSION 11 JANUARI' 2005 ... _._........

............

........, -* .. r

  • 0* m "' J q .,..._._._,._ . ..,._....,..,_.., T D f' lCIJIE. S, DlYU!OtUL st:PAIUTIOJI Ult M1CH-El£RIU UfN .U££l S Of HI < '